CJ20N : Settlement Rules Heritage on unique IeC WBS Element
Hi Experts,
I've customize PS for an investment project, who have a stategy for top down heritage of the settlement rules from the project definition, and an automatic generation of an only IeC (on first WBS element) when the entire project is launched from the project definition.
All settlement rules are settled to the first WBS element (WBS project), who becomes the IeC.
Heritage is OK on all WBS elements and I can see them under "Edit -> Costs -> Settlement Rule".
When I try to see my seetlement rules on the first WBS Element (WBS project), the system turn in loop and dump after 2 minutes (time over message).
In my opinion, the error comes that the system permiss to affect the settlement rule (for exemple WBS -> I/0001) on his own object (WBS ID I/0001) . They have no error message when I save the project for the heritage.
After this operation, impossible to go back under "Edit -> Costs -> Settlement Rule" to see the settlement rules of this WBS Element.
For more information, I don't want the create the heritage to level 2 or 3 of my WBS elements structure, because I don't want to loose a level (coding mask I/XXXX.XXXX.XXX.XXXX).
Does an expert have a solution to resolv my problem ?
Thanks in advance for your assistance.
Hi herieric ,
The program should not enter into an endlos loop in such case. It is rather a program error than a consulting issue. You can copy the key words from the dumps and search the notes. If there is still no suitable notes, create a customer message and ask SAP for support.
Kind regards,
Zhenbo
Similar Messages
-
Making Settlement rule mandatory for creating any WBS element
Hello All,
We have an requirement that system should not allow us to save any WBS element until the settlement rule is maintained.
This we want only for WBS elements where Investment rule is not assigned.
Can alyone help me to find out if this is possible, if yes then how.
Points Assured.
Thanks & Regards,
Jatinder BansalHi,
The only way it seems possible is using exists in validations.
if not try to check the status of the wbs element in a validation. function module is STATUS_CHECK. and i think the system might set a special status, if a settlement rule has been maintained for a wbs element.
Rgds
Sudhir Reddy -
CJ20n (settlement rule)
Dear Experts,
Can any one plz provide solution,
CJ20n (settlement rule)
1 Can we delete all settlement rules in single shot at WBS Element Overview.
Actually by mistake user has marked all billing items, generated settlement rule (CJB2) to all
WBS, now I have to remove for three project many WBS.
I have checked in MASS changesu2026.but I have option for Billingu2026.. no option for remove
settlement rule.
This is my second doubt:
2 How many ways are there to remove BILLING ELEMENT after becoming gray.
Long back i have faced same problem......i have removed manually,its painfull job.
Regards&Thanks
ChandraDear Experts,
Thanx for valuables inputs.
Virendra sir,
2 - for billing element - has revenue been posted? else you can delink the sales order run CJEN and then it open again then tick the correct WBS for billing and relink the sales order
DELINK...........It means i have to make partner tab blank...then cjen....is it correct.
I have to remove wbs in saleorder also?
(plz correct me if im wrong)
Thanx Nitin....
Previously i ahve done manually.but its painfull.
I have rewarded points for both
Regards
Chandra -
Settlement rules are permitted for one WBS
Hi Friends,
Would like to know how many settlement rules are permitted for one WBS Element , We have a need for over 200 Settlement rule.Hi Friend,
Limitation of the number of settlement rules is 999.
The Notes 483600, 31721 and 720619 describe the issue. The technical restriction to 999 distribution rule groups can not be changed.
Regards Bernhard
Edited by: Bernhard Kirchner on Dec 17, 2010 11:09 AM -
Settling the costs of a parent WBS elements
Dear experts,
i have a cost project consist of 3 levels work break down structure:
level 1: a root WBS element
level 2: splited into 2 WBS elements (Production - Maintenance)
level 3: spliting each WBS element of the above level into 3 WBS elements (Service - Materials - Labour)
actual postings ONLY is against level 3 WBS elements and the costs is acomulated to level 2 and then to level 1
but my customer wants to settle ONLY level 2 WBS elements (Production - Maintenance).
so...
i maintained settlement rules only for level 2 WBS elements (Production - Maintenance)
level 3 WBS elements (Service - Materials - Labour) are assigned settlement profile
90, which has the setting "Not for settlement".
when i tried to run settlement for level 2 WBS elements (Production - Maintenance) i failed coz i got 3 "Nor relevant" and 1 "No change"
so, my question is: is it possible to settle aparent WBS element in which there's no actual costs has incurred "has no actual costs of its own", however, it only has childs WBS elements that have actual costsIf you read your post carefully you will understand what mistake you are doing. Read SAP Help and search forum regarding settlement you will find the answer for this
so, my question is: is it possible to settle aparent WBS element in which there's no actual costs has incurred "has no actual costs of its own", however, it only has childs WBS elements that have actual costs
Edited by: Mohamed Rafi on Jul 4, 2011 7:06 PM -
TX CNS41 - settled cost from internal order to WBS element not displayed
Hi PS Expets,
I have a question regarding transaction CNS41 "Structure Overview" where cost settled from an internal order is not displayed in in the report for a selected project. This is in a ECC version 5.0
Settled costs from internal orders are posted with transaction type KOAO on WBS elements and when you check report RCNSTFCO you can see that the following transaction types are deselected when executing transaction CNS41:
delete t_rpsco_m where vorga = 'KOAO' "< insert
or vorga = 'KOAL' "< insert
or vorga = 'KOAP' "< insert
or vorga = 'KOAQ' "< insert
or vorga = 'KOAR'."< insert
CALL FUNCTION 'HFPM_RPSCO_TO_RPSCO_LIS_CONV'
This is implemented according to OSS note 51971 in order to eliminate internal business volume in the project structure when executing a PS hierarchy report.
But this also eliminate the display of the cost from the internal order.
Any ideas or a work around in order to display settled cost from an internal order on a WBS element in transaction CNS41
Kind regards,
AnneHello Tison.
I guess you have the Project created with a BAPI in your system in background. As far as I have seen I'd try the following in ABAP to create Partners in the Project Definition: BAPI_BUS2001_PARTNER_CREATE_M or the corresponding method ProjectDefinitionPI.PartnerCreateMultiple. This should happen in background when the Project is created also.
Best regards.
Jens Schmid -
Creation of settlement rules for WBS element
Hi,
Iam having problem when creating the settlement rules for WBS elements. The business goes like this.
We have XI interface which creates the Idocs and an inbound program(customized) to process the Idocs. When the Inbound program is run the WBS elements are created and settlement rules are created for the WBS elements. The inbound program is run automatically thru batch job.
First time when the Idocs are processed about 95% of the WBS elements have settlement rules created and for other 5% settlement rules are not created. The Idoc is in status 64. I tried reprocessing the Idoc and then the settlement rules are getting created succussfully. The problem is Iam not able to find why the Inbound program is not processing succusfully when its run first time but works when reprocessed.
I appreciate if anyone can send their views.
Best Regards
SKHi!
You might set the processing to check not only once the relevant IDocs, but more times...
Check out these programs, and set them into a batch job periodically...
RBDMANI2
RBDAPP01
Regards
Tamá -
How to configure the settlement rules to be automatically created when a new project is saved such as for the AUC settlement or Requesting Cost Center?
Automatic settlement rule work for the projects where object class is other than INVESTMENT.
You have to configure in SPRO IMG->>>PS->>>Costs->>>Automatic and Periodic Allocations->>> Settlement->>> Settlement Rule for WBSE ->>> Determine Strategy for Settlement Rule.
Here you can mention your default settlement receiver as requesting cost center / responsible cost center or you can enter a settlement rule for level 1 WBS element and then copy this to all lower levels.
Assign this to Project profile in OPSA transaction under the controlling area tab Settmt rule strat. field.
Then you have to execute the transaction CJB1 / CJB2 for generating the settlement rule automatically to all the WBS elements.
You can search the forum, <link removed>
you can also refer to the online help. <link removed>
Incase of INVESTMENT object class projects, the settlement rule is automatically created by the system when you execute the settlement for project first time, the receiver will be the respective AUC.
Praveen
Edited by: b praveen savan on Sep 14, 2010 6:27 PM
Edited by: Virendra Pal on Sep 15, 2010 4:56 PM
This time I am not deleting the post and do not bank on second chances. -
Error: Maintain settlement rule of the sender for a higher level WBS
Hi,
I dont want to maintain the settlement rule for a higher level WBS. How can i configure this in such a way that i dont get the following error:" Maintain settlement rule of the sender" while doing CJ88. Maintaing a separate Settlement profile for a higher level WBS is an option but we are looking if something else could be done The problem is that there are no actuals booked against, say, level 2 WBS but when i execute CJ88, i get the aforesaid error. How can i ensure that only the lowest level WBS ask for the settlement rule and not the levels above it. I have already removed the Investment profile from the higher level WBS but still getting the same error.
Regards,
DPilHi,
It is a type Capex WBS and Biling element is not checked. In fact i get a warning while doing the settlement: WBS is neither a billing element nor an account assignment element.
Diagnosis
WBS element is not indicated as either an account assignment element or as a billing element in the master record.
System Response
The WBS element cannot be assigned to an account.
Procedure
Correct your entries or add the missing indicator to the master record for the WBS element.
But this is just a warning. On pressing enter i get the error :Maintain settlement rule of the sender " -
Is there any single screen wherein I can maintain the settlement rules for all the WBS elements under a project definition instead of selecting the WBS and then going through menu to maintain the rules?
I know its possible to select settlement rule button by selecting all WBS and then maintain rules by clicking Next Entry.
Expecting something similar to an overall screen available on WBS wherein we maintain the master data.
Help me.
Regards
SreenivasHi Srinivas
Its not possible as you are looking at Projet Defintion level.
However, its possible to transfer settlement rule to all other WBS elements if similarities exists between them through T Code CJ02
Regards
Sudhakar
Message was edited by:
Sudhakar Pappu
Message was edited by:
Sudhakar Pappu -
Where to configure Account Assignment Category for WBS Settlement Rule?
Hi,
I would like to know where is the Account Assignment Category for WBS settlement rule (FXA, CTR, G/L, WBS) being configured. (SPRO Path)
Currently when I go to our settlement rule creation screen I can only see WBS and FXA, I need to add MAT (Material)
Thanks!
Regards,
VivianHi Shrikant,
Do you mean in my CJ02 WBS Settlement Rule creation screen, I cannnot put MAT as account assignment category?
Does it mean that WBS element CANNOT be settled to material? and we can only settle PM order to material?
Thanks!
Regards,
Vivian -
Settlement of order -WBS Element
Dear Experts,
Can any one tell me what is meant by WBS element and in what scenario,PM orders settlement rule created with category as WBS.If possible tell me with any practical example.
regards
KRISHNANDear,
Dear,
Budget: Amount of resources allocated under a particular head in a financial year.
Budget Control: Having/ creating a control on the resources allocated in a financial year.
Original Budget: The initial budget that you have allocated to a WBS element.
Supplement of Budget: One time/ discrete increment in the original budget.
Return of Budget: Taking out the unutilized portion of the budget.
Transfer of Budget: Transferring the budget among two or more expense heads.
Project Definition: A framework for a business undertaking with a fixed goal to achieve with given resources.
The project definition contains dates and organizational information that are binding for the entire project.
WBS Element: Individual structural element in a work breakdown structure (WBS) representing the hierarchical organization of an R/3 project. Describes either a concrete task or a partial one that can be further subdivided.
Proposed Business Process
Assume there are seven expense heads in maintenance department. There may be addition of expense head in near future.
Based on the maintenance heads, maintenance department will create a project in project system. This project will be used for statistical purpose only & will not have any financial implication.
Upon creation of a project, WBS elements will be created as per the expense heads. So for each expense head, there will be one top level WBS element. Again these WBS elements will be divided in twelve WBS elements. These twelve WBS elements represent twelve calendar months.
Budget will be allocated to each WBS element & the WBS element will be released from the project.
Maintenance department will create maintenance orders as per their work requirements. These orders will be settled to cost centre, which is maintained in the settlement rule. Also WBS element will have to be mentioned in each order so that the budget control can take place. So as to capture cost from each maintenance order, the WBS element field will be made mandatory field in maintenance order.
So when a maintenance order is released, system will do a budget check against the WBS element mentioned. If the budget check status is OK, order is released or else it will stopped from release. If the order is stopped from release, maintenance department will have to supplement the budget. Upon supplementing, the order is released again & the maintenance cost such as, labour, material costs can be booked on the order. Again the order cost is settled to cost centre & at the same time, budget is consumed from the respective WBS element.
Every year, maintenance department will copy the previous years project so as to save time & efforts to create project & WBS elements. And the maintenance department will assign the budget allocated to each WBS element in a financial year.
It is also possible to return the unutilised budget or, transfer of budget from one WBS element to another.
Create a project CJ20N
Create WBS element CJ20N
Assign Budget to WBS elementsKO22
Display assigned Budget KO23
Supplement Budget KO24
Display Supplement budget KO25
Return Budget KO26
Display Return budget KO27
Transfer of budget CJ34
Hope u wull get ur answer
Regards
Rakesh -
Hi all.
I am using line item settlement. using investment projects.
Unable to generate the settelemnt rule for the lower level WBS elements. while settling from WBS to AUC
1. Created project (throught AR) with one one level WBS element (top level), planned cost, released budget, posted actual. now while doing settlemnt, i am able to generate settlemnt rule for top level WBS element automatically and settlemnt is done.
2. Created project (throught AR) with TWO level WBS elements (top level and 2nd level), planned cost, released budget, posted actual and while doing settlemnt, i am unable to settle, as system is asking me to maintain settlemnt rule for the 2nd level.
is there a way to generate settlemenmt rule for 2nd level automatically, as i have mainitained settelemnt strategy 40, to take the settlement rule from superior WBS.
i have checked it with CJB2 also, and it giving an error ORB501.
regards
Edited by: Surya Pampana on Oct 12, 2010 12:25 PMThanks for all the inputs.
Ahmed, i have implement the note 211323 and its relevent notes, still not working.
Ok, if i have to maintain settelemnt rules manully, how to maintain at level 2.
FYI: both level 1 and level 2 are account assigned
Now i have to maintain the settelment rule for 2nd level as : from level 2 to level 1?
pls suggest
Regards
Surya -
Settlement rule for AUC not automatically generated
Hi Experts,
I am working on a capital project scenario where I have configured the investment profile and assigned this to the project profile. I have also configured the settlement profile and allocation structure for settlement to FXA.
On release of the WBS element the AUC is automatically created.
I have posted costs to the WBS element.
When I run settlement in test mode, using CJ88 the details show the sender as the WBS element and the reciever as the AUC, and the amount = the cost posted to the WBS element in the posting period, (as expected)
However, (now my problem)
When I run settlement in "update" mode the settlement shows 1 settlement however when I drill down to see the sender or reciever details are blank. There are alno no accouting documents and a settlement rule does not display for the WBS element. There are no error messages even though the settlement has not taken effect.
Please can anyone advise on the possible cause of this error. One further point the document type on the settlement profile is configured as "SA" GL Account Document.
Thanks in advance.
Ianhi,
Go to Settlement rule (CJ02),where enter the WBS .here go to Extra in the menu bar of that WBS ,under Asset under construction ckeck the box of Historiy....something like that .
Regards
Ricky -
Automatic settlement rule creation
Hello Guru's,
I have a scenario of capital proejcts. Were I create Assets with the help of Investment profile at the top(1st level) WBS element. Now my requirment is the cost of the second level WBS should be rolled upto top level WBS element. To do this I have to manually create settlement rule for all second level WBS to settle at top level. I have to create this rule automatically throught CBJ2 tcode.
As per SAP Note 211324 I have Implemented the modification. Now I have Insert value '5' with short text 'Superior WBS element'. Also have assign the strategy to Acct. Assign element. This strategy is also assigned to settlement profile. Also have assigned this settleemnt profile to project profile.
Now, when i run CJB2 tcode for my project the system issues me an error :-
Error(s) during creation of settlement rule
Message no. ORB509
Diagnosis
Errors occurred during the check on settlement receivers.
System Response
Processing stopped.
Procedure
Check whether the:
Specific receiver Account assignment e actually exists
Settlement profile ZPI03 permits account assignment to the specified receiver
Please throw some light on this error
Regards,
TusharThanks Virendra,
Thanks for your reply but tell me after the implementation of note do I need to implement BADI also as in past for some forums you have mentioned???
Regards,
Tushar
Maybe you are looking for
-
Nano No Longer Connecting...
Alright, I've recently had my entire computer reset. I've installed iTunes 7, and it doesn't recognize my iPod nano. Not the newer, bigger one, the older one. It charges and plays in my 360 just fine. I plug it in and am prompted to install new hardw
-
I ripped a new CD to iTunes and backed up to the cloud. The songs are already on my iPhone 4S, but I can't get them on my iPad. I already connected the iPad to my laptop and selected "Sync with the iPad over Wi-Fi". On the iPad I forced a Sync. Help!
-
Does iWork '09 Numbers launch for anyone under Yosemite?
iWork '09 Numbers fails to launch under Yosemite. Suspecting it may be Yosemite related. iWork '08 Numbers launches and runs ok. No indications of launch failure in Console. It just doesn't launch. This is only important to me because older spre
-
I want to update to ios7 on my ipod touch, but it says that it's already updated to the current ios 5.1.1, why?
-
Document for upgradation from 4.7 to ecc 6.0
HI Everyone, Can any one pls mail me some helpful documents regarding upgradation, what all things needs to be taken care and many more. my email id is <b>[email protected]</b> Thanks in advance. Sunny