Choosing among similar PRT records during confirmation

Within our assembly line, there are workcenters that contain multiple similar pieces of equipment that are not capacity controlled by the system.  For example, a specific operation is carried out by using 1 of 3 identical machines.  We would like to be able to record which specific piece of equipment was used at the time of confirmation.  Each of the three has its own equipment record yet only one is used to carry out the operation. 
What is the best way to structure the routing/workcenter for this requirement?  If I assign all 3 equipment records as PRTs on the routing, the system effectively thinks I am using all 3 for the operation.  I would like the ability to have visibility to all 3 as being possible and then during confirmation prompt the user to specify which of the actual equipment records was used.  Is there any way to capture this during confirmation other than via system enhancement?
Thanks!

I was hoping to model each equipment record as its own PRT rather than as its own work center.  Is it not possible to conditionally capture PRT usage independent of work center?  Our work center in this context is set up more to track labor costs/capacity and the equipment records are utilized for historical usage reporting purposes (not using PM).   We are using our work centers to represent employees rather than machines and am concerned with the amount of data redundancy required if we were to model multiple work centers that are identical other than equipment assignment.

Similar Messages

  • Storage location list during Confirmation

    Hi! I discovered during confirmation of the goods in SRM (SRM 4, extended classic) that when I choose to list the storage location for selection, although only the relevant storage locations are listed, there are gaps in between the storage locations. I suspect that it is taking the sequence of the order in the user attributes.
    For example, if I maintain the attributes in the following fashion:
    Plant   SLoc
    0001   0010
    0001   0020
    0002   0010
    0002   0020
    0002   0030
    On saving the attributes, it will be sorted and shown like this:
    Plant   SLoc
    0001   0010
    0002   0010
    0001   0020
    0002   0020
    0002   0030
    If my order is for plant 0002, on listing the SLoc for the item during confirmation, I get the sloc listed like this
    <blank>
    0010
    <blank>
    0020
    0030
    What I would like to achieve is for the system to show the storage location valid for the plant and as per maintained in the attributes
    0010
    0020
    0030
    Does anyone have similar problem as described? What should be the standard behavior?
    Cheers!
    SF

    Hi! I found this note 632616 but it is about listed the details of the plants and logical system so that the user knows which storage location to pick. It did not specially talk about the blanks/gaps.

  • Choosing among IDoc, RFC and Proxy

    Hi every one,
    We have 2 SAP systems, one in the US and other in Kuwait.
    The project is in the proof of concept phase. To communicate between the systems, I have a choice to choose among IDoc, RFC and Proxy.
    Can someone direct me in this direction.
    What are criteria that should be considered in choosing one of the methods of communication.
    My other question is that,
    there might not be internet facility at the remote location that is in Kuwait. I thought of going for asynch communication...I hope I am right in this.
    Please correct me and direct me.
    -Naveen.

    I guess you should start with the scenarios that you have in hand.
    During proof-of-concept stage, you analyze what kind of scenarios that you might encounter in the real-world or during the build stage and choose the technology (RFC/IDoc/Proxy) to prove the end-to-end capability of building an interface.
    During the scenario evaluation stage, list out the "out-of-the-box" capabilities of both the SAP systems and come up with a decision tree of when to use RFC, IDoc or Proxies.
    Also make sure that you include quality of service and error handling capabilities. In case of IDoc's the error handling capability is all standard and you don't need to build anything from scratch.
    I guess these would be some criteria based on which you can evaluate which method to choose from.

  • Availability check during confirmation

    Hi all,
         I need material availability check do be done during confirmation of a order instead of order release...Where do i have to make the configuration change..???
    Regards,
    Joseph.

    Hi,
    As per standard practice, it is always suggested to do availability check at the time of order create / release. However, still if your client is not willing for the same then set no availability check for material, capacity & PRT in OPJK & also in Material master MRP-3 Availability check you can put as no check (KP) case to case basis.
    Also if you want to prevent errors in Goods movements at the time of confirmation then you need to maintain following config. setting :
    GO to OPK4--> Select your Plant & Material -> Individual Entry General (Tab)--> Error Handling / logs ---> Maintain tick in check boxes Goods Movements & Termination of Incorrect Goods Movements.
    However, this config. will work in case you use backflush for components & control key with Auto GR functionality. So that your GI, confirmation & GR all will be linked. System will prevent errors in GI & GR while confirmation with this config.
    Hope this helps.
    Regards,
    Tejas

  • Serial number assignment during confirmation

    Hi,
    Can someone help me with this one please...
    In ECC6 I have configured serial number profiles and production confirmations to create the as built list during confirmation. This all works perfectly. when I assign my serialised components to my serialsed asssemblies in CO11n, hit the transfer button and save the confirmation, the installed basae is created in the background... everything works perfectly.... right ...
    I am now trying to do this in a 4.6c system and it's not working as expected. when I hit the transfer button and save my confirmation, the installed base is not created in the background.
    does anyone know the subtle differences between ECC6 and 4.6c and can explain what I need to do to get the 4.6c system to work the same as the ECC6 system?
    thanks... Neil.

    as far as i know there is no difference...
    looking at 4.6c make sure you have the following things:
    -in the material master record (Storage area) of the material to be produced, a serial number profile must be assigned;
    -the serial number profile must permit the creation of serial numbers for the serialization activity Create production order (PPAU)
    good luck

  • Automatic change of Work Center during Confirmation.

    Happy New Year to all!
    Just want to ask if anyone of you encountered the scenario during confirmation in which the backflushed work center was changed. The user claims that they did not do any changes during confirmation nor did they change manually the order itself. The confirmation happened last December and they only noticed it this month when they were checking the reports.
    I did not configure their system so that they can change the Work Center during confirmation. By default, the work center is grayed out during confirmation.
    Hope to hear from some of you soon!
    Thanks and regards,
    jLmendoza
    Edited by: John Luis Mendoza on Jan 4, 2011 3:15 AM

    Dear
    If your production order operations are re-scheuled and dispatched after Capacity Avalaiblity check in cm21/cm22/cm31 etc  , then during the dispatch of operation ,  you have option to change Work Cnetre , time , date based on the selection option in Startgy profile (CM31/CM21-Enter the WORK CENTRE /Order )  and check wether work centre is changed.
    One more option may be in Order Change in CO02-Operation Overview -Operation -Work centre -Here user may change the Work Centre .
    If you have Order Change management active then you can trace the same .
    Refer : Production order change history
    Otherwise , there is not such confirguration in SPRO where work centre can be changed automatrically during confirmaiton because it will grade out based on the ste of confirmaiton default screen in OP00.
    Hope it clarifies
    Regards
    JH

  • Exchange rate type for version - error message GP541 during confirmation

    Hi FICO Experts,
    I bumped into a problem during confirmation in CO15. (I would like to get the SFG by mvt 101 and consume the raw material by 261).
    The error messase I get is:
    Maintain the exchange rate type for version 000 in 2009
    Message no. GP541
    Diagnosis
    You want to use plan version 000 with controlling area 1000 in fiscal year 2009.
    You have not specified an exchange rate type for this plan version for fiscal year 2009. Since the update of all currencies in 2009 is active in the control indicators of the controlling area, currency conversions are possible and sometimes also needed.
    It is therefore necessary to specify an exchange rate type for plan version 000 in year 2009.
    System Response
    The system will not accept your entry.
    Procedure
    1. Please maintain plan version 000 first using the function 'Change Plan Version', or
    2. correct your typing error.
    I'd like to ask you to please help to resolve this issue.
    Thanks,
    Csaba

    go to Maintain Version at SPRO-Controlling-General Controlling-Organization->Maintan Version and do what ever it says. Provide Exchange rate type P or M would resolve your issue

  • Error During Confirmation Reversal of production Order

    Dear experts
    In production client during confirmation reversal for ,we are getting below error message
    Enter only true account assignment.
    Regards
    sandeep Patil

    Hi Sandeep,
    If it's just a warning, press the enter key and it should post.
    or then you will have to debug the reversal process to locate from where the error message gets triggered..
    Regards,
    R.Brahmankar

  • 0FI_AR_4  datasource is extraction 0 records during Init

    Hi,
    0FI_AR_4  datasource is extraction 0 records during Init. But if I run the Full-load I can get the data.
    I am not sure whether our extractors are uncoupled. 
    Currently we are using GL and AP extractors as well.
    We are on EEC6 and PI_BASIS 2005_1_700
    There were no selection fields defined 0FI_AR_4 to restrict the Init on Fiscal year period/ Company code.
    Not sure whether this note 551044 is applicable for the currect vesion of the component.
    Reagards
    Ajay
    Points will be assigned to all answers.

    Hi Anil,
    Thanks this is useful I have checked TPS31 Table the entry is maintained as described in your link.
    this table doesn't have any entries in it BWOM_SETTINGS ( Do we have entries only after running delta infopackage?
    When I tey to instral the datasource from RSA5
    The get the following error message.
    Units field HWAE2 for field H2STE of DataSource 0FI_AR_4 is hidden
    Units field HWAE3 for field H3STE of DataSource 0FI_AR_4 is hidden
    Units field HWAE2 for field ZLOCAL2 of DataSource 0FI_AR_4 is hidden
    Units field HWAE3 for field ZLOCAL3 of DataSource 0FI_AR_4 is hidden
    it will be great if you can help me out.
    Regards
    Ajay

  • Evaluate button inactive during confirmation posting

    Hi Friends,
    I am working with SRM5.0.
    I have defined a survey and a questionniare for VE during confirmation.
    Have assigned a use group and a user with valid email address to the survey
    In define events for VE, I have made entries for transaction category "confirmation" and have selected "procedure" as "individual-sel. via button".
    I can call the questioonaire from SPRO using right click mouse button on user--> call questionnaire in WEB"
    Also required SICF services are active and I am able to perform VE on portal using Vendor List.
    With these settings, when I perform the VE for the specified product category, I am finding "Evaluate" button inactive during confirmation posting.
    Any hint for my issue? Pls suggest.
    Thanks
    Regards,
    Prashant

    Hi Prashant,
    1) In define events, trying keying in an "*" for vendor & P.Org, enter the source system as your SRM system. Did you assign the survey & questionnaire in this define events. Enter probability as 100. Then try to post a confirmation.
    2) Defining a user group is not mandatory. Hence, you may try to delete this & re-try if point no.1 does not work.
    Cheers,
    Akash

  • Error in goods movement during confirmation

    I get an error while doing the goods movement during confirmation stating that posting is not possible during that period.

    Hi,
    If it is MM Posting period problem then check in MMRV and MMPV ..
    In MMRV - u can allow posting to previous periods
    In MMPV -U can close and open periods i think
    If it is CO posting period problem then check in OB52 , Here to get posting period variant for your company code from OBY6 and input in OB52 and check for all accounts the periods , change the periods accordingly for the year..
    regards
    pushpa

  • Component quantites change during confirmation

    Hi ,
    We are having make to stock scenario ,components are issued as per bom to production order ,but while confirmation of production order the issue quantities are changed manually ,due to this miss match in inventory quantities occur.
    How can we prevent quantity changes during confirmation of production order.
    Regards
    abhijeet

    Dear,
    You can use transaction SHD0 to create transaction variantvariant  for CO11N and hide Deletion button and make coponent quantity as out put only.
    Check this link,
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/snippets/transactionVariant-AStepbyStepGuidefor+Creation
    Or you can use BADI for this also  WORKORDER_GOODSMVT, method GM_SCREEN_OKCODE_CHECK.
    Just activate the code:
    IF I_OKCODE = 'DELE'.
    C_ERROR_FLG = 'X'.
    ENDIF.
    Regards,
    R.Brahmankar

  • Restriction to delete goods movement data during confirmation thru CO11N

    hello all
    Please let me know how to prevent the user to delete the rows in goods movement screen during confirmation through transaction CO11N ,as users are able to confirm without goods issue by deleting that rows.
    Should we contact basis person for the same
    with regards

    Dear,
    Please refer my reply in this thread,
    https://forums.sdn.sap.com/click.jspa?searchID=16368869&messageID=6047820
    https://forums.sdn.sap.com/click.jspa?searchID=16368869&messageID=6151829
    Try using transaction variants. There is a utility called GUIXT in transaction. You can write code to add a pushbutton on the desired screen by using the GUIXT. The coding syntax is provided in the SAP application help. Use transaction SHD0 to create the variants.
    http://wiki.ittoolbox.com/index.php/Implement_a_screen_exit_to_a_standard_SAP_transaction
    Hope it will help come back if any problem.
    Regards,
    R.Brahmankar

  • Error During Confirmation CO11N: No account is specified in item 0000000001

    Dear All,
    Please give me valuable input to resolve the above mentioned problem as a subject.
    This error occurred during confirmation. 
    It also gives the pop up for same error as follows
    Procedure
    A system error has probably occurred in the application you called up. Check the data transferred to item "0000000001" of the FI/CO document.
    Regards,
    Vijay Mankar

    Hi Vijay
    first can you please tell us if yours is MTO or MTS, if it is MTO, you need to define production order type Dependant parameters for settlement profile in OPJH
    and also discuss the settings for OPJ8 with your FICO consultant for  settings in teh controlling tab
    also another possible reason could be in the work center costing tab, you might not have maintained the correct cost center in CR03
    kindly check these and also explain your error in more details so we can try to help you
    reward your points if useful
    thanks

  • Actual data different during confirmation

    Hi all
    I confirmed first operation with yield of 800pc out of production order of 1000 pc and put 200pc as scrap. Now during confirmation of second operation the actual data should be 800 for yield but the system showing 1000pc. What are the settings that system will show as required.
    Regards
    roshan

    Hi,
             Pl. check ur entries in "Parameters for order confirmation - opk4". In the control data tab, check ur entry in " generated confirmations without qty. adjustments".
    If  don't set that indicator, then the scrap qty. will be taken into account.
    Regards,
    Jeyaraman.R

Maybe you are looking for

  • HT1476 It "charges" on the proper device and never actually charges and is now dead.

    My iphone 4s, has the symbol of charging and I left it for an hour.... nothing, still dead. Two hours, three, etc, and at the end of a whole day, it still says its "charging" but the battery is in the red and will not turn on. Please help. Also is th

  • Withholding Tax - Rounding Off

    Hi, I have problems on my withholding tax setup, it automatically round off even if my settings in the currency is NO ROUNDING. My SAP is 8.8 patch 13. I have no problems on Vat, only on withholding tax amount. Kindly advise. Thanks, Harlene

  • Windows 7 64bit ultimate and x-fi

    !Hi! Can somebody help me. I recently installed win 7 ultimate 64bit and found my driver CD is not compatibile. I went to Creative sites but by the images there's no my audio card. On my installation CD there is sign "Xtreme Fidelity", but I didn't f

  • Large iCloud backup size for some apps

    Was poking around trying to get my backup down to size and noticed a few apps are major offenders: Facebook - 28 MB Words for Friends - 3.6 MB Yelp  8.7 MB NYC Mate - 68.3 MB I'm not a programmer but it seems to me the only thing that should be getti

  • IPod wont turn on, except with hard reset

    I was just sent a brand new ipod mini (2nd gen) to replace an old one i sent in for repairs, but this one has its own problems... About 50% of the time, when the ipod is turned off, it will not turn on. I can hold menu and select to perform the hard