Hi gurus,
I work with the LO-TRA component. When I have a freight cost, and I have the good profitability segment regarding the sales ordrer, product and customer.
Now I want to assign the shippment type to a particular segment. Is anybody know how i can do ?
Thanks

You may have to create (KEA5) or choose from existing standard characteristics. Maintain vales for the Shipment type KES1 or derive characteristics KEDR.

Similar Messages

  • Problem during creation of shipment document and shipment cost document

    Hi
    My client  facing problem during creation of shipment document and shipment cost document at the time of Batch Job
    Delivery no 897654: goods issue on 30.11 at 13:22. Shipment on 30.11 (VT01N).
    Shipment costs on 1.12 (VI01).
    the problem is the shipment document get created on 30.11.2010 but the shipment cost document get created on 1.12.2010
    pleas advice.

    Hi,
    Please check the batch job processing log.
    As per my understanding, business requires to generate the Shipment & Shipment cost documents immediatley.
    However there is some time between the documents creation time. I dont see any issue in the data or problem in the delivery docs Because system will not generate the shipment docs after 1 or 2 days if there is an issue with the data . There must be problem in the Batch Job.
    Analyse the batch jobs and timing of the job process.
    Let us know your feedback...
    Best Regards,
    MKumar

  • About transportation and shipment cost caluclation

    Sir,
    I have searched the configuration step of transportation in this forum, but i couldn,t able to under stand the steps.
    Kindly give me the configuration steps of transportation and shipment cost settlement.
    This will helps me alot
    thank u

    Dear Supraja Ballari
    Please go thru this link
    [Transportation Planning Interface |http://help.sap.com/saphelp_47x200/helpdata/en/1a/0e37cd539911d1898b0000e8322d00/frameset.htm]
    Once you opened the link, check to your left screen where you will find additional links.  Go through the same
    thanks
    G. Lakshmipathi

  • Freight costs in Pricing procedure and Shipment costs

    What is the difference between freight costs in pricing procedure for a sales document and shipment costs in shipment documents. Arent they meant for the same thing. Why do we have to create them separately.

    hello, friend.
    freight charges in the sales pricing procedure may be represented by condition type KF00 (standard).  this condition type is a surcharge to your customer, meaning there is an inflow into your company.  this surcharge may be manually entered (if configuration allows this) in the condition tabs of your sales order or this could automatically be entered if the appropriate condition records (via VK11 or VK31) have been created.
    the shipment costs in shipment documents is what your company is billed or quoted by your forwarder, shipper or other transport related agent.  the shipment cost data will be used by the system to calculate and settle shipment costs.  when you have freight condition records (via TK11), purchase-vendor records and if all route/connection point/etc.  settings correct, all shipment cost data will be determined when you do shipment cost document creation.  you may also manually enter cost items, depending on the configuration.
    hope this helped.  is so, will appreciate reward.
    regards.
    jty

  • Batch job for shipment and shipment cost doc

    Dear all,
    In case of our client, shipment docs and shipement cost docs are created using a batch job. There are some documents that have not been processed with this batch jobs as expected. Now i want to analyse the job log for thosse failures. For this i want to know the batch job names which i am unaware of. In SM37 i am unable to trace in a generic way.
    I know that we can filter batch jobs using ABAP Prog. My question is that which programs have to be used here. are these RV56TRGN for shipment docs and RV56TRSL fir shipment cost docs?? Plz help as the issue needs serious attention ffom my side. also suggest how further i have to rectify this issue.
    Regds,
    Raghu

    Hello,
    The ABAP programs you have mentioned are correct and you can enter these in SM37 to check the job names, status etc.
    RV56TRGN  - creating shipment docs
    RV56TRSL - Shipment costs
    Check the spool for messages which will have the error docs.
    Cheers !

  • Third Party and Shipment Cost managed by Trader.

    Hi gurus,
    I have set up  the scenario third party with Delivery note and it works fine.
    That means i can execute all the process till the billing. Customer, trader and supplier are set.
    The problem here is that in this scenario, the trader wants to be responsible for the shipment costs. Before implementing the scenario i thought it would be possible to, from the purchase order generate an outbound delivery and create a shipment document for applying costs to it. The problem is  for position TAS it is not possible to do none of that.
    I can't find a solution for this... has anyone faced a problem like this? Or is capable of seeing a possible solution?
    best regards.
    Diogo

    Hi Tuffy,
    In Third party dropship scenario, customer give an order from your e-trade site or online sales site. after receiving the order, your contracted company with you will deliver the order, not you. you are adding your profit to the list pricing. Process is going below:
    customer >> shopping from you >> payment to you >> getting the amount of profit after sales >>> sending of order and delivery information about customer to contracted company >> contracted company will deliver th order to the customer.
    But in other type of third part sales, we sould create purchase order additionally.
    I hope these will clarfy your confussion.
    Regards,

  • Delivery - Shipment and Shipment cost docs

    Hi,
    I created delivery and completed invoicing , when I tried to create shipment doc with VT01N , Its asking for tranportation planing point and shipment type. FYI I have configured routes , legs(Direct leg) and shipment doc types.My question is , is there any way to link delivery document to shipment docu and dhipment cost document?
    Is there any field in delivery type to link with shipment doc ?
    Is there anything to do with copying controls for this?
    what is the T.code to maintain condition records(header and item) for shipment cost document?
    can anyone help me on this
    Thanks,
    Kanna.

    Hi kanna,
    I support sarthak mohanty. Yes usually if you are using Transportaion in your business process. then the PGI definately takes place through Shipment only.
    Even i do not understand until you complete PGI how did you manage getting an Invoice. Is it Proforma Invoice that was you created before PGI or Wher exactly PGI Takes place in your process. Let us know so that we can give you better info.
    Now coming to Process point:
    Transportation Planning Point (TPP) is the Highest Organizational unit like SD has Sales Organization.
    Each company code contain their own TPP. There are no Copy controls from Delivery to Shipment. the only way to connect Delivery with shipment is you have to assign delivery to shipment then all the relevant info copied into shipment from the delivery.
    To create a Shipment you need Shipment Type and TPP.
    Based on your transportaion models Shipment Type varies like Order Types OR,CR,DR etc.......
    You can use T-Code TK11 to maintain the condition Record, TK12 - to Change and TK13 - to Display
    Regards
    Venkat

  • Shipment and Shipment Cost

    dear All,
    While creating Shipment I noticed that the same delivery can be refernced multiple times i.e. the same delivery can be used to create multiple shipments.How to reolve this problem.
    Secondly while creating shipment cost I find that Net Value is zero and hence no Acctg.Doc is getting created.
    What is the problem.
    Please HELP.
    Regards.
    Saurav M

    Hi Saurav,
    It depends on how you define the shipment types for the shipment.  If you create shipment using shipment type that has multiple leg, then you can create multiple shipment for the same delivery.  However, if you create shipment using shipment type like direct, or return leg, you can only create one shipment for the delivery.  The Transportation Planning Status on the delivery header (under Transport tab, on the overview screen) is set based on the leg determination logic that you configure for the shipment type.
    For more information, you can go to a delivery using VL03N, then press F1 on the field for help.
    Hope this help you solve the problem.
    Quynh Nguyen.

  • Rail Car shipments and Shipment Cost Document

    Hi all,
    We have a rail car shipments scenario. We wanted to include the freight forwarder in the shipment cost document. The FF is not one of the carriers in the route stages ( hence they are not coming the shipment cost document) but they so some sort of documentation for which we pay them . The logistics department wanted the FF to come in the shipment cost document. At which stage of the rail car shipment /routes we can enter them so that a SCD will be created for this.
    Regards,

    hi,
    because there is no any T.code whic SAP has provided on the same.
    you can use BATCH JOBS for your requriment.
    other wise this is a major ENHANCEMENT.
    you need to catch hold of BAPI & develop a Z screen for your requriment and do it.
    please check and confirm
    balajia

  • Link between shipment item categories and Shipment Cost Condition Types

    Hi guys,
    Need more information on this. Would appreciate your help on this.

    Table TVAP
    or in SPRO goto
    SD>Basic Function>Pricing>Pricing Control>Define Pricing by Item Category>activate pricing
    reward points if it helps
    regards
    Biju

  • LE-TRA Shipment costs as inbound delivery costs, goods receipt

    Hello gurus:
    We are facing the following scenario, regarding inbound transportation.
    We plan our shipment document and shipment  costs, and they feature several items. Each of those items represent a shipping service, which in certain cases be taken on different countries by the same service agent.
    That is, we have a service X on country A, with tax indicator 1, and service Y on country B, with tax indicator 2.
    Both services would need to be transferred as delivery costs to the purchase order.
    According to note 427944, shipment cost value is cumulated by service agent., so that it looks impossible to get the values broken up to the purchase order, which would be the first step to subsequently get the right tax indicators for each item of the shipment.
    Even using different condition types on the shipment cost document, system cumulates by service agent and transfers to the first condition found on the purchase order schema.
    Has any of you faced similar issue? Any workaround possible?.
    Thanks in advance for your valuable help.
    David Ramos.
    PORCELANOSA MM.
    This is the section of note 427944 that indicates the treatment of the shipment costs in the purchase order,
    Transfer the shipment costs into the condition types of the purchase order:
    The shipment cost value (without tax amounts) is cumulated for all relevant shipment cost documents
    for each service agent and transferred to a corresponding condition type of the purchase order item.
    Before cumulation, the amounts are first converted into the purchase order currency.
    1. A transfer of the values for each condition type (similar to the transfer from a shipment
    cost document to the SD billing document) is not supported.
    2. If different service agents exist in the shipment cost documents, a corresponding number of
    condition lines (with value 0) must be specified in the purchase order item. These can always
    belong to the same condition type (in schema 'Manual') or also to different condition types (not
    'Manual'):
    a) Manual condition lines: If the condition type in the schema of the purchase order is
    marked as 'manual', the condition type must be created (with value 0) in the purchase order
    item before the goods receipt. If delivery costs are expected from different service agents,
    several non-valuated entries must be generated for this condition type. If more condition
    lines exist than required, these are then no longer taken into account. If condition lines
    are missing, the last service agents are not settled.
    - Advantage: You only have to define one condition type for the delivery costs.
    - Disadvantage: Each purchase order must be processed manually before the goods receipt.
    b) Automatic condition lines: If the condition lines are to be generated automatically for
    the delivery costs (the condition type is not flagged as 'Manual' in the schema), the schema
    must have enough condition types to settle several service agents. If more condition lines
    exist than required, these are then no longer taken into account. If condition lines are
    missing, the last service agents are not settled.
    - Advantage: The goods receipt can be carried out without manual preparation beforehand in
    the purchase order.
    - Disadvantage: You must define identical condition types with different names.
    Message was edited by: PORCELANOSA MM

    Hi,
    If you refereed the OSS Note 427944 correctly it explains how the shipment cost can be transferred to delivery cost based on some pre-requisite.
    Like the value for PO should be >0
    Like the service agent is involved during shipment liability, then there should be cumulative transfer for each value which will update based on shipment cost if PO value is "0".
    The shipment cost will be delivered to all delivery items based on weight.
    If you want to enhance this then you need to use the enhancement V54KSFRC to update the values as per your requirement.
    Rgds,

  • Looking for some demo on shipment and shimpment cost in Transportation

    Hi, everybody:
       I wanna some demo on shipment and shipment cost function of Transportation.
       Would you send some documents to my e-mail box below:
      [email protected]
      Thanks for your kind help!
    Justin

    Hi Justin could you forward the mails you got to my mail id
    [email protected]
    Thanks in advance

  • Issue in creating Invoice when route is not relevant for shipment cost.

    Dear All,
    We are facing a problem while creating an Invoice. The route used in shipment in not relevant for shipment costing. Shipment type is relevant for costing. So in normal scenario if I don't remove the tick mark from "Shipment cost relanace" at shipment type and proceed with Invoicing I get error as " SHipment costing is not complete", which is correct. The scenario works well if item/s in delivery are not batch split.
    But, if items in delivery are batch split and "shipment cost relevance" check is not removed from shipment type then, only batch split items get copied in invoice. Header item is deleted and invoice gets saved, which should not happen.I don't get error in this scenario.
    How should I make the error in invocie work in case of batch split items also? Could anyone please let me know?
    Thanks!

    Dear Manmeet Mohan K,
    Can you please check the copy controls in between delivery document to invoice(VTFL)
    Thanks&Regards
    Raghu.k

  • Freight capitalization for STO process using shipment cost document

    Dear MM experts
    I have been testing and trying to charge freight to material using transportation module. I know how to do it in simple STO process without SCD (shipment cost document) but I am not able to do it with SCD.
    I have searched and tried every link I found on SCN. Unfortunately there are many open threads and non of them is answered or giving complete solution. For example I have tried this link where Ajit Kumar has explained the scenario in detail I am but unable to achieve my result. I have also tried other links and SAP note 427944 as well.
    Now what thing confusing me is accounting entries and documents/steps where these accounting entries will be posted.
    My current process is like this in plant to plant transfer under same company code
    STO > OBD > Shipment Document > PGI > Accouting Entry with 641 movement type. Material account debit and same account credit. > Shipment Cost document > GR with 101 without any accounting entry > Transfer freight cost to FI using Freight Service PO determination > Accounting Entry Freight Outward Expense Debit and Freight Clearing Account Credit > MIRO > Accounting Entry Freight Clearing Debit and Vendor Credit
    As you can see we are booking freight as an expense and not charging to material. Now what I want is that freight should be charged to material. If I am sending material from plant P000 to plant P201 under same comapny code then freight charges should be added in material cost in plant P201.
    I have done FRB1 condition type with accrual and copy shipment cost tick mark and other stuff suggested in all those threads but it is not working.
    My requirement is to understand the points where and what accounting entries will be created as per my new scenario which is same as old one except one difference which is to charge freight to material instead of booking expense in freight service PO.
    Lets take an example that material cost price is 100 and freight charges is 50. Now as per old threads at the time of GR against OBD system will create accounting document with 150 debiting the stock in plant P201. What about credit? If we have added freight here then what about 2nd accounting entry in my first scenario in which freight expense is debited and clearing account is credited? Could anyone please explain accounting entries and points where these entries will be posted?
    Another thing is that is it only possible with moving average price to charge freight to material or can we do this with standard price as well using some standard or customized solution?
    Detailed and easy to understand answer will be highly appreciated.
    Thank$

    Hi Moazzam ;
    Firstly, you can benefit Badi/s in package VTRA which is given belowed.
    Secondly , i think that  shipping method --> create sto with delivery --> create shipment document and shipment cost document (problem is starting so system will be create PO and service entry sheet automatically , can you try shipment document is non-related with cost document.
    Thirdly , you can post invoices charge to material with miro , if you success to direct freight costs to stock account (BSX).
    Also , you can benefit doc. sap behaviours for Std price/ Map --> Planned & unplanned delivery costs in mm
    I hope , you can manage your process ; for me standart way is the best.
    Regards.
    M.Ozgur Unal

  • Delivery costs with shipment costs

    Dear Sir,
    I want to capture the delivery costs from shipment cost document.
    I did all bellow mentioned settings:
    For freight cost to be transfered as delivery cost, the Purchase order need to have a freight condition with zero value. Also the freight condition need to have indicator set in config for 'copy shipment cost'. Once this is set up and shipment cost document created, do PGI and it should create a DCGR document in PO History.
    Even after all these settings, i tried but no result. It is not creating ths DCGR in PO History.
    Can any body tell me this bellow setting: Where is this exactly. I tried no field with the name Relevant for costing
    Shipment cost item categories Under the Shipment cost types and item categories activity, set the Relevant for costing field to A = Relevant for calculating delivery costs (Delivery costs). This results in the shipment costs not being transferred directly into accounting. The accounting is done via the purchasing functionality for delivery costs.
    Can any body give me the solution?
    With regards
    Lakshmikanth

    Hi
    I think that you have had your question answered so if you are happy with this can you please award points if you want to but mainly can you please mark your question as answered so that it is easier to navigate around the open questions in the forum as the number of pages are growing and growing and it takes too long to go through everything especially if a satisfactory answer has already been given and people like me who want to help will give up and so some people may not get any help.
    Thanks for this
    Frenchy.

Maybe you are looking for

  • Problems with ipod connection.

    Problems with ipod connection. I have problems to connect my ipod to computer windows 7. When I connect I get the following error: "We encountered an ipod, but could not be identified correctly. Disconnect and reconnect the ipod and try again." And i

  • How can I refresh a calling page on return from a TF activity ?

    Hi, I have a (sounds easy) case where a view activity invokes a BTW with fragments. The called BTF has been declared with isolated data control scope. Inside the BTF some updates happen and when the BTF returns the calling view should display the mod

  • I cannot get my macbook contacts to sync with my ipod

    I have an ipod touch 8GB and an iphone4 and a macbook pro with Lion.  I was able to update the phone to ios5 and all is working fine there. I understand I cannot upgrade the ipod touch to ios5 because it is really not a 3rd generation device but I st

  • 30-pin adapter iPhone 4 to 6 Lightning

    I'm looking for a 30-pin adapter iPhone 4 to the new iPhone 6 Lightning . As I have a new iPhone 6 instead of iPhone 4 . Made by Apple . Any advice will be appreciated Thanks

  • ASA 5512 ver8.6(1)2 Turning off Flood Protection for a UDP range

    Hello, I've got a client that's using a file transfer program that uses UDP range 30001-30021 for data and TCP22 for control. The program, Aspera, can have up to 2000 connections a second and is causing the ASA to think it is under attack. Is there a