Combining 24fps and regular 60i

Hi folks,
I shot an interview in 24fps on my XL2. I'd like to combine it with some video I'm considering shooting on regular 60i.
Using FCP, what is my best course of action? Should I bring everything into a 29.97 DV NTSC project? Or should I edit my 24 fps in a 24 project, save the project, and then import it into a 29.97 project? Or am I just completely confused on all of this an need to start over
FYI, the project is a wedding video shot as a documentary. I shot the interviews in 24 but am afraid it won't look good as a 24 project so I'm considering shooting the rest in regular video.
Thanks
iMac   Mac OS X (10.4.6)  

Ryan,
Here are a couple things you could try:
Shoot at 1080/24p, but edit in a 720/24p sequence. Since you don't need 1080p output, you're not losing anything here, but actually gaining. You have a little bit of reframing capability with the 1080p footage in a 720p sequence, and it's pretty simple to scale the 1080p shots to fit the full frame of the 720p sequence. As you're clearly aware, it's better to decrease the size of a larger format than increase the size of a smaller format.
Your time remapping workflow is fine, if you need variable speeds, but a quick way to match the frame rate of the 60p footage to the 24p sequence is to change its frame rate interpretation. Simply select one or more of the clips, right-click them or go to Clip > Modify > Interpret Footage, and look at the Frame Rate section. If you type "23.976" in the "Assume this frame rate" box, your footage will be interpreted as 24p and give you a nice 2.5:1 overcrank.
Exporting 60p at 24p will not give you the 24p "look." Instead, you'll get a stuttered export, because Premiere will have to drop frames to conform the 60 frames per second to 24 frames per second. The first frame will make it into the export, followed by the third frame after that, and then the second after that, and then back and forth between the third and second frames--it won't look good You can export with Frame Blending turned on and interpolate these frames, but that will not look that good either.
Hopefully, that gives you a little bit to work with. Experimentation will be the key here. Have fun!

Similar Messages

  • Outline Agreements - min order qty and regular vendor flag

    As a part of E Source Integration with ECC we are planning to leverageusing Outline Agreement(Contract Type MK) to store
    Price and other Business Terms for Material / Vendor combinations. Currently we are
    using Purchase Information Record with minimum order quantity and
    regular vendor flag functionalities, and these are maintained manually.
    We intend to use Minimum Order qty and Regular Vendor Flag
    indicator in Outline Agreement as well, however noticed that these fields are
    not available in the screens. Does anyone know if these fields can be enabled in an outline agreement?

    Guys
    thanks for reply..
    But I thnik my question was not fully clear as the aswers didn't make sense to me...
    As a logistics consultant .I know that I can maintain Min Order qty for a material + vendor at PIR level..
    My question ..if I buy 10 items in a PO from a sinle vendor..is there any option to restrict Min qrder qty for these combination of materials..
    or in other words vendor says he dont care about number of items ,but the lot lot should be min..10 cartons only..
    appropriate points will be rewarded.
    thanks in advance.

  • Is null and regular value in where ($variable)

    is there any polibility to create select depend on value in where ?
    select count(x) where y = $variablebut if variable is NULLit doesn't work cause must be IS NULL or IS NOT
    select count(x) where y is $variableIs there any posibility to make it working with null and regular variable?

    try:
    select count(x) from <yourtable> where nvl(y,<not_possible_value>) = nvl($variable,<not_possible_value>);where <not_possible_value> is a value that is not possible for column y.
    E.g. if y always is a positive number you could use the value -1.

  • A single report can't combine portrait and landscape oriented pages

    Post Author: joelo2
    CA Forum: Crystal Reports
    Hi,
    Can a single report in Crystal report XI (version 11.5.8.826) combine portriat and landscape oriented pages like Crystal report 2008?   For example, I have one main report with several subreports in the main report.  I want one subreport be in portrait page orientation and the other subreports in landscape.  Can I do something like that in Crystal report XI version?    I even tried writing a small .net program to do this, but it doesn't seem to allow me to do that programmatically either.  Please help

    Post Author: ngra
    CA Forum: Crystal Reports
    I'd like to elevate this issue with Crystal Reports XI. There is a critical application which we developed in-house which needs both portrait and landscape orientation in each of the 30,000 plus documents we are sending out every month.If developers in Business Objects are picking this thread up - we need a patch for this limitation - quick. Right now, we are toying with the possibility of exporting the documents into a text format with markers indicating if a page is portrait or landscape. This is to be loaded into a Xerox machine (which costs hundreds of thousands of dollars), where it is mapped automatically to portrait or landscape. Note to Business Objects: This will provide us and countless others with much value. Think 80/20 rule - most bang for your development bucks and value for your customers!

  • How do I combine text and photos on the same page in iPhoto using photobook

    How do I combine text and photos on the same page in iPhoto using photobook?

    You mean while creating a book in iPhoto?  Click on the layout button while viewing a page and select the layout that includes both text and photos.  Most themes will have those options.
    OT

  • Have Windows XP and Adobe 9 Reader and need to send a series of large documents to clients as a matter of urgency     When I convert 10 pages a MS-Word file to Pdf this results in file of 6.7 MB which can't be emailed.     Do I combine them and then copy

    I have Windows XP and Adobe 9 Reader and need to send a series of large documents to clients as a matter of urgency When I convert 10 pages a MS-Word file to Pdf this results in file of 6.7 MB which can't be emailed.  Do I combine them and then copy to JPEG 2000 or do I have to save each page separately which is very time consuming Please advise me how to reduce the size and send 10 pages plus quickly by Adobe without the huge hassles I am enduring

    What kind of software do you use for the conversion to pdf? Adobe Reader can't create pdf files.

  • I imported pics to catalogs on different external hard drives.  Later renamed external HDs.  I want to combine catalogs and have my source (NEF) files all together on one drive. Can I merge cats and will new path to source files be correct if when inporti

    I imported different trips to different catalogs on different external hard drives.  Later renamed external HDs.  I want to combine catalogs and have my source (NEF) files all together on one drive.  I’m not really sure how to get those source files back and get rid of the extra long path to where the source files are now located. If I re-link files to their current catalog (many different paths to files in same catalog) can I merge (import catalogs) into one master catalog?  Will the new (Master catalog) have the correct link to the source file?  If not, how or can this be done?
    I have tried to explain my situation as clearly as I can.  Do you understand my situation?
    This maybe something you don’t have time to help me with.  If not can you suggest somewhere I can get an answer?  I really need help.  PLEEEZZZ HELP ME.
    Bruce Schuerman
    Norman, OK
    405_514-4875 (call collect)
    [email protected]

    I imported different trips to different catalogs on different external hard drives.  Later renamed external HDs.  I want to combine catalogs and have my source (NEF) files all together on one drive.  I’m not really sure how to get those source files back and get rid of the extra long path to where the source files are now located. If I re-link files to their current catalog (many different paths to files in same catalog) can I merge (import catalogs) into one master catalog?  Will the new (Master catalog) have the correct link to the source file?  If not, how or can this be done?
    I have tried to explain my situation as clearly as I can.  Do you understand my situation?
    This maybe something you don’t have time to help me with.  If not can you suggest somewhere I can get an answer?  I really need help.  PLEEEZZZ HELP ME.
    Bruce Schuerman
    Norman, OK
    405_514-4875 (call collect)
    [email protected]

  • I imported different trips to different catalogs on different external hard drives.  Later renamed external HDs.  I want to combine catalogs and have my source (NEF) files all together on one drive.  I'm not really sure how to get those source files back

    I imported different trips to different catalogs on different external hard drives.  Later renamed external HDs.  I want to combine catalogs and have my source (NEF) files all together on one drive.  I’m not really sure how to get those source files back and get rid of the extra long path to where the source files are now located. If I re-link files to their current catalog (many different paths to files in same catalog) can I merge (import catalogs) into one master catalog?  Will the new (Master catalog) have the correct link to the source file?  If not, how or can this be done?
    I have tried to explain my situation as clearly as I can.  Do you understand my situation?
    This maybe something you don’t have time to help me with.  If not can you suggest somewhere I can get an answer?  I really need help.  PLEEEZZZ HELP ME.
    Bruce Schuerman
    Norman, OK
    405_514-4875 (call collect)
    [email protected]

    Is there any solution (other than buying
    I really think 'buying' is the best solution on this one.  Ideally, you would have at least five internal hard drives.
    System
    Projects
    Cache/Scratch
    Media
    Exports
    Use externals and network drive only for backup.

  • Macbook 2GHz 2GB upgraded to Lion 10.7.4 - Now slow, heats up quickly and regularly stops responding

    I have a 2008 Macbook 2GHz 2GB that initially ran on Snow Leopard, and I upgraded it to Lion about 6 months ago. Since the upgrade, it has become slow to start up, open programmes and regularly stops responding - especially when I'm on the Internet - leaving me with the processing colourwheel, and forcing me to turn it off by the button.
    I have tried repairing permissions and it doesn't seem to make a difference, could it just be that I don't have enough RAM (only 2GB) to run Lion? I don't want to revert back to Snow Leopard because I sync my laptop with my phone using iCloud, and Snow Leopard would complicate that.
    I have also noticed that it heats up especially quickly and gets very hot, although I'm not sure if this problem is related or something to do with the version of Adobe or Microsoft Silverlight that I run on my Macbook.
    Any suggestions would be appreciated, thanks a lot!

    Honestly I would never run both Win 7 & XP at the same time in a VM. 7 needs at least 4GB to run properly and uses more resources then XP.
    I personally use VMware Fusion and XP. At this time there is no software, that I'm aware of or use, that does not run on XP. So for my Mac Win VM purpose I only run XP with the software in need to use in Windows. This work very well for me. I have 2 CPUs and 3GBs of RAM assigned to XP. Leaving the other 2 CPU cores, 4 HT cores, and 5GBs of RAM for OS X.
    Not sure why you need, or want, to run both versions of Windows at the same time. I don't see the need as stated above.

  • Combined Upgrade and Unicode conversion of Sap 4.6C to ECC6.0

    Hello all,
    my project team intends to carry out a combined upgrade and unicode conversion of an SAP ERP 4.6C system with MDMP to ECC6.0 (no enhancement package). The system is running on Oracle 10.2.
    In preparation for this upgrade, I have gone through the SAP notes 928729, 54801.
    We need to get a rough estimate of the entire downtime so as to alert our end users. From the CU&UC documentation in 928729, I read up note 857081. However the program in this note cannot be used to estimate the downtime as my system is < SAP netweaver 6.20.
    Is there any other SAP note or tool or program that I can use to estimate the downtime for the entire CU&UC? Thanks a lot!

    Hi,
    Combined upgrade depend upon number of factors like database size, resources on the server and optimization. In order to get idea of how much downtime, it will take, I would suggest you to do combined upgrade and unicode conversion on sandbox system which should be the replica of your production system. And try to optimize it. From there you can get approx. downtime required.
    Also, please read combined upgrade and unicode conversion guides on  http://service.sap.com/unicode@sap
    Thanks
    Sunny

  • How to combine sales and delivery data

    hi
    i have requirement to make a report from sales as well as deliveries. Important fields in report are sales document , material , plant , sales document type , country key , sold to party , ordered quantity , delivered quantity , price from vakon ( KBETR ), actual goods issue date.
    The required extractors are 2LIS_11_VASCL, 2LIS_11_V_SSL ,2LIS_11_VAKON.
    Problem is how to combine sales and delivery data as V_SSL has different key figures.Multicube is not the solution as dont have plant , sold to party and many other fields in V_SSL.
    Kindly suggest how to combine sales and deivery data.
    Regards,
    Monika

    I guess you do have shipping point in delivery.
    In most scenarios shipping point may not(or) may be same like order plant.
    Although they are different you can still roll up the delivery information to order level by plant since you have order # available as reference key in delivery.
    With this reference key you can convert all delivery information to order (item) level.
    I guess you can use one merge ODS with one cube (or) with 2 ODS for each at order level for validation.
    You may have to map delivery type to order type as per R3 configuration as well.
    speak with any Logistics guys for help.
    cheers
    Martin

  • Need urgent help!!!! (combine prompt and formula)

    Hi,
    I am using Oracle Business Intelligence 10.1.3.3.2, and creating some reports from answers. I desperately need to combine
    prompt and formula on some column.
    I need to use prompt in my formula on some column.
    Need urgent help !

    You can use the presentation variables to pass the value of the prompt into the report or any column formula.
    In the dashboard prompt you see an option called "Set Variable" where and you need to give a name to the variable.(Say Var_value)
    Now the value of the variable can be simply referenced using the syntax @{var_name}{10}. Here '10' being the defualt value which is optional you can simply reference using @{var_name} and you have the value of the prompts passed.
    Hope it works
    Thanks
    Prash

  • G/L A/C Determination for Drop Ship and Regular Ship of Same Item

    Hello Friends,
    We have a scenario,
    Stock is Sales order valuated stock
    For the same material, some times we do a drop shipment from vendor and some times we do a regular shipment from our plant.
    Being sales order valuated stock the GL account (On the PR generated from sales order) for drop shipment is getting picked up from BSX. (standard SAP)
    Our Finance team dont want the G/L account from BSX to be picked up.
    Because the BSX G/L account is a finish good G/L account and we dont want to use that for drop ship.
    How do we solve this issue?
    What is the standard process to get the G/L account if the same material is drop shipped and regular shipped?
    Thanks for your help.
    Thil

    Hi,
    The most common way to solve your problem is to use split valuation.
    This can be easily done. I you want to know how to use split valuation let me know I will detail steps you need to follow.
    Regards
    Srinivas

  • A series of video files (0001.MTS to 0005.MTS) were imported into premiere, when moved to timeline premiere combined them and made them look like one long clip nmed 0001.MTS. Multiple motion edits and opacity edits were made. When project manager moved th

    A series of video files (0001.MTS to 0005.MTS) were imported into premiere, when moved to timeline premiere combined them and made them look like one long clip named 0001.MTS. Multiple motion edits and opacity edits were made. When project manager moved the project, the actual video content of 0002.MTS to 0005.MTS was missing(source clips are still there but they were playing and working as part of that 0001.MTS timeline clip before). Those parts of the 0001.MTS clip in the timeline were Danger Striped and can be relinked but now have no edits anymore. The edits are apparently only linked with the original 0001.MTS source clip but extend beyond the actual range of the actual source clip. At the time I thought it was weird that premiere displayed the whole string of clips as one (with one name and no breaks) but it all works in the original project file but cannot be transferred to another location without multiple clips showing Danger Stripes.I need to move it and preserve the dozens of motion and opacity edits linked to the apparently oversized timeline clip. HELP!! any ideas?
    I did not nest any clips or sequences, premiere just seemed to combine the clips under one name when I moved them to timeline.
    I am using CS5.

    A series of video files (0001.MTS to 0005.MTS) were imported into premiere, when moved to timeline premiere combined them and made them look like one long clip named 0001.MTS. Multiple motion edits and opacity edits were made. When project manager moved the project, the actual video content of 0002.MTS to 0005.MTS was missing(source clips are still there but they were playing and working as part of that 0001.MTS timeline clip before). Those parts of the 0001.MTS clip in the timeline were Danger Striped and can be relinked but now have no edits anymore. The edits are apparently only linked with the original 0001.MTS source clip but extend beyond the actual range of the actual source clip. At the time I thought it was weird that premiere displayed the whole string of clips as one (with one name and no breaks) but it all works in the original project file but cannot be transferred to another location without multiple clips showing Danger Stripes.I need to move it and preserve the dozens of motion and opacity edits linked to the apparently oversized timeline clip. HELP!! any ideas?
    I did not nest any clips or sequences, premiere just seemed to combine the clips under one name when I moved them to timeline.
    I am using CS5.

  • Need to delete the old page number from a combined file and replace it with the new number. is there a way for me to do that using JavaScipt

    is there a way of using JS to delete the old page number (1,3,32,78) on a combined PDF and inset it with a new page numbers (1,2,3,4) Thank you

    Depends. If the page numbers can be located by their location on the page then a script can be written to redact that area, and then add new page numbers in their place (or somewhere else).

Maybe you are looking for

  • Convert a string of an array to an int

    I want to convert numbers[k] which is a string array to an int. How can i do this. I have tried everyting on the net I can find but not much help

  • Video Conferencing with AIM PC users

    If a PC user has an AIM account, does this mean that I can video chat with them?

  • Calling crystal reports through JSP

    Hello everyone, Could any one forward me the url where I can find information and sample examples regarding calling of crystal reports XI through jsp? Waiting for reply.

  • Image Scroll Through Effect

    Hey, can someone help me? I am still learning Adobe Muse and when going through examples, I saw this one effect on many websites: http://www.soulmemoria.com/themes/tf-tersus/tersus03_muse/ as you scroll down, the laptop image behind the text "Learn M

  • Problem with updating 10.6.3 - 10.6.6/8

    Hello, my problem is with updating my macbook pro (late 2010, 2.4 intel core duo, 4gb ram, 128gb ssd disc) When i using auto-update, or combo update downloaded from apple site, my mac just don't want to turn on, it freezes on apple logo. Re-installin