Client Copy SRM from prod to dev -Urgent

We have done the client copy and trying to change the logical system names. We are in the process of changing the SPRO-> Account Assignment -> Define G/L Account for Prod Cat and A/C Assignment Cat
We want to change the source system but it is not enabled even in change mode. Only the G/L Account is enabled for change.
We will have to change in 2 to 3 more places
How do others do when it comes to client copy and change of logical names. Use BDLS or make is it because we have some missing roles hence the field is protected?
Any help/
Thanks

Hi
<u>This is standard SAP functionality. The table which holds the data for
"Define G/L Account for Prod Cat and A/C Assignment Cat" is BBP_DET_ACCOUNT and it holds data in similar manner.
Since other fields except the GL account, are key fields, these are not coming as enabled in change mode. There is no problem with any settings as such.</u>
<u><b>Since you want to make chnages in 2 to 3 more places(better approach using create template functionality, firstly copy the existing entries and make changes to them and finally, delete the existing extra unrequired entries in the table.</b></u>
1. Either using the SPRO path
SPRO-> Account Assignment -> Define G/L Account for Prod Cat and A/C Assignment Categories
2. Or using SM30 transaction for the table - BBP_DET_ACCOUNT table
<b>Hope this will definitely help. Do let me know.</b>
Regards
- Atul

Similar Messages

  • Steps should be taken to make a client copy say from dev to test using BDLS

    Some one help to write up on real situation at any client site...by BASIS group
    for SRM box..
    Say client num in Dev is 100
    and we want to copy all that to a test box where the client number is 101...
    initially client 100 SRM box is pointing to R/3 say dev box 201
    the new R/3 box is 202. And we have to point the 101 to 202. So I am just wondering the steps
    taken by BASIS group to build the test env. 101 ---> 202

    Hello,
    we had experienced some problems during client copy with SRM in our earlier project.
    I am not a basis guy but i can give you some hint for yr situation:
    - Copy R/3 client 101 to 202 with the profile SAP_ALL
    - change the SID with BDLS
    - Copy SRM client 100 to 101 with the profile SAP_CUST
    - change the SID with BDLS
    - Now download the masterdata from R/3 to SRM
    SRM client should never be copied with SAP_ALL profile because ,if done so the logical system for product masters is copied that of old client.
    This creates total chaos and nothing works.
    BR
    Dinesh
    reward if helps

  • Transport object from Prod to Dev

    Hi Folks,
    Developer wants to restore a version of SAP "Smart Form" from production to Dev system as the one in dev system lost some modifications. In Dev system, it was always showing the current active version and there are no traces of old versions or i am not looking in the correct place.
    In this particular landscape, there is no transport path between Dev and Prod. We manually FTP transports (Cofile and data files). Could you please, guide how to create a transport with a "Smart Form" from production to dev. After searching the forum, i could find only one posting talking about opening the production system and create a transport.  I can open the production system for a brief period and create a transport but i am seeking for help if any one has done this before.
    I am not sure if i have to crearte temporatry transport path.
    Thanks a lot in advance.

    Hello again rk_007
    on this case, you can create a 'temporary' transport route from Production to Development (temporary on the sense that you can delete it afterwards. By all means, this route is just another normal one).  By doing so, you will be able to create a transport request in the Productive system, release it and import it on the other system.
    You just have to go to u201CSTMS --> Overview --> Transport Routesu201D, create the route you want and distribute the new configuration. Once that the transport is done you can delete that transport request.
    Do you know who to manage transport routes? It's not difficult, you need to go to STMS transaction, click on the routes button (or Shift + F7), go on 'Edit' menu, then 'Transport Route' option then 'Add Transport Route'.
    You can find everything explained here:
    http://help.sap.com/saphelp_nw04/helpdata/en/44/b4a1df7acc11d1899e0000e829fbbd/frameset.htm
    Further and valuable information can be found here:
    http://help.sap.com/saphelp_nw04/helpdata/en/57/38de0c4eb711d182bf0000e829fbfe/content.htm
    http://www.sap-img.com/basis/transport-request-within-same-server-different-clients.htm
    http://wiki.sdn.sap.com/wiki/display/EmTech/TMSassigningclassorpackagetoroute
    But there is another option where the creation of a transport route is not needed, which might fit your need (and which I believe it's the FTP option you're already using):: you can create the transport request in Productive system (from SE01) and instead of creating a Workbench transport request, create a Transport of Copies. Once that the request is created, you can add the objects you need manually and release the transport request. The datafile and cofile will be created in the data and cofile directories of the transport directory of the Productive system; now you will have to copy manually (at operating system level) the datafile and cofile of the transport request to the transport directory of the Development system, and go to u201CSTMS --> Overview --> Imports --> double click in DEV --> Extras --> Other Requests --> Addu201D  to add this transport request to the import queue of DEV system. Now you will be able to import it into DEV, avoiding the creation of the transport route from PRD to DEV.
    Best regards,
    Tomas Black

  • Refresh 11.5.4 Apps from Prod to DEV

    Hi All,
    I am in the procees of refreshing 11.5.4 apps + DB
    from production to DEV.
    Please note on production autoconfig has not been
    switched on. It is also not posible to implement it
    on prod, as no proper dev/test system exist to
    implementing the patch (part to switch on autoconfig).
    Do you have any documentaion or URL where I could get
    information on - "How to refresh 11.5.4" (not via
    adclone or rapid clone).
    It would be much appreciated if I get a copy of the
    documnetation.
    Thanks in advance for your help.
    Regards, Kunal

    You could try the following
    Clone the DB by recreating the control file
    Modify references to the hostname and port in the configuration files and scripts
    Change the profile options
    Relink executables
    Compile invalid objects
    Check the node names from concurrent managers
    Sam
    http://www.appsdbablog.com

  • Local client copy running from long time

    Hi Experts,
    The local client copy is running from very long time at the phase "Post Processing"(since 14 hrs).
    and our database size is 971.5 GB.
    Could some body help me , generally how much time it will take to complete this phase,
    and really if some thing is going wrong could you please where to check why its taking this much time.
    Current screen shot:
    Target Client                400
    Source Client (incl. Auth.)  500
       Source Client User Master 500
    Copy Type                    Local Copy
    Profile                      SAP_ALL
    -  Restart                   X
    Status                       Processing (Restart)...
    User                         SAP*
    Start on                     14.03.2011 / 10:10:11
    Last Entry on                15.03.2011 / 22:06:46
    Current Action:              Post Processing         Component
    -  Last Exit Program         RSSOUSCO_FOR_CC         BC-SRV-GBT
    Statistics for this Run
    - No. of Tables (Total)          55537 of     55852
    - In This Run                        0 of       315
    - Previously Copied Tables       55537
    - Deleted Lines               39542230
    - Copied Lines               300488666
    Thanks in advance.
    Suresh Babu

    Hi,
    As sunny explained.. there is lot of factors involved in Client copy.
    1) Database Size
    2) Tables
    3) System Resources
    You can exclude the tables in client copy if you really dont need the data of tha particular tables while scheduling the client copy.
    any way we could see that  No. of Tables (Total) 55537 of 55852 copied.. it's almost done 300+ tables are there to copy.
    -Srini

  • Scc4 local client copy SRM 7

    Hi Experts
    I will do a client copy in SRM 7.
    First I am logged in client 001 with User=  SAP* and  Password= 06071992.
    I have created a new client named 300 with SCC4.
    Logon to the newly created client 300 with  User=  SAP* and  PW= 06071992 as password doesn't work.
    I have also tried PASS as password  without any success. How can I ever access into client 300.
    Please advice
    Regards
    Marco

    Dear Experts I could fix the problem.
    I have set the parameter to zero. Privously it was set to 1.
    login/no_automatic_user_sapstar=0
    Regards
    Marco

  • RAC clone from PROD to DEV

    HI,
    I wanted to know what would be the steps to clone a RAC database instance to another RAC database instance, in this case PROD RAC to DEV RAC? Are there any docs out there?
    Thanks in advance

    The steps are no different to clone a single instance db.
    With Oracle 11g there are 2 nice new feature in Enterprise Edition which makes creation and maintaining of a development system faster and easier:
    => Use RMAN Duplicate to clone a DB without the need of a backup location
    => Use DataGuard Snapshot Standby. This allows you to open the Standby DB for development (e.g. over the day) and resync it with production (e.g. at night). This reduces the need to do the cloning every time again.
    See: http://www.oracle.com/technology/deploy/availability/pdf/twp_dataguard_11gr1.pdf
    Regarding Pre Oracle 11:
    Cloning of the DB can also be done via. RMAN duplicate (see documentation), but you will need additional space to store the backup.
    See Oracle® Database Backup and Recovery Advanced User's Guide 10g Release 2 (10.2) under RMAN Duplicate.
    Furthermore in GridControl there is a nice GUI to do this.
    Hope thats helps a little
    Regards
    Sebastian

  • Copy PC from production to dev system

    Hi Friends,
    I have PC(process chain) created in prodcution environment only.  Now i want to copy it to developement enviroment. What are the ways for copying?
    One more thing because of urgency, did some settings in prodcution system like infopakage settings,changed dtp setting for running in background to foreground, activation of transfer & update rules(becoz of transportation deactivated). For all these requests were created. Now if we want all settings to be reflected in development system, how to proceed further?
    appreciate ur help with points.
    RP

    Kumar RP
    You are in which System (BI Version), There is no need to transport the Process chain in BIW 3.5,
    Just Go in Transport Connection in Administrative Workbench (RSA1) at Left Bottom, there in Trasport Connection you will see Object Changeability Option at the right Side.
    Click on that, after that you will see a list of Objects
    Select the following Objects
    RSPC - Process Chain
    RSPT - Process Chain Starter
    RSPV - Process Variants
    at the Right side of these Objects you will see options Not Changeable or Everything Chnageable.
    Make Sure that this is Everything Chnageable for these Objects.
    Now you can create the Process chain in production System directly. No need to transport.
    Regards,
    Rajdeep.

  • Oracle Internet Directory propogation from prod to dev

    I'm having a hard time figuring out how passwords from one Oracle Internet Directory are getting propagated to another. I've taken ownership of an OracleAS Portal system and the DBA who set both it and the development box up has long since moved on. I've had pretty good luck learning enough to be proficient from the documentation, but one aspect eludes me. When a password is changed in Production portal environment (whether through the Portal app or through the admin pages), the password change is almost immediately propagated to our development OracleAS Portal environment. I know this through testing, but also by checking the times for attribute "pwdchangedtime" in the Oracle Internet Directory. The development Oracle Internet Directory entry is updated roughly 5 seconds after the production entry.
    I know there's something called replication, but from what I could glean from Directory Manager GUI, I don't think this is in play (though I can't say for sure). I also don't believe it is custom code or a scheduled job.
    Any ideas would be greatly appreciated.

    Found it! Been poking around and found an entry under "Server Management-->Integration Server --> Configuration Set1" for "OID Import". It was pointing at our production server. Mystery solved.

  • Insert or Update data from PROD dc to DEV DB

    We have one instance of a DB in PROD box and another in DEV box [unix]
    Requirement is to write a script to copy data from PROD to DEV for 10 related tables.
    Store Procedure will have input argument as Number or FromDt and To Date [date range]
    Can anyone give step by step guide to do this? Have worked on Package proc and store proc for Oracle 8 but for long have no touch or Oracle. We have Oracle 10g at present.
    TIA.

    "@PROD" uses a database link (called PROD) to access the remote table. In the definition of the database link are all the sql*net parameters necessary for one database to connect to another.
    You can start by reading the SQL Reference Manual to get the basics of the CREATE DATABASE LINK statement. It has links to other manuals as well:
    http://download-east.oracle.com/docs/cd/B19306_01/server.102/b14200/statements_5005.htm#i2061505

  • Logical  system name to be updated while client copy--URGENT HELP REQUIRED

    Hello All,
       I have a  query regarding the "Logical System name" updation during Client copy.
      When we make a client copy(SRM Masters) for the Production system(SRM),the Old Logical system name for backend(which is attached to the SRM masters) gets copied to the new Client (Copy) which needs to be updated.
      There is  a  std transaction BDLS through whcih w e can change the current Logical system name to  a  new one but this  seems to work fine for System copy but not for Client copy.
      So when i make  a client copy of  SRM masters  for Production system,is there  any other std  way wherein i can change the "Logical system name " for the  backend or  do i have  to write a  CUSTOM program wherein entries  for  the Backend Logical system name in tables like CRMMLSGUID will  be updated  with  the new  Logical system name?
       Any help on this is  appreciated.
    Thanks & Regards,
    Disha.

    Disha,
    Yes, I did it twice and it worked fine.
    The R/3 GUID is sent by the OLTP system (R/3) in R/3 message header.
    SRM checks this GUID in CRMMLSGUID table.
    If is not the same one, then replication process fails.
    The only solution I found was to delete this entry. It is automatically recreated with the new GUID with the next replication, with FM CRMT_OLTP_LOGSYS1, called in BAPI_CRM_SAVE.
    Look at OSS note 588701 & 765018 for deletion of CRMMLSGUID.
    The issue is exactly ours: around system/client copy.
    In an CRM environment, this is more critical, because we make a huge use of the middleware. But in our case, and especially after system/client copies, we can go, even if SAP does not guaranty anything, because we don't care about "old" replicated data (I don't care about old BDOCs, that should even be deleted after processing).
    We have to take some risks sometimes...
    Rgds
    Christophe

  • Imp into Dev from Prod - schemas, data only, truncate tables

    Hello,
    I am going to impdp from Prod to Dev. This is a data only import. I plan to do a schema impdp. This is the command I plan to use:
    impdp system/password schemas=user1,user2,user3,user4 directory=dir_123
    logfile=imp123.log dumpfile=dump123.dmp content=data_only table_exists_action=truncate
    1) Do I need to disable the contraints/triggers in Dev before doing impdp?
    Is disabling contraints necessary in Dev since the contraints in Prod have no violations?
    2) What is going to happen if in Dev the objects already exist? For example, an index on a table, would this index be over written during the impdp? Or do I drop the index in Dev prior to the import and then let the import create new ones?
    3) What impdp options should I use, if I only want to truncate the tables belonging to the schemas being imported? What about existing objects, such as indexes, what is going to happen to the existing objects? Are they going to be over-written by the impdp?

    Hello,
    I am going to impdp from Prod to Dev. This is a data only import. I plan to do a schema impdp. This is the command I plan to use:
    impdp system/password schemas=user1,user2,user3,user4 directory=dir_123
    logfile=imp123.log dumpfile=dump123.dmp content=data_only table_exists_action=truncate
    1) Do I need to disable the contraints/triggers in Dev before doing impdp?
    Is disabling contraints necessary in Dev since the contraints in Prod have no violations?
    2) What is going to happen if in Dev the objects already exist? For example, an index on a table, would this index be over written during the impdp? Or do I drop the index in Dev prior to the import and then let the import create new ones?
    3) What impdp options should I use, if I only want to truncate the tables belonging to the schemas being imported? What about existing objects, such as indexes, what is going to happen to the existing objects? Are they going to be over-written by the impdp?

  • Client Copy v/s Transport

    Hi ,
    I want to understand the difference between Client-Copy and Transport.
    After I have developed reports in Dev Box , which is the best option out of both ?
    Should one do a client copy from Dev to QA or Transport Objects ?
    What are typical Advantages and Drawbacks of both?
    Can someone share on this ?
    Thanks
    Sajid

    Hi,
    you should transport your objects from DEV to QA and PROD.
    Client copy is typically used when you want to have your DEV and QA system look like your prodcution system. You then make a client copy from PROD to DEV and QA in order to "clean up" the systems.
    Kind regards
    /martin

  • Remote client Copy

    Dear All,
    I am trying to do Remote client copy from Production to Dev system (two system landscape).Below is my hardware configuration of DEV and PRD system :
    SAP - R/3 4.7(NU) , O/S - AIX , DB - ORACLE 9
    PRD SYSTEM :
    DATABASE Server
    CPU - 2 (375 MHZ)
    RAM  - 3 GB
    APPLICATION server
    CPU  - 2 (375 MHZ)
    RAM  - 2 GB
    Database size of the Prd system is around 95 GB
    DEV SYSTEM
    CPU  -  2 (375 MHZ)
    RAM  - 2 GB
    I am doing test run first so that i can see if any errors come and also to estimate downtime of the PRD Server(as SAP recommends that no user should be login in target and source client while doing client copy).
    From the last 24 hrs. it has just completed 2500 tables only. total tables are 27500 something(Non - Unicode system).Its running very slow.... 
    Is there any way to improve the speed of Remote client copy ?
    Else I am planing to do Export - Import of client.
    Is there any way to estimate downtime of PRD Server while taking Export of client like In how much time Export of Source client will be completed....
    Thanks & Regards,
    Rohit

    Hi Rajesh,
    >
    . Make sure that it has the same permissions as /usr/sap/trans directory.
    >
    Do I need to share that directory too
    > by default it will be "/usr/sap/trans".
    >
    > After Export you should revert it to default...
    >
    I want to go for the process you suggested.
    I have a question for this;
    1.  My DEV server is the domain controller and when I login to my PRD server and run the command df -k (it shows /usr/sap/trans directory mounted to DEV server).
    So if I change the location trans directory through STMS (system overview DEV-->Transport tool) will it get updated for PRD or I need to restart the machine DEV or PRD. do I need to do anything else like mounting etc so that PRD server can access the same to save the export file when I will be taking the export of PRD client.
    Regards
    Rohit

  • Copy data from one schema to another schema tables

    Hi,
    I was doing a copy using sql developer copy feature, data copy worked perfect but for few table data didn't move there are about 30 tables from schema prod to schema dev i need to move tables are already created only data needs to be moved from prod to dev
    Can you suggest me any method were I can move all the tables data at a time from one schema to another. Please suggest.
    Thanks
    Sudhir

    Hi,
    If table structure is the same then:
    insert into dev.table_name
    select
    from
      prod.table_name  --if prod is in another database change to prod.table_name@db_link_to_prod_db
    commit
    ;Hope this helps. Otherwise give some more info about where these schema's are.
    Regards,
    Peter

Maybe you are looking for