Client Copy Export/Import on large system. 1.5 TB
Hi,
We have a 3 tier landscape. DEV, TST, PRD.
Database size in PRD is 1.5 TB (1500 GB)
Our developers need fresh master and trans data in TST and DEV.
We are thinking about making a
PRD --> TST (1.5 TB) we do a system copy.
TST --> DEV (1.5 TB) we can't do a system copy. (Company policy says not to touch repository objects, version management what so ever in DEV....)
1. How long will a client export / import take from TST --> DEV, lets say we have "good HW" ? Will it work ?
2. I've read about TDMS but its toooo expensive.....is there maybe any 3 party tool that is good for this purpose ? Transfering 1.5 TB of data ...
Br,
Martin
Hi,
>1. How long will a client export / import take from TST --> DEV, lets say we have "good HW" ? Will it >work ?
In my opinion, a 1.5 TB database is much too big for a client copy.
It will work but may last a full week and would degrade the production system performance.
We have 1.3 TB databases and stopped using client copies since the system was 300 GB...
We only use database restores and renaming for system refresh even for the dev system.
There is procedure to keep the versionning of sources.
Regards,
Olivier
Similar Messages
-
Client copy (export/import) from ECC to BW
It is technically feasible to import a client exported from a NW system installed as ECC 6.0 into a NW ABAP Stack (designed to be a BW system)?
Hi,
1. SAP_ALL profile would not copied using export/import method (SAP ECC --> BW ABAP) as most of the tables of ECC are not present in BW (mismatch of data dictionary structure).
2. You can copy SAP_USER (user master record)
3. If your ECC and BW systems are not in same transport landscape/shared transport directory (trans group), then copy/ftp the export files from ECC (data and cofile) to BW system (same path - usr/sap/trans) and add the transport requests manually to import buffer of target system/client. -
Difference between client Export/Import and a system refresh
Hi Experts,
I would like to know the diffrence between client Export/Import and System refresh.
Actually i have done client export from our production system and imported it into our quality system, I have asked our functional consultants whether the production data is now available in Quality. They replied me saying whole data of production system is available in Quality system as off date i have copied the export.
The size of the export was around 8GB, How can this have all the data of Production system which is around 600 GB.
In this way what is the use of System refresh which is done by database level ( changing the cntrl file etc... ), As i am getting all the data by doing Client Export/Import.
Thanks & Regards,
InjamuriHi,
What is system refresh when and why it is done?
The system refersh is nothing but the deletion of the client and replacing the data from other client. For example : you have clients 100, 200 and 300. Suppose when you want to refresh the client 100 you remove the client 100 and replace it with 200 0r 300 as per your reqiurement.
Mostly the refresh of clients will be happen at the time of development stage.
System Refresh is a simplified term to Client Copy. Client Copy means copying the production client on to the quality to test the real data. As recommend by SAP this need to carried out every 3 months.
The process to carry out the same is as follows:
1. Create a client on quality system using txn scc4
2. Create a RFC between Production system and Quality System (need to create on quality system)
3. Login to the newly created client using sap* and pass as a password
4. Txn sccl to start the client copy.
You can test the client copy by selecting the test run option. (test run will estimate the time taken for the activity).
Anil -
After client copy and import export, WebUI not functioning
Hi Experts,
We have copied the client MKH300 into the client MKH305. The client
copy was performed using SAP_ALL authorization.
After the client copy a client compare was performed and several
differences were discovered. BDLS was run and a custom program was run
to copy custom tables from MKH300 to MKH305. This program has been run
in several other client copy cases and there is no issue with it.
When logging into the WebUI in client MKH305 an error message is
displayed in the application log:
"An exception has occurred during program processing"
(Please see attached screen shot)
When looking into the details the following text is shown:
Diagnosis
An exception occurred during request processing. This was handled
centrally. It changed the program flow and the result of the request
probably contains errors.
Procedure
Contact your system administrator.
Procedure for System Administration
Activate checkpoint group BSP_WD_EXCEPTION_DISPLAY. To do this, use
transaction SAAB. If the error recurs, further details are displayed.
When the check point group was activated there was no more information.
The links in the Homepage are not correct even though the business
roles, config keys etc look the same between the clients.
Much customization seems lost for the WebUI although when comparing the
two clients' customization for the WebUI they seem identical.
The client MKH300 works fine so the intention was that MKH305 should be
an exact copy of that client, but that did not happen.
Could you please help me out.
Thanks!
Nagarajuthey are included in the xe server install ...you could try copying the executables but maybe that wont work if all the libraries arent present
failing that install the regular oracle client -
Client copy between PROD and QAS system
Hi!
We would like to copy a client from productive system to quality assurance system.
Questions:
1) What is the best procedure?
1a) export/import
1b) remote copy
2) Where can I find the appropriate documentation?
Thank you very much!Hi,
I will suggest that you opt for export/import method.
Please find the link for more detail procedure.
http://help.sap.com/saphelp_nw04/helpdata/en/69/c24c824ba111d189750000e8322d00/content.htm
With Regards,
Saurabh -
My Client Copy/Export keeps failing!
Guys,
I have tried almost everything but any attempt to perform a local client copy keeps failing. I have tried a client export but that too didnt succeed.
Configuration:
- R/3 Enterprise 4.7 1.10
- AIX 5.2
- DB2 with FixPak10
Error log of the export.
Main export
Transport request___: N02KT00205
System______________: N02
tp path : tp
Version and Release: 340.16.03 640
SQL error -902 accessing AGR_HIERT: SQL0902C A system error (reason code =
SQL error -902 accessing LKSML: SQL0902C A system error (reason code =
SQL error -902 accessing T074: SQL0902C A system error (reason code =
Incorrect export. Request is not imported.
Main export
End date and time : 20060508121828
Ended with return code: ===> 12 <===I have sm21 logs
20:37:52 BTC 11 220 DDIC BXF Table logging in program RSCLXCOP disabled by user DDIC
20:38:50 BTC 11 220 DDIC BB1 Buffer TABL reset
20:38:50 BTC 11 220 DDIC BB1 Buffer TABLP reset
20:38:51 BTC 11 220 DDIC F77 Spool: Invalid Output Device
20:38:51 BTC 11 220 DDIC F77 Spool: Invalid Output Device
20:38:51 BTC 11 220 DDIC FBJ DB_RTAB_ERROR at Table TSP0A, Error 64 rspogdio 2
20:38:58 DIA 03 000 SAPSYS D01 Transaction Canceled BT 513 ( )
20:38:58 DIA 03 000 SAPSYS R68 Perform rollback
20:44:58 SPO 15 000 SAPSYS Q0I Operating system call gethostbyname failed (error no. 0 )
20:46:52 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
20:47:23 DIA 00 200 Z714G41 DB13 BYM SQL error -902 . Work processes in reconnect status
20:49:18 BTC 12 220 DDIC BYM SQL error -902 . Work processes in reconnect status
20:49:18 BTC 12 220 DDIC R68 Perform rollback
20:49:18 BTC 12 220 DDIC BYY Work process has left reconnect status
20:49:18 BTC 12 220 DDIC AB0 Run-time error "DBIF_RSQL_SQL_ERROR" occurred
20:49:18 BTC 12 220 DDIC AB1 > Short dump "060503 204918 rn0434 DDIC " generated
20:49:18 BTC 12 220 DDIC D01 Transaction Canceled 00 671 ( DBIF_RSQL_SQL_ERROR 20060503204918rn0434 DDIC 2201 )
20:49:19 BTC 12 220 DDIC R68 Perform rollback
20:51:48 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
21:04:45 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
21:12:14 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
21:13:34 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
21:42:13 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
22:01:37 BTC 11 220 DDIC BYM SQL error -902 . Work processes in reconnect status
22:36:14 BTC 11 220 DDIC R68 Perform rollback -
Client copy in bitween different plotform systems
Dear Friend's
I am having a scenario at our work place about client copy .
Our requirement is to do client copy from Production to our sandbox system which is on Window 2003.
Here the problem is Our Production is ECC 6.0 SR2 on AIX 5.3 , oracle 10.2.0.2.0 and our Sandbox is ECC 6.0 SR 2 on Window 2003 , Oracle 10.2.0.2.0.
I did not face this kind of scenario ever. So Please let me know, If you have any solution about my issue.
Thanks in advance.
Regards;
R k.sindolDear R k sindol,
Post your queries in relevant forum to maintain the quality of SCN.
[Transporting Clients Between Systems|http://help.sap.com/saphelp_nw04/helpdata/en/69/c24c824ba111d189750000e8322d00/content.htm]
Regards,
Naveen -
Export / import with logical system
Re: AC 5.3 - RAR - SP17
I have DEV and QA connected to GRC DEV\QA and am defining my ruleset here. The ruleset is defined against a logical system.
I have PRD connected to GRC PRD and want to import the ruleset that I have developed in GRC DEV\QA. I have exported the ruleset using utilies \ export and then try to import using the utilies \ import function I get an error message and cannot import the rules into the GRC PRD system. When exporting I have selected the ruleset to export against the logical system. When importing I am selecting the physical system. Will that work ? What am I missing ?
Edited by: Jan Chan on Jul 8, 2011 5:02 PMI determined that there was some corrupt data in the ruleset connected to the logical system that I was exporting. Attempted to correct it by removing the entries and regenerating the rules under the logical system area. All attempts to correct the data have not worked - even removing the "Action" completely from the ruleset but the data still contains the corrupt data associated with the logical system. May need to use "manage deletion" to completely remove it but my entire ruleset is defined for this logical system.
I don't think there's a simple way to just change the "system" on each functions "action" - mass function maintenance does not appear to work for this. -
Homogeneous System Copy - Export Import of RFC's, ALE, Content Repositories
Good Morning,
I have a landscape with a Development and Production Systems with SAP R3 Enterprise 4.70 Ext 110, MaxDB 7.5, HP-UX 11.23. A Homogeneous System Copy is going to be done from Production to Development.
I have a idea to be able to recover the RFC's, ALE and Content Repositories Information after the Copy, which is to create a transport order with the structures which contain data for the RFC's definition, the ALE configurations and definitions and the Content Repositories configurations and definitions in Development and after the copy, transport the orders back to Development. The problem is that i don't know which structures should i use, and if my idea is viable?
For example, if i go to transaction oac0 and look at the content repositories and if i look at the Technical Information, i can see that the fileds with data are from Structure SCMS_SCREP, but my question is, inserting thsi structure in a transport order to import after the copy willbe enough? Aren't there more structures i need to insert in a transport order? And for RFCs and ALE?
Can anyone help me on this matter please?
Kind Regards,
Pedro GasparHi,
If the target system is being refreshed then first secure any information that you may require.
1) Backup user master and authorization data from each client where this data needs to be retained.
Use transaction SCC8 to export this data. Select profile SAP_USER and specify target system = TARGET_SID.
2) Backup RFC tables to restore destinations afterwards.
the only below tables required to take backup.
Call SE01 and create a new request of type = ""Transport of Copies"" with description = ""Export RFC destination tables prior to system refresh"".Make sure to specify a Target for the request or no data file will be created.
RFCATTRIB
RFCCHECK
RFCDES
RFCDESSECU
RFCDOC
3) ALE / Partner profiles.
Call WE20 and select each partner profile.
Follow menu path ""Partners --> Check"" and obtain a list of tables used.
The only tables listed were the ones listed below.
These tables are client-dependant therefore you will have to logon to each client and call SE01 and create a new request of type = ""Transport of Copies"
EDPP1
EDP13
EDP21
Also document the WE21 --> Ports --> Transactional RFC" section.
Run transaction BD64 and document each configured distribution model. This information is client-dependent so make sure to record values for each required client. and also record RFC destinations for synchronous method calls in BD97.
I hope it will help you.
Regards,
Kiran .V -
CHARM - avoid developer login to client 000 when import to QA system
Hi Gurus.
I've activated a new system to use CHARM for import. When testing the import to QA, the logon screen to QA 000 is displayed.
I already applied SAP Note 913232 which suggests that the TMSADM user (with profile S_TMW_OPERA) in QA 000 can be used as default user for import so that developer don't need to exist in QA 000, but it still didn't fix the issue.
Are there other configurations that I need to do to fix this issue.
We are currently using SOLMAN 7.0 SP25.
Thanks,
TessHi Tess,
Check the TMW and trusted RFC mapped to correct client of satellite system.
SM_(system)CLNT(client)_TRUSTED
SM_(system)CLNT(client)_TMW
Rg,
Karthik -
SYSTEM Copy with Data ( SAP Export/Import way)
Hello ,
There is requirement at my client site to build SAP system copy from Production System without copying Data but
should have Programs/ Structures / Repository/ Tables & views etc.
Though We have thought of building SAP system with Export/ Import way and then deleting the Client from copied system
after that running Remote client copy from Source to Target system with SAP_CUST profile
But I have heard with SAP Export/Import way , We can have SAP data copy skipped and only structure to copy. If there is any way
of such kind then Please help me in letting know the same
Thanks
Deepak GosainHi Deepak
Kindly refer the SCN link difference between the Client copy Export / import & Remote copy method
Difference between remote client copy and client Import/Export- Remote client copy steps
BR
SS -
Hai
Please guide me how to do the client copy -import/export method. i want to do from prd to dev. os -windows,db-oracle,sap 5.0
1. What are pre request for that.( pre checking)
2.approx. time for client copy.
3. how to check the client size and dbsize.
4.test run will effect the prd system.(ie client wants to lock during the client copy testing..)
5.what are the other things i want to follow.
Thanks in advance.
Edited by: rameshsrina on Mar 21, 2011 4:57 PMYou may want to do the client copy when users are not working on the system. For the client export/import, source system can be used as soon as export process is ready. You can use reports like RSSPACECHECK for the size of client. Client copy export/import timings depends on your hardware configuration, database size etc. You will need to decide on client copy profile before starting the export.
You may want to refer to the following SAP notes:
SAP Note 552711 - FAQ: Client copy
SAP Note 489690 - CC INFO: Copying large production clients
SAP Note 118823 - CC-ADMIN: Size of a client
SAP Note 24853 - CC-INFO: Client copy, functionality -
Export/Import and Client Copy
Hi All,
Could you please help me with what are the major differences between Export/Import...client copy...and a System Refresh.How they differ from each other.
Regards
RajeshHello Rajesh ,
I have capture some data from SAP Help :
Local Copy: Copying Clients Within a System:
You can improve the performance of the client copy by, for example, by excluding tables or packages, with Edit -> Expert Settings.
You can exclude tables from the client copy, for example if they are not relevant for the target client, in the Tables tab
Copying Clients Between Systems (Remote Copy):
The same product is installed, with the same release, in both systems
The client copier can copy a client into another system. The systems can be on different platforms. You can change the client number.
When you copy a client from one system to another, the data is transferred directly via the RFC interface - there is no intermediate storage on hard disk.
Transporting Clients Between Systems ;Client export (SCC8):
The client copier can copy a client into another system, which can be on a different platform. You can change the client number.
You are no longer required to transport clients before you can copy them between systems. You can make a remote copy instead.
Up to three transport requests are created, depending on the selected copy profile and the existing data.
The transport request for texts is e.g. only created if the source client contains customer texts.
<sid>KO<no> cross-client data
<sid>KT<no> client-specific data
<sid>KX<no> texts and forms
The data export is performed automatically asynchronously. The output of the export includes the names of the transport requests that are to be imported.
Import transport requests into the target client (STMS)
Choose one of the transport requests of the client transport in the Transport Management System (TMS). The other transport requests belonging to this client transport are then automatically added in the correct order.
Import these transport requests into the target client.
client import postprocessing (SCC7)
You need to perform postprocessing activities to adapt the runtime environment to the current state of the data.
Copy by Transport Request :
This function transports customizing changes that have been recorded in a transport request between two clients in a system.
You can choose whether you only copy the object list of the request or also the object lists of unreleased tasks in the request.
Entries in the target client are overwritten or deleted according to the key entries in the transport request.
Choose Administration -> System administration -> Administration -> Client admin. ->Special Functions -> Copy Transport Request.
<a href="http://help.sap.com/saphelp_nw70/helpdata/en/69/c24c0f4ba111d189750000e8322d00/frameset.htm">For more info Click here</a>
Regards ,
Santosh Karadkar -
Client copy error - Export/Import
Hello Folks,
With a certain business requirement we have small scale implementation planned every quarter and as per the requirement we are performing a client copy into one of our SANDBOX(SDX) client (201) every quarter from our Production ECC system (cleint-600).
*The SANDBOX is used for POC and new enhancement testing and also for training purposes.
Cleint copy (export/import method)
============================
PRD (600) ==> SDX (201)
Both Sanbox and production are with same SAP version, patch, OS and database versions.
The client copy(client export-import method) is successfull when the client is new (SDX-201), but when we did the client next time on the same client, the client copy finished with many inconsistencies.
We have also tried deleting the client 201 and then recreating client 201 in SDX and copy from our PRD-600. But the result is same, the client copy finished with many inconsistencies.
Now we are not able to figure out the problem why this problem is occuring. The whole point of client copy from PRD is not helping project. As a workaround at the moment we are copying onto a new client every quarter.
We have to get a solution. Please suggest.
PS: We can not do the system refresh, because there are other clients on the Sandbox systems and we do not want them to be disturbed.
Lookign forward for your suggestions.
Thanks
JamesHello James,
The client copy(client export-import method) is successfull when the client is new (SDX-201), but when we did the client next time on the same client, the client copy finished with many inconsistencies.
What inconsistencies ? Can you please post the error log ?
Regards,
Subhash -
System copy with Export/Import Distribyted system UNIX database, Windows CI
HI
we have a distributed system witch I want to make a copy of
Oracle Database on HP-UX
CI + SCS on Windows
Dual stack system ABAP/Java
1) I have made an system copy with data base copy tools, and that works fine.
2) I have made a system copy export/import of a "central system"
If I try to make an export/import system copy on a distributed system it wont work.
( this work fine in a central system) I dont get anny error messages all gren checks marks !
It seems like the problem are in not finding the profiles from CI ?
It find the profiles for the sapgateway.
I someone are more interested I have more documentation with screen shots in a word document.
I Have used Installation Master SR3 and tryed with some older versions as well.
I have read SAP Note 970518 - Hom./Het.System Copy SAP NetWeaver 7.0 (2004s) SR2
SAPINST
Using virtual hosts for central and/or DB instances
SYMPTOM:
You are using virtual host names for your central instance and/or the database instance (e.g. in a HA environment). Although SAPinst finishes successfully, some export steps are not being performed.
SOLUTION:
Start the export with the property SAPINST_USE_HOSTNAME=<virtual host>.
If the central instance and the database instance run on different hosts, run the database export with SAPINST_USE_HOSTNAME=<virtual host name of the DB server> and - if you run a Java or ABAP+Java system - run the central instance export with SAPINST_USE_HOSTNAME=<virtual host nameof the central instance host>.
If you run a central system with different host names in the profiles, handle the export as a distributed export, calling SAPinst with parameter SAPINST_USE_HOSTNAME. Perform the export of the database instance on the DB server, calling SAPinst with SAPINST_USE_HOSTNAME=<virtual host of the DB server>.Hi I have received folloving answer from SAP:
You're doing everything correct - besides one thing.
When you specify the profiles during the database export it cannot be
correct to specify the profiles of the gateway instance located on
the same host.
As a consequence - it picks up the wrong instance G01 and sets the
property 'hasABAP' and 'hasJava' to 'false'... - thus the export
is empty. You can see this within the corresponding 'sapinst.log' file.
The correct procedure would be to specify the profiles of the central
instance on the Windows Machine. If you cannot access them, you should
make them available by Samba or by any type of software which makes
it's possible to export filesystems or directories from windows to
unix.
Best regards
Bent
Maybe you are looking for
-
Manual reservation for Project Stock / wbs element
Dear Gueus, In Project base Industry, For Production order confirmation I want to transfer Project stock of raw Materials from Main Storage stock to Production WIP stock, from this WIP Stock, I will consume raw mtl at the time of Order confirmatio
-
Friends, Existing datasource added one object and transport to quality without deleting data in DTP. So i got error in quality datasource is not updating and not able to open DTP data. now i want to delete the data from that DTP. please suggest m
-
hi, We are in the process of upgrading from BI 3.1 to BI 7. During testing one of the queries through BEX ( Analyzer 7 ), we are getting the following error message whenever we try to refresh the query or change the variables : "A table name is missi
-
I think I said it all up there, but will prob'ly be proven wrong.
-
IMovie trailer - how to make a copy to edit
I have an iMovie trailer I've created and I want to now make a copy, new name, etc., that I can change up a bit and publish separately. I do not want to lose the current version either though. Is there an easy way to make a copy to edit without sta