is possible run good issue (101) for the component HALB whit type procurement = E and special procurement = 52 ?
I created a collective order  :
FERT ORDER 100001
          HALB    1000002
We need have the structures whit the example but the good recepet for the component HALB , as the standard order , is possible whit the type order (Network order - collective order )?
Thansk a lot
I find the flag in the customizing for type production order but this flag don't create a good moviment for 101 of component HALB?
Daniele Pistilli

Dear gurus,
for the component HALB the system when create a subnetwork view the stock quantity?
Example:
Stock oh component HALB = 100000000
Requirement of Halb is 100  pz
Because the system create a production order subnetwork also if the stock is 100000000  ?
Is possible don't create a subnetwork order when the requirement is covered to stock ?
Thanks a lot
Daniele Pistilli
PP TEAM

Similar Messages

  • MRP for collective order

    Dear experts:
           I met a problem of Collective order.
           My scenario is :   Fert (A) -- Halb (a) -- ROH ( b) .  Set special procurment 52 in mrp2 of material a.
           suppose material "a" has stock 30pcs,  now when i creat a Plan order for "A" 100pcs,
           and then run MRP,system generate a plan order "a" 100pcs directly,
           not consider the stock of a (30pcs). 
            my question is how to setting, then i can get the result :  Plan order "a"  is 70pcs.
            And also how to setting when scenario is creating Production order.
            Thanks in advance.

    Dear R.Brahmankar:
          Fert A :        M0      Individual/coll.  "blank"
            Halb a:       M0  ,  special procurement:  52  , idual/coll.  "blank",     stock 30pcs
               ROH b:   PD.
      Now , I creat a Plan order for "A" :100pcs, and Run MD41,  
      result is:    material  "a",   plan order :  100 pcs.
      but what I expectation result is :   material  "a",   plan order :  70 pcs.  for I already have 30pcs stock  of material "a".
      how should i do. Thanks

  • Direct production\ collective order cancellation

    i have a problem while dealing with collective order network schenario.
    i have 2 levels of collective order network e.g. A is parent order and B is child order.
    now as soon as i confirm the sub\child B order the header material for taht perticular order has 101 and 261 movement automatically,
    i.e. as soon as 101 is done for child order's(B) header material which is a non stockable material is also gets consumed(261) for header order\ parent order A.
    but while confirming the header order A, the header material of order B(which is non stockable material) is not there in goods movement screen.
    now while cancelling the orders A i don't have order B's header material in component list so that perticular material will not be cancelled so no 262 for that material.
    now when i try to cancel order B i get an error for order B's header material that deficit of sales order stock.
    how to deal with such problem?
    and i also want to know something about collective orders and special procurement key 52 with respect to order confirmation and cancellation..
    Edited by: Anil Jonnalagadda on May 23, 2008 3:38 PM

    Now the Reply for the Application of Collective Order
    Normally we have a Header Item Fert and Child items Halbs
    For Example If a BOM for a Fert contains 5 Halb materials and below some ROH
    Here what happens in discrete scenario 6 production orders can be created 1 for Fert and 5 for Halb
    so as a usual practive we have Release the Halb orders, GI for ROH , Confirmation of Halbs,GR for Halbs,.... then
    similar thing for Fert
    Now as the Halb is inhouse item and manufacturing parellely, the process of Relasing ,confirming ,GR are difficult process, you want to control through the Header Material
    So we want
    1) If i release the Fert Material the Bom Assy components (inhouse) below with collective order setting has to Relases Automatically
    2) If i confirm the Fert Material the the Bom Assy components (inhouse) below with collective order setting has to Confired Automatically
    3) The GR has to takes place automatically for Halb items(without any document) you can't see the stock of halb also it will always show "0"
    4) For the ROH below Halb a reservation will be generated those you can control manually or through Backflush
    So the setting required is
    Fert item keep Procurement =E
    For the bom halb items where you want collective order keep Procurement =E and special Procurement =52
    it will work
    thanks
    Prabakaran K
    Edited by: prabakaran k on May 23, 2008 4:00 PM

  • Incorrect quantity updates of sub-order in collective order

    Hi,
    We are using Cable solutions ver: 4.6c. When the quantity of the leading order is changed (co02), the sub-order quntities are not changing accordingly. Let me explain you in detail.
    Following are the settings in Material Master.
    Material      BaseUoM      AsseblyScrap  ProcurementType    SpecialProcurement   MatType
    MAT1          FT                11.5%               E - inhouse                                                  FERT
    MAT2          FT                                         E - inhouse               52 - Collective Order  HALB
    MAT3          LB                                         F - External               10 - consignment       ROH
    Following is the BOM structure for Leading Material MAT1 with base qty 1000FT
    Component      Qty     UoM
    MAT2               1000  FT
    Following is the BOM structure for MAT2 with base qty 1000FT
    Component      Qty     UoM
    MAT3               7.280  LB
    If I create a production order for MAT1 with qty 1000 - system adds 11.5% scrap and the final qty = 1115 and at the same time it creates a production order for MAt2 with qty 1215 (this is another issue - it suppose to be 1115 but it adds 100 more, dont know why). Now if go to change mode and change the qty for MAT1 to 10000 then the target qty = 11150, but the Qty for for order of MAT2 = 5529 - which is incorrect, it is suppose to be around 11150.
    One thing i noticed is - if Assembly scrap for MAT1 is removed in Material master then the Quantity of the MAT2 is updating correctly.
    Anyone had this kind of issue before? Please let me know the solution to this problem.
    Thanks in advance.

    Is any one there who can help me on this problem. I am waiting.....
    Thanks in advance

  • Collective order processing

    I have gone through the threads in w.r.t collective order and direct production. the sap help (IDES too) and the ERP documentation. I still cannot trigger get a process order to be directly created for the subcomponent when I convert the parent planned order (superior planned order).
    My BOM structure is the standard FERT-HALB-ROH.
    I have setup sp proc key 52 for the halb, BOM and recipe are valid and they are linked to a prod ver. I see a DEP req for the FERT material in the HALB's MD04 screen after I run MRP for the FERT.
    I know this setup works for production order. I am however trying with "process orders" since this is required for a PI based inventory. Is this possible?

    Dear colleague,
    Which transaction do you use?
    The conversion should be possible.
    Please use COR7 and COR8.
    we usually recommend not to use PPBICOR8 for collective orders,
    because the program flow logic is different from planned order
    conversions that do not result in a collective order. For example,
    in dialog mode, you usually receive the collective order overview,
    in batch input mode (PPBICOR8 is a batch input for COR7), you don't.
    PPBICOR8 cannot distinguish between collective orders and non-collective
    orders when the batch input is set up for the planned order conversion -
    at this point, it is not known if the resulting order will be a
    collective order. This is why PPBICOR8 should not be used for
    collective orders.
    Please apply the attached note 974946 to suppress the pop-up.
    If the issue persists, please open a new OSS message with this issue,
    thanks and best regards

  • Collective Order good moviement 101 - 261 ( sub - order )

    Dear gurus,
    i inserted in the HALB component the special procurement (52) and the Type procurement = E
    I created a production order for the Material Fert and the system create a collective order .
    Order 0001 for the FERT material and the order 0002 for the HALB material.
    When we confim the order 0002 the system don't create a good moviment 101 for the HALB component  and the MD04 don't exist . In the production order 0002 the issue quantity is 5 pz but we don't see the stock in the MD04.
    I need to have the moviment 101 for the sub order . 
    How i can have this situation of good moviment ? You can tell me the example of movimentation for the collective order ?
    Where we can find the information of this collective order ?
    Thanks a lot
    Daniele Pistilli
    PP TEAM

    Dear,
    Within a collective order stock movements only take place for the leading order (that is, the order that is at the highest production level) and not for directly produced components. This makes it easier to maintain the collective order in comparison with several individual orders. A further advantage is a more realistic representation of the costs of the production process, since subordinate orders can be directly assigned and settled to superior orders
    Hope this will help you.
    Regards,
    Pavan

  • WF10 Collective Order Split

    Hi all,
    I am having a scenario where I need your help. I am creating Collective Orders from WF10. I am supposed to have a split of Collective Orders after 900 articles which is not working.Illustration is below :
    STO 1 : 500 articles
    STO 2 : 500 articles
    Expected outcome : 2 Collective orders : 1 having 900 articles and other having 100 articles.
    Actual outcome : 1 Collective order with 1000 articles (split didn't work)
    I want your help to find out why the split is not working or as to where I can check. I am new in this, so kindly suggest me .
    Thanks.
    Edited by: abhishek_g on Jan 8, 2012 6:32 PM

    Hi yal
    In general for GI to header material it will look for item material stock. You cannot do prod of header material with out completing the prod of item material of BOM. So you have to cofirm HALB prod order first , do GR for prod . then only FERT material can be prod.
    For Direc prod Special procurement key 52. This is possible.
    You can do all at a time
    Regards
    J . Saravan

  • Collective orders-Mrp is not considering partial orders in planning.

    We are using collective orders,Backflush for goods issue. The order below the main order is partially confirmed(child order).
    The order qty is 100.The child order is confirmed for 75.i.e: it is partially confirmed.
    But the main order is confirmed and delivered for 100 and the status is REL  CNF  DLV  PRC  CFCO GMCO GMPS MACM.
    Help

    I want to explain this more clearly.
    we are using collective orders and planning strategy 10.
    Say we need 1 roh to produce 1 halb
    and need 1 halb to produce 1 fert.
    target qty =100 say
    MRP run
    Production order qty for fert 100
    production order qty for halb 100
    purchase req qty for roh 100
    say GR for roh qty 50
    we confirmed qty of halb = 50 i.e:partially confirmed
    Now went to fert order and will be able to confirm 50.But this is not happening.User is able to confirm 100.
    we should be able to confirm only 50 since we have halb=50.
    How to restrict this.he should be able to confirm fert qty 50 since confirmed  halb qty is 50.
    Could  you please tell me what config setting i should do and where.
    thanks

  • MD50 With Collective order scenario

    Hi!,
    Can we have multi level sales order planning for collective order scenario without runnnng the multi level planning (MD02 / MD01) subsequently.
    Actually when we run MD50 system creates the planned order for header material but not for dependent requirements.
    I know that this can be done by subsequently running MD02 / MD01. Please let me know that whether is it possible in collective order scenario without running the maulti level planning.
    Thanks in advance.
    Regards.
    Uday

    Hy Uday,
    Yes It is possible To generates Planing Proposals for dependent requirement also through MD50.But most imp conditions are, 
    - For all the BOM Components Ind./Coll requirement type(MRP4) should be maintain as individual requirements only (option 1) or individual or collective requirements.(Blank).
    - For Header Material - MRP for Dep. Requirements should be active in MRP 4 view.
    If above condition is maintain for BOM components then system will generates Planing proposals for all the BOM components upto the last level of BOM.
    For In house Production system will generates Plan order with reference to Sales order (HALB).
    And for externally procured Items system will create PR with Reference to Sales order.
    Regards,
    Dhaval
    Edited by: Dhaval Choksi on Aug 18, 2008 3:16 PM

  • Collective orders issue

    Hi Gurus,
    There is an issue with the collective orders for our client. For the child orders the Plan and actual are coming same. And for these child orders GI and activity booking is done but GR is done at the Parent order level.
    Pls tell me at this point how the plan and actual are equal for the child orders.
    Regards
    Dinaker

    I want to explain this more clearly.
    we are using collective orders and planning strategy 10.
    Say we need 1 roh to produce 1 halb
    and need 1 halb to produce 1 fert.
    target qty =100 say
    MRP run
    Production order qty for fert 100
    production order qty for halb 100
    purchase req qty for roh 100
    say GR for roh qty 50
    we confirmed qty of halb = 50 i.e:partially confirmed
    Now went to fert order and will be able to confirm 50.But this is not happening.User is able to confirm 100.
    we should be able to confirm only 50 since we have halb=50.
    How to restrict this.he should be able to confirm fert qty 50 since confirmed  halb qty is 50.
    Could  you please tell me what config setting i should do and where.
    thanks

  • COGI error generated while collective order confirmation

    hi ALL, this is the real  task for all PP GURUS.
    the issue is related with collective order confirmation.
    client is using customised program ZPP_CONF to confirm the collective order which is based on the sap spro program CORUPROC.this include automatic goods receipt,backflush & actual cost update .as user use zpp_conf for confirmation all this actions happened in backgruond.
    now after using ZPP_CONF . the confirmation is not happening .instead of that it is going in COGI where they are getting a error massage which is as follows
    "You have no authorization for this transaction with movement type 101u201D
    this error continues for 10-15 minutes after doing refresh it goes. & confirmation happens.
    this is not happening for all orders but for 8 out of 10.
    users have proper authorisations.
    they have enough stocks in st. locn.
    they are loosing lot of time becuse of this.
    HOW CAN I RECTIFY THIS ERROR GURUS?
    when i search i found this is written in the CORUPROC documentation
    Incl. incorrect goods movement: Not only preselected but also incorrect goods movements that are usually processed with transaction COGI are  selected and processed. 
    VENKADESH

    Hi,
    The Program CORUPROC only can adjust the Errors in Goods movements. It can not handle the Table Locks..
    The Program CORUAFWP, can taek care of table locks also, apart from the Errors in Goods Movements.
    Refer below thread for similar type of problem..
    COGI errors
    Hope this helps..
    Regards,
    Siva

  • Goods receipt in collective order

    Hi Experts,
                     In collective order situation, for the the child order, after confirmation the stock of SFG is not increasing automatically. Subsequently, after confirmation of parent order, in the material tab the SFG withdrawn quantity is showing up as zero. How to ensure that consumption of SFG occurs in the parent order ?
    regards

    SM,
    Please refer the below thread,
    Re: direct production
    In case of collective order scenario the goods movement of the child items are hypothetical, i.e. it is for document purpose.
    The stock doesn't get built up if you go for confirmation with auto GR.
    Rather as soon as you confirm the last operation or you go for the order confirmation the goods receipt on the child order & goods issue on the parent order happens simultaneously.
    Hope this helps you.
    SmanS

  • How to trigger creation of collective orders

    Hi,
    How to trigger the creation of Collective orders.
    regards

    Hi,
    Collective Orders
    Use
    In a collective order, planned orders or production orders are linked to one another over several production levels. Each order in the collective order has its own order number. If subassemblies are produced directly for superior orders within a production process, without physically entering the warehouse, it is useful to have a representation via collective orders.
    The components for which separate production orders are created in the collective order are called directly produced components (see Creating Collective Orders)
    Prerequisites
    A collective order cannot be created for components that have one of the following indicators set:
    · Co-product
    · By-product
    · Alternative item with strategy 2
    · Alternative item with usage probability 0
    · Discontinued
    · Follow-up material
    · Intra material
    Features
    Collective orders offer the following advantages:
    · Integrated view of a production process
    Collective orders make it possible to represent different levels of the production process together in the system. The production process can be viewed as an integrated whole.
    · Separate order number for every order
    Every level in a collective order represents a separate production order/planned order. Every production order/planned order has its own order number. This enables you to process the entire collective order, a subtree in the collective order or an individual order.
    · No placements in storage or removals from storage between production levels
    Within a collective order stock movements only take place for the leading order (that is, the order that is at the highest production level) and not for directly produced components. This makes it easier to maintain the collective order in comparison with several individual orders. A further advantage is a more realistic representation of the costs of the production process, since subordinate orders can be directly assigned and settled to superior orders.
    · Business functions simultaneously for several orders
    Certain business transactions can be carried out simultaneously for several orders. Releasing an order that belongs to a collective order has the effect that all the hierarchically subordinate orders are released simultaneously.
    · Automatic change to dependent orders
    Changes to an order automatically affect dependent orders / components affecting orders. For example, if you change the order quantity in an order then
    ¡ the relevant quantity changes are automatically made to dependent orders
    ¡ the requirements quantity of the directly produced component is automatically changed.
    In the collective order, you also have the option of manufacturing directly produced material in a different plant to the planning plant.
    · Set status in leading order
    If you make changes in subordinate orders that have an affect on the status, then the system sets the corresponding status in the order header of the leading order in the collective order as follows:
    u2013 CFCO Confirmation in collective order
    u2013 GMCO Goods movements in collective order
    u2013 RLNE Release taken place in network
    In this way you are informed about changes in the whole collective order.
    · Reading master data
    You can copy the routing data and BOM data to the order again. You can find more information in Read master data.
    Example
    You want to produce a pump. The BOM for the pump contains a pressure regulating valve and a spiral casing. You want to enter these two components in separate production orders, but you do not want them to be posted to stock.
    You set the special procurement type to direct production in the material master record for the pressure regulating valve and the spiral casing, so that production occurs using a collective order.
    When you create a production order for the pump, a collective order is automatically created, which contains subordinate production orders for the pressure regulating valve and the spiral casing.
    Creation of Collective Orders
    Use
    Collective orders are only created if the special procurement type is set to direct production in the components for which the separate production orders are to be created (materials planning area in the material master).
    In the standard system, 52 is the special procurement type for direct production (that is, for components that are produced within a collective order).
    To create a collective order, you must use an order type with internal number assignment.
    Hope this helps.
    Regards,
    Tejas

  • Collective orders header order basic finish date is not changing

    Hai all,
    I am working on collective orders. The header order has Basic finish date as 17.05.2011 . Now i have changed this date to 10.05.2011 and re scheduled the order . But again system changing the Basic finish date to 17.05.2011. how to solve this.
    In the outline dates also i have given finish date 10.05.2011 it is remaining the same but order Basic finish date is not changing and schedulded dates are also not changing. can anybody help.

    Hi gurus,
    In a collective order suppose the lead order is having three child orders.  Kindl
    If one of the child order is partially confirmed is the entire collective order can be rescheduled.
    If one of the child order is Fully confirmed is the entire collective order can be rescheduled
    Can any body help me out

  • Scheduling in collective order

    I need some hint on a problem I'm facing here...
    We are using collective orders(Proc. E- SP. 52) and no scheduling parameters are defined in our workcenters...
    When I create a production order on the top level (finish good) for 10/ 31, the component that has an In-house production time =1 scheduling margin key = 000 is scheduled to finish 11/03
    I tried using "backwards" scheduling, "backward in time" scheduling...
    I would like the component to have start date 10/30 and finish date 10/31
    Any ideas?
    If I remove the in-house production time, the finish date of the component is the same as the finish good...

    Luc,
    Check with Route time for the component. It is likely the route time is higher than 1 day. Production order schedules on route time & hence likely the order has a finish date of 11/3.
    If your only looking at the planned order planning then it will take the material master inhouse production time. Also please check if you have 31 Oct as a non working day in your factory calendar. If yes then it is likely 1 & 2 Nov( SAt/Sunday) are non working too & hence the order plans to finish on 11/3( monday).
    That also explains if you remove inhouse time, system takes 0 days & has finish date as 10/03.
    Hope this gives you with some hint about what might be going on in your system.
    Thanks,
    Ram

Maybe you are looking for

  • Photoshop elements editor does not open

    I had photoshop elements 12 for windows working fine on windows 7 professional 64 bit .   Then recently attempted to  install the12.1 upgrade which failed with the usual lack of any useful information. I removed elements, rebooted, reinstalled, reboo

  • How to find and delete duplicate photos

    I have combined photos from various sources, friends, family, etc. and have found that there are many photos that are the same. I have been trying to find a way to find and delete all the duplicates but am unable to do so. Anyone have any ideas pleas

  • HT1491 Purchased an album on my iPad it does not appear on my iMac?

    I purchased and downloaded an album on my iPad. It downloaded fine and it plays etc. But even though it is supposed to synchronise automatically via iCloud it does not appear on my iMac or my iPhone. When I log into iTunes from my iMac and check avai

  • My iphone 5 is not charging? And my Mac disables the USB?

    My relatively new iphone 5 is not charging.. I only have one cord so i cant test if it is the cord or the actual phone.. I tried plugging it into my MacBook but then a message popped up saying "the USB is using too much power and has been disabled" h

  • Error 39 when syncing iphone

    I keep getting an Error 39 when I try to sync my iphone. What is it? and How do I fix it?