CO07 - got error Reference operation set DOOR not found

Hi PP Experts,
I'm unable to create prod order without material (transaction CO07).
The error says 'Reference operation set DOOR not found',
but I can't click the error to find the message number.
I checked that reference operation set DOOR has been created correctly.
Please give me some light.
Thanks and regards,
Thomas Wahid

Many thanks for all your suggestions.
The problem is now solved.
We use the unit SHE, this is actually the commercial of unit ZSH, you can see it if you check in CUNI.
The referenced operation set DOOR uses unit M3, but we do not have the same dimensiond in CUNI.
The unit M3 has dimensions VOLUME, but the ZSH has not been assigned any dimension so it get the default one AAAADL which is different, so the system can not convert the unit and the error happens.
Best regards,
Thomas

Similar Messages

  • Error 48: File or folder not found when using photomerge panorama - imac photoshop elements 10

    Any help is appreciated.  Followed the photomerge panorama instructions and got error 48: file or folder not found.....line 16 ...
    using photoshop elements 10 on imac with OSX 10.8.2
    Thx

    Have you recently updated your Operating system? Please try repairing permissions for your hard disk.
    Please check the help document to know more about repairing permissions http://helpx.adobe.com/x-productkb/global/error-licensing-stopped-mac-os.html#main_Solutio n_3__Repair_Disk_Permissions

  • Rework using reference operation set

    Dear Gurus,
    Am working in an ECC 6.0 environment.
    Want to create rework order using reference operation set.
    Master data created:
    BoM
    Reference Operation set to which the header material is assigned to which a BoM is assigned.
    The settings in OPL8 for order type ZXXX are:
    Production version :  manual selection
    Routing:
    Application: Routing
    Selection Id: RW (priority 01, task list type 'S', and usage 1)
    Task list type: S
    Routing Selection: 4
    BoM:
    Application: PP01
    Create a production order (CO01), with order type ZXXX. The system asks to select the task list group once the order quantity and dates are entered. On selection of the Group for the reference operation set system generates an error 'No valid BoM exsists for Material xxxxx Plant xxxx'.
    SAP helps says - A reference operation set cannot be used directly in production.
    Am I doing something wrong?
    Your expert advice please.
    Tarang

    Dear first create a reference operation set go to CA11 just press enter without entering anything then enter plant,usage,status and lot size in component allocation you can select the required BOM and assign with the operation.
    and create the order in CO07 enter the plant and order type in next screen don't give any material code give description rework and give the quantity to be reworked and in components give the required components for consumption during rework before this you need to give the reference operation set group and task list in the popup and in settlement rule maintain the category and settlement receiver and save the order.
    You can confirm the order in CO15 by providing the order number and enter the yield quantity to confirm and save.
    Please note that during this rework order confirmation, only Goods issue will happen based on the input given in the components tab rework order and NO GOODS RECIEPT will happen.
    Cheers
    KK

  • Prod.Order Creation- Using Reference Operation set.

    Hi
    While creating a production order of particular order type,after entering the quantity and order finish date as today's date(05.06.2007),backward scehduling,it's showing no routing found for the material (as we are using REM-Repetitive manufacturing,we are having rate routing) ,and in the same mesaage box itself I choosed the Reference operation set(that I have created today) and entered the  group no,and after entering its showing me an error as <b>Ref. operation set 50000008 is not valid according to the selection conditions</b>,
    So I created a routing for the same material nd in MRP4 view of the same material under for selection method i kept blank(Selection by order qunatity) and tried to create Prod.order,and there was no problem,but if the same i'm trying to create using Reference operation set I'm not able to create the Production order.
    Kindly give me a solution for this,Is there anything to do with order type dependent parameters of the particular order type?
    Thanks & Regards
    Raj

    Hi,
    Is your problem solved ?
    One more solution to create a order with reference operation set,is to use a trigger point.
    Once you create a reference operation set.
    Use T.code co31 to create a trigger point, chosoe create order with reference & choose a system status eg: PCNF. & click the user parameter tab.
    The system will aks for the reference operation set no & group counter.
    Then assign this reference operation set to the routing operation.
    When you do partial confirmation of this operation, this will trigger the generation of a order.
    Regards,
    Senthilkumar SD

  • Is it possible to transport Reference Operation Sets?

    Hallo,
    I want to transport Reference Operation Sets from the productive to the consolidation system. Later on I want to transport the Sets back to the productive system.
    Is this possible with a transport request or is their any other possibility?
    Thx in advance!

    Markus Meier ,
    To my knowledge there was a 3rd party tool named Infoshuttle which is add-on to SAP, if you have that in your system then it is possible to transfer transaction data from Production to Non-Production system. It can also transfer from Non-Production system to production system though this is NOT recommended at all as it could create data inconsistency.
    [Information on Infoshuttle|http://www.erpgenie.com/products/infoshuttle.htm]
    Hope this helps....
    Regards,
    Prasobh

  • CA11: How copy a reference operation set without its materials attribution

    Hello gurus
    I have a reference operation set that has many materials attributed.
    Using transaction CA11, when I create a new reference operation using the functionality copy from the existing operation set, also the material attribution are copied in new one. How It is possible to avoid that. I would like to copy only operations not the materials attribued.
    Thank you in advance

    Was it really necessary to post the whole API description?!?
    Locale[] locales = Locale.ENGLISH();ENGLISH is not a method in class Locale, so do not add the braces "( );".
    Also, the constant ENGLISH is not an array, but just a single Locale object.
    You didn't say what your problem was. What do you want to achieve with your program and what is it that you don't understand?

  • Assignment of Reference Operation set to routing.

    Dear Experts,
    This is regarding the assignment of a reference operation set to a routing. We have one ref. op. set which is applicable for some 30 variants of our products. Now, we need to assign this ref. op. set to the existing routing. The follwoing points are to be taken care of:
    1. Set up, m/c time, etc are allocated based on the operation number.
    2. Change in the operation number leads to the change in these values. This is not acceptable.
    Now when assigning the ref.  op. set to the routing using the t. code. CA02, the systems asks for operation increment  say 0010 (mandatory field). If we accept this value, the operation number  follows a different sequence. Consequently, the setup, m/c times gets upset. This is due to upsetting of the operation number sequence.
    How can we assign the ref. op. set to the routing without upsetting the operation number sequence i.e., copying the operations as it is in the ref. op. set.
    Pl. suggest.
    Regards,
    Pradeep Santara

    Dear Sharavan,
    Probably, i have not been able to explain the issue. I will give it another try..
    Say for the ref. Op. Set the operation sequence is 12, 14, 19...so on
    But when we assign the Ref. Op. set to the routing CA02, the at the intial screen we come across one mandatory field "operation srl. no. increment", if we use 0010 in that field . The system copies the ref. Op. set with operation serial nos. starting 00,0010,0020 onwards and not in the order of 12, 14, 19....so on...
    If still not clear pl. revert

  • Delete reference operation set CA12

    Hi,
    how to remove "reference operation set " so that isn't visible on list of searching ?
    regards
    Artur

    Dear Arthur,
    1) in CA12, input Group number & enter
    2) then select the operation & Got o EDIT option in menu bar
    3) now press on delete, os that this particular operation will be deleted
    Regards
    kumar

  • Creating reference operation set using RCPTRA01

    Hi Experts,
                      I have to create a LSMW for reference operation set (CA11) by using the program RCPTRA01.I dont have to create the routing. Can this standalone task be acieved using the above mentioned program.If yes then please provide me the steps for the same.If no,then why?
    Thanks
    Abhishek

    Hello Abhishek,
    I am trying to do Reference Operation Set upload with component allocation using RCPTRA01 program in lsmw.
    Even though  i assign values to BIMPZ structure fields the component allocation is not happening.
    Could u please give some inputs ?
    Thanks!
    Regards,
    Deepali

  • Phantom, Assembly, Reference Operation Set

    Hi All,
            I am always having a little confusion with follwoings, so could you please help me to understand clearly will be grateful.
    What is Phantom ?
    What is Assembly ?
    What is the difference between Phantom & Assembly ?
    What is Reference Operation Set ?
    What is the difference between Routing and Reference Operation Set ?
    At which situation Reference Operation Set is used instead of Routing in SAP?
    Thanks in Advance

    Hi Madhan,
    Phantom
    Phantom assembly is a logical grouping of material.
    Design point of view it is assembled.
    Physically not assembled, but logically it is assembled.
    Ex: CAR
    BOM Header: CAR
    Item: ENGINE
    For ENGINE: Items are cylinder, piston, crankshaft....Here engine is phantom... while manufacturing car, engine is mandatory so if u assign engine as phantom it won't create planned order for engine. We can direct issue the materials (such as cylinder, Piston, CS) to car; by that time it reduces the work of issue and receiving goods to engine assembly.
    But if u want engine as spare parts that time u can create planned independent requirement for engine and u can stock as ordinary processes...
    In material master of MRP 2 view spl. procurement key - 50.
    or Assign in BOM item - make tick mark in phantom assmbly.
    If you create in material master wherever the material, system consider as a phantom.
    If you mark in BOM, only that particular BOM, system consider as a phantom.
    There is no stocking of phantom material
    Routing and Reference Operation Set
    Refer below link
    Routing & Reference Operation Set
    Regards,
    Sankaran

  • Reference operation set:tr CO48

    Hi guys,
    while I 'm running the tr.CO48 to convert partially a planned order the system have given me the message 'Reference operation set ..&..not found(check entry) ' but I have cretaed the operation set and it exist..which is the meaning?
    Thanks in advance
    Best regards
    Massimiliano

    dear Massimiliano,
    check following things
    1) Check the plan order start date, On that date the Reference operation set is valid?, IF not change the start date in plan order and then try to convert to production order
    2) Is the reference operation set is Released? if not change it to release in Header
    3)  check are you assigned the finish material to that reference operation set by clickimg material assignment If not maintain it
    and then try to convert to production order

  • Java SOAPClient RenderFormException error is: operation style: "rpc" not supported

    Hello,<br /><br />I am trying to get a simple command line test program to invoke the Adobe Form Server 7.0's AdobeFSService and generate a PDF. <br /><br />The following is the method code<br /><br />private static byte[] getPDF(byte[] inXML)throws RenderFormException, IOException {<br />          byte[] cContent =null;<br />          <br />//          Create a SOAPClient object<br />          SOAPClient formServer = new SOAPClient();<br />          String sEndPointURL="http://adobeformserver:8080/jboss-net/services/AdobeFSService";<br />//          Set the soap end point<br />          formServer.setSoapEndPoint(sEndPointURL);<br />//          Declare and populate local variables to pass to renderForm<br />          String sFormQuery = "test.xdp"; //Defines the form design to render<br />          String sFormPreference = "PDF"; //Defines the preference option<br />          String sContentRootURI = "http://adobeformserver:8080/myapp/Forms/xdp";<br />          String sTargetURL = "http://<AppServer>:<AppPort/LoanApp>/HandleData";<br />          String sApplicationWebRoot = "http://<AppServer:<AppPort>/LoanApp";<br />          <br />                    <br />          try{<br />//               Call renderForm<br />               IOutputContext myOutputContext = formServer.renderForm(<br />                         sFormQuery, //sFormQuery<br />                         sFormPreference, //sFormPreference<br />                         inXML, //cData,<br />                         "CacheEnabled=False",//sOptions<br />                         null,//sUserAgent,<br />                         null, //sApplicationWebRoot<br />                         null, //sTargetURL<br />                         sContentRootURI, //sContentRootURI<br />                         null //sBaseURL<br />               );<br /><br />               <br /><br />//               Create a byte array. Call the IOutputContext interface's<br />//               getOutputContext method<br />               cContent = myOutputContext.getOutputContent();<br /><br />               <br />          }<br />          catch(RenderFormException rf){<br />               System.out.println("RenderFormException error is: " + rf.getMessage());<br />          }<br />//          Catch a thrown exception<br />          catch (Exception ioEx)<br />          {<br />               System.out.println("Exception error is: " +ioEx.getMessage());<br />          }<br /><br />          return cContent;<br />     }<br /><br />I can generate the WSDL correctly when i hit the AdobeFSService,<br />but when I run this program, I get an error <br /><br />RenderFormException error is: operation style: "rpc" not supported<br /><br />Can somebody please give me some insight or suggestions<br /><br />Thanks,<br />Kevin

    Got it to work, There was a problem with the libs I used in the CLASSPATH.
    I then changed it to use libraries from JBoss 3.2.5's jaxrpc,saaj,..., the jars in the client dir, and Axis 1.4's libs
    Works like a charm.

  • Problem in Component Allocation using RCPTRA01 for Reference Operation Set

    Hello,
    I am trying to do Reference Operation Set upload with component allocation using RCPTRA01 program in lsmw.
    Even though i assign values to BIMPZ structure fields the component allocation is not happening.
    Could u please give some inputs ?
    Thanks!
    Regards,
    Deepali

    Hi,
    Check this link, if it can help you.
    http://help.sap.com/saphelp_45b/helpdata/en/35/a47e3b763e0392e10000009b38f9b7/content.htm
    Reddy

  • Link for reference operation set

    Dear SAP Guru's
      Can anyone provide me the link for Reference Operation Set in SAP Library?
    Thanks in advance
    Regards
    Kalyan

    Dear kalyan,
    i think ur looking for Rework order, Reference operation set
    Plz refer my reply from this Thread
    [http://forumsa.sdn.sap.com/click.jspa?searchID=32188014&messageID=8172970]
    Regards
    kumar

  • Reference Operation Sets

    Hello Everybody,
    Can someone tell what is meant by a Reference Operation Set?
    Where can we create it and how can we assign it to the Routing?
    What are the important feilds to be passed to it?
    Please help. Its urgent.
    Thanks,
    Shashi Devi.

    Hi,
    A Reference operation set can be created using transaction CA11.
    Here we can enter a set of operations needed.
    Then in CA01 (create routing) from the operations screen we can add the reference operation set & all the operations from the reference operation set will be copied to this routing.
    Hence whenever we need to create a routing with similar set of operations we can use reference operation set.
    Also to create a rework order we can use reference operation set with the help of trigger point.
    Regards,
    Senthilkumar

Maybe you are looking for

  • How to back up an external hard drive?!

    I have a 500GB external hard drive that I use to store a very large photo catalogue. I also have a 1TB external hard drive that I have set as my Time Machine volume. TM isn't backing up my 500GB drive, and I've verified that it's not on the exclusion

  • Problem with submit information

    dear all, i got problem with the javascript function: function fsubmit(){ document.all.formSubmit.action = "\servlet\SubmitServlet" document.all.formSubmit.submit(); ...onClick = 'fsubmit()' After i execute the function i got this message " Object do

  • IPhoto and Aperture crash on launch, iPhoto and Aperture crash on launch

    Hi everyone. Recently when I launch iPhoto it crashes immeadiately and I have to 'Force quit' the application. I haven't been able to use it for weeks! I decided to purchase Aperture and when I open it I get the same problem! Both iPhoto and Aperture

  • Insertion of data to MS SQL Server is not happening via SOA layer

    Hi, There is a requirement in our project to take the data from Orcale EBS and insert into a different legacy and it is a MS SQL Server. So it makes it Orcale DB to SQL Server. When i manually insert data to a table in SQL Server it's working fine. W

  • Space management in exchange

    what kind of metrics do you need to monitor when it comes to capacity monitoring of exchange 2010? is it just the actual remaning disk space, or do you define thresholds for each element of exchange, i.e. mailbox database, public folder database, lo