CJ88 Error
When I settle wbs to g/l account, error message appears:
"WBS element 00002060 does not exist
Message no. CJ021
Diagnosis
WBS element 00002060 does not exist.
System Response
Processing stopped.
Procedure
Check to make sure that you maintained the right key for the WBS element Change it, if necessary."
But I have checked my project and prps table, wbs number and 00002060 number are still there.
and newly created project and old project have the same promblem.
The settlement rule and settlement profile have none error, because project in other controlling area which use the same profile and settlement rule don't have the same problem.
when I do CJIC
a error mesage appears:
No assets under const. exist for cap. inv. measure PR00002060
Message no. AY026
Diagnosis
You have called up the function "Display asset under construction" for the capital investment measure (PR00002060). No asset under construction has been created for the capital investment measure.
Procedure
Check whether you need an asset under construction for this capital investment measure.
If necessary, create an asset under construction for the capital investment measure (Maintain capital investment measure).
Similar Messages
-
Error Max no of items in FI reached during CJ88
Hi All, We are getting a similar error as above in cj88 error no F5727. The number of Fixed Assets defined in Level 1 WBS is 964. This is less than 999 so dont understand why this issue is coming. I find two other discussions in this forum: First we can use another secondary WBS to post all the cost which is not possible here as we define all fixed assets only in level 1 wbs Second we found the note 36353 is this going to help? Third we can settle cost to one single WBS only rather than all these and then transfer cost or distribute to all FXA through Asset posting. But this is also not possible as how to change the settlement rule now. All these line items are already used in previous period 12/2014 and there are no unsettled balances of previous period. Then how to remove this error? Can anybody suggest.
Hi,
Read this thread
You are not yet reached to 999 levels still it is giving an error message, strange. Can you check the settlemen rules at table level does it have more than what you see on the settlement screen. if that is the case then you delete unwanted netries from table COBRB and COBRA by using SM30.
Message no. F5727:maximum number of items reached in FI sereen MI07.
Maximum number of items in FI reached - CJ88
follow the work around suggested by Virendra. Hope that will solve your issue. if not raise OSS to SAP.
Thanks,
Sudhakar -
Settlement G/L account Error in CJ88 Transaction
Hi
i am receiving error in CJ88 transaction when I am trying to settle cost. I have created default settlement rule on WBS by enhancement, The G/L Account is also balancesheet account. Error message-- G/L account is not assigned to controlling area.
Please suggest the soulution. ThanksHi,
Can you elaborate the error in detail,
You want settle the WBS to GL right?
The GL which you are setting the same GL is getting error.
You have checked the GL in FS00 or FSP0, If you have not checked in FS00 then check in FSSo whether it is extended to Company code. -
Error in CJ88 Posting transaction is not possible (value date not allowed)
When i try CJ88 with a wbs element, it shows the following error :
Posting transaction is not possible (value date not allowed)
Message no. AA 478
Diagnosis
A retirement was already posted on the asset 000022400733 0041 on 20091231. Based on the value date 20091231 of the transaction, this transaction should have been included in the calculation of values for the retirement.
System Response
The transaction is rejected.
Procedure
Check the value date of the transaction.
In need to put year 2009 in date of the transaction, but it isnt posible. ¿Why? I dont know very much about asset accounting...Hi
It is not allowing for WBS element final settlement, because of your asset already retairement was done.
By best suggetion is, You will create the new WBS element and transfer the all cost line items from old WBS element to new WBS element, then you will try to settlement for another asset in CJ88.
I hope it will use for you.
Regards
PVCPVC -
Error During CJ88 Msg#F5702
Hi Gurus,
I encountered error during settlement via CJ88, am settling amounts from previous year to current year as full settment.
The error encountered: Balance in transaction currency
Msg No. F5702
Diagnosis:
A balance has occured in transaction currency SGD with the ff details:
Exchange Rate "00", amount 284,000- and currency key SGD
The data in the transaction currency were transferred from the calling application.
System Response:
Your data cannot be processed in FI
Procedure:
The error is probably in the calling application
Thank you very much.
EvelynHi Narayan,
Have checked the currency maintained in Co Area and it is in SGD.
Please advise how to solve the error in CJ88.
Thanks!
Eve -
Hi All,
Thre is a pressing issue that I need to solve.
I am receiving a settlement error (cj88) for project
*Settlmnt from revenues/debit-side down paymnts to receiver CTR 22893 not
allowed*
Message no. KD561
Diagnosis
The sender has revenues or customer down payments with cost element
4540999 (business transaction-- CO Through-postings from FI).
You cannot settle these revenues or customer down payments to receiver
CTR 22893.
Procedure
Change the settlement rule for the sender. It can be useful, for
example, to use a source structure to settle costs and revenues
separately to different receivers.
Note
Revenues or customer down payments can only be settled to G/L accounts,
profitability segments, sales documents, real estate objects, orders
with revenues, or WBS elements.
It appeared an amount was posted to G/L 4540999 when it shouldnt have
been and we had this corrected by reversing it. 4540999is a revenue element with catagory 11
However the error is still appearing. It appears that even though there
are two offsetting transactions settlement will still try to do each one
hence it is still giving the error. I have not been able to find a work
around to this.
Please throw some lights in how to proceed from this
PratikshaHi,
You may try to switch off the message.
Hi,
OBMSG (nothing but table T100S) and add the entries in OBA5 (view V_T100C).
Please go to OBMSG
ignore the cross client warning message.
Find out the application area KD
Select that and click on messages
If 561 message number is not there, then enter the same and Allowed is you please put WE and Standard W, then Tick switch off message.
Then please go OBA5
Enter work area KD
Enter message No.561
Online select - (switch off the message)
Standard - (switch off the message)
Regards,
Ravi -
Dear All
Please guide me i had Struck ed in this error
When i am doing the settlement for activity against the network
this following error is occurs
Define a settlement cost element for receiver type WBS
Message no. KD506
regards
RajHi
Goto SPRO-PSCosts--Automatic and periodic allocations --- Settlement -Settlement profile-allocation structure.
In this screen select allocation structure A1and click on the assignments folder. Now select the line item and click on the source folder
Alloc.structure A1 Generic Settlement Structure
Assignment 10 Generic Settlement Structure
CO Area BP10
Cost Elem.Group ALL
Then select settlkement cost elements folder
Here you define the Receiver Cat as CTR and Settlement cost element ( Ask your FI consultant).
kindly do the above mentioned steps and Run the CJ88
Thanks
S.Murali -
Error while settling costs to AUC (T.CODE CJ88)
The following error is encountered while settling costs to AUC using
t.code CJ88 with WBS element,
with parameters
with orders
Selection processing type 3 (partial settlement),
period 4,
FY 2008,
selection - with hierarchy, with orders.
Error message is:-
Typ Message text
LTxt
Sender: WBS ASCP.DSCA.CP.NS.DS.003 PLANNO MILLING 4MX2M
Acquisition value negative in area 01.Hi,
Use T.Code: as02 and click on Depreciation areas, then double click on Depreciation area(example :01 - book dep), there u can select the field allow negative postings allowed. Once this process is completed, remove that indicator.
If u couldn't found that field, then goto screen layout for depreciation area and change status from suprress to optional.
Hope it can resolve ur problem
regards
Prasad -
Budget Exceed error while settlement in PS T-Code CJ88
Hi Guru's,
I have created structure upto 6 level and i have done planning and budgeting at 6th level only, and actual cost is also posted at 6th level.
When i am setteling that amount at 5th level WBS using T-Code CJ88 then it is giving Budget exceed error of that particular amount as budget is also available at higher level WBS as accumalation of budget at 6th level is going to higher level WBS as i am following buttom-up approach.
Please suggest.
Regards,
AmbujHi Rajesh,
When you distribute budget to lower level WBS, the budget is only available at the lower level (availability is checked as: Budget - Distributed Budget - Assigned) regardless of whether it is shown at the superior level or not.
AVAC status is activated automatically on WBS where budget is distirbuted and released (provide you have maintained Activation Type 1 in Budget Profile OPS9). Please check if AVAC status is active on your 5th level WBS. If it is active then the system will throw the error as SAP standard behavior. You can remove this status from 5th level WBS via CJBW.
You may need to look at your budget configuration accordingly.
Regards,
Ammar -
Dear All,
In my client side, In periodic processing activity CJ88, getting error that "Sender: WBS OP.SACE.05003114 REFRACTORY MATERIAL" and "Acquisition value negative in area 01". Because of this error we are unable to run for this particular WBS element. Will anybody explain clearly and give me solution for this. I will assign points.
Regards,
PrasadIn your case I guess, the settlement is happening to an Asset.
The error due to definition of depreciation area '01' for relevant Chart of depreciation. You have choice of configuration for all types of values i.e., Acquisition value, Net book value, Ord.depreciation,etc. The Options are:
1) * All values allowed
2) + Only positive or zero allowed
3) - Only negative or zero allowed
4) 0 No values allowed.
To solve your probelm do either of below:
Change the configuration to say * All values allowed
else
In asset master depreciation areas screen, for area 01 check "negative values allowed' indicator.
Regards
Sreenivas -
Hello All,
Good Day!
I have encountered error while running CJ88 WBS settlement, according to it:
"Data Inconsistency: Parallel depr. area is not posted"
Message no. AAPQ104
What is the possible cause of this?
Please advice.
Thanks in advance!
JheroHi,
Please check the below OSS notes:-
Note 97388 - Asset transfer: Problems with parallel areas
Note 124231 - AAPO104 w/o reason in intercompany asset transfer
Note 210557 - Mass retiremt w/ revenue in case of parallel crcies
Also check whether there is any deletion of additional dep area recently after the asset creation. If yes, you need to add it again & populate additional Dep in Asset created during trial run by T code AFBN than rerun the settlement issue will be resolved.
Regards,
Gaurav -
Dear All
The WBS DGP-0001-FS-PM-01-M unable to settled for AUC 4000029 through CJ88. Where as these wbs DGP-0001-CW-PM-01-M,DGP-0001-CW-L,-01-S,DGP-0001-EX-CS-01-M,DGP-0001-EX-CS-01-S has been settled to AUC which are same nature with DGP-0001-FS-PM-01-M.
The systmen error is
Complete allocation structure GI
Message no. KD503
Diagnosis
During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
Cost element 80011 cannot be assigned to a settlement cost assignment in allocation structure GI, and therefore it cannot be assigned to a settlement cost element.
Procedure
Possible solutions are as follows:
u2022 If the posting under cost element 80011 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
u2022 If the posting was made correctly, you can do the following:
a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
o You can update allocation structure GI
The Cost Element 80011 (Balance sheet GL & Cat :90 Statistical Cost element for BS), which is not applicable for allocation structure.
Please advice for the same.
Regards
AvijitAvijit,
You have to include the cost element 80011, in the cost element group. Use transaction KAH2, for knowing the cost element gruoup go to IMG-PS-Costs-Automatic and periodic allocation - Settlement - Settlement Profile - Create allocation structure.
Here select the allocation structure GI, double click on Assignments, select the appropriate assignment line item then double click on Source. Here check the cost element group, copy it enter the same in KAH2 then add the cost element 80011 Save.
Now come out of settlement and retry the settlement.
I suggest you to talk your FICO consultant for resolving this issue.
Praveen -
Hi All,
I've tried to reverse some WBS/assets settlements in CJ88, but I've received an error:
"Sender: WBS HXG/09110-009-01-01
System error - deletion not possible"
What this stands for? How can I reverse this settlements? Is there another way to do that?
Thanks a lot for help!Hi,
Thanks for quick replies.
I used CJ88, Message no. AAPO186.
Document is created and I can check it in FB03. -
Dear All,
while i am trying to settle the AUC with WBS, i am getting below error message.
Debit to source assignment REV cannot be settled
Message no. KD569
Diagnosis
There are costs for a cost element on the integrated asset under construction (AuC), which were assigned to the source assignment REV in the source structure (-> Sender settlement rule -> Parameters).
This source structure does not have a distribution rule with settlement type FUL. Alternatively the total of the percentage rates is < 100%.
Note:
During FUL settlement (full settlement) of an investment measure, all costs incurred up to the settlement period on the AuC, and not yet settled to the finished asset or to another CO receiver, are settled. During a partial capitalization of the investment measure (settlement with processing type 3, if the measure has not yet got the "Technically complete status"), you can capitalize individual costs from the AuC on the finished asset. Alternatively, you can settle them to another CO receiver.
Procedure
Maintain the distribution rules for source structure REV and settlement type FUL, or use partial capitalization.
If required, change the error message category in Customizing, under General Controlling -> Change message control
Please suggest me where can i maintain the distribution rules for source structure REV and settlement type FUL, Any path or T-Code.
Regards,
Shekar.Hi,
Allocation Structrure & other setting are all fine, it showing below error message & procedure to resolve.
Error Message
Debit to source assignment REV cannot be settled
Message no. KD569
Procedure
Maintain the distribution rules for source structure REV and settlement type FUL, or use partial capitalization.
If required, change the error message category in Customizing, under General Controlling -> Change message control
Please suggest where i have to maintain the distribution rules for source structre REV and settlment type FUL. -
Error while Settlement to AUC from Project CJ88
Hi,
ECC 6.00/PSM-BCS
While settling the Project to AUC I am getting the below error. Please advice.
*Asset DAML 000009000004 0000: no subnumber with FM assignment CAPEX / /*
Message no. AW851
Diagnosis
During settlement of sender WBS DAMEPL 1.1.1.1 there was an attempt to settle a posting that has account assignment CAPEX / / (fund/functional area/grant) to an asset subnumber. However, the receiving asset DAML 000009000004 0000 does not have an asset subnumber with this assignment.
System Response
The posting on this sender cannot be settled to an asset subnumber.
Procedure
Either create an asset subnumber with account assignment CAPEX / / for asset DAML 000009000004 0000, or settle to a different receiver.
If this message appears as a warning only, then the posting from this sender is settled to the asset main number.
Fund Capex : CAPEX
Company Code : DAML
WBS Element : DAMEPL 1.1.1.1
Best Regards
Shekhar
Edited by: Chandrashekher Yellapragada on Jun 5, 2010 7:00 PMI am facing the same error and find this OSS Note 440396 - Missing entries for configurable messages in IS-PS-FM where you can deactivate the error message.
Hope this will solve your issue too.
Regards,
OSS Note 440396
Symptom
System issues messages AW851,AW852,AW856 or AW857 as Error even though
functionality exists to make these configurable.
Other terms
LAIMBFM1, OBA5, AW, AW851, AW852, AW856, AW857
Reason and Prerequisites
Missing entries in tables.
Solution
Create Application Area for Customizable messages for 'AW' using transcation SM30 with view V_T100SA.
Next using transaction SM34, enter view cluster VC_T100S, click maintain and select Application Area AW and double click Messages. Add the following entries:
AppArea No. Allowed Values Std Switch off
AW 851 EWI E X
AW 852 EWI E X
AW 856 EWI E X
AW 857 EWI E X
Afterwards with Transaction OBA5 insert the entries for the messages you want to customize, and set them to the error level the behaviour should be for your particular case.
Maybe you are looking for
-
How can I upgrade to ios5 without losing games data
I need to upgrade my iPad, but if I do I will lose my game's data, and will need start all from the begining again. The backup made by iTunes do not save this kind of data. What can I do??????????
-
Mac App Store problem - I have an update for an app that do not exist in my Mac
Hi, I have an update for an app that I never didn't bought before in my Mac App Store. Thats happen before more than a year, I tried everything including updating the app (got an error) and format the Mac but the update for this app didn't remove. th
-
Using same Wildcard certificate on multiple SAP systems with same domain name.
Hello All, Need urgent help. I have a WILDCARD SSL certificate in pfx format. I also have individual root certificate , primary certificate in text form. The certificate mentioned above is already active in one of our portal. We want the same certifi
-
Fms_adminConsole.htm remote login times out, won't connect
FlashMediaServer4.5_x64.tar.gz (fms 4.5.1 release) linux instructions followed, success! System Information, logs, etc.. Below. uname -a Linux poolhdz01.localdomain 3.0.0-16-generic #28-Ubuntu SMP x86_64 x86_64 x86_64 GNU/Linux lsb_release -a Distrib
-
Difficulties using an iPod Nano
Hi, I wonder if anyone can help. I'm having trouble using my nano that I ordered on 14th September. The trouble is that when my Nano was delivered from the apple store (18 September), it was already broken, I then had to wait seven days for Apple to