Co products and by products during production process

hi,
I have a production scenario where in both co products as well
by products exists during production process.
We can maintain co products by choosing the indicator in material master and in BOM but how should i maintain the by products?
And also, co products and by products produced will undergo further production process with different operations, in this scenario how I can include these operations and products in my production planning? and how the costs are calculated?
Can any one please help in this regard.
Thanks and Regards,
Pavan

Hi
For Co-product just by choosing the indicator in material master and in BOM.
So when ever u confirm the production order co- product GR done automatically through 101 movement type.
For By-product
1) u have to enter the byproduct code in the BOM with -ve sign if ur by-product is fixed qty.
2) If ur by-product is varying qty then u have to post the by product qty through MIGO 531 movement type against the production order.

Similar Messages

  • Scan products by bar code during packing process

    Hello al SAP experts,
    During packing process in my company, for some products of  finish goods we would like to  scan them by bar code one by one ( like a point of sale in a super market) instead of scanning the material number and typing the quantity.
    Like in serial mode where you scan one by one we would like to do it also for non serial products- to scan the catalog number
    (or the EAN/UPC code) and the system will sum up the quantity according to the number of items scanned.
    Are you familiar with such an option?
    Viky Sloutsky
    SAP SD Consultant

    Hi
    Scanning barcode at packing means, do you mean scanning the HU/carton? can you explain your requirement in little more detail?
    We do have the similar requirement & its happening through RF gun. Have barcode for the HU/Carton ready, scan that which creates carton> then pack the product>scan the carton for the SSCC number which gives assurance for the right SKU, qnty & process PGI further.
    Rgds
    Ramesh

  • BOM and routing selection during production order creation

    I am having a material which is having only one BOM and one routing. Now for this material in the material master in the selection method indicator i have put as 3 as selection only by production version. But i have not maintained any production versions in the work scheduling view for checking purpose. now when I am creating a production order for this material manually through CO01 system is allowing to create production order. when is the selection is only by production version how system is allowing to create production order when there is no version is maintained.

    Hi Kumar,
    Looking into scenario as u have maintained,if you have define the selection id and not maintained the production version then it should ask for the production version and show the following
    Since the production version is missing, you cannot execute the desired processing step.
    As well as pls look into OPL8 ,what Production Version is maintained.
    Thanks,
    Mohit
    Edited by: Mohit Sharma on Feb 4, 2011 5:35 PM

  • Architecture for base Product and customized versions of product

    Hello
    We have a product written in Flex.
    We have several customers who have this product. The product is customized to each customer.  When starting a new project, we copy the project of a customer who had similar requirements, and then make further changes.
    We have this idea to have a base product layer and then have a customization layer where we can place project and customer-specific fuctionalities.   Also:  when we update the base product, these updates can be incorporated into the customized versions.
    I wonder how can you accomplish this in Flex?
    Thank you,
    Juan Esteban

    Developing a good plug-in architecture is *hard*.However, it's definitely worth it. The best approach will depend on exactly what you want to do. At the high level, you can:
    1. Write the base application and load plug-in modules, and allow them to changes aspects of the application behavior or style
    2. Turn your base application into a core application logic library and a (separate) custom component library, and turn each customer implementation into a new project that leverages these.
    If you use dependency injection (e.g., SmartyPants or SwiftSuspenders), you can allow (1) a fairly flexible manner of interacting with the application without depending on gynormous "context" objects. You just need to perform injections on the loaded plugins, and they can pick up any dependencies without having to worry about anything else.
    Whether (1) or (2) makes more sense will depend on exactly what you're trying to do, but in general, (2) is more flexible while (1) is somewhat simpler (and generally less per-implementation work).

  • When will Apple South Africa start selling newly launched Apple products and not out dated products?

    All the Apple stores as wll as the istores in South Africa always only start to sell new lines a year or two after the lines were launched. I always have to inport all my Apple products as it is never for sale in my country.
    It defnetly give Apple a bad name in Africa and that is why Apple is looked down to here in Africa. Android, p.c and linex is strong here because its afalable as soon as it enter the market but by the time we can buy the Apple product android have newer apps ect.
    I ask out of the bottom of my heart, please Apple PTY LTD. Get your Africa suppliers and branches up to date.
    Daniel

    We are fellow users here on these forums, you're not talking to iTunes Support nor Apple - I've asked the hosts to remove your phone number from your post (it's not a good idea to post personal info on any public forum).
    We won't know if/when current models might be sold there. If you want to leave feedback for Apple then you can do so here : http://www.apple.com/feedback/

  • Problem with item and/or data during page-processing-PS/SQL

    Greetings!
    On my page I have a custom report (from 2 tables) and a small form-field, that adds and edits data in the report. After generating the form with the wizard I added an extra item, to store the id from one of the tables from the report data.
    Now, on submit a calculation should take place, that updates data according user input with a procedure in Page-Prosseses:
    declare a number;
    begin
    case :PLATZ
    when 1 then a:=100;
    when 2 then a:= 50;
    else a:=25;
    end case;
    update TBL_MITGLIEDER set TURNIERPUNKTE = TURNIERPUNKTE + a
    where ID_MITGL = :P14_ID_MITGL;
    end;
    :PLATZ is user selected (1,2,3), :P14_ID_MITGL stores the reference to TBL_MITGLIEDER (and shows the change, when I select another record)
    As I understand, that process should also run, when I submit a chance, but nothing happens then.
    But when I try to save a new record (which worked without any problems before adding that process), I get this error message:
    ORA-06550: line 1, column 64: PL/SQL: ORA-00957: duplicate column name ORA-06550: line 1, column 7: PL/SQL: SQL Statement ignored
         Error      Unable to process row of table TBL_TURNIERSIEGER.
    Then, when I go back into the app-builder and try to run the page again, I get this message:
    ORA-01403: no data found
         Error      Unable to fetch row.
    I am not sure, if you guys have all the information you need, to know whats going on. Maybe this has to do with session-id and the whay, items are updated. I hope you can help me.
    Thanks, best regards,
    tobi

    First can you please post all log file errors
    >> I can't really give you a solution or specific recommendation since I did not saw this error yet myself, but on your own risk you can try:
    1. You may try to just register 'dts.dll' using regsvr32.exe, but this error may indicate a bigger problem with setup.
    If you are running SQL Server 64bit then try running this at the command prompt: %windir%\syswow64\regsvr32 "%ProgramFiles(x86)%\Microsoft SQL Server\90\dts\binn\dts.dll"
    2. You can try reinstall from start (In this case you have to make sure that you un-install all)
    [Personal Site] [Blog] [Facebook]

  • Reading VBAK, VBAP and VBFA table during a process

    Hi friends,
    I have an execution DUMP in a Z report, so I would be very thankful if you can give me your expert opinion.
    I have a Z report which collects some information into an internal table. After that, I need to go over each record and read VABK, VBAP and VBFA tables and compute some quantities. It is not possible to do this in another way because I need to get some information first.
    Of course, each table is being read in the corresponding sequence (1st VBAK, then VBAP and then VBFA and at the end LIPS table) using the key or part of it. The problem is that if the user wants to execute the report online, it will be finish in a dump at this routine.
    My question is if it is possible to skip the dump getting VBAK and VBAP tables in memory and instead of reading directly, read them from memory. Notice that if I do this I need to put almost the entire table into memory. So, do you think that I will earn time or it will be the same or worse?
    Thanks in advance & kind regards,
    MMP.

    Hi everybody!
    We applied the note but it doesn't help. We realized that we have a problem with records quantity, so the key user is going to analyze which other parameter could be helpful.
    Thank everybody very much!
    Kind regards.

  • Acrobat Pro 6 Average Daily Production and Math.round problem

    Acrobat Pro 6 Average Daily Production and Math.round problem
    (Production.0) (154) (whole units) . (Production.1) (90) (fractional) / (divided by) 31 (days) results in (Average.0) (4)(whole units) . (Average.1) (10) (fractional) using :Math.round.� Noticed that 154 (whole units) . 85 through 99 (fractional) also show 4.10. (without Math.round : 5.00)
    Method:
    �Production.0� (whole units) . �Production .1� (fractional) / Days = (Average Daily Production) (�Average.0� (whole units) . (Average.1) (fractional)
    � Production.0 (value not calculated)�, � Production 1 (calculated) (event.value = util.printx("0099", (event.value)).substr(-2,2); � �Average.0 (value not calculate)�, and �Average.1 has following calculation:
    var punits = this.getField("Production.0");
    var pfrac = this.getField("Production.1");
    var average = 0.0;
    average = (punits.value + pfrac.value / 100) / this.getField("Days").value;
    this.getField("Average.0").value = average - average % 1;
    this.getField("Average.1").value = util.printx("0099", Math.round((average % 1 * 100))).substr(-2,2);
    �Math.round� appears to be a problem. Also, could you explain the purpose of �0099� . Anyway, why would 154.85 through 154.90 divided by 31 give 4,10. Also, their must be a better way, to find the average daily production. All you have to do is divided the production (whole. fractional) by the days, and display the average daily production as (whole. fractional). Any suggestions??

    There are a many loose ends in your question.
    First, I have never seen before a variable type called 'var'. Is it a java primitive or a class?
    Next, I cannot seem to find any class that has the printx method.
    When it comes to substr(-2,2), I get confused. First, I thought that it was a method of the String class, but I only got as far as substring(beginIndex, endIndex).
    If you really must break the production and average into pieces, try this:
    float average = (punits + pfrac/100) / days;
    int avg_units = (int)average;
    int avg_frac = (int)( (average - avg_units) * 100 );My guess is that util.printx("0099", x) formats x having two optional digits and two mandatory digits, showing 0-99 as 00-99, but allows to show numbers with three and four digits.
    154.85/31 = 4,9951612903225806451612903225806
    154.99/31= 4,9996774193548387096774193548387
    If you round the fraction of theese numbers multiplied by 100 ( = 99.51.. and 99.968...) you get 100, and this will be the output of printx. My guess for "4.10" is that substr(-2,2) returns the two first characters of the string, because the start index should not be zero. (According to java docs, substring throws an exception on a negative index, so what kind of class are you really using ??????)

  • CREATING SERIAL TRACEABILITY DURING PRODUCTION PROCESS IN DISCRETE MANUFAC

    We are manufacturing part with serial number identification.
    We can identify the history fo material + serial combination only after completing our production and transfer completed part to storage. 
    We are interesting in creation serial history / traceability during our production process.
    WE could not found any solution via Phase confirmation or via Equipment management or even Material movements
    We must to know in what operation sereal number exist in real time traceability.
    With regards.
    B. Betzer

    Basically the Serial Number is Unique irrespective of the operation.
    That will be carried out through outthe life cycle in the way of particular Material+Serial Number combination
    So you can give the Serial Number in the Particular Work Order and Operation
    I assume there will be a Marking Machine that needs to Punch/engrave/print the Serial Number and you are interested to give work order to that machine
    Prabakaran K

  • Consumption during the processing time of the production order

    Which adjustments must be made in the material master for the calculation of the lot size in the MRP run, that the consumption of the material during the processing time of the production order is considered for the calculation of the lot size.

    Hi ,
    You have to judiciously indicate  the re order point  in the material master(  the re-order point is the sum of saftey stock and consumption during replenishment lead time).
    How ever , this does not in any way influence the lot size , but only influence the no of lots i.e the procurement proposals. The lot size is determined by the lot sizing procedure selected by you , depending on various factors like agrrements with your vendor , optimum lot sizes to reduce the cost of procurment and storages etc.
    You can refer to the following url for details on lot size :http://help.sap.com/saphelp_47x200/helpdata/en/fe/819b9f643b11d3b4e40004ac160649/frameset.htm
    and  for details about re order point :
    http://help.sap.com/saphelp_47x200/helpdata/en/db/6f143ea7ec11d3a8330000e82a3c24/frameset.htm
    Hope this information will be useful.
    Regards
    Raghuramam.

  • Waiver process during Production order

    Hi,
    My client has a requirement whic is called as waiver process, whereby a part could be replaced by another alternative part during production order process, however the whole process need to be integrated with ECM and workflow for seemless communication and approval.
    Has anyone come across manufacturing waiver process and can this process be designed within ECC60 or is it better to look for MES or MII tool to address the business requirement?
    Appreciate any response concerning this topic.
    Thanks and regards,
    Bhaskar

    I resolved this issue by using the process in SAP ME and ECC, using WIP processing in MES.

  • Rejection and scrap during production

    hi
    During production process many child items get wasted and the finished product received is lesser than the planned.in system where we can reduce the child items during receiving?and also the the scrap or rejected items should go in other wharehouse.Please solve it.
    Thanks

    Dear Sir,
    At the time of Report Completion, instead of complete ,  you can choose the option reject the parent item. Here you can also select different warehouse.
    Please see following documentation on production process:
    https://websmp106.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_HIER_KEY=701100035871000371280&_OBJECT=011000358700004837182004E&_SCENARIO=01100035870000000183&
    Regards,
    Preety Goel
    SAP Business One Forums Team

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Please uninstall and re-install this product Error Code 6

    I have 7 users running single licenses of Adobe Acrobat X Standard and 5 users running a multi license version of Adobe Acrobat X Pro. between Wed 14/01/15 and Thursday 15/01/15 all of these products stopped working on all machines. All machines are windows 7 machines. They are throwing up
    "Configuration Error"
    Please uninstall and re-install this product.
    Error code 6.
    It then closes the program
    When i run this product as an administrator the error message still appears but it allows the program to run. When i then close the program it does not close to process so the next time i open adobe it gives me the error message that the product is not licensed. I assume this is due to the product running in 2 instances.
    I have tried:
    un-installing the product,
    i have currently set all my users to local admins to have a work around.
    I have used the adobe clean up tool and removed everything i can think of to do with adobe.
    I have re-registered the products
    I have edited to permission and followed the guide for Error Code 16 as it was a similar problem.
    None of the above has worked so far.
    This is now a matter of urgency and any help would be appreciated.

    Let's try a standalone Apple Application Support install. It still might not install, but fingers crossed any error messages will give us a better idea of the underlying cause of the issue.
    Download and save a copy of the iTunesSetup.exe (or iTunes64setup.exe) installer file to your hard drive:
    http://www.apple.com/itunes/download/
    Download and install the free trial version of WinRAR:
    http://www.rarlab.com/
    Right-click the iTunesSetup.exe (or iTunes64Setup.exe), and select "Extract to iTunesSetup" (or "Extract to iTunes64Setup"). WinRAR will expand the contents of the file into a folder called "iTunesSetup" (or "iTunes64Setup").
    Go into the folder and doubleclick the AppleApplicationSupport.msi to do a standalone AAS install.
    Does it install properly for you? If so, does iTunes launch properly now?
    If instead you get an error message during the install, let us know what it says. (Precise text, please.)

  • QM inspection at various quality gates during production

    Hi All,
    We need clarification on how to plan inspection during production at various stages.
    1. How to trigger and use inspection point planning at various inspection stages??
    2. How will the characteristic be activated, processed and closed at various inspection stages??
    3. How to define different characteristic at different inspection stages?
    4. Will a single inspection lot be generated for entire production of a machine or separate lot will be generated at all the inspection stages??
    If possible, please provide the process flow.
    Thanks & Regards,
    Ritesh

    First questions
    1. How to trigger and use inspection point planning at various inspection stages??
    .. QCC0 > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points
    2. How will the characteristic be activated, processed and closed at various inspection stages??
    .. When user define new inspection point at result recording, system activates the characteristics automatically based on inspection plan.
    3. How to define different characteristic at different inspection stages?
    .. Not possible with inspection point function in SAP standard
    .. You have to define all characteristics at inspection plan or use add characteristic function at result recording.
    4. Will a single inspection lot be generated for entire production of a machine or separate lot will be generated at all the inspection stages??
    .. It depends on production order process because inspection lot for production is generated based on production order.
    Second questions
    1. How can we define partial inspection points within production processes?
    .. QCC0 > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points
    2. Process to activate and process characteristics at every inspection points?
    .. Yes
    3. Is it possible to allot score against those characteristics during inspection?
    .. Allocation is not possible, only add is possible.
    4. How is partial check points processed and closed?
    .. You can define it in operation header detail of inspection plan.
    5. Is defect recording done at every inspection point or at the end?
    .. Every inspection point
    5. How to summarize the result and close the inspection lot finally??
    .. System summarize the result automatically when you execute usage decision transaction.
    Regards, DoWook Kim.

Maybe you are looking for

  • Report Builder 3.0 launch issue in SharePoint Integration mode

    Hello, I'm facing issue when opening the report builder 3.0 tool. Report server is configured in SharePoint Integration mode. I already have the FQDN configured for report server and in SharePoint (AAM) but still it fails when the end user is trying

  • External Drive/Back-up

    I'd like to purchase the LaCie 2big Quadra (2 TB) external drive to use in RAID 1 mode to edit and to use as a back-up for a single project. Here's the link: http://www.lacie.com/us/products/product.htm?id=10310 Can anybody please advise about your e

  • Firmware upgrade query

    Hi Guys, Is there a newer firmware version for my N70? I currently have: V 5.616.2.0.3 24-04-06 RM-84 Thanks in the future "Only two things are infinite, the universe and human stupidity" Previous phones:5110,3210,6210,5210,7650,6600,3660,7610 Curren

  • Firefox keeps opening the Add-ons page

    Whenever I launch Firefox or open a new tab, the add-ons page opens. This has been happening since I updated to Firefox 4 a few days ago. I've tried disabling all the add-ons I have but it makes no difference. I've also turned off updates for add-ons

  • Row level validation for Master-Detail form

    OA JDeveloper 9i (RUP5) 9.0.3.5 (Build 1453) I have a form which is based on a master detail relationship. - For each employees details (Advancetable) based on a EO (AbsenceInputsEO) - For each employee you can add one or more allowances records (Adv