CM02 Transaction is showing Capacity requirements in Hours

HI Guys,
I have a question in regards to CM02 transaction, Plz help me finding out what is wrong with it  let me walk you through the step which I take
CM02 > Workcenter name> Plant
Click on Planning (Upper Left Corner) => Profiles > Option Profile and select SAPB023 which is Weeks (78)
Click on Standard  Overview Tab (upper left Corner)
Select any one the week and hit Cap. details/Period
My problem begins here
IN Rem.proc column(Remaining capacity rqmts.for operation segment "Processing) it is showing as Minutes, however in Reqmnts (Capacity requirements) it is showing the same value as in Hour Unit with the same number for instance if the number is 30 min and Reqmnts column it shows as in hour.
Why it is showing Unit of Measure in Hours rather then Minutes and secondly, where this value is coming from.
Thanks In Advance.

CM02 > Workcenter name> Plant
Click on Planning (Upper Left Corner) => Profiles > Option Profile and select SAPB023 which is Weeks (78)
Click on Standard Overview Tab (upper left Corner)
Now before you do the below step ,Go to Setting > General > Here you will geta Screen POP up for Settings: VAlue display
And here there is check box for the unit of measure for capacity
activate the check box.- and then follow the below stept. F1 details of this check box is self explanatory
and now you do the below step
Select any one the week and hit Cap. details/Period
Kinldy let me know the feedback'
reg
dsk

Similar Messages

  • Capacity requirement showing up in previous month in RCCP

    Hi Experts,
                     I am doing RCCP through MC88. But when i am giving the sales quantity in January and generating a synchronous production quantity, the capacity requirement and load are shown in the month of December instead of in January.
                     How can i get the requirement and load in January, please suggest.
    Regards
    Sm.

    Hi Jiaul,
                I cannot find a provision to change the profile dynamically from MC88 screen. This is possible in my understanding in capacity levelling/planning screens like CM38/CM01, etc.
                But even in such screens the same problem remains. For example when i did LTP for this material with PIRs in Feb 2011, the capacity requirements in CM38 appeared from current period that is from 09.12.10, though my planning scenario was valid from 01.01.2011. I changed the period and evaluation period dynamically from  the CM 38 screen, but that did not solve the problem as the requirement and load which was wronly showing up in Jan instead of Feb 2011 ( just as it happened in RCCP) merely vanished from the output and now i have the available capacity in Feb 2011 showing up but without any capacity requirement or load in the month.
    Regards
    Sm.
    Edited by: Sm on Dec 9, 2010 1:02 PM

  • Planned capacity Requirement of Past

    Dear Experts
    I Have selected the profile and displayed the report through CM02 for the past capacity planning Requiremnt.But the problem with report is that it is only showing the capacity of Released order and order status with TECO is not displaying in the report.Please guide me to get the same by selecting the suitable profile.
    Actually i want to see the how much was the capacity planned in last month or week.Please tell me some suitable report to get the required output.
    Thanks in advance for your valuable help.
    AR
    Edited by: Amit  Rana on Aug 26, 2009 12:45 PM
    Edited by: Amit  Rana on Aug 26, 2009 12:53 PM

    Hi Experts,
    i Want to see the Planned capacity for workcentre.I mean to say what was the actual planned capacity of workcenter last week or Month.The system is only displaying order which is having released status system is not considering order status with TECO.This ineed to analyse my capacity requrement for this year Plan vs Actuall.
    Please guide me
    AR
    Edited by: Amit  Rana on Aug 26, 2009 2:52 PM

  • Function module to calculate capacity requirements of production order

    HI
    Hav a requirement to calculate capacity requirement  for production orders like we see in cm50... does anyone know a function module to calculate capacity requirement?

    Hi All,
    Just to reopen this issue, even I am looking for a similar functionality.
    To reinstate the requirement:
    I want to find shifts and corresponding capacities for a work center. These details are obtained from CR03 and CR13 transaction.
    If possible do let me know Function module or tables for the same.
    Debs

  • While doing MIGO transaction system showing error: Check table169P the entr

    Hi experts,
    while doing MIGO transaction system showing error: Check table169P the entry BP01 does not exit.
    pls do needful.
    Thanks&Regards
    sreenivas.p

    Hi,
    Please specify Whether you are doing Blocking of Invoices or what?
    As the T169P is A Parameters Invoice Verification, so you can check the values for T169P table in SE16 so that you will get Clear idea regarding  company code BP01 in which the stochastic block is active with Threshold value for stochastic block...
    Please check....
    For maintaining Entries please go to OMRG maintain Company code and Threshold value as per client requirement so that This will specifies the degree of probability that an invoice is stochastically blocked.
    Regards,
    Ninad Kshirsagar

  • Repetitive manufacturing - CM01 Capacity Requirement

    Hi All,
    I configured repetitive manufacturing process with lead time scheduling.
    Conf. at OPU5 is set as below
    Rate.plng horzn  - 999
    SelID:rate plng -  02
    Scheduling u2013 X (selected)
    Generate Capacity reqs. u2013 X (selected)
    Scheduling level  - Via Rate based scheduling
    Adjust dates u2013 Do not adjust basic dates, dep reqmt to operation dates 
    For capacity scheduling u2013 Always basic dates, dep. Reqmt to operation dates 
    I run MRP (MD02) with option - Lead Time Scheduling and Capacity Planning
    I could see required capacity is calculated at tab u201CProduction Ratesu201D & also in menu Planned order >> Goto >>Capacity leveling.
    we are unable to view Capacity requirement in CM01 transaction & in planning table MF50.
    Regards

    Hi,
    Select the correct profile in CM01.  Menu->Planning->Profiles
    Thanks

  • Hi there i have issue in mavericks i thing so because now in 80% the battery shows it has 3 hours and 5 minutes left only using safari and mail....

    hi there i have issue in mavericks i thing so because now in 80% the battery shows it has 3 hours and 5 minutes left only using safari and mail....is there any fix or update.....help appreciated....

    Is the MacBook/Air still covered under any AppleCare plan?
    If you are in the US or Canada, the Apple Store with Genius
    bar can have a look at it, and diagnose it for free; you'd have
    to set an appointment at a store nearest you, for them do do it.
    Not sure how old the unit is or how it was used, charged, or re-
    charged; but those are the kinds of little things that may affect
    battery life or subtract possible useable Cycles off its life.
    Some users of MB/Air models (and MB/Pro, etc) had noticed
    a loss of battery capacity after an upgrade to Mavericks. So
    that may be some kind of revision to how the battery is seen
    by the newer OS X. No idea if Mavericks uses more power.
    To see an expert or specialist about this issue, for advice, &
    or test/diagnose may be an idea. Could be it needs a new
    battery. How does the rest of the battery/power specs look?
    Perhaps the MacBook just wants to get out on the town...

  • Getting error ORA-02067: transaction or savepoint rollback required

    I am performing the task of archiving the data from one database into another database. This is being achieved by using a shell script. I run the shell script to call the procedure. After running two or three hours, I am getting the following error
    ORA-02067: transaction or savepoint rollback required
    Even I re-ran the job I was getting the same error.
    Can any one suggest me why I am getting this error and what is the possible remedial of it ?

    Please post this question in General Database Discussions forum.
    To get you started, here is what the documentation says about this error.
    ORA-02067:     transaction or savepoint rollback required
    Cause:     A failure (typically a trigger or stored procedure with multiple remote updates) occurred such that the all-or-nothing execution of a previous Oracle call cannot be guaranteed.
    Action:     rollback to a previous savepoint or rollback the transaction and resubmit.

  • Table for Remaining capacity requirements

    In Project Systems, Person Assignment tab of an activity, there is a field Remaining capacity requirements (which result from subtracting the requirements of the individual split from the overall requirements). Can you tell me the table where I can findout the total details of this filed.

    Hi
    Click on F1 on the field and go to technical information and check the field name. If you dont find table over there, take the field name and go to SE84 transaction code.
    click on ABAP Dictionary  --> Fields  --> Table fields
    Enter field name and execute. YOu will get list of tables, where this field is containing. You can check relevant table from list.
    Hope it helps.
    regards
    Srinivas

  • Capacity requirement reduction

    I need an information about capacity requirement reduction in CRP.
    During production process I confirm, with CO11N transaction, only time
    (setup and machine) but without quantity. The quantity is confirm when
    each operation is finish.
    Can the CRP reduce the requirements capacity (for processing formula)
    after each confirmation without quantity (only machine time)
    declaration for processing formula?
    I have tested but without quantity confirm the system didnu2019t reduce
    the capacity requirements. These is a good solution? Do we have to
    modify the setting in work centre?
    Thank you in advanced for your support.
    Best regards.

    Dear,
    You can do the capacity levelling in CM25 else
    Capacity requirement reduction only possible if you active TECO the order in CO02FunctionRestrict processing--Techenical Complated. After teco also system will allow you to do the confirmation.
    Please rfer this also,
    http://help.sap.com/saphelp_47x200/helpdata/EN/8a/a586964adc11d189740000e8322d00/frameset.htm
    Regards,
    R.Brahmankar

  • MD02 - Capacity Requirement Plan for External Procurement Material

    Hi, I have the following requirements.
    MRP Scheduling is getting executed material level (material no, plant) with scheduling type 2 which means lead time scheduling using MD02 Transaction Code. This is works fine for the Inhouse Product. In order to achieve lead time the functional team has maintained the necessary routing/workcenter configs.
    The business needs the same functionality "Capacity requirements calculation" for the external procurement material. Business is willing to maintain routing/workcenter config.
    Currently standard program (MD02) is not considering the Capacity planning for the external Procurement material.
    Could you please suggest is it can be controlled through programming.
    Kindly suggest the function modules for Capacity Planning - materialwise, plantwise.
    Please suggest.
    Thanks
    Giri

    Hi Giri
        I think the requirement is not mentioned clearly. Capacity is required only if the material is assembled/produced in house.
    Anyway try this. Set the Procurement type to X in the MRP views in material master. You might have to define your custom material type so that it does not force the procurement type to F. Try the feature called "Quota arrangement". The idea is to define the material in such a way that it can be procured externally or produced in house. With quota arrangement you can say what % has to be bought and what % to be produced in house. If it is produced in house then you can have capacity requirements.
    Regards
    Pragnesh

  • How to Split Capacity Requirement

    Dear PP Guru's,
    We are in discrete manufacturing, there are several operations having capacity requirements say 24 hours .
    But in actual we do not perform such operations at a go. We carry out operation in partial lots of operation qty. say each lot requires 4 hrs & there are 6 lots. Say for each lot operation is perforemed on alternate day.
    My query is how we can split the capacity requirement of (single) operation in to six (lots) so that we can schedule each lots on alternate day. Currently we schedule capacity in CM31 where the order is shown in single block of 24 hrs.
    Please suggest how to split the operation qty. Any configuration required to do so?.
    Regards,
    Srinathan.

    Perhaps this documentation can help you:
    http://help.sap.com/saphelp_47x200/helpdata/en/8a/a593554adc11d189740000e8322d00/frameset.htm
    Sincerely
    Luciano Nobrega

  • Rough -cut plan with capacity requirment calculation

    Hi all,
    We checking SOP with rough-cut plan
    We created Rough-cut profile in mc35 for our bottle neck work center with base quantity -1 and time span - 1
    then we selected new work center (there is no existing cap req). and assigned base unit measure:min.
    and we assigned 1min for each day and saved the profile.
    Now we went to mc88 and checked the material's active version production plan. (period split- DAY)
    in View -> capacity situation -> rough cut planning -> show.
    System calculates some capacity requirement for our production plan.
    Say for tomorrow's date i given 1000 qty - production plan.
    but system showing capacity req
    Work center:  TESTWC3                  Plant: 0001         Capacity:  001
    Info structur  Material          Plant   Order qty     Unit     From              To          Capacity reqmts      Unit
    S076            TESTFERT14    0001  1000.000       EA    29.01.2010  11.02.2010   9000.000              MIN
    with 9000min and cap load more than 652% ( Actuallly  it has to show 1000min as per rough cut plan profile)
    Our available capacity of work center per day - 1380 min
    We cant understand the capacity requirement calculation in MC88..
    Help us out...
    Thanks in advance

    Hi,
    Rough cut planning is genrally done for the group of material say product group, group of workcentre rather than individual material or workcentre.
    As standard, in resource table whatever the value you enter that corresponds to no. of days. Each column represents one day.
    Pl. refer this link for clear understanding of the same.
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/63212e43a211d189410000e829fbbd/frameset.htm
    Madhava

  • Planned Order Capacity Requirement CM29

    Hi All
    This may be a trivial question for you guys, but I am couldnt find the problem, need your help again please:
    In CM29 my planned order and process orders are visible, and I am using the standard overall profile: SAPSFCG013.
    Earlier I use to see a continous red bar for length of the planned order / process order in the graph, but somehow now it just show up as a single line, irrespective of the order quantity.
    Can you please let me know how to resolve this!
    Thanks in advance!
    -Rahul

    Hi Vivek
    Here is the link for attached screen shot for CM29 with weekly and daily split:
    CM29 with weekly split:
    [CM29 Screenshot|https://picasaweb.google.com/110467857304221340164/CM29?authkey=Gv1sRgCNLYw_uHj8-lUA#5626401198199374018]
    CM29 with daily split:
    [DailySplit|https://picasaweb.google.com/110467857304221340164/Jul72011?authkey=Gv1sRgCLKtzPPn5_SARQ#5626402521518801586]
    I have trie changing hte qty to 1000 and more, the capacity (detailed capacity and roughcut capacity requirement) changes as expected but the graph does not moves
    Thanks in advance
    Rahul

  • Capacity requirement for long term planning and make to order planning

    hello,
    anybody please guide me.
    my client using make to order scenarion and we are doing regulaly MRP run is MD50 with refernce to sales order.
    sales orders planning will follow for 2 to 3 months.
    at the same time my client wants to do long term planning also. to analize the capacity.
    for that he is creatind planning scenario and multi level planning with MS02 also.
    But the problem is when they are checking capacity requirement in cm38 it is showing only planning scenario load only. my client wants existing load and longterm planning load also. so they can plan the planning is sutibale in existing plan.
    so how can i get both plan in CM 38or is there any other T.code to get that data.
    please suggest me
    Thanks & Regards
    Bhakta

    Hi Pierre and Rajesh,
    When we create the simulation version, you have the possibility to choose the short-term planning. My point of view is, you can use the LTP fonction to do your scheduling for ex the next 3 months.
    I think it's what Pierre did. Am I right ?
    between to scheduling scenario to deliver my customer. With the simulation mode I can do my scheduling + use the MRP simulation to check if the raw material are available or not. Then use the MD04 to do the comparaison (or MS04 to compare between 2 scenario).
    But I found 2 problems :
    First : I don't find the parameters to show in the graphic MFS0, the planed fix order (I can only see the process order)
    Second : When my scheduling is finished, I want to update my operational planning with the simulation version. But I don't want to do article by article : when you have 400 references (raw mat, packaging, finish goods)  it's impossible (same issue like Pierre)
    Have you found a solution for this 2 points ?

Maybe you are looking for

  • Can I watch a DVD on my iPhone?

    Is there any legal way for me to watch a DVD on my iPhone?  My workouts are on DVD, and it would be much easier to bring my iPhone to the gym than my macbook. Thanks, Jaws

  • System freezes randomly

    Alright, so whenever I start up my mac, it goes through the whole startup process fine. It loads Finder and I can start opening menues or starting programs. Then, roughly 30-120 seconds after the startup completes, the system freezes. This is usually

  • SLO Data Integrity check

    Hi, Currently we have 10 company codes in our production system (e.g. Company Code P01 ~ P10) However, there is a requirement that 1 (one) of them need to be separated/migrated into separated system (eg. Company code P10) The idea is to copy client u

  • File exists needs an unconditional outgoing transition

    Hello All, I am just starting to play with process flow, OWB 10.2.0.1. On file exists activity I would like to proceed if file exists or send an email and stop the process if it doesn't. When I set condition as missing and exists on transitions I get

  • Copy users with their Org assignments

    Hi, I'm working in a SAP system in which SAP Users are directly linked to Positions (for indirect role assignment need). Is it possible to copy users with all assignments ? All tests done using SU01 only copy User's data without their assignments. Th