Client executed F.5E in Production run and told us no entries are

Hi All,
Issue:
Client executed F.5E in Production run and told us no entries are
generated.
When they/i run
1.F.5D no error.
2.Initially when they run F.5E error is
No postings can be created for company code 1000
Errors occur when determinig adjustment accounts
Correct the error
Run report SAPF180K
Thankx in advance

Dear Vivek
Thanks for your quick response
In our case error message is same but when we click on it, it take us to FS00 screen
we are not maintained any where post automatically for GL account In GA0, GA1, GA2
Please help me to solve this issue

Similar Messages

  • I deleted one of the email accounts from my i5 because I don't like all the password popups since upgradingto ios 7.2, and now ALL calendar entries are gone!  I need them!!!  Can anyone help?

    I deleted one of the email accounts from my i5 because I don't like all the password popups since upgradingto ios 7.2, and now ALL calendar entries are gone!  I need them!!!  Can anyone help?

    Well you need to add the email account back to get the calendar entries. Transfer them to another email provider.  Then delete the account you don't want.

  • Recent changes (v 31) have made a mess of the address box and addressing; address book entries are incorrectly entered and lists don't work.

    Not really a question. I've gone back to an earlier version of T-Bird because the address block format and addressing function in V31 is a total mess. When calling addresses from the address book, they are incorrectly entered. Lists simply don't work at all. V24 was pretty good so I've turned off auto updates.

    Thanks Bob for that very fast reply!
    But neither "Modifying hal configuration" nor "Using the Desktop Environment settings" (xfce) worked. So I tried the "I don't want this crap, how do I turn it off?" solution and well it works
    Maybe I turn it back on in a month or so.. but for now i'm fine with no hot plugging but a working keyboard...
    Thanks and Bye!
    smax
    Last edited by smaxer (2008-12-09 17:42:43)

  • Automatic Clearing Program  not clearing in production run -

    Hi All,
    I am getting strange problem. I am trying to execute F.13 transaction code and When I run in test run mode its selecting all the relavent POs for GRIR clearing. But when I execute the same in Production run, its not at all  picking the  POs for GRIR clearing. Can anyone explain me why its not picking in Production run........

    Hi Chandra,
    you must check the criterion of automatic clearing in the two environnements (test and production). may be there are differences. if it's the case you make changes.
    IMG path for the criterion of automatic clearing :
    Spro > Financial Accounting (New) > Accounts Receivable and Accounts Payable > Business Transactions > Open Item Clearing > Prepare Automatic Clearing
    hope this helps
    regards

  • Lock screen shows blurred background image with Safari run and volume controls

    The normally sharp image in the lock screen is blurred. Run and volume controls for Safari are displayed at the top of the screen - volume slider moves, play button has no effect. I do not know how to return the screen to normal appearance. Wallpaper settings show normal image. There are no active movies or videos running.

    OK, I returned to the settings for Wallpaper and Brightness and selected a different Wallpaper - the problem went away. The cause may be that the specific wallpaper I had been using is no longer present for selection.
    John

  • BPC 10.0 NW: JOURNAL ENTRIES ARE REVERSED WHEN RUNNING CONSOLIDATION

    Hi Expert,
    After running consolidation, I made various journal entries. After posting the journal entries, status of consolidation and currency translation in consolidation model was changed from "done" to "to be executed". When I re-run the consolidation, the journal entries were reversed.
    Please help.
    Thanks,
    A

    Hi A
    The fundamental principles of Consolidation Journal entries are when posted, Please keep in mind following rules for any Consolidation system.
    Journal Entry Type  Local Currency  Group Currency ScopeTranslation     Consolidation
    Reporting or
    Local Currency             LC                    NONE                 NOSCOPE    YES             YES
    Group
    Currency                        -                        USD                 NOSCOPE     NO              YES  
    Scope Level
    Adjustments                 -                         USD                    SCOPE1        NO            NO
    (Top side Adjustments)
    ==============
    I believe that you have had posted Journal entries in Local Currency(LC) and Group Currency with NOSCOPE level.  Based on your entry System would perform from above rules.
    Hope this will clarify your questions on journal entries why the Monitor  has to re-run CT and Consolidation Process.
    Thanks
    Venkat
    *** You Can not Post "  LC with SCOPE1(actual ownership scopes)****

  • Hi Experts , I am currently facing problems while running restricted version copy .. The log says 0 location products copied and that the process has has timed out. the error message is /SAPAPO/MVM_INT_SVC_CO_VER_LCW reported exception in task DP00014, th

    Hi Experts , I am currently facing problems while running restricted version copy in sap apo .. The log says 0 location products copied and that the process has timed out. the error message is " /SAPAPO/MVM_INT_SVC_CO_VER_LCW reported exception in task DP00014 " , then ending in time limit exceeded. could anyone explain why this happens. please note even if the log says 0 location products copied , in reality they have have been partially copied.
    Regards
    Jerel

    Hi, thank you for your replies, I found out few things about my servlet, and its portability
    and i have few questions, although i marked this topic as answered i guess its ok to post
    I am using javax.servlet.context.tempdir to store my files in that servletcontext temporary directory. But i dont know how to give hyperlink
    of the modified files to the user for them to download the modified files.
    What i am using to get the tempdir i will paste
    File baseurl = (File)this.getServletContext().getAttribute("javax.servlet.context.tempdir");
    System.out.println(baseurl);
    baseurl = new File(baseurl.getAbsolutePath()+File.separator+"temp"+File.separator+"files");
    baseurl.mkdirs();so i am storing my files in that temp/files folder and the servlet processes them and modifies them, then how to present them as
    links to the user for download ?
    and as the servlet is multithreaded by nature, if my servlet gets 2 different requests with same file names, i guess one of them will be overwritten
    And i want to create unique directory for each request made to the servlet , so file names dont clash.
    one another thing is that i want my servlet to be executed by my <form action> only, I dont want the user to simply type url and trigger the servlet
    Reply A.S.A.P. please..
    Thanks and regards,
    Mihir Pandya

  • I want to enrol in the developer program but am unsure which one to enrol in. I currently work fro a business employing 2-3 people and have clients asking about apps for ipad iphone and i also run my own personal marketing business with my wife.

    Which developer prgram do i enrol in.
    I work for a small company which my brother and myself run and i also have my own business which i run with my wife.
    Which developer program do i enrol in for creating ios apps for clients for ipad and iphone?

    Choosing an iOS Developer Program / Which Developer Program is for you?

  • The relationship between production order and purchase requistion After running MPS

    Dear Experts:
         I met a issue . My users want to know the relationship between production order and purchase requistion . In my company we create production order and  purchase req. by  running MRP. our operations are:
    1. T-CODE: MD41  create planned order .
    2. T-CODE: CO41 convert planned order to production order .
    3. T-CODE: MD15 convert planned order to purchase Requisition.
      but I can't  find the  relation of them. would you like to give me some advices? thank you very much.

    Hello
    On the standard MTS process there is no link between the requirement (STO) and the replenishment element (production order).
    See the below extraction from note 12955:
    There is no index that the system could use to determine which issue element (sales order, planning, reservation, dependent requirement, ...) is covered by a certain receipt element (purchase order, production order, purchase requisition, planned order, stock level ...).
    A production order, for example, can be created to cover several different requirements, even when you are using lot sizing procedure EX.
    You can use transaction MD09 or MD04to determine the pegged requirements, but they are calculated dynamically and there is not fixed link between requirement and receipt.
    BR
    Caetano

  • ICal failing to run applescripts: The 'Open' button does not change to 'Run', and the script file is opened but not executed on alert.

    iCal failing to run applescripts: The 'Open' button does not change to 'Run', and the script file is opened but not executed.

    Calendar (not called iCal anymore) does not include that capability any longer, apparently.  What you have to do now is go to Automator and create a Calendar Alert action.  You can add a Run AppleScript object to the action and paste in your script there, then when you save it, it will become available as a choice in the alert menu in Calendar.

  • My LabVIEW exe starts to run and then stops in Windows 7

    I have built an executable in LabVIEW 2010 on a Windows XP machine and set the properties to be built for Windows 7 or later but when I try to run the exe on the Windows 7 machine the application starts up briefly and then stops running with no error message. Has anyone seen this? I have disabled the firewall on the Windows 7 machine.

    Hi Wassa,
    It's very strange that your application window opens and then slowly fades away while "LabVIEW shuts down." Can you first verify that the VI itself runs properly on the development machine? Can you then build a .EXE and ensure that it too runs properly on the development machine? If we can get the .EXE working on the development machine you have two deployment methods:
    1. If you are deploying to a computer that already has the LabVIEW Run-Time Engine and any additional drivers required for your application, then you simply need to copy the .EXE to the deployment machine
    2. If you are deploying to a fresh computer that has no NI software, you'll need to create an installer. When creating the installer, you will need to look through the 'Additional Installers' sections and select any of the additional drivers etc. that are required for your application. By default, LabVIEW only includes the Run-Time Engine. If you are missing any of the 'Additional Installers,' the application will not run properly.
    Sanjay C.
    Embedded Software Product Manager| National Instruments

  • I need options for data replication within production db and dimensional db

    Hi,
    I'm looking for options on how to solve this issue. We've 2 databases, one is our production, operative database, used by around 400 users at a time, and another one, which is our dimensional model of the same info, used to obtain reports. We also have a lot of ETL's (extract, transform and load) processes running every night to update the dim model.
    Mi problem is that we have some online reports, and nowadays, we're getting data from the operational database, causing a performance issue in online operations. We want to migrate this reports to the dimensional model, and we're trying to find the best options for doing this.
    Options that we're considering are ETL's process running continuously every XX minutes, materialized views, ETL's on demand, and others.
    Our objective is to minimize performance issues on transactional database.
    We're using Oracle 8i (yes, the oldie one) and Reporting Services as report engine (reports just run a pkg to get data).
    Any option is welcome.
    Thx in advance.
    Regards,
    Adrian.

    The best option for you if the performance is the
    most important is ORACLE STREAMS. Also is the most
    complex but the final results are very goodsAgreed. As User12345 points out, though, that requires Oracle 9.2 or higher.
    Another option is the materialized views with Fast
    Refresh , that need the materialized view logs in
    the master site.
    The first load is expensive but if you refresh each
    15 minutes the cost is not high.I'd be careful about making that sort of statement. The overhead of both maintaining materialized view logs (which have to be written to synchronously with the OLTP transactions and which impose an overhead roughly equivalent to a trigger on the underlying table) and doing fast refreshes every 15 minutes can be extensive depending on the source system. One of the reasons that Streams came about was to limit this overhead.
    For refresh i execute a cron shell that run the
    DBMS_MVIEW.REFRESH package. my experience with group
    refresh not was goodWhat was your negative experience with refresh groups? I've used them regularly without serious problems. Manual refreshes of individual materialized views against an OLTP system would scare the pants off me because you'd inevitably end up with transactionally inconsistent views of the data (i.e. child records would be present with no parent record, updates that affect multiple tables would be partially replicated until the next refresh, etc). Trying to move that sort of inconsistent data into a different data model, and trying to run reports off that data, would seem highly challenging at a minimum. Throwing everything into a single refresh group so that all the materialized views are transactionally consistent, or choosing a handful of refresh groups for those tables that are related to each other, seems like a far easier way to build a system.
    Justin

  • Automatic Clearing not done in Production Run

    Hi,
    There is strange case in automatic clearing.
    When I am executing the transaction F.13 in test run it is showing a clearing date but when i am executing in production run it is not generating the clearing document.
    The message I am getting is as follows:
    "SAPMF05A 0131 S    F5  074 5 items were selected
    SAPMF05A 0700 S    F5  413 Correct the marked line items
    SAPMF05A 0700 S    F5  413 Correct the marked line items
    SAPMF05A 0700 S    00  344 No batch input data for screen SAPMF05A 0700"
    Please can anyone help me on this.
    Thanks,
    Srini

    Hi,
        Check the field status groups of the accounts involved and also the settings for the document type.
      Basically you have a field defined as required, which is not populated by F.13.
    You can post a manual clearing to check what field is causing this.
    Kind regards

  • Product Costing and Production Planning

    Hi,
    Is Product Costing absolutely required before implementing Production Planning, specifically PP orders? My client does not want to plan costs or need any cost estimates. They want to use a PP order to check availability for a BOM, and then issue it out to an external vendor for services. After this material is processed by the external vendor, he would ship it back and we would be doing a goods receipt at the parent level of the BOM. The whole purpose of this is to get the accurate price of the BOM parent which would include all service costs. This parent would finally be sold via the regular SD sales order process. Our Logisitics consultant suggested that the only way this could be accomplished is a PP order. All this looks okay, but he also mentioned that a PP order cannot work without Product Costing and the process cant be accomplished CO-PC. I am unable to grasp why SAP would force us to have costing when the client doesnt need any cost estimates, planning etc. Could any one please tell me if we need CO-PC for this scenario?

    Dear SAPFicon,
    Technically, to run PP without using product cost planning would cause a lot of problems during business process of production order. Because, once a production order is created then the data structured is freezed in the PO and if there is any missing data it will cause errors. Any errors in production order would stop the following transactions. We never know what would be the error level of the production order. The worst case, the production or should be cancel and start it all over again.
    But by using product costing or product cost planning, this is a preliminary step to prevent and eliminate any error of the products tobe produced.
    So, ideally, there is one person in charge to ensure that the products which be produced in the production orders are free of error.
    So, the product costing is an integrated module that take data from variouse module such as PP, MM, CO, HR.
    The product costing use the Logistic master data such as folllowing;
    1. Bill of material
    2. Routing
    3. Work center
    4. Material master
    How you can say, that running PP without PC will run, while the to run the smooth production order, you need to mandatory parameter in Material Master that belong to Costing area.
    Without having product costing, I can assure that your client will trap in a lot of troubles with their business process.
    Please see the online documentation for product costing for a better overview or you are welcome to ask again
    Regards,
    Irhasni

  • LTP consider production version and not consider selection id for routing

    Dear guru.
    I run mrp long term planning for a material.
    The material have a production version linked to a specific bom and routing.
    In trx OPU5 I have defined that the planning scenario consider a specific selection id for routing  , this routing is different from the  routing of production version.
    The result is that for this material ltp donu2019t consider any routing and no evaluation activity is possible.
    Do you know a solution in order that for LTP the system donu2019t consider production version and instead only consider OPU5 settings ?
    Thanks for your interesting.

    Dear CONS SAP,
    Create a new planning scenario in T Code MS31 and then maintain the scheduling parameters for this planning scenario and
    assign this selection Id and then execute and check.
    Check and revert
    Regards
    Mangalraj.S