CM25 : automatic dispatching outside basic dated

Dear.
When I try to do an automatic dispatch of a production order I need that the po can be dispatched forward outside the basic date. Actually in my settings the automatic dispatching is executed only inside the basic date. Only with a manual drag and drop i can dispatch forward outside.
Can you help me in order to solve my problem ?
Thanks.

Similar Messages

  • No Automatic Dispatching Of Planned Order to new Production Version

    Dear Sir,
    When rescheduling an operation from one line to another, the system
    checks whether a production version exists for the material to be
    produced that contains the new production line as the preferred work
    center. If such a production version is found, this version is taken
    over into the planned order. The planned order is scheduled again based
    on the production version.
    The second function allows you to automatically search for an
    alternative work center in the case of a capacity overload of a work
    center, and to dispatch the operations to it. The predefined
    prioritization of the alternative work centers is considered in this
    case.
    The indicator Reschedule with production version must be set in the
    strategy profile.
    My issue is sytem does not making automatic Dispatch to the second
    Production version for the material at the time of insufficient capacity
    Best Regards
    Rami Abd El Fattah Mohamed,PPQM Functional & Technical Application
    Consultant

    In the dispatching control u can remove operation date check indicator and regarding the termination indicator SAP help says"
    "if you have not set this indicator then dispatching is not terminated but carried out without taking the production version into account. That means that the planned order is scheduled with the old standard values and the formulas from the new work center and dispatched to the new line."
    Please check if it works now.
    thanks

  • Automate 'transfer of basic dates to forecast dates'

    Hi Experts
    I wish to have automatic transfer of Basic dates to FRC at the time of changing the status of Project definition to REL.
    So that, after release i will prohibit the transfer of basic to FRC. This is required to retain original scheduled dates in FRC.
    So, is there any userexit to build code for trigger transaction 'transfer basic to FRC' at the time of status change of PD?
    Or you may suggest any new idea in this regards
    Thanks and warm regards
    ramSiva

    Hi,
    I am not sure if there is  a standard way to do this, if anyone knows it please share your knowledge,
    There are several ways to obtain this , but all of them envolve development :
    - You can use this BADI ( if you are at least in 4.6 C) --> WORKBREAKDOWN_UPDATE ( method AT_SAVE)
    - You can create an event for object BUS2001 when it is released and the you have to program to copy from one date to another date
    - If possible you can use standard substitution (OPSN transaction) but you have to develop your requirement.
    I am not sure it is very clear...
    sara

  • CM25 : automatic rescheduling of dispatched orders

    Dear guru ,
    In CM25 for a work center all the production orders are dispatched with a specific sequence.
    Some of these production orders have a backlog of capacity load.
    I want to reschedule all the production orders in advance starting today and I want to maintain actual sequence.
    I donu2019t want to deallocate all the production orders and dispatched again.
    Does exist a function that execute an automatic rescheduling of dispatched orders ?
    Thanks in advance.

    Hello Cris,
    Hope you got the solution for your query. I am facing a similar kind of problem.
    I want to deallocate all the production orders if any of the order has backlog automatically
    Please suggest any idea.
    Please send your valuable reply to my  Id available in the Business card.
    Thanks !!!
    Cheers,
    Vasanth
    Edited by: Vasanth M on Jun 25, 2009 2:13 PM
    Edited by: Vasanth M on Jun 25, 2009 2:14 PM
    Edited by: Vasanth M on Jun 25, 2009 2:14 PM

  • Automatic dispatch of Planned Order - Reg.,

    Hi
    Here i'm trying to dispatch a planning order automatically, when a work center capacity got fully loaded. What is the necessary settings has to be done?
    Kindly explain clearly
    Regards,
    Gopi

    Dear ,
    When you are dispatching the operation for Planned Order /Production order in that day , system checks the availble capacity load in that work centre .If required capacity is not avalaible based on the work centre available capacity (Capacity Tab-Available capacity -Check overload CM05 for workcentre in that week) , operation will not be dipatched and Scheduling logg will be created
    .I suggest that you need to check the Available Capacity (can be viewed weekly /monthly -Select the weekly grid -double click -system will dipaly the daily load in a week ) of the work centre and then go back to CM25 with your work centre -select Overall Profile -Enter Work centre -Strategy -Mark "Date Entry while dispatching " which will hel you to dipatch the date based available capacity CM05.Or else try to use CM21-Graphical view (goto -settings-scale-daily split -chek the available capacity date -dispatch.
    In CM01/CM05 , please enter Plant /Work Centre in CM05-Hit DETAIL Capacit list or Varibale View -it will display with weekly bais capcity set up based on the .Select the week where this date fall on or If you want to look the daily baisi load , then goto Planning tab-Profile-Option Profile -select as appropirate to analysis the load daily /weekly
    Setting Required :
    1. Settings for Available Capacity
    2. Setting for Capacity requirements
    3. Settings for Capacity evaluation and leveling
    1.Materials Master define the Production scheduler and production scheduling profile
    2.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    3.Routing - enter the values for the standard values. Use control key with scheduling.
    4.In transaction OPU5 and OPU3Z - define the scheduling parameters for planned order and productiion orders and activate the checkbox Capacity requirement and Scheduling. what is the settings in OPPQ and OPPR for the "Start in Past" parameter, you need to keep them consistent with the OPU5 settings.
    Capacity Setup :
    Define time profile in OPD2.
    Define the strategy profile in OPDB
    Define the Overall profiles in OPD0.
    In the order control OPJK I have maintained check capacity with SAPSFCG013 profile.
    Define Scheduling parameters for Production orders-OPKP-Maintain Capacity Checked /Finite Scheduling Cheked /Scheduing Type -BW/FW .
    Hope this will help u in analysis the set up.Revert if u need any help
    Regards
    JH
    Edited by: Jiaul Haque on Apr 28, 2010 2:04 PM

  • Automatic Extrapolation of Basic Date to WBS

    Hi,
    What setting to be done in SPRO, So that everytime scheduling is done, basic dates are extrapolated to higher level WBS element and to next level WBS with "Open Planning Scheduling Metod". Adjust Basic Dates is selected.
    Thanks,
    Rahul

    i am not sure if there is any cofig that does that
    you can try bottom up planning with automatic scheduled on so that the dates get extrapolated on project save

  • Automatic dispatching in capacity levelling

    HI All,
    After MRP Run, I want to dispatch all orders in CM21 , Capacity levelling automatically with some predefined sequence.
    Is it possible in std SAP ?
    Amit

    Hi
    Yes, you can, the transaction CM40 can do that, please click the button 'Program documentation Shift+F1) to read the detail.
    Please make sure that the field 'Dispatch' is ticked on in the section 'Action'.
    Best Regards.
    Leon.

  • Basic HTML Can I set Firefox to automatically load pages as 'Basic HTML'?

    Will loading pages as "Basic HTML" load faster?
    Pages take 30 - 60 seconds, downloads OK at 1 MB a minute.
    Some sites, e.g. Yahoo Mail, have a button to load faster as Basic HTML. Can other sites load as Basic HTML?
    So: Can I set Firefox to automatically load as Basic HTML if that site can be?
    (Firefox 3.6.15, Windows XP, 2MB RAM, ISP is Hughes satellite in Virginia, USA.)

    You can look at:
    * Adblock Plus: https://addons.mozilla.org/firefox/addon/1865
    You need to subscribe to a Filter list (e.g. the EasyList).
    *http://adblockplus.org/en/subscriptions
    *http://adblockplus.org/en/getting_started

  • Snow Leopard users: Turn off automatic date and time in System Preferences immediately

    http://arstechnica.com/apple/2014/12/apple-automatically-patches-macs-to-fix-sev ere-ntp-security-flaw/
    When exploited, the NTP flaw can cause buffer overflows that allow remote attackers to execute code on your system.
    What this means is that, if you allow date and time to be set automatically by outside servers, you risk having your computer taken over.
    This is a critical issue, it's being exploited as we speak, and Apple has not provided the update to Snow Leopard users, only to 10.8/Mountain Lion and above. I strongly doubt Apple will ever get around to issuing an update for Snow Leopard, or they would have already. Chances of that happening are close to zero

    To me 10.6.8 is still the best OS X Apple ever released and I patched my system just like the shellshock back in September. It's really easy if you have some basic shell skills and XCODE installed,
    Here is what I did, it may save you some time:
    open the terminal app
    1) Download the source code, apply the patch (I got the source code links from the ntp site)
    cd ~
    mkdir ntpd-fix
    cd ntpd-fix
    curl http://www.eecis.udel.edu/~ntp/ntp_spool/ntp4/ntp-4.2/ntp-4.2.8.tar.gz | tar zxf -
    2) Patch and compile the ntp source code
    cd ntp-4.2.8/ntpd
    curl http://bugs.ntp.org/attachment.cgi?id=1165 | patch -p1
    cd ..
    ./configure && make
    3) Open the system preferences - Date & Time - uncheck Set date and time automatically (to stop the process)
    4) Rename the old object and then replace/copy them with the new objects
    cd /usr/bin
    sudo mv sntp sntp.old
    sudo mv ntpq ntpq.old
    sudo mv ntp-keygen ntp-keygen.old
    cd /usr/sbin
    sudo mv ntpdc ntpdc.old
    sudo mv ntpdate ntpdate.old
    sudo mv ntpd ntpd.old
    cd ~/ntpd-fix/ntp-4.2.8
    sudo cp sntp/sntp /usr/bin
    sudo cp util/ntp-keygen /usr/bin
    sudo cp ntpq/ntpq /usr/bin
    sudo cp ntpdc/ntpdc /usr/sbin
    sudo cp ntpdate/ntpdate /usr/sbin
    sudo cp ntpd/ntpd /usr/sbin
    sudo chown root:wheel /usr/bin/sntp
    sudo chown root:wheel /usr/bin/ntp-keygen
    sudo chown root:wheel /usr/bin/ntpq
    sudo chown root:wheel /usr/sbin/ntpdc
    sudo chown root:wheel /usr/sbin/ntpdate
    sudo chown root:wheel /usr/sbin/ntpd
    5) Open the system preferences - Date & Time - uncheck Set date and time automatically (to start the process)
    6) Done.
    -- update time manually
    sudo ntpdate -u time.apple.com
    -- check ntpd version (should now be: ntpd [email protected])
    sudo ntpd --version

  • BAPI or FM to DISPATCH PLANNED ORDERS

    HI Gurus,
    We have a requirement to automatically dispatch planned orders instead of manually going to CM25/CM21 screen to manually do it.
    Is anybody aware of any BAPIs, FMs or anything to be able to dispatch planned orders.
    I was going to use BDC but the table control has restricted me to do this.
    Thanks for you help.

    Hello Basil,
    I am looking for the same solution, can u plz update if u hav some information how to approch for the requirement.
    Thanks in Advance.
    Adar

  • Automatic Clearing - Customer Account

    Hi All,
    is there a way in SAP to clear the customer open items automatically for the below scenario
    Invoice : 3750
    Credit Meo - 500
    I want the system to clear the above mentioned line items based on certain pre-defined parameter and for the difference i.e., 3250 create a residual item.
    Please suggest if you have solution other than manual clearing F-32
    Best regards
    Abishay

    Hi,
    For automatic clearing the basic condition in SAP is that the total of the items to be cleared should be zero, which is not in your case. So the automatic clearing can not be done.
    However you can create your custom program to clear of the credit items againest debit items by calling F-32 in batch mode. This program can then be run in periodic batch job mode.
    Regards,
    SDNer

  • R11.0.3: An Invoice with future dated apyment data flow

    제품 : FIN_AP
    작성날짜 : 2003-11-18
    R11.0.3: An Invoice with future dated apyment data flow
    ===============================================
    PURPOSE
    Future Dated Payment Term을 사용하는 Invoice의 Data Flow에 대해 살펴보도록 한다.
    Explanation
    accounting rule = accrual
    .allowed future dated payment
    1. Create a standard invoice (invoice amount: 2100, item amount: 2100, payment term : future dated payment)
    And transfer it to GL.
    * ap_invoice_distributions_all
    accounting_date = 2003-11-11
    accrual_posted_flag = Y
    posted_flag = Y
    * ap_trial_balance
    accounting_date = 2003-11-11
    distribution_amount = 2100
    * 해당 data gl_interface table로 넘어감.
    2. Posting these transferred journals in gl module
    * 해당 data가 gl_interface table에서 삭제 된 후
    * gl_je_lines
    accounted_dr = 2100 charge
    accounted_cr = 2100 liability
    3. Create a payment against this invoice with mature date = 12-nov-2003 and then transfer it to gl
    * ap_invoice_payments_all
    accounting_date = 2003-11-11
    accrual_posted_flag = 'N'
    posted_flag = 'N'
    future_pay_posted_flag = 'Y'
    * ap_payment_distributions_all
    line_type_lookup_code = 'CASH'
    * ap_trial_balance
    accounting_date = 2003-11-11
    payment_amount = 2100
    * ap_checks_all
    status_lookup_code = 'NEGOTIABLE'
    4. Posting these payment journals in gl module
    * 해당 data가 gl_interface table에서 삭제 된 후
    * gl_je_lines
    accounted__cr : 2100 future pay
    accounted_dr : 2100 liability
    5. Clear this payment and then transfer to gl
    Future dated payment 이고 Cash Management 를 사용하면 Cash Management 에서
    Bank Reconcilation을 해주시면 됩니다.
    Cash Management 를 사용하지 않으실 때는
    "automatic clearing for future dated payment" 를 수행하여서 clear 를 해주어야 합니다.
    이번 test case에서는 cash managemnt를 사용하지 않고 automatic clearing for
    future dated payment 를 수행하여 clear 해주었습니다.
    * ap_checks_all
    status_lookup_code = 'CLEARED BUT UNACCOUNTED'
    Cash Management를 사용하지 않기 때문에 status가 위와 같이 나타납니다.
    Cash Management를 사용하면 option에 따라 status가 cleared나 reconciled로 변경 됩니다.
    6. Transfer these cleared payment to gl and posting in gl
    * 이 때에는 ap_trial_balance table에는 아무런 영향도 주지 않습니다.
    * ap_invoice_payments_all
    accrual_posted_flag = 'Y'
    posted_flag = 'Y'
    * gl_je_lines
    accounted_dr= 2100 future pay
    accounted_cr = 2100 cash
    Example
    Reference Documents
    N/A

    Rohini,
      Thanks for your answer; I was out for few days and hence the delay.
      What I am looking for is the complete usage model of the following ODS.
    1> 0BBP_SC     we have figured it out
    2> 0BBP_SCA    we have figured it out
    3> 0BBP_DOC    we have figured it out
    4> 0bbp_inv    we need help
         Looks like this can be populated from R3 using the following
    Data Source    Info Source                    ODS Object
    2LIS_02_ITM    2LIS_02_ITM                 0BBP_INV
    2LIS_02_HDR    2LIS_02_HDR                0BBP_INV
    5> 0BBP_DS     we need help
    6> 0bbp_po     we need help
        The same combination is also used to populate the 0BBP_PO as well. We suspect that 0BBP_DS will then be populated from both 0BBP_INV and 0BBP_PO. At least that what we though after activating the BC and reading the sap help on BC for SRM.
      We are doing a proof of concept and want to know all the ODS with data. We want to build an end to end (Shopping cart, approval, Doc flow, PO data with value, Invoice data with Value) and struggling to understand the model surrounding this three ODS ( 0bbp_inv, 0bbp_ds, 0bbp_po). Any help in this area will be appreciated.
    Thanks
    Arun

  • Dispatch an operation of a PM order

    Hi Experts,
    Could you tell me if a BAPI, FM, Method or anything else can be used to dispatch an operation of a PM order?
    Here is the need:
    Our customer uses the Planing Board (CM25) to dispatch operations of PM orders.
    When the related work can't be executed on field, corresponding operations need to be dispatched a second time (at another time and day).
    Currently we simply add a constraint on the StartPoint date/time and change the status of the operation to DSPT. But this doesn't take into account the workcenter capacity. So it can result to workcenter capacity overload.
    For that pupose I'm looking for a standard FM or BAPI or ... that can do the job.
    I think the following information should be sufficient to make the dispatching: Order nr, Workcenter, operation, day, time.
    I found some threads about his on SDN forums but none answer my question.
    Thanks a lot.
    Regards,
    Philippe
    Edited by: Philippe Tsalos on Jan 18, 2010 9:33 AM

    Hi Philippe,
    So you want to reschedule considering available capacity. That is exactly what dispatching in the planning table does.
    If you were to re-dispatch the operation dependent upon the availability of capacity, it may not end up at day + 2. It may be shifted to some other time in the future, assuming you have search in the forward direction as your strategy. So is your intent simply to "throw" it forward somewhere or is it a hard requirement that it is re-scheduled for today + 2? I presume you know how to change the operation details programatically.
    For the sake of the following, I presume that the order operations to be re-scheduled were once dispatched in the planning table.
    So why don't you explore the following:
    Why don't you collect all the order operations together and undispatch (deallocate) them with Transaction CM40 in background? and then after you have changed their dates to day + 2, reschedule them, then dispatch them with CM40 again in background?
    By using an appropriate profile, you can specify the appropriate work centres and the order operations belonging to them that need dispatching. say profile SAPPM_G006 - define the plant and workcentre on the first screen, then the orders on the filter screen.
    If you feel like a little more of a challenge, you can review the coding of RCCYMAB2, particularly the subroutine EXECUTE_MASS_DISPATCHING, which shows all the details. Unless you are really confident, I'd stick with the transaction CM40 if I were you and set the objects and filter according the definition of your overall profile to define the order operations you wish to dispatch / undispatch.
    I should point out that CM40 is designed to let the system do a first cut dispatch for all the requirements on a workcentre prioritised according to the strategy sort key. In your case you don't want (I don't think you want) to deallocate and then dispatch all non-dispatched requirements - just those of the particularl order operations. That is why the filter is necessary to further restrict which order operations are to be processed. You could also use the selection schema as well, selecting those with user status NOEX.
    Is that helpful?
    Edited by: Andrew Barnard on Jan 26, 2010 11:05 PM

  • Capacitity leveling - Dispatching production order considering PM block

    Dear friends,
    I am trying to dispatch a production order of large Qty by using transaction CM21.
    The order will take 15 days to complete.
    Two days are blocked by plant maintenance order on that work center in future. They are shown as black in CM21.
    When I try to dispatch, system is automatically dispatching the order in such a way that its end date is before PM block date or start date is after PM block date.
    e.g. Order will run from 10th August to 25th august.
    PM has blocked dates 20 & 21st August.
    Hence the expected result is start the order on 10th and will end on 27th.
    But when I dispatch the order on 10th, system automatically takes it to 22nd (First day after PM block).
    Can we not plan orders with PM block period in between?
    Best Regards,
    Avinash

    You need to enable splits in the operation (routing definition).

  • Can't dispatch planned order (LA), but can dispatch production order

    Hello,
       I'm new to capacity planning and all of the related configuration screens.  I'm probably missing something simple.  We've configured our work centers and routings.  We've configured our production order types (tcode OPU3, type US01) and planned order types (tcode OPU5, type LA) so that all create capacity requirements and are relevant to 'detailed scheduling'.  Requirements are being generated for production orders and planned orders.  We can see correct setup and production times in the graphical planning table CM21.
       Here's the problem: When we try to dispatch a planned order, nothing happens.  There is no error, but the order is not dispatched.  If we convert the planned order into a production order, accepting all SAP proposed defaults, and then try to dispatch the production order, it works fine.
       What configuration are we missing?  My first thought was to look in OPU5 for order type LA.  In the detailed scheduling section, scheduling horizon is zero (is this Ok?), SelID: Detailed is 01, 'scheduled' and 'generate capacity reqs' are checked.
    Thanks,
    Randy

    Randy ,
    Please analyse the below note related to your issue.Hope this will help you to sort out the problem.I have cheked the configuration area.I hope u are correct .In fact , it may related to your production version if you do automatic dipatch.Please reade the note and come back.
    If an error arises when automatically dispatching planned orders (for example, a capacity overload at a work center) then the system schedules the affected planned orders to another production line.This function is available in both types of planning table. It is of interest for all areas that use planned orders, for example in repetitive manufacturing or in MRP/MPS. It can also be used in production control when later converting planned orders to production orders.
    this function the following conditions must be met:
    The dispatching function Change production version on error must be set in the strategy profile.
    The original work center
    must be entered in the production version of the material as the production line (not necessarily in the current production version).
    can only be assigned to one operation in the routing for this production version
    The alternative work center can only be assigned to one operation in the routing for the alternative production version
    If an error arises the system copies the production version with the version key that is next alphanumerically into the planned order. The planned order is rescheduled with this production version. However, it is not dispatched to the new production line but remains in the pool. In this way you can dispatch the rescheduled planned orders together with other planned orders in the pool to the new production line.
    To give you a better overview and to improve handling you should choose a sort key with which the planned orders in the pool are sorted according to work center and, for example, latest start date. All orders that are to be dispatched to a production line are then placed next to one another in the pool. If an error arises during automatic dispatching to the new line every planned order affected is rescheduled with the next production version
    . If the conditions are not met then the following occurs depending on your settings in the strategy profile:
    Dispatching is terminated
    Dispatching to the same work center is continued and error messages are written to the planning log
    You can only dispatch main operations with this function, but not sub-operations. Operations are always dispatched with the full quantity to the new work center
    Reward point if useful
    Regards
    Jia

Maybe you are looking for

  • Custom paper size - seems scaled for A4

    Hi, I'm trying to print on the front of a card which when unfolded is 15cm x 30cm. I've made a PDF in Inkscape (page size matches paper dimensions) and opened it in Preview. I set a custom paper size of 15 x 30cm for my printer (Samsung ML-2010) in t

  • Array of Cluster with event structure

    Hi, I am having Array of cluster with cluster having 1 String Control , 1 Combo box, 1 Led control and 2 Numeric control. In the combo box i am having two options to select ('Binary' and 'PWM').Whenever Binary is selected then Led control has be enab

  • Zipping multiple Payloads to single Zipfile using payLoadZipBean

    Dear Friends, Can you help me in doing this sceanrios: I'm trying to send multiple payloads from source (selection of multiple payloads is done by checking Advance selection for Source file)  to PI, that inturn Zip all Payloads in to a single Zip FIl

  • Microphone and camera translation not optional

    I've added permissions for use of the camera and microphone, but the app wont let me select them. Any ideas as to why? <html:div data-url="https://social.msdn.microsoft.com/Forums/en-US/4dbbeae1-74a7-4e0f-bb66-e0c397005dc6/microphone-and-camera-trans

  • Laptop broken and music deleted from iphone5  - I need help to retrieve itunes?

    My old laptop has broken and at the same time my music has been deleted from my iphone5 (silly mistake by my husband to free more space for newborn photos!). I am not very technologically advanced with this sort of thing - can anyone tell me if it is