I have 2 x Cisco Catalyst 3850 stacked together. What are your recommendations if I use the C3850 as a ntp master for all edge switches connected in my network? All edge switches must be authenticated if it needs NTP sychronization. But other than that, what are the downsides?
For example,
1. I heard that switches do not have an internal clock so is a poor device to be a centralized NTP master.
2. I have also read that switches also have slow CPU processors that may lack the processing required.
3. Its NTP sychronization will use external NTP servers which are resolved into IP addresses (e.g. pool.ntp.org). IP address can change. What other more reliable NTP sources are there?
4. Any other thoughts and comments are most welcome.
Firstly, DO NOT use the command "ntp master". Cisco do not recommend using this commands because this will confuse the NTP propagation inside the network.
Next, all Cisco devices do not have a dedicated clock. All appliances need to get SNTP/NTP time synch from somewhere. This "somewhere" could either be a dedicated GPS-based NTP server and/or a time synch somewhere out in the internet.
You can also use the command "ntp update-calendar". This new command allows appliances to take regular "snapshot" of the time and save it into the NVRAM. In case there was a reboot or a power failure, the appliance's time is not too far away instead of waiting 5 to 10 minutes for SNTP/NTP to synch.
Similar Messages
-
How many Cisco Catalyst 3850 switches can make up a Cisco StackPower stack?
I know the number of Cisco 3850 switches for stacking is 9, so, if I make up a Cisco StackPower stack, MAX is 9, too?
Hi, emma, only 4 switches can become part of the same Cisco StackPower stack in a ring topology.
For the Cisco 3850 switches stack number,there are two types:
Up to 9 Cisco Catalyst 3850 switches can be stacked together to build single logical StackWise-480 switch since Cisco IOS XE Release 3.3.0SE. Prior to Cisco IOS XE Release3.3.0SE, up to 4 Cisco Catalyst 3850 switches could be stacked together. -
How many Cisco Catalyst 3850 switches can stack into a single logical entity?
Hi, emma, only 4 switches can become part of the same Cisco StackPower stack in a ring topology.
For the Cisco 3850 switches stack number,there are two types:
Up to 9 Cisco Catalyst 3850 switches can be stacked together to build single logical StackWise-480 switch since Cisco IOS XE Release 3.3.0SE. Prior to Cisco IOS XE Release3.3.0SE, up to 4 Cisco Catalyst 3850 switches could be stacked together. -
Can I use DC power supply for
Cisco Catalyst 3850 Series?Unfortunately your post is off topic here, in the TechNet Site Feedback forum, because it is not Feedback about the TechNet Website or Subscription. This is only one forum among the many
that are on the TechNet Discussion Forums, and given your post, you likely chose the wrong forum. This is a standard response I’ve written up in advance to help many people (thousands, really.) who post their question in this forum in error, but please
don’t ignore it. The links I share below I’ve collected to help you get right where you need to go with your issue.
For technical issues with Microsoft products that you would run into as an
end user of those products, one great source of info and help is
http://answers.microsoft.com, which has sections for Windows, Hotmail, Office, IE, and other products. Office related forums are also here:
http://office.microsoft.com/en-us/support/contact-us-FX103894077.aspx
For Technical issues with Microsoft products that you might have as an
IT professional (like technical installation issues, or other IT issues), you should head to the TechNet Discussion forums at
http://social.technet.microsoft.com/forums/en-us, and search for your product name.
For issues with products you might have as a Developer (like how to talk to APIs, what version of software do what, or other developer issues), you should head to the MSDN discussion forums at
http://social.msdn.microsoft.com/forums/en-us, and search for your product or issue.
If you’re asking a question particularly about one of the Microsoft Dynamics products, a great place to start is here:
http://community.dynamics.com/
If you really think your issue is related to the subscription or the TechNet Website, and I screwed up, I apologize! Please repost your question to the discussion forum and include much more
detail about your problem, that could include screenshots of the issue (do not include subscription information or product keys in your screenshots!), and/or links to the problem you’re seeing.
If you really had no idea where to post this question but you still posted it here, you still shouldn’t have because we have a forum just for you! It’s called the Where is the forum for…?
forum and it’s here: http://social.msdn.microsoft.com/forums/en-us/whatforum/
Moving to off topic.
Thanks
MSDN and TechNet Subscriptions Support
Did Microsoft call you out of the blue about your computer?
No, they didn't. -
Using a Cisco Switch as the NTP Master time source for a Windows PDC
Hi all,
We have a closed network (no connectivity to the internet) and we have a Core router setup as the NTP Master for the rest of the network.
All network devices are getting the time synced as intended but we are having issues getting the Primary Domain Controller (PDC) registering to it as a valid NTP time source.
The problem we have is that we are affected by IOS bug CSCed13703 which rejects the PDC as an NTP associated device. Short of changing the IOS on the Router which is the main router feeding 30 other sites I would like to point the PDC at a different switch (an NTP Client switch) as it’s NTP source, rather than it going to the actual NTP Master.
I have changed the values in the PDC to point to a different switch (3750) that has it’s time synced with the NTP master, but the PDC doesn’t want to know. I assume it will only accept the time from an official NTP Master .
Could any of you fine people advise if what I am trying to do is possible and if so how I would go about it. I was thinking of setting the 3750 with the NTP Master command also, but I don’t want to confuse the other cisco devices in the network
Thanks in advance
DavidThanks Marvin,
I can confirm the Stratum on the 3750 is set to 15. This is due to the NTP Time source being an internal router and not an authoritative time source out on the internet. When setting the clock and using the NTP Master command on my internal router it sets the Stratum level to 14.
I have pointed the PDC at the Router (Stratum 14) and it does successfully sync time, but won't trust it as a valid source after the first sync. Upon reading I believed this to be the IOS bug as the symptoms are identical. Your theory of the PDC requiring a Stratum 2 time source is logical (especially in this scenario) but I have seen them use Stratum 4 before and it worked just fine.
I guess I could change the Router acting as a time source for the network to be NTP Master 1 which should force Stratum 1 giving the PDC and all other switches pointing to it a Stratumlevel of 2 which would prove it either way. I don't mind pointing the PDC at the router instead of the switch so long as it gets the time synced and trusts it from that point on.
I was going to make the 3750 switch an NTP Master for the Network and point the PDC to it (as per my previous post) but I have noticed this morning that the NTP Master command isn't available on the 3750 as it has no hardware clock!
Are you aware of any other way of forcing the 3750 to become a time source for the PDC without using the NTP Master command? I have looked at the NTP Peer command and I have ruled this out already and I still need the switch to be a client of the NTP Master Router on the network
Cheers for getting involved,
David -
Hi All,
I would like to configure my core switches as the ntp master for the environment but also I would like to have the core switch sync with a public NTP server. Can you advise if this is possible? I have seen both commands available on the switch.
ThanksIt is possible but you do not have to use the command "ntp master" on your switch. Point all your device to the switch and it should work.
The switch should be able to synchronize NTP with a trusted source. -
Problem Cisco Catalyst 3850 input errors
Ive installed two stacked Catalyst 3850s. Connected to these two switches I have a SAN 6210 Equallogic Dell ESX .
The interfaces on the switches is bundels with Port-channel. MTU size 9198. On swich one its no problem but on switch two I see input errors on these interface.
If I move the cables from switch two to one then its ok...
I have two 10G going to the SAN. And 4 ESX server with 2 ISCSI each.
interface Port-channel21
description ESX1 ISCSI SAN
switchport access vlan 21
switchport mode access
flowcontrol receive desired
spanning-tree portfast
spanning-tree bpduguard enable
Port-channel21 is up, line protocol is up (connected)
Hardware is EtherChannel, address is
Description: ESX1 ISCSI SAN
MTU 9198 bytes, BW 2000000 Kbit/sec, DLY 10 usec,
reliability 255/255, txload 17/255, rxload 16/255
Encapsulation ARPA, loopback not set
Keepalive set (10 sec)
Full-duplex, 1000Mb/s, link type is auto, media type is
input flow-control is off, output flow-control is unsupported
Members in this channel: Gi1/0/25 Gi1/0/34
ARP type: ARPA, ARP Timeout 04:00:00
Last input 00:07:12, output never, output hang never
Last clearing of "show interface" counters 1d21h
Input queue: 0/2000/0/0 (size/max/drops/flushes); Total output drops: 0
Queueing strategy: fifo
Output queue: 0/40 (size/max)
5 minute input rate 128760000 bits/sec, 8233 packets/sec
5 minute output rate 137021000 bits/sec, 7343 packets/sec
520088013 packets input, 1454135312 bytes, 0 no buffer
Received 1088 broadcasts (0 multicasts)
0 runts, 0 giants, 0 throttles
1534 input errors, 0 CRC, 0 frame, 0 overrun, 0 ignored
0 watchdog, 0 multicast, 0 pause input
0 input packets with dribble condition detected
564793180 packets output, 978716517 bytes, 0 underruns
0 output errors, 0 collisions, 0 interface resets
0 unknown protocol drops
0 babbles, 0 late collision, 0 deferred
0 lost carrier, 0 no carrier, 0 pause output
0 output buffer failures, 0 output buffers swapped outHi and Sorry Just copied and past the part that I thought was the problem. It seems that MTU size on switch two in the stack still has MTU 1500......
So here is the lot....
This interface is OK
sh controllers ethernet-controller g1/0/25
Transmit GigabitEthernet1/0/25 Receive
2373084674113 Total bytes 2700589618458 Total bytes
1259517537 Unicast frames 1355829627 Unicast frames
2373055994149 Unicast bytes 2700589410330 Unicast bytes
314726 Multicast frames 0 Multicast frames
25604588 Multicast bytes 0 Multicast bytes
44657 Broadcast frames 3252 Broadcast frames
3075376 Broadcast bytes 208128 Broadcast bytes
0 System FCS error frames 0 IpgViolation frames
0 MacUnderrun frames 0 MacOverrun frames
0 Pause frames 0 Pause frames
0 Cos 0 Pause frames 0 Cos 0 Pause frames
0 Cos 1 Pause frames 0 Cos 1 Pause frames
0 Cos 2 Pause frames 0 Cos 2 Pause frames
0 Cos 3 Pause frames 0 Cos 3 Pause frames
0 Cos 4 Pause frames 0 Cos 4 Pause frames
0 Cos 5 Pause frames 0 Cos 5 Pause frames
0 Cos 6 Pause frames 0 Cos 6 Pause frames
0 Cos 7 Pause frames 0 Cos 7 Pause frames
0 Oam frames 0 OamProcessed frames
0 Oam frames 0 OamDropped frames
423237 Minimum size frames 78563 Minimum size frames
593742624 65 to 127 byte frames 338414660 65 to 127 byte frames
1416083 128 to 255 byte frames 4836098 128 to 255 byte frames
558097 256 to 511 byte frames 1505992 256 to 511 byte frames
5464138 512 to 1023 byte frames 6457219 512 to 1023 byte frames
472854085 1024 to 1518 byte frames 834470341 1024 to 1518 byte frames
80781 1519 to 2047 byte frames 257961 1519 to 2047 byte frames
2891352 2048 to 4095 byte frames 13701476 2048 to 4095 byte frames
14353508 4096 to 8191 byte frames 8698824 4096 to 8191 byte frames
168093015 8192 to 16383 byte frames 147411745 8192 to 16383 byte frames
0 16384 to 32767 byte frame 0 16384 to 32767 byte frame
0 > 32768 byte frames 0 > 32768 byte frames
0 Late collision frames 0 SymbolErr frames
0 Excess Defer frames 0 Collision fragments
0 Good (1 coll) frames 0 ValidUnderSize frames
0 Good (>1 coll) frames 0 InvalidOverSize frames
0 Deferred frames 0 ValidOverSize frames
0 Gold frames dropped 0 FcsErr frames
0 Gold frames truncated
0 Gold frames successful
0 1 collision frames
0 2 collision frames
0 3 collision frames
0 4 collision frames
0 5 collision frames
0 6 collision frames
0 7 collision frames
0 8 collision frames
0 9 collision frames
0 10 collision frames
0 11 collision frames
0 12 collision frames
0 13 collision frames
0 14 collision frames
0 15 collision frames
0 Excess collision frames
LAST UPDATE 4870 msecs AGO
This interface have problem. It is in portchannel with g1/0/25. Ive got more interfaces and port-channels showing the same behavior for switch two in my cluster.
sh controllers ethernet-controller g2/0/25
Transmit GigabitEthernet2/0/25 Receive
925460044357 Total bytes 201085804055 Total bytes
702370104 Unicast frames 184041790 Unicast frames
925449913241 Unicast bytes 201085599895 Unicast bytes
118823 Multicast frames 0 Multicast frames
9171804 Multicast bytes 0 Multicast bytes
14251 Broadcast frames 3190 Broadcast frames
959312 Broadcast bytes 204160 Broadcast bytes
0 System FCS error frames 0 IpgViolation frames
0 MacUnderrun frames 0 MacOverrun frames
0 Pause frames 0 Pause frames
0 Cos 0 Pause frames 0 Cos 0 Pause frames
0 Cos 1 Pause frames 0 Cos 1 Pause frames
0 Cos 2 Pause frames 0 Cos 2 Pause frames
0 Cos 3 Pause frames 0 Cos 3 Pause frames
0 Cos 4 Pause frames 0 Cos 4 Pause frames
0 Cos 5 Pause frames 0 Cos 5 Pause frames
0 Cos 6 Pause frames 0 Cos 6 Pause frames
0 Cos 7 Pause frames 0 Cos 7 Pause frames
0 Oam frames 0 OamProcessed frames
0 Oam frames 0 OamDropped frames
155980 Minimum size frames 3226 Minimum size frames
92357460 65 to 127 byte frames 52503630 65 to 127 byte frames
542363 128 to 255 byte frames 660137 128 to 255 byte frames
1843346 256 to 511 byte frames 500600 256 to 511 byte frames
6158096 512 to 1023 byte frames 1116353 512 to 1023 byte frames
601445933 1024 to 1518 byte frames 129261034 1024 to 1518 byte frames
0 1519 to 2047 byte frames 319527 1519 to 2047 byte frames
0 2048 to 4095 byte frames 0 2048 to 4095 byte frames
0 4096 to 8191 byte frames 0 4096 to 8191 byte frames
0 8192 to 16383 byte frames 0 8192 to 16383 byte frames
0 16384 to 32767 byte frame 0 16384 to 32767 byte frame
0 > 32768 byte frames 0 > 32768 byte frames
0 Late collision frames 0 SymbolErr frames
0 Excess Defer frames 0 Collision fragments
0 Good (1 coll) frames 0 ValidUnderSize frames
0 Good (>1 coll) frames 319524 InvalidOverSize frames
0 Deferred frames 3 ValidOverSize frames
0 Gold frames dropped 0 FcsErr frames
0 Gold frames truncated
0 Gold frames successful
0 1 collision frames
0 2 collision frames
0 3 collision frames
0 4 collision frames
0 5 collision frames
0 6 collision frames
0 7 collision frames
0 8 collision frames
0 9 collision frames
0 10 collision frames
0 11 collision frames
0 12 collision frames
0 13 collision frames
0 14 collision frames
0 15 collision frames
0 Excess collision frames -
Cisco catalyst 3850 switch won't take command: "switchport mode trunk encapsulation dot 1q"
Hi all,
I'am working on this switch's configuration. when I typed "switchport mode trunk encapsulation dot 1q", I got an error " invavid input". I'm guessing that this model already set encapsulation type to dot 1q, and that's why the switch won't take it, right?
Please help!According to the documents it supports both.
You are however using the wrong command, it should be -
"switchport trunk encapsulation dot1q"
ie. no "mode" keyword.
If it doesn't take that then do a "sh int <x> capabilities" and it should show you which encapsulation methods are supported.
Jon -
Hi ,
I have a question. If the only requirement for the DC is to have iSCSI for some servers , is it better to go for Nexus 3K or I should choose Cat 3850. Apparently with 10 gig uplinks Cat 3850 is more expensive. Can someone plz tell what would be the benefits of each in this scenario?
FawadHi ,
Cat 3850 is mainly used for unify wired and wireless networks. Cisco Catalyst 3850 Switches, which combine wired and wireless by supporting wireless tunnel termination and full wireless LAN controller functionality.
In other hand , Nexus 3000 is datacenter top of the rack switch and low latency , unify data ad storage switch and well suited for your Iscsi requirement . so i would suggest nexus 3000 .
HTH
Regards,
VS.Suresh.
*Plz rate the usefull posts * -
Catalyst 3850 rack mount kit: 3850-RACK-KIT or C3850-4PT-KIT ?
When purchasing a Cisco Catalyst 3850, do we need to buy the rack mounting kit to install it in a standard 19" rack? 3850-RACK-KIT or C3850-4PT-KIT ? Is the 4-point kit really necessary, can the 3850 hang only on the front of the rack?
No, you don't need the C3850-4PT-KIT. 3850-RACK-KIT comes in the box and it is good enough as long as you rack it nice and tide. The reason some people use C3850-4PT-KIT is because the switch will hang from the back a little when using 3850-RACK-KIT and so if you don't like that than you want the 4PT.
HTH -
Catalyst 3850 Cross-Stack EtherChannel
On 3850 configuration guide, I came across PAgP desirable mode is not supported in the switch stack (cross-stack EtherChannel).
http://www.cisco.com/c/en/us/td/docs/switches/lan/catalyst3850/software/release/3se/layer2/configuration_guide/b_lay2_3se_3850_cg/b_lay2_3se_3850_cg_chapter_0101.html
But on Q&A document, it mentioned 3850 supports PAgP.
Q. What cross-stack EtherChannel link bundling protocols are supported?
A. The Cisco Catalyst 3850 supports Cisco Port Aggregation Protocol (PAgP) and industry-standard IEEE 802.3ad Link Aggregation Control Protocol (LACP). Other 3750 Series Switches support only LACP for cross-stack EtherChannel.
Seems like both statements are contradicting.
Can someone shed some light on this?
Thank you.Hi, adimakmur
Cisco Catalyst 3850 Cross-Stack EtherChannel can be PAgP+ and can be used for VSS dual active detection.
In last deployment of 3850 we use Cross-Stack EtherChannel and use it as trusted for VSS dual active detection.
c6500-V#sh switch virtual dual-active pagp
PAgP dual-active detection enabled: Yes
PAgP dual-active version: 1.1
----skiped----
Channel group 106 dual-active detect capability w/nbrs
Dual-Active trusted group: Yes
Dual-Active Partner Partner Partner
Port Detect Capable Name Port Version
Te1/7/7 Yes c3850-307 Te1/1/3 1.1
Te2/7/7 Yes c3850-307 Te2/1/3 1.1
---skiped----
c6500-V#sh etherchannel 106 protocol
Protocol: PAgP
c3850-307#sh etherchannel port-channel
Channel-group listing:
Group: 1
Port-channels in the group:
Port-channel: Po1
Age of the Port-channel = 235d:20h:50m:10s
Logical slot/port = 12/1 Number of ports = 2
GC = 0x00010001 HotStandBy port = null
Port state = Port-channel Ag-Inuse
Protocol = PAgP
Port security = Disabled
Ports in the Port-channel:
Index Load Port EC state No of bits
------+------+------+------------------+-----------
0 00 Te1/1/3 Desirable-Sl 0
0 00 Te2/1/3 Desirable-Sl 0
Time since last port bundled: 169d:04h:58m:49s Te1/1/3
Time since last port Un-bundled: 169d:05h:00m:47s Te1/1/3 -
Catalyst 3850 indirecttly connected ap
Does the Cisco Catalyst 3850 with version 3.06.01 support indirectly connected access points?
Wich does version the switch need to support this feature?
Thanks...Duplicate post.
Go HERE. -
Catalyst 3850 Stack - 10G Modules
I have installed a (3) switch stack of Catalyst 3850 switches. I installed a 10G module in the 1st switch (the master) configured it and plugged it into the network and all works fine. Now I would like to add a second 10 Gigabit Ethernet connection to the stack in a channel group. When I install the 10G module into the standby switch (switch 3) I can do a "show inventory" and the 10G module is there. I can configure TenGigabitEthernet 3/1/3 and do a show run interface TenGigabitEthernet 3/1/3 all looks normal, but when I do a "show interface status" it is not listed and I cannot get the interface to come up. Is there anything I maybe missing when installing the 10G module or in my configurations?
Thanks!Hello Martin,
As a reference, please look at this link, it may help you,
https://supportforums.cisco.com/docs/DOC-36084
Berta.
MARTIN HUERTER escribió:I have installed a (3) switch stack of Catalyst 3850 switches. I installed a 10G module in the 1st switch (the master) configured it and plugged it into the network and all works fine. Now I would like to add a second 10 Gigabit Ethernet connection to the stack in a channel group. When I install the 10G module into the standby switch (switch 3) I can do a "show inventory" and the 10G module is there. I can configure TenGigabitEthernet 3/1/3 and do a show run interface TenGigabitEthernet 3/1/3 all looks normal, but when I do a "show interface status" it is not listed and I cannot get the interface to come up. Is there anything I maybe missing when installing the 10G module or in my configurations?Thanks! -
Hello,
I am an engineer working with a Cisco Gold Partner in Saudi Arabia. We have a large university as our client where they are constructing a new
building and require our services to build the network infrastructure. Therefore, we are to implement the routing and switching infrastructure as
well as the Wireless solution.
At present, I have no issues in implementing the R&S infrastructure as it is very straight forward but it has implications on the deployment of
the wireless solution which I explain further below. The R&S infrastructure comprises of the typical Core, Distribution, and Access layers and we
are focusing on the local distribution and access switches with regards to the new building. The client has a converged Layer 3 network spanning
from distribution layer to core layer and they are running EIGRP for this convergence. This is not a problem and has already been implemented.
Yet, the challenge arises in deploying the WLAN infrastructure. The client already has a Cisco WLAN infrastructure in place where they have a
large number of LAPs that are registered with their controllers in the Data Center. They have two WLC 5508 where one is the Primary and the other
the Secondary. The local distribution switch to which the WLC are connected also is the gateway for the SVIs for the SSIDs that are configured on
the controllers. This means that once the packets from the AP come in to the WLC, they are tagged with the correct VLAN and sent to the directly
connected distribution switch which then routes it into the rest of the Layer 3 network. Interestingly, the WLC 5508 are running AireOS 7.6 and
support the "New Mobility" feature. The two controllers have formed a Mobility Group (MG) between each other.
Now, the new building will have two Catalyst 3850 switches installed where each one has a total of 40 AP licenses pre-installed and activated
i.e. a total of 80 APs can be supported by the two switches. A total of 67 LAPs will be deployed in the new building which can be accommodated
between the two switches and their integrated controller.
Yet, based on my understanding and research about Converged Access is that, ideally, the Catalyst 3850 will only run the Mobility Agent (MA)
feature while a central controller would provide the Mobility Controller (MC) service. unfortunately, there are not enough licenses on the
existing WLC 5508 nor can we migrate the new licenses that will facilitate such a split deployment.
This means that I would need to configure the two Catalyst 3850 as independent MC and form a MG between them. I have done this and tested this
already and the mobility is working fine. But my concern is not about getting the Catalyst 3850 to work as this is simple but rather it is
focused on creating a common Mobility Domain (MD) so that clients can roam from this new building to the rest of the campus while maintaining the
state of their connections to the WLAN infrastructure.
To make things more complicated, since the new building will have its own Layer 3 distribution switch and the Catalyst 3850 switches will connect
to this distribution switch, it means that new VLANs and SVIs need to be created for the SSIDs broadcast in the new building. This means that new
subnets need to be assigned to the SSIDs.
As such, I have the following questions:
Q1) If we create new SVIs for the SSIDs (same SSIDs names will be used in the new building as in the rest of the university campus) this means
that new subnets will be assigned to these SSIDs. Now, I believe I have two options...one is to make the new Catalyst 3850s to be in the same MG
as the existing WLC 5508 which then cater for Layer 3 client roaming or I have to treat this as a totally seperate WLAN network and follow on to
the solution as per the next question. Please advise which is a better option?
Q2) I could create separate MG i.e. the new building Catalyst 3850s can be in one MG and the existing controllers can be in another MG. I can
then have one of the existing WLC 5508 (the primary one) to run the Mobility Oracle (MO) feature so as to create a single Mobility Domain (MD).
Would this facilitate in Layer 3 client roaming and RRM for all the controllers in the same MD?
Q3) If I do create a MD, how is this accomplished in such an environment since the documentation is severely limited in this regard?
Please advise at your earliest. To assist further, I have attached a topology diagram which may aid in explaining the situation with more
clarity. If these things are clarified, I will be better able to wrap my head around the technology and in turn service my clients better.
Regards,
AmirHi Amir,
Q1) If we create new SVIs for the SSIDs (same SSIDs names will be used in the new building as in the rest of the university campus) this means that new subnets will be assigned to these SSIDs. Now, I believe I have two options...one is to make the new Catalyst 3850s to be in the same MG as the existing WLC 5508 which then cater for Layer 3 client roaming or I have to treat this as a totally seperate WLAN network and follow on to the solution as per the next question. Please advise which is a better option?
I would configure them in the same mobility group. Also configure same SPG for those two 3850 stacks if users are frequently roaming within these two buildings.
Q2) I could create separate MG i.e. the new building Catalyst 3850s can be in one MG and the existing controllers can be in another MG. I can then have one of the existing WLC 5508 (the primary one) to run the Mobility Oracle (MO) feature so as to create a single Mobility Domain (MD). Would this facilitate in Layer 3 client roaming and RRM for all the controllers in the same MD?
MO is not required (it is only for very large scale deployments)
Q3) If I do create a MD, how is this accomplished in such an environment since the documentation is severely limited in this regard?
Yes, documents are hard to find :(
These notes may be useful to you based on my experience. I am running IOS-XE 3.6.1 in my production.
http://mrncciew.com/2014/05/06/configuring-new-mobility/
http://mrncciew.com/2013/12/14/3850ma-with-5760mc/
HTH
Rasika
*** Pls rate all useful responses **** -
Distributed multicast routing command not working on Catalyst 3850 switch
Hi Cisco community,
I was wondering if there is a known problem as to why the ip multicast-routing [distributed] option is not available on the Cat 3850 platforms
global command " ip multicast-routing " is accepted
the configuration guide named:
IP Multicast Routing Configuration Guide, Cisco IOS XE Release 3SE (Catalyst 3850 Switches)
First Published: January 29, 2013
Last Modified: October 22, 2013
explains that this option "key word" [distributed] should be available>
Enables IP multicast routing.
ip multicast-routing [distributed]
Device(config)# ip multicast-routing distributed
=============== Here is what i have and see =========
Config attempt
============
CAT-3850-1(config)#ip multicast-routing distributed
^
Show command:
========
CAT-3850-1#show ip multicast
Multicast Routing: enabled
Multicast Multipath: disabled
Multicast Route limit: No limit
Multicast Fallback group mode: Sparse
Number of multicast boundaries configured with filter-autorp option: 0
Software:
========
Cisco IOS Software, IOS-XE Software, Catalyst L3 Switch Software (CAT3K_CAA-UNIVERSALK9-M),
Version 03.03.03SE RELEASE SOFTWARE (fc2)
License rights:
============
CAT-3850-1#sh license right-to-use
Slot# License name Type Count Period left
1 ipservices permanent N/A Lifetime
1 apcount adder 10 Lifetime
License Level on Reboot: ipservices
Slot# License name Type Count Period left
2 ipservices permanent N/A Lifetime
2 apcount adder 10 Lifetime
License Level on Reboot: ipservices
Any hints and help would be greately appreciated.
Many thanks in advance
MarkusHi Reza,
Thank you for your quick reply, and for putting the record staright. As such, a helpful rating was provided
PS: Feel free to help me one more time if you happend to know folllow on this query :)>
I guess that the disributed function has been included in the standard mulitcast routing command because the key word is no longer needed. Or perhaps this platform does not support this at all.#
Once again , thank you for your help above.
Best regards
Maybe you are looking for
-
Need to use DocNum as parameter in Crystal report
Dear All, I am developing a report for our customer now. It is a invoice report. We need 2 parameters 1) Customer code (drop-down list. can only choose one each time) Here is my token Customer@ SELECT CardCode, CardName FROM OCRD WHERE CardType = 'C'
-
AddAppUser can't associate more than 2 groups
Has anyone experienced this with this new AXL API on CUCM 7.0? When trying to associate more than 2 groups with an application user, AXL responds with: Could not insert new row - duplicate value in a UNIQUE INDEX column the original request is: <axl:
-
I'm trying to compile an application in FlexBuilder 2.0.1 and I have an HTTPService object in my main MXML file: <mx:HTTPService id="makes_list" url="data/makes.xml" useProxy="false"/> The compiler chokes with this error: Can not resolve a multiname
-
Profile parameter to control the data valume going through PI
Dear all, Now I'm doing the stress test on PI and found that some error occurs when executing the test of about 16MB data volume. Does anyone know some profile parameters (RZ10/RZ11 or someting like that ) to control the data valume going through PI
-
SAP business Bydesign FOR Development
Hi, Is there any SAP Business Bydesign Programming Documents for Beginners. By V.Manikandan