CMP2 work force planning available capacity shows less

In CMP2 workforce planning : The available capacity for a person (assigned to activity) shows 7.5 Hrs each day although Capacity for that one resours is 8 Hrs (=Operating time). There is only 1 capacity in the work center.
Can some one give any idea why this descrepancy ?
Thanks.

Hi,
Also check the formula used in the capacities tab of the workcenter.
BR
Anjali

Similar Messages

  • Work force planning & tracking graph.

    Hi all,
    I am stuck up  with a issue on creating a report on Work force.
    The scenario is such:
    Suppose the quantity of work is 1000 m3.
    the work is to be completed in 30 days duration.
    What is the no. of manpower needed to complete the work on per day basis?
    When the actual work starts. The engineer will feed the manpower available per day.
    A graph is to be generated which will show the actual manpower present on each day against the planned manpower.
    Still now I have tried in the following way:
    i) I have created a work center.
       In the capacity I have defined 5m3 = 1 hr.
    So if per day the work takes place for (say) 10 hrs. then 50m3 can be done.
    ii) In Project Builder cj20n -
    in the internal activity I have put 30 days in normal duration.
       Now , when I am puting 1000m3 in WORK and taking the option calculate capacity from the drop down the system is asking to maintain the unit in Time unit.
    How to map this scenario?
    And after this how to feed the manpowre on per day basis?
    This report is only for tracking purpose . The manpower is external.
    Pl. help me out regarding this.
    Thanks.
    ...A. Bose

    Hi,
    Create a work center for Labor    1 Man - 1 workcenter
    Create a internal activity
    Select the work center for labor-- LABOUR
    Put the work requirement aagainst Work -- 1000 M3
    Against the next  cell Number Put number of Labor-- 5 and Percent 100
    Against calculation key Select Calculate duration
    Enter
    In normal duration u can see the System calculated duration
    Rgds

  • Rough cut planning & available capacity

    I need one clarification, in the rough cut planning, the existing load
    is not considering for available capacity.It is considering only from
    the resource capacity.
    E.g : Avaialble capacity of for Resource A (today) is 24 hr
          One Order is created and released for 4 hr with Resource A
          As per that now my available capacity of the resource is only 20 hr
          In SOP planning view, it showing as 24 hrs.
          And If i am running the SOP today at 1400hrs for calculating the
    resource capacity. Practically my avaialble capacity is 10hrs. But
    in the system it showing as 24hrs.
    How to capture the above both requirements?
    2. Through roughcut planning we can able calcualte the cost, material and
    PRT availability also. But it is not coming the the SOP screen.
    Is it any configuration i missed out? Help me out
    Regards,
    sakthivel
    <Title of the thread has been changed. Please use meaningful title.>
    Edited by: Csaba Szommer on Nov 15, 2010 9:52 PM
    Edited by: Csaba Szommer on Nov 15, 2010 9:58 PM

    Hi!
    Available capacity means the total capacity available for use in production. Presence of an requirement will not reduce the available capacity.
    Regarding SOP. Check for the starting time of the order or requirement. See if you can schedule from the current time instead of start of the day.
    Regards,
    S.Satish Kumar

  • Work center-CApacity-Work force planning

    Dear Expert !
    Please tell me all necessary steps to configure Work center , Capacity and workforce planning .........please provide me all the information of business scenerio where I can use this at user level....with screen shot.
    Thanks in Advance
    ROBERT SMITH "HP"

    Check out below links....
    http://help.sap.com/bp_bblibrary/600/Documentation/Q60_BB_ConfigGuide_EN_US.doc
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPCRPPS/PPCRP_PS.pdf
    Venkat

  • Reg; Capacity & Work force Planning

    Hi Experts
    I would like to do capcity & workforce planning. I would like to assign resources to WBS rather than workcenter.
    pl let me know the procedure
    regards
    pavan

    Hello Pavan,
    You should elaborate your query before posting so that we can understand your requirements. These topics are a subject for Production Planning module and the same should be posted there.
    Kind Regards // Shaubhik

  • Rotating Off-Days in PM Work Center Available Capacity

    Good Day!
    Background:
    Each Maintenance person is represented by a PM Work Center.
    Maintenance person have a rotating off-days which cycle repeats after 21 days.
    Requirement:
    We want to reflect rotating off-days to PM Work Center Available Capacity.
    Options tried but did not worked;
    Shift Definition Grouping:   Off-days is in HR's Period Work Schedule but only Daily Work Schedule can be pulled into Shift Definition Grouping and then into Work Center
    Reference Available Capacity:   Can be achieved via Shift Sequence Key in interval of available capacity but needs to maintain for each week with on-going maintenance
    Do anyone has implemented this similar requirement that we can reapply/build on?
    Your valuable inputs are deeply appreciated.
    Thanks!

    In work center capacity header
    click   change intervals
    click   insert
    Enter manually
    valid from and valid to dates
    No of ind capacity - 0

  • Workforce planning- issue with available capacity

    Hi All,
    I have an issue in workforce planning. I have created a workcentre and have entered the required details in capacity tab to arrive at available capacity. The available capacity for this workcentre is visible in transaction CM01.
    I have done the workforce palnning using worcentre view in transaction CMP3, but for some reason I am unable to see the workcentre avaliabile capacity. I only see the distributed total requirements.
    Would appreciate any pointers on this.
    Regards
    Pradeesh

    Regarding the availablity of CMP3, it refers the availability of  assigned persons rather than the work centers.
    Please check the involved person with transaction PA30 using infotype 007
    (see details in consultant note 543362).
    Kind regards,
    Zhenbo

  • FM for checking Available Capacity of Work Center

    Dear All,
    I have trying to find a Function Module to get the latest available date of the Work Center (The Period where no Production Orders has been dispatched to it).  It is only when the Work Center is available then we can dispatch the Production Order's processes to its work center.
    Does anybody knows which Function Module or Table where I can get the latest available date for carrying out the Production Order dispatch process.  Any inputs would be appreciated.
    Thanks in advance.

    Dear
    Goto CM05/CM07-Select Work Centre Load or Work Centre Basic Load -Enter Work Centre or just give the Plant Code -Hit Standard Profile -It will display you weekly basis Work Centre Avaliable Capacity , Requirement , Load .
    It will give you a broad picture over an period -You can select any one the check box representing Weeks or you can change over in Monthly basis .For that you have select Planning -Profile -Option Profile -daily , Monthly , Weekly , yearsly
    If you are stick to FM : Help about available capacity
    Hope this will address you issue
    Regards
    JH
    Edited by: Jiaul Haque on Oct 11, 2010 10:17 AM

  • Maintaining work center list in Capacity Planning: Selection List in CM01

    Hi,
    Where can find the config route in SPRO for maintain work center into the Capacity Planning: Selection List in CM01?
    Thanks a lot!
    Min

    Mandy,
    Couple of combinations you should check,
    1. First try to identify "Selection Profile" which is used. In "CM01" go to menu Planning->Profiles->Selection Profile.
    2.Check the defination of this profile using transaction "OPA2". Here you need to look for "Work center Set" which is assigned.
    3. Now look at the defination of the workcenter set using transaction "CMS3", here is were we define as how the list is to be fetched.
    Hope this helps....Reward your points and close the thread if so,
    Regards,
    Prasobh

  • Collective export of available capacity for work centers

    Experts,
    I am looking for a way to collective export the available capacity for multiple work centers for a plant.
    Data should be based on periodes and intervals&shifts determind in CR12.
    What might be a good way to do that ?
    Thanks in advance
    Jörg

    hi,
    this is no Standard report kind avaliable in SAP, but u needto develop the requirement. Its the best way which I feel is achievable.
    thanks
    svrsap

  • REM Planning table - Capacity requirements and Levelling.

    Hi i have few queries in REM planning table.
    In REM planning table MF50 my selection is based on entire plant. Here in total capacity data tab for any particular plant it will show the list of work centers which are maintained in particular plant to know the capacity details as per our requirement.
    1.When i select any WC line and click on change capacity display from CRP it is giving break up with required and available capacity hours for any particular WC available time is assume 22.5 hrs per day which is given in operating time in capacity header in WC but in MF50 it is showing 23hrs.I have defined shift sequence in OP4A and assigned in capacity header grouping which have 3 shift with 30 mins break in each shift which results in 22.5 hrs working for a day so in shift sequence and operating time it is mentioned as 22.5 hrs is the time available for day but in MF50 it is showing 23 hrs available for day?
    2.What is due% in MF50 total capacity data for any work center and how required time would be calculated?
    Appreciate if any one has any example.
    Cheers
    KK

    Hi bump for any suggestions?
    i have noticed one thing the time available is a round up value actual time available as per capacity header is 22.5 but in MF50 it is showing as 23..if i change to 21.5 then it is showing 22hrs available per day is this the standard behaviour?
    can anyone tell me how the required time is calculated?
    Cheers
    KK

  • Help about available capacity

    Hi Experts,
    I want to know the entire available capacity of my plant and also maximum how much quantity I can produce by using this available capacity, Is there any T-code or any reports?
    Please help.
    Regards,
    Imran

    Dear,
    It is possible through Rough cut planning
    Here we check the capacity for our bottel neck work center. So you have to define time for your material requried to manufacture certain quantity on this work center . Ex-enter the time to produce 1 pc
    Create Rough cut planning profile - MC35. Enter material and plant nd execute. Enter status = 4, usage = 1. Enter a resource name and double clik on that line, choose example work centre: Enter work center name, plant and unit = H.
    Enter the times required in Hours in the time buckets and save
    Create SOP plan - MC87. Enter material and plant. Execute. Enter sales and prod qty. Go to views>Capacity situation>Rough cut planning>show.
    Or in MC82, go to views->capacity situation->show
    You could display the capacity requirements at the bottom of the screen.
    Please refer this link also,
    http://help.sap.com/saphelp_46c/helpdata/en/8a/a5905c4adc11d189740000e8322d00/frameset.htm
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Rough -cut plan with capacity requirment calculation

    Hi all,
    We checking SOP with rough-cut plan
    We created Rough-cut profile in mc35 for our bottle neck work center with base quantity -1 and time span - 1
    then we selected new work center (there is no existing cap req). and assigned base unit measure:min.
    and we assigned 1min for each day and saved the profile.
    Now we went to mc88 and checked the material's active version production plan. (period split- DAY)
    in View -> capacity situation -> rough cut planning -> show.
    System calculates some capacity requirement for our production plan.
    Say for tomorrow's date i given 1000 qty - production plan.
    but system showing capacity req
    Work center:  TESTWC3                  Plant: 0001         Capacity:  001
    Info structur  Material          Plant   Order qty     Unit     From              To          Capacity reqmts      Unit
    S076            TESTFERT14    0001  1000.000       EA    29.01.2010  11.02.2010   9000.000              MIN
    with 9000min and cap load more than 652% ( Actuallly  it has to show 1000min as per rough cut plan profile)
    Our available capacity of work center per day - 1380 min
    We cant understand the capacity requirement calculation in MC88..
    Help us out...
    Thanks in advance

    Hi,
    Rough cut planning is genrally done for the group of material say product group, group of workcentre rather than individual material or workcentre.
    As standard, in resource table whatever the value you enter that corresponds to no. of days. Each column represents one day.
    Pl. refer this link for clear understanding of the same.
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/63212e43a211d189410000e829fbbd/frameset.htm
    Madhava

  • Determine Available Capacity at a Location in SAP TM 8.0

    Dear friends,
    I need to create a demo in SAP TM 8.0 for which I need to show the available transportation capacity at a particular location at any particualr time.
    Currently we define the resources (by defining the capacity dimensions) and then use the cockpit via capacity profiles to determine the capacities to be used for planning. But in my situation the customer would like to use the available capacity resources for planinng i.e. he wants to see currently available resource(trucks) at a particular location. I mean, if some trucks i.e. resources are being processed by the frieght order, such resource(trucks) should not be shown in the capacity profile.
    In the TM system, even though a resource (single resouce) has been utilized by FO, this single resource is still shown in Capacity profile of the transportation capacity. This happens because I don't have any restriction in the capacity profile setting which restricts the selection based on availability of the vehicle?
    Is there a standard setting/configuration in TM which shows the planner exactly the resources which are free i.e. not associated with any FO which is currently beig processed?
    For example.
    We need to transport goods from Location A to Location B using a Single Resource (RES1 - truck) via MTR - MTR_FTL. Initially The planning cockpit shows me the FU along with the RES1 with MTR_FTL. I accept the planinng proposal and associate the FU with RES1. This essentially means that RES1 is fully loaded and should not be used for planning in the
    next time. I create the second FU but due to restriction in the capacity profile screen, I still see RES1 in the planning cockpit. My requirement is that since RES1 is fully loaded, it should not be seen in the planing cockpit. Where do we make this configuration?
    Many thanks for your help.
    Best wishes,
    Abhinav

    TM8.0 requires ehp5 (sp5) to have the ERP-TM integration.
    But TM provides webservices which can be utilised for integration purpose. Please evaluate if this works for you. This may not be a seamless integration as with ehp5.

  • No Available Capacity

    Why cant i dispatch my Order? It says that there is no available capacity, but when i look at the work center, "Finite" is checked. Furthermore, in the week it is supposed to be dispatched, remaining capacity is greater than order capacity, meaning that it is possible to dispatch it there.
    i also noticed that the Work Center in the Planned Order is this different from the one stated in the Lower Left Tab/List. Why is this?

    >
    Rajesha Vittal wrote:
    > If I understood you,
    >
    > You have created a productiion order.
    > You have ticked finite scheduling tick in the work center concerned - WC1.
    > Now you see there is no overload.
    > But when you dicpatch in capacity leveling it is showing no capacity available.
    >
    > Did you release the production order?
    > what is setting you have in SPRO for availabilityy cheking for the capacity and which over all profile you have assigned to the order type?
    >
    > Edited by: Rajesha Vittal on Jul 29, 2008 11:03 AM
    It is not a production order.
    But for production orders, there is an availability check using profile SAPSFCG013

Maybe you are looking for

  • JScrollPane - Graphics - Headers

    Hi ! I am using a JPanel with a JScrollPane. I have define 2 JPanel to set the columnheader and the rowheader. I paint in this 3 panels with Graphics. My problem is the following : When I use the scroll bar (moving up and then coming back) there is t

  • Regarding the authorization based on persinal subarea

    dear experts,                   my company has two offices what we want that in HR that one offices will not see  the live datas of another office,for this we have two subarea raipur & raigarh what i did that in the authorization object P_ORGIN i add

  • Website building

    I am new to this game and was wondering can i build a fully functioning professional website to sell things on with dreamweaver cs3 if so were can i get help. I need to start from scratch and the only thing i have found is how to build a personal one

  • Update the Asset

    Hi, How can I update the existing asset data through "FA_MASS_ADDITIONS" interface table? When I run the "POST_MASS_ADDITIONS", it gives me below error:- Request ID: 798222 Asset 3000 already exists in book Mass Addition ID: 5002 ==> ** FAILED ** Num

  • KDE 4.9, Akonadi and google calendar/contacts

    Hi, Searched around, didn't seem to find anything up to date on this. Anyone else having problems getting Akonadi to sync with google stuff? Apparently we don't use AUR packages for this anymore (the akonadi-google-git package doesn't even exist anym