Clarification on SAP Note 961897

Hi,
We are currently on SAP BASIS 620 --> SAPKB62052.
With regard to the SAP Note 961897, it has been mentioned that the problem mentioned in the note has been solved in SAP BASIS SAPKB62062, I understand that, if our SP is below SAPKB62062, then we should implement the note corrections.
But, If we go and see the correction instruction 803799 relevant for 620 release, it has been mentioned that the correction instruction is only valid for SAPKB62055-SAPKB62061.
Just to try out, I also downloaded the same note through SNOTE and the note has become grey and says this note can not be applied.
1 --> Is that means this note need not be applied for SAPKB62052.
( means the reported problem is irrelevant for SAPKB62052)
(or)
2)  --> or the correction instructions for SAPKB62052 is not yet released and we should wait
Appreciate feedback from someone who faced the same problem.
Thanks & Regards,
Raghunahth L

Hi,
I understand it in that way.
You SP level is too low to be able to implement the note correction.
You have first to update at least to SP 55 before being able to implement the note correction.
That is one of the reason, to import regularly Support Packages.
Regards,
Olivier

Similar Messages

  • Clarification on SAP note 835466

    Hi,
    I need to proceed with the SAP note 835466 and I would like the clarification on steps # 3 and # 9 from it.
    The prerequisities note 834897 and the relevant application were applied already.
    Please can someone on this one?
    Thanks.

    Hi,
    I understand it in that way.
    You SP level is too low to be able to implement the note correction.
    You have first to update at least to SP 55 before being able to implement the note correction.
    That is one of the reason, to import regularly Support Packages.
    Regards,
    Olivier

  • Need clarification on SAP notes

    Hi,
    I need information on SAP notes relation.
    Suppose a note X says corrections are delivered in the attached correction instruction, then its enough if we implement that specific note X.
    If we go to correction instruction then it may have several other notes, do we need to implement all those notes specified  in correction instruction 1st and then implement main note or directly we can apply Main note X.
    If we apply main note obvisoulsy all the notes within correction instructions will be implemented
    Regards,
    Ravi

    Hi Ravi
    Suppose a note X says corrections are delivered in the attached correction instruction, then its enough if we implement that specific note X.
    =>Before implementing those correction verify whether that X note applicable to your system release. Also verify is any manual code correction instructed in that note.
    If we go to correction instruction then it may have several other notes, do we need to implement all those notes specified in correction instruction 1st and then implement main note or directly we can apply Main note X.
    => Before implementing those correction verify whether that X note applicable to your system release or its already implemented in your system. All these Prerequisites need to implement before final correction.
    If we apply main note obvisoulsy all the notes within correction instructions will be implemented.
    => No we need to implement Prerequisites notes before main notes.
    Thank

  • Clarification on SAP Note 612132-Stock consistency between serial & MM-IM

    In the above Note 612132 SAP Question Number 3 is as under:
    Question:
    How do I achieve a consistent initial status if I have already (inconsistent) stocks?
    Answer:
    With the execution of a complete physical inventory under required serialization conditions, all stocks are serialized or existing inconsistencies are corrected.
    Can anybody explain the steps to be performed to achieve this consistency.
    Regards
    Rajkumar Reddy
    Edited by: Rajkumar Reddy on Aug 26, 2009 8:51 AM

    Hi,
    What is the volume of data you copied. Also have you followed the best practice of minimal/no activity in the source client.
    The dictionary differences seems to be becuase of some SPs not applied in your ECP system yet
    Regards,
    Sanujit

  • Clarification on SAP Notes 1873559

    Hi,
    I want to clarify something about 1873559 - B1iF_Using the DB Purge Tool for Database Size Reduction.
    In Step 9, it says:
    Shrink the integration framework database (e. g. using SQL Server Management Studio 'Shrink' option).
    Under the Shrink task, there are 2 options, Database and Files.  Which one to choose?
    Either which, will the shrinking help to reduce the size of the mdf file?  Because the Intercompany mdf file is now over 40GB and the C drive is running out space.
    Please advise how to reduce the size of the mdf file (not just the LDF file).
    Thanks.
    Regards,
    Richmond

    Hi Richmond,
    Choose shrink database as it will shrink both .mdf and .LDF file.
    Regards,
    Qiaoli

  • Related to SAP Notes Implementation

    Hi Guys,
    I have a dbt and need a clarification on SAP Note.
    How I will be able to know by seeing the SAP Note or how I can judge my self that either (SAP Note)  should be implemented thru manually or using SNOTE transaction.
    Regards,
    Ravi Ganji

    hi Ravi,
       SNOTE Transaction is available from 4.6C version owards only ... and to know whether you have to apply it manually or through SNOTE you will have to confirm it by the user ... for details refer
    OSS Note
    http://www.sappoint.com/basis/.pdf
    http://www.sap-img.com/basis/oss-notes.htm
    http://www.sap-img.com/basis/manually-applying-the-oss-note.htm
    Regards,
    Santosh

  • Clarification on Canada Year End SAP Note : 1658938 and 1662043

    Dear All ,
    We are currently doing yearend SAP note updates for Canada and need clarification on Canada Year End SAP Note : 1658938 and 1662043 .
    SAP Note : 1658938 is with yearend delta transports which needs to be applied ,but it is mentioned that we need to apply all Year End related notes released on or before December 15th before applying the Delta transports.
    My query is that Note 1662043 released on 12/12/2011 whether this needs to be applied before or after applying delta transports mentioned in 1658938
    Pls help us on this .
    Thanks
    Muthuraj

    Hello Muthuraj,
    You need to apply note 1662043 the note before applying the delta transport.
    I hope it clarifies.
    With Regards,
    S.Karthik

  • SAP Note clarification

    Hello Guys
    I came through a SAP note that, in extended classic scenaio 'do not have the need to create SAP MM Purchase Requisition or Stock Reservation from the SAP SRM Shopping Cart''
    Please let me know why.
    Thanks in Advance.

    Hello,
    With Extended Classic Scenario, follow-on document for a Shopping Cart is always a Purchase Order.
    This PO is first created in SRM, then replicated to the backend system. Reason why PO can be modified only in SRM system: you cannot edit corresponding PO in MM.
    With Classic Scenario, follow-on document for a Shopping Cart can be:
    - a Reservation,
    - or a Purchase request,
    - or a Purchase Order.
    Those three kind of purchasing documents are always created in the backend system where you can modify them.
    Regards.
    Laurent.

  • SAP System inconsistency for Inbound delivery / MIGO and a "sap note"

    Hello Friends ,
    After following SAP instruction on how to remove the inconsistency between posting GR through MIGO (Inv. mang.) and the reflection of the goods movement status in the inbound delivery document - done that using sap note 570991
    the problem is that the system start behaving in a weird way throwing unjustified Error messages for any suggested goods receipt using MIGO with reference to inbound
    for example after creating an inbound delivery document and trying to post it via migo , an error will pop up
    - Inbound delivery storage location cannot be changed to here Message no. VLA316
    the thing is i didn't even maintain any storage location entry up to that point and yet i cannot post any stock !!
    also another error  like
    - Inbound delivery batch cannot be changed to *** here
    which doesn't make any sense because there is not batches in the inbound document !!
    i think this behavior is coming from the "Document Flow Update for Stock Postings" inbound  indicator  at the shipping parameter at client level customization
    i need help on  how to overcome this annoying SAP Bug/Problem specially i am in a post go live critical situation

    Hi,
       The messages you mentioned were introduced to avoid inconsistency between inbound delivery and IM, through the note:  1050944 - GR for inbound delivery using inventory mgmt as of ECC 6.00
       If the messages are issued incorrectly, then you may check for SAP notes (I couldnt find anything relevant) or raise an OSS ticket to SAP.
    Regards,
    AKPT

  • How to revert back a SAP NOTE? Dump- Field symbol has not yet been assigned

    Hi Experts,
    We r getting dump(cause: Field symbol has not yet been assigned) in production for ABUMN tx, so, when debugged, it came to know that, the Field symbol is coming from REUSE_ALV_LIST_DISPLAY!!
    So, for some reason the system message text is not getting output in ALV-->Dump!!
    So, found a NOTE causing this problem!!
    So, pls. let me know that, How to revert back this/any SAP NOTE? pls. in detail steps wise!!
    thanq
    Edited by: Srinivas on Jan 24, 2008 4:32 PM

    Hi
    In SNOTE tcode,  select the Note that you implemented and click on 'RESET SAP Note Implementation'
    shylesh

  • Sap note 1507799 - Sec 80CCD - pension contribution notified by central gov

    Dear
    I have applied the sap note 1507799 - Sec 80CCD - pension contribution notified by central govt. and have done the necessary manual config steps as mentioned in the sap note.
    When i am trying to check this pension contribution notified by central govt item in IT0585 and IT 0586.
    i am unable to get this item.
    Regards
    Vish

    Hi ,
    First do the manual changes & then apply the note. You will get "Contribution to pension scheme of Central Goverment" this option in IT 585
    Regards,
    Mahesh

  • Sap notes for 103 movement type and 105 movement types in sap

    Hi all,
    Please let me know if there are any sap notes for 103 movement type and 105 movement type in sap as soon as possible
    points will be awarded.
    thanking u in advance,
    srinivas.

    There are many SAP notes related to these movement types e.g 514609,750836,
    533833, 808029, 317823,etc.
    You can search them at http://service.sap.com
    Regards,
    Amit

  • Doubt in Downloading Sap notes in SNOTE Transaction

    Hi Experts,
      I want to download the sap note (442831) in my developement system. For that i am using the Tcode SNOTE here i used Goto-->Download Sap Note. I gave my sap note number in that window, then i executed. after few minites its saying downloaded.
    After downloading i searched the notenumber in that list but its not displaying.
    Why its happening? Plz guide this any otherway is there or i did any wrong things over this??
    Plz plz its urgent. Point will be sure.
    Thnx,
    Mohana

    HI,
    Once you download the note it will be in NEW list click on it and expand then search the same
    if you want to apply the patch then implement the note and finally change the processing status to completed
    Regards
    Shiva

  • How do remove commitment value in the PO ? any SAP note avl?

    Hi,
    Project (WBS)releated service PO (Account assignment category P and Item category D), in which SES,GR,IR have been completed for entire Project services for the year 2005,PO history also updatd for SES, GR,IR in the 2005 only.But Now system is showing still commitment value in the PO for the year 2009?.
    Henece how do remove the inconsistency of the  commitment value in the PO for the year 2009?. (i.e value is comming from COOI table entry).Is there any SAP NOTEs are available for this case?
    Note:
    But this case no PR has been refered in the PO. PO has been directly created, and PO  QTY,Value changes have not been done after SES,GR,IR completion.
    But still system  commitment value is showing in the PO for the year 2009, so HOW do remove the value?
    i am looking suitable answers.
    Regards,
    kumar

    Hi,
    Pre-requisites for a commitment update are:                                                                               
    o  In transaction OKKP, the commitment management indicator must be              
           active for the given controlling area in the current fiscal year.                                                                               
    The controlling area is the highest organizational unit in Controlling,              
    however this area is missing from the accounting data of the PO.                                                                               
    o  The accounting objects must be active for commitments:                                                                               
    -  Work orders: The commitment management indicator must be set               
              in transaction KOT2 for the given order type.                                                                               
    -  Cost centers: In transaction KS02, in register "Control", the              
              commitment update indicator must NOT be set.                                                                               
    -  Projects: see note 47992                                                                               
    o  In transaction CUNI, the unit of measurements used at item level              
           must be set to value based commitment.                                                                               
    Please check the following notes 152571, 634298, 459509 and            
    772206 carefully and also 165823. 
    Please check also if the "delivery complete" indicator is set in the PO item (see note 735404).
    Usually for service POs the "Delivery completed" indicator will be   
    hidden and this indicator is fully controlled by the "final entry    
    sheet" indicator in ML81N. You must allow to set this indicator trough a field selection customizing for your PO item.
    Regards,
    Edit

  • Date option in stock reversing program(SAP NOTE 175842)

    Hi Gurus,
    We have prepared a program with SAP NOTE 175842 for reversing stock posting.My client has done GR in march 09 and quality peoples have posted to unrestricted stock in same month.Now because of some reason stores person want to cancel GR. So we have reversed the  posting for the lot in April using the programme.Now when stores person try to cancel GR in month of march system is giving error "Deficit of SL St.in QI prev. 14.800 MT ".Because we have reversed the posting from unrestricted to quality in april and we are trying to cancel GR in March system is giving above error.
              Is there any settings such that in stock reversing program we can enter the date, so that on a particular date we can reverse the stock.Because in current situation we can enter lot no. only or is there any other solution to overcome this situation
    Regards
    Amit

    hi amit
    Yes system will not allow you to cancel GR for March when Reversal stock posting was done in April.
    Because it will consider the status of stock when GR was made.
    Which movement type you have used for reversal From Unrestricted to Quality.
    Was it the activation of 08 & then 322.
    If it is so then cancellation of GR will not take place through original GR document(as it is in unrestricted), It will give error msg if you give reference of same.
    Even GR can not be cancelled based on 08 inspection lot as 08 is not wrt PO.
    Just asuggetion explore User Exit
    QEVA0008 Usage decision: Customer function key (e.g. to cancel UD)
    Sujit

Maybe you are looking for

  • Failed to install Flash Builder 4.5 in Mac OSX 10.7 Lion

    Quickly after starting the installation procedure, the installer says the installation is cancelled and gives me the following error report: Exit Code: 24 -------------------------------------- Summary -------------------------------------- - 0 fatal

  • Help needed on balance sheet plan report for the current year

    Hi BW gurus, I have a problem with reporting. I need to get  Balance-Sheet Plan Reports for the Planned year and for the current year. To get the report for the planned year its  straight forward just by restricting 0balance by the version to 1 and t

  • Cannot find config.js file in user folder

    Dear All, I could not find config.js in user java script folder. I used  app.getPath("user", "javascript"); function to find the user folder and it contains glob.js and glob.settings.js file. Where should i find Config.js file to execute priviledged

  • Changing XML payload

    Hello,   Is it possible to change the xml payload when an XI message has run into error ?   And after the change, restart the processing.   Like with idoc's, change the idoc segment data and reprocess the idoc again. Regards, Michel

  • 3.0 Inbound ABAP Proxy not executing

    I am attempting a simple SAP (IDoc) -> XI [WAS 6.4] -> SAP (ABAP Proxy)[WAS 6.2]. This proxy receives a couple key elements from the Idoc and writes them to an accessible directory on the recipient SAP machine. Here's what I have thusfar: - ABAP Prox