CJ20N - Change Document Details

Hi All,
We need to capture the details of the project and WBS elements in change document tables(CDHDR,CDPOS). Right now when the project is being created and released in the Cj20N then only it captures the change document details in CDHDR table. If I create any project and hit the save option then it is not getting saved in CDHDR table. Even if i add any WBS element in the existing Project and hit the save button the information is not captured in the change document tables. I checked the configuration in SWED, SWEC,SCDO also. But the details are maintained properly. Could any one please guide me how to resolve this issue?
Regards
Ram

HI Madhu,
I followed the same step which you mentioned and I am able to check the change history. But could you please clarify few points. 1. I am not able to find the change history details of the WBS element in CDHDR under my name when ever I am chaging something or creating new WBS element. 2. The 'I' icon checking and EXTRAS->CHANGE DOCUMENT-> STATUS ALL needs to be done for each and every WBS element that I am creating ? 3. This 'I' con is available for each and every WBS element that I am creating so Do I need to do this for all the WBS element?
Please advise.
Regards
Ram

Similar Messages

  • FM to fill outbound IDOC with change document details.

    Hi ,
    I am working on an enhancement EXIT_SAPLMGMU_001 for an interface to track the changes to the material master.
    Can someone please let me know if there is a FM to populate outbound IDOC with change document details like when a material is
    created /changed. Thanks much.
    Regards,
    Sanjeev
    Edited by: sanjeev.s on Apr 14, 2010 3:32 PM

    Call the function module "MASTER_IDOC_DISTRIBUTE" to create idoc.  Use function module "CHANGEDOCUMENT_READ_HEADERS" to get the change document details.
    Regards
    Vinod

  • Change document details for a particular incident

    Hi All,
    I have a requirement like we are creating a ticket through Help------>Create support message.
    And Ticket owners can update the ticket through crmd_order transaction and change the status from open to in process and so on.
    So when ever a user updates the ticket the detials are getting updated in the Extras------>Change documents.
    I need to create a ABAP report which should indicates the changes made to the particulat ticket( I mean to say i need to grab the history of owners who handled the ticket)
    Can any one provide me some table or logic from where i can take this history?
    Appreciate your answers.
    Thanks,
    Joe

    Hi Joe.
    Any transaction changes in SAP are stored in tables CDHDR (header) and CDPOS (details).
    First, find the value for key fields OBJECTCLAS and OBJECTID of the data that you will be reporting. You can do this by creating a sample ticket and then search the corresponding record in CDHDR using your username (USERNAME) and the current date (UDATE). (This will take few minutes as this is a big table and you are not searching using an index field. Preferably, you should do this query in you development Solution Manager, if you have one).
    Another way to get the OBJECTCLAS is to get the GUID from CRMD_ORDERADM_H of the ticket that you have just created and then search CDHDR using OBJECTID.
    Then, you can search the history of changes in CDPOS using the OBJECTCLAS and OBJECTID.
    I hope this information can help you.
    Regards,
    Tess

  • MM02 - Enable options change number, change overview and change documents

    I am with the following problem: I enter the transaction MM02, I enter the material 1000765, I select the view "Classification". Later I access the environment option from the menu bar and options for change number, change overwiew and change documents are disabled.
    How do I enable these options change number, change overview and change documents?
    Regards,
    Sérgio Salomã

    Hi Sergio,
    If we activate the change documents for classification data, then we will be able to see the CHANGE DOCUMENTS for characteristic values through CL20N transaction (CL20N via menu ENVIRONMENT --> Change Documents) or MM02.
    For reference please check SAP Note 65124.
    For enabling change documents for classification data in SPRO --> Cross-Application Components --> Classification System --> Classes --> Maintain Object Types and Class Types.
    In this enter into MARA table entry. Inside that corresponding to the respective CLASS TYPE (say 001) enable the CHANGE DOCS check box in Classifications part (For enabling this please check SAP Note 65124). Then for this CLASS TYPE (say 001) inside the OBJECTS folder, enable the CHANGE DOCS CLASS checkbox also.
    Now in MM02 and in CL20N under menu Environment --> Change Documents you can view all the changes done to that characteristic values.
    Once the change documents is activated, then we can get the change documents details in CDHDR and CDPOS tables. The OBJECTCLAS may be "CLASSIFY". We can also use the "CLLA_CHANGE_DOC_CLASSIFICATION" function module to fetch the data from these tables.
    Hope this helps in solving your issue.
    Thanks and Regards,
    Harish kumar.

  • User Id for changed Document

    Dear All,
    How do we know who has changed Document details.
    e.g  One user has Prepared Down Payment Request by Tcode F-47.
    another user has changed DPR Document by Tcode FB02. i.e user has removed Payment Block flag ('Z') from DPR Document by FB02.
    I want to know user ID , who has removed Payment block flag from DPR Document by FB02.
    Regards
    Swati Shah

    fb03 - environment - Document changes.- All changes - F6
    You get an entry as below
    Date           Field                       New                           Old
    26.12.11    Payment Block                                           A
    Double click this entry
    Details
    Date             26.12.2011
    Time             14:16:21
    User             RAOSO
    Field            Payment Block ( BSEG-ZLSPR )
      from            A
      to               
      Changed in Line Item 001
    Hope this helps
    Kind Regards
    Soumya

  • How to get the Change Document Header details for a given date

    Hi All,
    Can anyone help me on this Change Document Header details(CDHDR).
    Better way to pull the information of Change Document Header details(CDHDR). No Index is maintained for the tables.
    So please suggest better Optimising techniques to get the Change Document Header details(CDHDR).
    Using this Function module : CHANGEDOCUMENT_READ_HEADERS how to import the DATE_OF_CHANGE.
    Thanks in advance
    Regards
    Chakri

    HI,
    Go through the documenattion of the FM u can get the details.. and also where used list
    Regards,
    Nagaraj

  • Problem with Change Document FM  - Not all fields are tracked in CDPOS

    Hello everybody,
    Using transaction SCDO and following necessary steps described in forum, I have created a change document ZFBR to track changes of a table ZFBR. The problem is, the generated FM ZFBR_WRITE_DOCUMENT does not track changes of some fields of the table (inserts are always ok, problem is with updates). After some debugging I realized that the FM DDIF_NAMETAB_GET was returning the table DFIES_TAB where the LOGFLAG was empty for some fields (which are not tracked) so that changes of these fields were not visible in table CDPOS. However, fields with LOGFLAG = 'X' are tracked succesfully (changes are visible in table CDPOS).
    I did not specify any fields to be get logged or not during the steps in SCDO (can we do such a specification anywhere?), does anyone know why the field LOGFLAG has the value '' (space)?
    Best regards;
    Ozcan.

    Hi again,
    The problem has been solved.
    The data elements used in a table are the reason for the problem I have described above. When displaying the details of a data element, under tab "Further Characteristics" , the "Change Document" checkbox has to be selected to enable change document tracking. I have copied the problematic data elements with Z prefix and made the necessary enabling. I have replaced the data elements with their Z equivalents.
    Best regards.
    Ozcan.

  • Getting Bad request error while trying to get a specific document details from c#.

    Hi,
    While trying to retrieve a specific document details using RESTful WS API from C#, it is throwing "The remote server returned an error: (400) Bad Request" exception.
    the request URL i am using for this is like;  "http://<Server>:6405/biprws/raylight/v1/documents/1111"
    But it is working fine, if i change my request URL to get the dataproviders of the same document like; "http://<Server>:6405/biprws/raylight/v1/documents/1111/dataproviders"
    Please let me know if i am missing any thing in first case, getting the details of a specific document, while sending a request to RESTful SDK.
    Thanks,
    Kalyan

    I think you are using “Content-Type” header or an “Accept” header.
    You should be using “Accept: application/xml” for that request
    - Ludek
    Senior Support Engineer AGS Product Support, Global Support Center
    Canada
    Follow us on Twitter

  • Error while approving change document(TR lost project code)

    Hi All,
    I am having issue in change document approval, when we are approving change document for unit testing or if release management approving change for pre-production or production approval, we are getting error, I started coming from last two days only,\
    when I did detail analysis,  in all transports project code related to change document, disappear
    although if I create new change document, project code appear,
    Do we have  way to solve this issue?, I even not able to decouple the transport from change document, it giving error, do we have way where we can resync change document and transport?
    Dinesh

    Hi All,
    Do anyone have some solution for this issue?, it  is bigger than I thought, I can check it impacted all systems, and all transports,  all transports seems to issue they lost project code in it we rollover maintenance cycle last week and this problem started from their, we put charm master note and few other charm fixes(notes) last week,
    this problem not coming any new change document, but all change document created before rollover impacted
    Dinesh

  • Problem in multiple item for change document objects

    hi gurus,
    I have created change document object in tcode SCDO . It had giveN function module /TMW/CHG_OBJ1_WRITE_DOCUMENT.
    CDPOS AND CDHDR tables are updated with changed data. now i am trying to display all old and new data in se38 program.
    here my problem is when ever i changed multiple  item data , my program showing first item details only . I need to show all item data when ever i changed parallel . please help me where is my problem .
    thank you

    I think this is issue with function module generated thru SCDO Please check in your function module inside that the following function modules are used
    CALL FUNCTION 'CHANGEDOCUMENT_OPEN'
    CALL FUNCTION 'CHANGEDOCUMENT_MULTIPLE_CASE'
    CALL FUNCTION 'CHANGEDOCUMENT_CLOSE'
    if not then there may be issue with SCDO

  • Regarding Workflow trigerring using change document

    Hi all,
    I am trying to trigger a workflow using change document object.
    I want that to trigger the workflow on the material master change through MM02.
    I have created  a business object ZBUS1001 and wanted that on change of material master
    the custom change document object should call the workflow
    I went through all the material avaialable over SDN ,but can not find a change object for change in material master through MM02  for std business object  BUS1001.
    Please tell me how to find one.
    Please reply if any one of you have some solution.

    Hi,
    Thanks for your reply.
    I am using an existing change object - MATERIAL_N of Business Object - BUS1001 and the event
    BASICMATERIALCHANGED.
    I have mentioned  the details in the tcode SWEC.
    And even in the workflow i have given the start of event  as the BUS1001 and event BASICMATERIALCHANGED.
    But workflow not called .
    Do we need to maintain an entry in SWED?
    If yes then in function module column what we need to mention.

  • Enhance ZMMJ or Normal Change Document with Custom User

    Hi there,
    I am wondering if it is possible to add a specific field into a change document.
    We have a requirement whereby 2 different testers need to be added to a change. The first tester will perform testing of Development in DEV (as per our custom workflow) and then the second tester will perform the normal testing in QA.
    Now these two testers might not necessarily be the same person or have the same authorization.
    So, my question is that when you are assigning team members to the change (Developer, Tester, Change Manager, IT Operator), is there an option to add another user field here, such as Dev Tester?
    Thank you.

    Hi Bradley,
    SAP Note 1728284 has a PDF Attachment with a detailed description what needs to be done. Please follow this description to adapt your configuration.
    Thanks
    Vikram

  • Not able to release normal change document for development

    Hello All
    We have Implemented ChaRM in SolMan 7.1 SP10
    Have created the Project and activated Charm with required DEV/QA/PRD logical component and before creating the Maintenance cycle, we did a check in the project which showed all green..
    We are able to create a request for Change and go till the approval, when we try to change the status to release for development, it is throwing the below error and not letting us go further.
    We have checked the MC phase, and it is in phase Dev with release.
    Project is in IN PROCESS state.
    IBASE and Component details are correct.
    Tried to put back to Validation and re tried for Development and this did not work.
    Until unless change document created successfully, we cannot go ahead even though MC phase is in DEV with release.
    I have seen few blogs and I have checked below steps
    system roles in SMSY
    Landscape system info
    Changed MC phase to DEV with release
    Strange why it is not allowing to create change document ???
    Please assist
    Thanks
    Sateesh.

    Hello,
    Three consistency checks are performed when you choose action "release for development" (resulting in the SMCR's status "being implemented"):
    PROJECT_ASSIGNED: Project is Assigned
    SYSTEM_EXIST: System assigned to collective change request
    FOLLOW_ON_GEN_OK: Change Documents Can be Created
    In case any of these checks fails, the SMCR's status returns to "approved".
    These same consistency check are also checked when the SMCR status is set to "approved". The behavior for a failed check, however, is different in this case. Just a warning message is shown on the top of the screen and the "approved" status can be set.
    Question 1: When you set the SMCR to "approved", those warnings are shown too?
    Perhaps there is something wrong with the assigned project.
    Check if the assigned logical component has the correct systems/clients.
    Check if the transport tracks between the systems listed in the logical component are working.
    Question 2: When you assign the scope (change type, in your case, Normal Change), some system data from the production system defined in the logical component are automatically filled (System, Client, Configuration Item, etc). Is this happening?
    Regards,
    Daniel

  • How to change the details ina BPS workflow item

    Hi,
    I'm working in a SAP BW 3.5 environment and I need to change some details in a BPS workflow item. Unfortunately I have never used BPS and am struggling to get to grips with it and also to resolve the issue.
    Can anyone advise on my issue and also offer any advice / documents that cover BW BPS in a 3.5 environment.
    thanks.

    I think I better change my question. Can anyone please provide link(s) / documents where I can quickly pick up the basics of BW 3.5 BPS so I can start looking into the issue I have.

  • Change documents cannot be generated

    When trying to approve an admin charm we are getting warning : change documents cannot be generated
    Diagnosis
    Change Documents cannot be generated.
    System Response
    The status is reset, the action is canceled.
    Procedure
    Your Change Request Document contains data which cannot be used for the generation of the follow-on change documents.
    Please check the following possible errors:
    The chosen project in project field of the 'Details' assignment block is a project without a maintenance cycle or the assigned maintenance cycle is in a status where the generation of Change Documents are not allowed. The generation of projects is for example not allowed if the project is in a final status.
    If possible, change the project or choose a phase in the maintenance cycle which allows the generation of Change Documents. If this is not possible, this project cannot be used.
    The 'Scope' assignment block contains scope items for with a chosen IBase which is not the IBase of the productive system in the one (or more) logical components assigned in the chosen project. This is only relevant for the change category 'Urgent Correction', 'Normal Correction' and 'Administrative Change'.
    Choose the right IBase for the change category scope item.
    If a change is not possible because the Change Request was approved and the fields are not edit able, set the Change Request to 'Validation'. Then the data can be changed and the Change Request can be approved again.
    Can someone help why this happens

    Hi,
    Have you checked all the possible errors stated as in your error?
    1. Do you have proper auth to create, proper system assigned with the dev role and ibase created?
    2. is it new CR or you are trying to extend the scope? if this case, what is the status of CR? check out
    ChaRM: RfC process stuck at "Being Implemented"
    3. whether your project has the valid maintenance cycle assigned? you can check in solar_project_admin maintenance cycle is open ?
    4. what is the phase status of maintenance cycle and project cycle. check this allows to create CD, with the status as development with release ?
    Phases in the Project and Maintenance Cycle - SAP Documentation
    please check
    Thanks
    Jansi

Maybe you are looking for

  • Marketing planner - Year Calandar

    Hi, Can someone help me out, I lost my state of the art marketing year planner.:( Because it was very time consuming to make, I do hope that someone can share his or hers. It was a year planner that gives you in one glance on overview of: - your trad

  • Spot Color in photoshop

    I have a customer that does a front and back newsletter in photoshop. They use 100% black and 100% magenta and save it as a .psd. (They don't have no other layout programs) How can I put it in an IndesignCS2 or quark document and separate it into 2 c

  • R9 270x Mini - ITX : Will not turn on.

    Hello, I recently purchased a R9 270x and it seems like it doesn't turn on when the pc turns on.(the fan doesn't turn on and the monitor is just black) I was hoping someone could help me, even if the only fix is buying a new psu. I have an Intel core

  • Need 2 find a way 2 connect external Firewire drive2only USB G3 iBook?

    my G3 Clamshell iBook only has a USB port and i need to connect my external Firewire Drive. can someone help me figure out how to do this? This iBook happens to be running 10.2.8 if it matters. Both my other Laptops are having their own big problems<

  • File transfer via bluetooth on iPad

    So I have an iPhone 3GS and an iPad 2, both have iOS 5.0.1 installed. I was wondering if it were possible to transfer pictures from my iPhone to my iPad through the bluetooth connection. Or is there some other quick way to this?