Hi everybody:
I'm confirming Fert items by the MF42N in REM and, i've a Repetitive Manufacturing Profile with  GI backflush at GR posting activated as well as Post Activities with Using data from prelim. costing  f. prod. cost collector but, in the product cost collector they are not updated (the activities) because the materials movements yes.
When i confirm by the MF42N but with "Post with corrections" and i mark the Activities, it's all right.
I need to do this posting of my activities in automatic way with de MF42N without "post with corrections".
somebody can help me please?
Thanks
Omar Perea

Mr Prabakaran:
Thanks for your help, I reviewed my Profile for REM, your advice was good, but, i need the next:
I need that the posting for the activities will be in automatic, just with the confirmation, that is to say, i've in my routing the times for these activities originating from my Work center, but... when i do the confirmation (MF42N) just the materials are doing the respective GI & GR, but not the activities, then i go to the MFBF and select the Confirmation for Activities for posting it and all right, so this do not is useful for me, i want not go to the MFBF nor to "post with Corrections" in the MF42N
Would you help me whit this? If you wish i can send you in a e-mail some screens of my case.
thank you in advance

Similar Messages

  • What are  Pre Database Copy and Post data base copy activity list, Pre Migration and Post Migration activity list from SAP BW 7.0 to SAP BW 7.4 SPS6.

    BW on HANA :  Pre Database Copy and Post data base copy activity list, Pre Migration and Post Migration activity list from SAP BW 7.0 to SAP BW 7.4 SPS6.
    We are trying to copy database from SAP BW7.0 to SAP BW on HANA 7.4 SPS6 so we are in search for list of steps or activities during database copy both pre and post steps.
    Along with the above we are in search of Pre and post migration steps ones database is transferred successfully from oracle to HANA on 7.4 SPS6.
    Kindly help us in getting the exact course of action as requested.
    Thanks and Regards,
    Lavina Joshi

    Hi Lavina,
    try this link for starters: Upgrade and Migration - BW on HANA | SAP HANA
    Points to remember are:
    Preparation:
         -- Hardware Sizing
         -- Preparation of Data Centres
         -- HANA Hardware preparation
         -- System Landscape Readiness (upgrade software downloads, system readiness checks, etc)
         -- House Keeping activities on BW system (data clean up, etc)
    Post Installation:
         -- Sanity checks / Preparation and License checks
         -- JAVA Configurations
         -- Infoprovider conversions 
    Overall Stages are described below:
    # Environmental setup (HANA box)
         -- Initial system checks and Building Activities (system copy, Appln server setups, etc)
    # System readiness
                   - ZBW_HANA_COCKPIT Tool
                   - ZBW_HANA_CHECKLIST Tool
                   - ZBW_ABAP_ANALYZER Tool
                   - ZBW_TRANSFORM_FINDER Tool
                   - SIZING Report
                   - System Clean up Activities
                   - Impact of 7.4 on source system checks
                   - Java Upgrade for portal
    # DMO Stages
                   - Preparation & Pre Migration checks
                   - Execution / Migration
                   - Post Migration Activities
    # Testing Phase
                   - Source system checks/Activities
                   - System and Integration Testing
                   - End to End Testing
                   - Performance testing
                   - Reports
                   - BO reports / Interfaces
    Do let me know if you require any further information.
    Regards,
    Naren

  • Standard report for Activity types in REM scenario.

    Hi PP Gurus,
    Is there any standard report like MCRP, MCP6, MF12 in REM scenario to capture time booked for Activity types? Please revert.
    Thanks & Regards,
    Abu Arbab

    Hi R. Brahmankar,
    Thanks for your prompt reply. We need to track Activity types booked in terms of quantity. We checked all the transaction code that you suggested.
    The track of Activity type is also possible in standard SAP system provided we do Separated Backflush only.
    T-code- MF12:
    Field Name- Production Activities:*
    Production activity posting in worklist
    If you select this indicator, the system only displays the document logs for which production activities still have to be posted.
    The selected documents provide you with a worklist which you process using the separate backflush transaction.
    Thanks & Regards,
    Abu Arbab
    Edited by: abu arbaba on Sep 24, 2008 11:07 AM
    Edited by: abu arbaba on Sep 24, 2008 11:12 AM
    Edited by: abu arbaba on Oct 16, 2008 8:16 AM

  • Use SkyDrive to upload collected files and post screen shot/picture. (Updated: 1/16/2012)

    To help community members troubleshoot issues efficiently, sometimes we need to collect related files (such as Event logs, Network traces, Setup
    log files, Screenshots, etc.) to perform a specific analysis. 
    We can simply use SkyDrive, which is a free storage on Windows Live, it’s easy to store and share your files and photos with almost anyone. To make the
    steps clear, I would like to share the detailed steps for:
    1. How to use  SkyDrive to upload collected files?
    2. How to post screenshots or other pictures in forum threads?
    1.  
    How to use
    SkyDrive to upload collected files? 
    1)   
    Open the
     SkyDrive site.
    2)   
    In the
    Sign In page, if you own a Windows Live ID, please type your Windows Live ID and Password to sign in; Otherwise, you may click Sign Up to register a new one. See the following screen shot.
    3)   
    After signing in Windows Live, click Create folder.
    4)     Name
    the folder and edit permissions to share with relevant person.
    Important Note: You
    can share the folder with Everyone if there is no private/sensitive information (such as the screen shot of a prompt error message). To so so, simply select the "Everyone (Public)" option in the "Share with" box. Please refer to the following screen shot:
    However, for private information that you do NOT want to be accessed by everyone, it is recommended to share with specified individuals. To do so, you can expand the "Share with" box, choose the "Select people..." option, and then type their
    Live IDs in the Individual box. Please refer to the screen shot below:
    5)   
    Drag the previously collected files directly to the Skydrive folder. For example:
    6)   
    Click Upload.
    7)   
    Click on the uploaded files and tell us the URL.
    2.  
    How to post screenshots or other pictures in forum threads?
    (This section updated on 1/16/2012 to reflect changes in Skydrive. Thanks to
    Jeeped on the Microsoft Answers forums)
    1)   Please
    use the above method to upload the picture files in advance. Then, in your Skydrive space, Right Click the picture and select
    View Original. Press Ctrl + A, or Right Click and select Copy, to select it.
    2)   
    Press Ctrl + C to copy this picture. 
    3)   
    Navigate to your post textbox, and press Ctrl + V, or Right Click and select Paste, to paste the picture there.
    Then, the picture will be successfully inserted in that thread.

    I cant even open windows now!!!! it crashes mecilessly here is a copy of the only dump file i have. i retreved it from second life and cant copy it onto the clip board.
    Problem signature:  Problem Event Name:BlueScreen  OS Version:6.1.7600.2.0.0.768.3  Locale ID:1033
    Additional information about the problem:  BCCode:124  BCP1:0000000000000000  BCP2:FFFFFA80050BE8F8  BCP3:0000000000000000  BCP4:0000000000000000  OS Version:6_1_7600  Service Pack:0_0  Product:768_1
    Files that help describe the problem:  C:\Windows\Minidump\073011-29484-01.dmp  C:\Users\madamediva\AppData\Local\Temp\WER-72805-0.sysdata.xml
    Read our privacy statement online:  http://go.microsoft.com/fwlink/?linkid=104288&clcid=0x0409
    If the online privacy statement is not available, please read our privacy statement offline:  C:\Windows\system32\en-US\erofflps.txt
    dump_pciidex.sysdump_pciidex.sys+216e730fffff880`01464000fffff8b0`014700000x000000300000c0000x4a5bc1137/13/2009 7:19:47 PMntoskrnl.exentoskrnl.exe+782e2fffff800`02a03000fffff800`02fe00000x005dd0000x4a5bc6007/13/2009 7:40:48 PMMicrosoft® Windows® Operating
    SystemNT Kernel & System6.1.7600.16385 (win7_rtm.090713-1255)Microsoft CorporationC:\Windows\system32\ntoskrnl.exeACPI.sysfffff880`00f46000fffff880`00f9d0000x000570000x4a5bc1067/13/2009 7:19:34 PMamdxata.sysfffff880`00c6c000fffff880`00c770000x0000b0000x4a12f2eb5/19/2009
    1:56:59 PMatapi.sysfffff880`00e59000fffff880`00e620000x000090000x4a5bc1137/13/2009 7:19:47 PMataport.SYSfffff880`00e62000fffff880`00e8c0000x0002a0000x4a5bc1187/13/2009 7:19:52 PMAtiPcie.sysfffff880`01fe8000fffff880`01ff00000x000080000x4a0054865/5/2009 11:00:22
    AMBATTC.SYSfffff880`00e1e000fffff880`00e2a0000x0000c0000x4a5bc3b57/13/2009 7:31:01 PMCI.dllfffff880`00d1a000fffff880`00dda0000x000c00000x4a5be01d7/13/2009 9:32:13 PMCLASSPNP.SYSfffff880`01800000fffff880`018300000x000300000x4a5bc11e7/13/2009 7:19:58 PMCLFS.SYSfffff880`00cbc000fffff880`00d1a0000x0005e0000x4a5bc11d7/13/2009
    7:19:57 PMcng.sysfffff880`01000000fffff880`010730000x000730000x4a5bc8147/13/2009 7:49:40 PMcompbatt.sysfffff880`00e15000fffff880`00e1e0000x000090000x4a5bc3b67/13/2009 7:31:02 PMcrashdmp.sysfffff880`01ff0000fffff300`01ffe0000xfffffa800000e0000x4a5bcabd7/13/2009
    8:01:01 PMdisk.sysfffff880`01fd2000fffff880`01fe80000x000160000x4a5bc11d7/13/2009 7:19:57 PMdump_dumpfve.sysfffff880`01235000fffff87f`012480000xffffffff000130000x4a5bc18f7/13/2009 7:21:51 PMdump_msahci.sysfffff880`01470000fffff87f`0147b0000xffffffff0000b0000x4a5bcabd7/13/2009
    8:01:01 PMfileinfo.sysfffff880`01145000fffff880`011590000x000140000x4a5bc4817/13/2009 7:34:25 PMfltmgr.sysfffff880`010f9000fffff880`011450000x0004c0000x4a5bc11f7/13/2009 7:19:59 PMFs_Rec.sysfffff880`0122b000fffff880`012350000x0000a0000x4a5bc1117/13/2009 7:19:45
    PMfvevol.sysfffff880`01f98000fffff880`01fd20000x0003a0000x4a5bc1a77/13/2009 7:22:15 PMfwpkclnt.sysfffff880`01400000fffff880`0144a0000x0004a0000x4a5bc1647/13/2009 7:21:08 PMhal.dllfffff800`02fe0000fffff800`030290000x000490000x4a5bdf087/13/2009 9:27:36 PMhwpolicy.sysfffff880`01f8f000fffff880`01f980000x000090000x4a5bc0fa7/13/2009
    7:19:22 PMkdcom.dllfffff800`00bd1000fffff800`00bdb0000x0000a0000x4a5bdfdb7/13/2009 9:31:07 PMkl1.sysfffff880`01830000fffff880`01f8f0000x0075f0000x4c0f985b6/9/2010 9:34:19 AMksecdd.sysfffff880`01200000fffff880`0121a0000x0001a0000x4a5bc1567/13/2009 7:20:54 PMksecpkg.sysfffff880`015d3000fffff880`015fe0000x0002b0000x4a5bc84a7/13/2009
    7:50:34 PMmcupdate.dllfffff880`00c9b000fffff880`00ca80000x0000d0000x4a5bdf657/13/2009 9:29:09 PMmountmgr.sysfffff880`00e3f000fffff880`00e590000x0001a0000x4a5bc11a7/13/2009 7:19:54 PMmsahci.sysfffff880`00ff0000fffff880`00ffb0000x0000b0000x4a5bcabd7/13/2009
    8:01:01 PMmsisadrv.sysfffff880`00fa6000fffff880`00fb00000x0000a0000x4a5bc0fe7/13/2009 7:19:26 PMmsrpc.sysfffff880`01165000fffff880`011c30000x0005e0000x4a5bc17c7/13/2009 7:21:32 PMmup.sysfffff880`01452000fffff880`014640000x000120000x4a5bc2017/13/2009 7:23:45
    PMndis.sysfffff880`01481000fffff880`015730000x000f20000x4a5bc1847/13/2009 7:21:40 PMNETIO.SYSfffff880`01573000fffff880`015d30000x000600000x4bbe946f4/8/2010 10:43:59 PMNtfs.sysfffff880`0124c000fffff880`013ef0000x001a30000x4a5bc14f7/13/2009 7:20:47 PMpartmgr.sysfffff880`00e00000fffff880`00e150000x000150000x4a5bc11e7/13/2009
    7:19:58 PMpci.sysfffff880`00fb0000fffff880`00fe30000x000330000x4a5bc1177/13/2009 7:19:51 PMPCIIDEX.SYSfffff880`00c5c000fffff880`00c6c0000x000100000x4a5bc1147/13/2009 7:19:48 PMpcw.sysfffff880`0121a000fffff880`0122b0000x000110000x4a5bc0ff7/13/2009 7:19:27 PMPSHED.dllfffff880`00ca8000fffff880`00cbc0000x000140000x4a5be0277/13/2009
    9:32:23 PMMicrosoft® Windows® Operating SystemPlatform Specific Hardware Error Driver6.1.7600.16385 (win7_rtm.090713-1255)Microsoft CorporationC:\Windows\system32\PSHED.dllPxHlpa64.sysfffff880`01159000fffff880`01164e000x0000be000x4a4162536/23/2009
    7:16:35 PMrdyboost.sysfffff880`010bf000fffff880`010f90000x0003a0000x4a5bc48a7/13/2009 7:34:34 PMspldr.sysfffff880`0144a000fffff880`014520000x000080000x4a0858bb5/11/2009 12:56:27 PMtcpip.sysfffff880`01602000fffff880`017ff0000x001fd0000x4bbe94e24/8/2010 10:45:54
    PMvdrvroot.sysfffff880`00fe3000fffff880`00ff00000x0000d0000x4a5bcadb7/13/2009 8:01:31 PMvolmgr.sysfffff880`00e2a000fffff880`00e3f0000x000150000x4a5bc11d7/13/2009 7:19:57 PMvolmgrx.sysfffff880`00c00000fffff880`00c5c0000x0005c0000x4a5bc1417/13/2009 7:20:33 PMvolsnap.sysfffff880`01073000fffff880`010bf0000x0004c0000x4a5bc1287/13/2009
    7:20:08 PMWdf01000.sysfffff880`00e93000fffff880`00f370000x000a40000x4a5bc19f7/13/2009 7:22:07 PMWDFLDR.SYSfffff880`00f37000fffff880`00f460000x0000f0000x4a5bc11a7/13/2009 7:19:54 PMWMILIB.SYSfffff880`00f9d000fffff880`00fa60000x000090000x4a5bc1177/13/2009 7:19:51
    PM

  • Collect data and post change-events using POJO datacontrol

    How can I get users of my POJO datacontrol to get changed data from the datacontrol. The datacontrol will receive new data from some source ? I'm able to create a datacontrol from a POJO java class easy enough. However, is there an example showing how to create a datacontrol that receives data from some source and updates users of the datacontrol?
    Thanks
    Travis

    Yes, I want to push new data to the client without the client specifically requesting the data. I suspect the datacontrol will have to fire an some event and the client has a listener for that event.
    The datacontrol will receive data from a device, such as a barcode scanner, in the form of a string of text. The datacontrol will provide the data via one or more attributes (i.e. fields) such as "Product ID", "Expiration Date", etc.

  • Action billing button appear even button confirm and post gi not done yet..

    Dear Expert,
    Current, i'm facing problem that the the billing document button will appear even the GI button and released not completed if have more than 1 job in the service order.
    If only have i job...the action control is smooth.
    I try to do config but still failed. hence, appreaciated that somebody can help me to resolved my problem....
    For more info, i'm using DBM5.
    rgds,

    I am running the TestStand 3.0 Full-Featured CVI operator Interface. This is a user modified version (perhaps something I've done has exaserbated the inherent problem).
    After Loading a sequence file, run it once.
    Click on the List Bar to switch back to the sequence view.
    Click on the Test UUT button -- it flickers, but nothing happens.
    The user waits, wondering when his test will run.
    Click on the Test UUT button a second time -- this time the enter serial number box appears and the run proceeds.
    Click somewhere else on the panel, perhaps using a custom feature or in response to a step generated popup.
    The sequence stops at a breakpoint.
    Click on the Resume button or the Terminate button-- it flickers, but nothing happens.
    Click on the Resume button a second time and the sequence proceeds.

  • How to Create New Activity Type  for Assiged to work centre Costing in Acti

    Dear Sir,
    We have four activity type to assigned in workcentre Costing Activity. Details are as under
    AIRJET     2010     AIRJET
    DONIER     2010     DORNIER
    SULTEX     2010     SULTEX
    SULZER     2010     SULZER
    in addition one more loom is comming in our unit and require new activity type.
    How can i create new.
    Please guide.
    Thanks in advance
    Regards
    Ajit

    Dear ,
    To create new Activity Type  , you need to follow the below steps :
    KA01 - Create Primary Cost Element for the new activities type.
    KL01 - Create Activity Type tied to the primary cost element. 
    KP26 - Change Activity Type/Activity Price Planning - maintain the Variable price
    Assign the activity type to cost center using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal Year as 20xx.
    Click on Overview tab on top and key in costing details in this screen.
    After performing this ,while creating the work center ,this combination of activity type & cost center should be assigned.
    At work centre level , you should have
    1.Create Standrad Value Key -OP19 and Formula Key in OP49.
    2.Create Formula Parameters in OP7B or u can use existing one to assing in the Standard Value Key
    3.In CR02-Assing the Standard value key in Basic Data  and select the Formula Key in Costing tab with cost centre assingement .Save
    Try and check
    Regards
    JH

  • Costing for activity types in CS

    Dear All
    Hope you all are doing well.I want to perform costing on service order based on activity type for Customer Services. These activities should be assigned to service material. How can activities assign to service materail? Currently I have configured  valuation catagories , assign cost elements to value catagories, define activity types,Price planning for activity type and assign these activity types to work center.
    Your immedite response is higly appreciable
    Thank you,
    Nomi

    Dear All
    Really sorry for late reply! DIP Profile helps a lot in Configuring Quotation and Billing document. What I did was
    1. I create activities with the help of CO consultant and give price to the activities type.
    2. Setting performed for DISPLAY OF COST in Maintenance and Service       ProcessingBasic settings for these activities.
    3. Assign Cost element for these activities. 
    4. Assign these activities type to the work center.
    5. Define Services Materials for each activity type so that they can be displayed in my quotation and billing document.
    6. Assign services materials to DIP Profile as such:
    u2022     Define planned cost u2013 Total Record as source.
    u2022     In Material Determination for profile I assign each of my service material to Transfer cost and Quantity and assign respective cost and revenue element of that activity type to the Service material.
    When I create a service order with revenue u201CSM02u201D.I do not specify service material. I assign my activities types in operations and when I calculate costing it sums up all the revenue in costing for planned costs but when I create quotation and billing document for the service order it shows individual material for each activity type and its amount on item data and total is displayed in header data against EK01 condition type moreover planned and actual cost are displayed in service order.
    The problem is, I have not create any condition record nor assign these condition type to my pricing procedure as value is arising from activity type.
    Which condition types can be assigned to pricing procedure so that they can pick up the value of the activity type?
    Thank you
    Nomi

  • Activity Type in PP

    Hi All,
    I am working of DATASOURCE 2LIS_04_P_ARBPL.
    There are some fields like activity type actual and target, conform activity type.
    Can anyone please help me understand what is this activity type in ECC. What and where does user enter the data in ECC based on what parameters.
    Thanks

    Solved

  • Trip activity type permissibility for Expense part

    Dear Experts,
    I would like to use trip activity type permissibility, grouping concepts etc. - as it is possible for Travel Planning - for Expenses in order to be able to differentiate the trip activities as per comany code. All company codes however, are using only one, same trip provision variant and one trip schema - 01.
    Once I´ve mantained the groups and permissibility in Planning part, I have now two fields for Trip actiivty type on the Request screen. I would like to use only one, with permissibility possible. But the client is using only one trip schema, 01. TRV Planning is not being used.
    Is there any way to do it?
    Thank you
    Best Regards
    Emilia

    Hi Emilia,
    I don't understand the problem. There are are three parameters below a schema of a trip provision variant to further distinguish customizing specifications and the overall process flow of FI-TV, these are (trying to loosely translate from German, might not be the exact English wording) KZREA (trip type by law) , BEREI (trip type by company) and KZTKT (trip activity type). Then, additionally, from the planning component, there's PLAN_ACTIVITY_TYPE (trip activity type only relevant for the planning module, has no function for the rest of FI-TV whatsoever).
    I'm not really sure what confuses you, but if you do NOT use FI-TV-PL, then you can just disable PLAN_ACTIVITY_TYPE in FITVFELD_WEB and all is good.
    Cheers, Lukas

  • PM Order Confirmation using Personnel's Cost Center and Activity Type

    Hi All,
    Is it possible to have PM Order confirmation (IW41) using Cost Center and Activity type from Personnel instead of default from Work Center?  If it is, can it be done with some configuration or user exit?  Please advise.  Thank you.
    Dai

    Hi friend,
    Order confirmation will be done for order operations.While doing confirmation we post the actual work done by the repective work center and respective activity type assigned to the same workcenter.
    But these activity types are assigned to cost center for cost calculation.confirming the respective operation in maintenance order through workcenters gives the report of planned work and actual work done by the respective workcenter.
    We cannot confirm the operation using costcenter and activity type directly through transaction IW41.
    If you want to develop new confirmation screen and making confirmation of the respective order operation with only costcenter and activity type fields, you can do it .
    Regards,
    Pardhreddyc
    Edited by: Pardhreddyc on May 17, 2011 12:45 PM

  • Yeild and Activity Types are not coming on confirmation

    Dear Sir's
    Hope everyone fine by the grace of GOD.
    Friends i am facing a problem while doing Confirmation of production order in T.Code Co11n .Yeild(net production) is not picking from the Production order and also Activity types are not coming while doing confirmation.
    please help me out in this problem
    Best Regards,
    HAFIZ ABDUL HASEEB KHAN
    SC.PP Consultant

    Dear
    There are 3 possibilities to populate the activity  and yeild field:
    1) The system can propose them based on quantity, using the standard
    formula, directly after entry of the operation being confirmed please check it in your order first
    2) The system can propose them at the time of saving
    3) They can be manually entered ~ however using this option, formula
    will not recalculate using the settings from the Standard value key,
    set for the work centre.
    To set one of the above as default in customising, follow these steps:
    - Call transaction OPK0
    - Select the default Confirmation Profile SAP001 is being ticked marked. - Default Values , Qty and Service in OPK0
    - Select the Default tab and set the default for Quants and Services
    to 'Immediate Proposal' or 'Propose When Saving'
    These options allow you to choose whether the activity  and yeild proposal in
    C011N is given immediately after entry of the operation to be
    confirmed or upon saving the confirmation. However note that if
    you subsequently override these proposals by maually entering activity
    details, the formulae will not be recalculated and manually entered
    data will take presidence.
    Hope this is clear
    Regards
    JH

  • Confirmation of activity type in Process order -Impact in FI.

    Dear All,
    On doing a confirmation of a activity type for a process/ Production order - values get posted to secondary cost element which has been assigned to a acitivity type.  This means only a impact in controlling but not in FI
    How woould the booking happens in FI ?is it not required to book in FI, if yes, why.
    Please suggest.
    Thanks.

    Hi Daya
    1. You can calculate activity price for plan in KSPI and for actual KSII for respective CCtr and activity type...but some times people manually update price at KP26 directly which in my opinion is not right way because price is either more or less than the real calculation in KSPI and KSII...
    2. However in your case price is directly updated in KP26 against activity type..when confirmation is done in order this rate * activity qty is your value posted in order level and at the same time respective CCtr is also credited by this amount which you can see in CCtr report
       Example:  CCtr  XXXX01
                       Activity type 999999
                       Sec cost Element for activity type 999999 (43 cat)
        Suppose you have booked FI entries for some expenses like Salary in F-02/FB50...against CCtr XXXX01   So your CCtr XXXX01 is debited by Salary amount and this amount will be absorbed in product through activity for which you need  activity price and confirmation.
        FI entry is booked your expense in GL a/c Salary and same time debited your CCtr through CE salary....Now when you charging this expense in product through prod order you are doing it through confirmation of activity qty which in turn calculating value by taking price from KP26 and qty from confirmation.
    Kamal

  • Automatic TO Creation and Confirm for the 321 Mvt type

    Hello Experts,
    Like to know the customisation invovlved for automatic TO creation and confirmation for the 321 movement type in which QM is activated.
    I have already activated in OMKZ as below
    1.Automatic TO for 321 mvt ytpe
    2.TO item to be confirmed immediately
    3.Propose confirmation
    Table T333 -AUTTA
              T333-SQUIT &
              T333-VQUIT is activated.
    Please let me know any other settings to be performed
    Regards
    Krishna

    Hello Experts,
    I am trying to create the Automatic TO and TO confirmation for the mvt type 321.
    I made the below settings
    I have activated in OMKZ as below
    1.Automatic TO for 321 mvt ytpe   -"A"
    2.TO item to be confirmed immediately  - tick mark
    3.Propose confirmation   - tick mark
    Table T333 -AUTTA
    T333-SQUIT &
    T333-VQUIT is activated.
    I have activated in OMKX as below
    Table T321-TBFKZ Immediate TO Creation with "A"
    T321-TAFKZ TR creation with "X"
    After doing the settings i am not able to see the Posting change number in the Material document created for the mvt type 321.
    Please let me know how to create the Posting chnage notice for the material document and how to convert the Posting change notice to automatic TO and confirmation.
    Thanks & Regards
    Krishna
    Edited by: Hariharan krishna on May 25, 2011 8:01 AM

  • Use of activity types and cost splitting

    Hi All,
    We would like to track activities for cost centers, but don't necessarily have the need for a sending cost center/object.  I understand in a traditional manufacturing set-up, you have sending and receiving cost objects that incorporate the use of activities.  Our business is a service that we provide, not a tangible product that we produce.
    Here is the scenario.  We have activities that a cost center performs.  Cost center 1 will perform 2 types of "pick-up" activities, so this would require two activity types.  Throughout the course of the month, the activity quantities would get posted to the cost center.  So my first question is how can you post only quantities to a cost center--what is the t-code?  We're not concerned with incorporating an activity price, we just want quantities.
    Second, as primary costs get posted to the cost center in FI, we want to split the costs onto the activities.  I have researched t-code KSS2 and can't seem to split the primary costs based on the activity quantities.  It keeps refering to target costs, which I don't really want to have to worry about.
    What we're trying to do is a makeshift ABC scenario.  Since the use of true abc seems almost non-existent, there's not much info out there on it.  Does anybody have any good docs on abc in SAP?
    Thanks
    Kory Squire

    Hi,
    1. I understood your case in this way .
    Cost Center A performs 2 activities . The cost center collects cost by Fi posting through out the month.
    Now you want the activity type should nt have price , only it should have quantities.
    And now you want to allocate the cost of the cost center to other object by activity types.
    If i am right..
    then instead of activity types why not create SKF(statistical key figures) . At the month end by t.code Kb31n post the activity qts. for combination of cost center and SKFs.
    Then as per your requirement run allocation cycle.
    The kind of you are planning , in that case activity types to be converted as cost object ( it can be done in control area setting) and then you want to allocate.. seems to be little complicated..
    Hope i understood and in turn i conveyed the message properly..
    Assign points if found helpful
    Regards
    Prabhat