Committed quantity and committed date in STO
Hello friends,
How and on what basis the committed quantity, committed dates updates in STO delivery schedule tab while doing the STO.
Regards,
Cherryk
Cherry,
During configuration of STO's, an availability check is assigned (IMG > MM > Purchasing > Purchase order > Set up Stock transport order > Assign delivery type and checking rule).
Because of this, during the creation of a STO, the system will perform an availability check for the material in the source plant. The results of this ATP are the two fields that you have mentioned. Zero in committed quantity means that the ATP check found no material available, according to the ATP check you have assigned, on the date you have proposed. A quantity less the entire quantity of the STO indicates that only a portion of the STO requirements was found to be available on the proposed date in the supplying plant.
Any time the committed quantity is less than the entire quantity of the STO, it means there is no assurance that there will be product available when the day comes to actually create the delivery note and PGI the STO.
Any time a requirement is not committed during an ATP check, the possibility also then exists that other requirements in the supplying plant (such as new sales orders, or new production order dependent requirements) may take stock that you intended for use in your STO. It is always wise (but not mandatory) to manipulate your STOs so that committed qty = delivery qty.
Rgds,
DB49
Similar Messages
-
BAPI_PO_CHANGE is not updating Quantity and Delivary Date
HI All,
I am trying to update quantity and delivery date of PO by using BAPI_PO_CHANGE,
by Passing below parameters.
As per the documentation:
Parameter: PURCHASEORDER 4500003477
Parameter: POHEADER
PMNTTRMS = 0002
PUR_GROUP = 002
Parameter: POHEADERX
PMNTTRMS = X
PUR_GROUP = X
Parameter: POITEM
PO_ITEM = 00001
CONF_CTRL = 0001
Parameter: POITEMX
PO_ITEM = 00001
PO_ITEMX = X
CONF_CTRL = X
Parameter: POSCHEDULE
PO_ITEM = 00001
SCHED_LINE = 0001
QUANTITY = 10.000
Parameter: POSCHEDULEX
PO_ITEM = 00001
SCHED_LINE = 0001
PO_ITEMX = X
SCHED_LINEX = X
QUANTITY = X
Parameter: POACCOUNT
PO_ITEM = 00001
SERIAL_NO = 01
GL_ACCOUNT = 0000400020
Parameter: POACCOUNTX
PO_ITEM = 00001
SERIAL_NO = 01
PO_ITEMX = X
SERIAL_NOX = X
GL_ACCOUNT = X
and executed bapi_transaction_commit FM immediate, i am getting below message
Purchase Orders 4500003477 changed
Error transferring ExtensionIn data for enhancement CI_COBL
No message generated for output of purchasing document
but quantity and delivery date was not changed..
why this quantity and delivery date is not changing?
<removed by moderator>
REgards,
Suresh.D
Edited by: Thomas Zloch on Feb 27, 2012Hi ,
Are you trying to pass the non char fields in CI_COBL. Please look at the link below .
[http://forums.sdn.sap.com/thread.jspa?threadID=1137795] .
Also serach for the similar threads when and notes while transferring currency and quantity field in different custom includes of the EKPO ...
Thanks,
Anjaneya . -
RFQ quantity and delivery date
Hi,
I created a smartform for RFQ.I am getting material details from EKPO.But i need RFQ quantity and delivery date to be displayed for each quantity.I found the field in structure RM06E.I tried by putting structure name in form.Its not working.
Any table to find these data(reg RFQ details)?How to solve this issue?Hi,
u can get the RFQ date and Quantity from EKKO & EKPO tables.
Quantity: EKPO-KTMNG;
RFQ No and Date: EKKO-EBELN, EKKO-AEDAT
Thanks,
Pavani. -
Doubts in statistic Delivery Date and Commited Date in STO PO
Hi,
I would like to know statistic delivery date and Commited Delivery date in STO PO.
2 different type of date is displaying STO PO like;
1. We are getting statistic delivery as "09.02.9999" and Commited Date as "09.02.2011"
2. 1. We are getting statistic delivery as "09.02.9999" and Commited Date as "09.02.9999"
Could you explain, where we are maintiang those date and how it is displaying in PO Delivery schedule line?
Thanks.
Dhanush.When you create a PO, then the statistical delivery date is set equally to the delivery date.
the statistical delivery date is automatically changed if you change the delivery date before you have outputted the PO.
After you outputted the PO, the statistical delivery date has to be changed manually by the user if he changes the delivery date.
the idea behind this is because of the vendor evaluation, the vendor evaluation is done with the statistical delivery date.
as long you have not printed/faxed/mailed the PO to your vendor, then the statistical delivery date is changed automatically with a delivery date change.
But after a transmission you always have to ask yourself, who is responsible for the change in the delivery date.
If it is you, then you have to change the statistical delivery date to the new delivery date manually, to avoid that the vendor gets valuated against the wrong delivery date. But if it is because the vendor cannot meet the delivery date, then you change the delivery date to have an accuracy for planning, but you keep the old date in the statistical delivery date to valuate the vendor against it. -
Why the committed Date of STO becomes 12/31/9999
Hi Please help me, just new in STO.
We have the problem in STO where if checking md04, available stocks still is on 500K++
though there are entries such as Open SO qty and some delivered items already.
But what happen is the STO was created sept 28 but we put delivery date of it as dept 17 earlier
than those dates in delivery.
still if checking the stocks, deliver items doesnt short the stocks buy why
sto committed date becomes infinity date.
does the open so quantity consumes the stocks already?
is there a way we can see where the priority of stocks allocation is set in the configuration?
thank youHello,
If not all quantity can be confirmed for the delivery date,
and the ATP-chek runs without Replenishment lead time, the system set
the committed date to 12/31/9999. This is the normal system behavior
and not an bug.
During an STO-process the system check the availability in the supplying
plant(APO) for the date when the delivery has to be created (ekpv-ledat)
This date can be determined with shipping data determination or
without, accordingly your settings in customizing OMGN. Without the
system takes only the planed delivery time into account. This time
can be different in PREQ and Material master so it can be different
in the time when the system checks the availability if you create the PO
with reference to an Preq or without.
In addition, the committed date in the PO is only for informational
purposes, it is not interpreted by the ATP check since the ATP situation
might have changed immediately after the committed
date was calculated.
Regards, -
How does committed date in STO- different company codes gets calculated
Dear All,
Please let us know How does committed date (ATP date) in the STO across different company codes gets calculated
Regards
Ahmad IdaisHello,
RA is always a Company Code specific process due to the possibility of financial postings. I think that your WBS structure better be reconsidered not to mix up different Company codes at different levels, but maybe having a parallel nodes for different Company codes.
I also believe there is a consulting OSS note to explain the standard system behavior, just search the OSS.
Since you already have a master data in place it must be quite easy for you to test how the system behaves.
Regards, -
Updating Quantity and delivery date from bapi_po_change.
Hi Guru's.
i had a question which is regarding PO updation through bapi-po_change.
my requirment is to update PO from PR.
i can able to update a po from PR for multiple line items.
i am facing the problem with single line items.
problem :
when i create single line item and change existing line item, which is performing two actions at a time
i can able to create a new line time from PR to Po , even i can able to change the existing line time partially that is it is updating only quantity but not delivery date, it is updating the delivery date which is created for new line item.
please help me out how to resolve this,
plz guide me what are the parameters which i supposed to pass.
every thing is working fine for multiple line items but not single line item.
Regards,
Raj.Hi,
No response , please any one can provide the resolution for this.
Regards,
Nagaraju. -
Committed Date Calculation in an STO
Hello,
Can anyone detail how exactly the committed date is calculated during an availability check for an STO?.
Thanks.STO Delivery Date is receipt date at destination location. This minus Transportation Lead time is STO requirement date at source.
When you conduct ATP check for this PO/STO, your committed date is updated at source and delivery date will be updated as committed date plus TL lead time. Also check SAP help at http://help.sap.com/saphelp_45b/helpdata/en/41/191fce45fd11d188ff0000e8322f96/frameset.htm -
SAP Inter company PO Checking rule and commitment date
Hello there,
I am trying to understand the commitment Qty and commitment Date on the NB type PO between two different plants.
I have a setup where my Plant1 buys from Plant2 and Plant1 takes 100 days to get it from Plant2.
Plant2 will source it from Vendor1 and takes 200 days for the Vendor1 to supply to Plant2.
Plant 2 does not have any stock today, the stock from Vendor 1 will arrive only on 6/10/2015, there is an Open PO for Vendor2 for GR will be done on 6/10/2015. So on 6/10/2015, there will be a stock of 2500 units.
No other requirement exists in MD04 for this material in Plant 2.
Plant1 is raising a PO for Vendor Plant2 on 3/27/2015 for 1000 units. The planned delivery date is 100 days on Plant1 Material Master. So the delivery day is shown on PO is 100 days from now which is 7/5/2015.
Considering the fact that Plant2 is receiving 2500 on 6/10/2015, why wont SAP commit to the Qty. When I do the availability check, it does not consider the 2500 units coming in from PO and from CO09. The checking rule does not consider the Purchase Order Qty.
Now, here is where I need clarification.
The checking rule says not to consider Purchase Order in the in/out movement, So when I play around with this check I was able to commit the Qty on the PO. When I take out the check it will not commit the Qty and puts the commitment date based on the Plant 2 planned delivery time ( the time Plant 2 takes to buy it from the supplier).
It makes sense so far, however when excluding Purchase order to be considered for my purchase order availability check and when I remove the 200 days from Plant2 material masters planned delivery date and then create a purchase order, my PO is committing the QTY, how is this explained? or am i having some bad setup somewhere.
Same exact checking rule i.e excluding purchase order, everything else constant.
Scenario 1: Qty committed on PO when Planned Delivery time on Plant2 is zero days
Scenario 2: Qty not committed on PO when Planned Delivery time on Plant2 is 200 days
Can someone assist me to understand this. thank youAnyone thoughts? thanks
-
Statistics-relevant delivery date and Committed date in Stock Transport Ord
Dear Friends,
Kindly tell me how the System Calculate the Statistics-relevant delivery date and Committed date in Stock Transport Order.
Thanks & Regards
T.ArulvananHi Jürgen,
in the Include MM06EFET_ETT_FUELLEN there is following coding:
IF NOT im_sd_scheduling IS INITIAL.
PERFORM ett_sd_scheduling USING 'X' 'X' eket *eket
CHANGING eketdata_sd.
In the FORM ETT_SD_SCHEDULING
there is the following coding:
Datum oder Uhrzeit geändert --> Versandterminierungsdaten zurücksetzen
CLEAR c_eketdata_sd.
Lieferdatum und Uhrzeit setzen
c_eketdata_sd-eindt = i_eketn-eindt.
c_eketdata_sd-uzeit = i_eketn-uzeit.
So the internal table c_eketdata_sd is cleared and only the delivery date and time are updated, but not the statistc relevant date.
It seems to me like standard behaviour of SAP.
Best regards
Georg -
Material Staging date and Committed Date
Deal all,
At the outset,Wish you a very happy new year.
As per my understanding the material staging date should always be equal to Committed date in the Delivery schedule of the PO. Also the pick date in the delivery would be the staging date of the PO.
In which scenario, the staging date could differ to the committed date? What may be the reasons to have different staging and committed date in PO?
Appreciate your speedy responce.
Regards,
Shashidharit would not make much sense to have 2 fields for staging date and committed date if they should always be equal.
The F1 help of each field describes it already a little bit more.
Staging date is the date by which sufficient quantities of the item must be available for picking to begin.
Dependend on the volume that must be picked and staged it can take days to have everything in the staging area so that it can be delivered from there.
In the customizing of shipping point you can enter days/hours needed for picking and packing. -
Missing Parts in production Order no committed date and qty
Hello Guru,
May I ask your help to check our issue when we create a Production order, we got an error Order has missing parts. When check the Availability Check view, most of the components do not have committed date and qty even there are available stocks on them.
Can you help check what went wrong and its possible solution already check OPJK and OPJJ seems we have correct set up for this.?
I tried to check in CO09 on one component. from there there is also 0 committed qty and date. While the other component has OrdRes with 0 committed qty and date and there are some with values. Please help thanks.Hi Ramagari,
OPJK
Plant AAAA
Ord Type: YYY1
Avalability Check: 2 (Check availability during order release)
Material Availability Part
Check mat. availability when saving order (tick)
Checking Rule : YP (PP checking rule - Production Order rel.)
Component Check Type : ATP Check
Release Material: 1 (User decides on release if parts are missing)
PRT Part
Checking Rule : 02 (Status check and inventory audit)
PRT Release : 1 (User decides to release when there's no PRT)
Capacity Part
No check (tick)
OPJJ
Availability Check: 02 (Individ. Reqs)
Checking Rule: 01 (Checking rule 01)
Stocks parts:
Include safety stocks (tick)
Missing parts processing part:
Checking period: GR : 0
In/outward movements part:
Incl. Pur Ord : X
inlc. pur Req (tick)
incl. dep req (tick)
Incl. reserv (tick)
incl. sales req (tick)
incl deliver (tick)
incl. ship notif (tick)
incl rel ord reqs : X
incl pld ord : X
incl prd ord : X -
Confirm date and Commitment date
Hi all,
What is Commitment date and Confirm date and what are the differences between both .
Thanks in advance
Regards
SKCommitment date is the date on which the goods or materials have been promised/committed to deliver.
Confirmed date is the date on which the goods/materails was delivered or received.
Hope this helps.
Reward points for all helpful answers.
Thanks,
Balaji -
Commited Date - in process order
Gurus,
I am creating a process order using a BDC recording. While releasing the process order, Material shortage popup is coming and my BDC is failing in production environment.
My issue is eventhough i have enough stock of my component SAP throws me this material shortage popup. On anlysis we found out commited date is calcualted as 31.12.9999 and there is no confirmed quantity in missing parts list.
I had maintained Avaliablity check and checking groups in material master and factory calendar is also valid.
Please help out with this issue and solution to this is highly appreciated.
Thanks,
AravindHi Aravind,
Please check on the following things.
1) Lead times and processing times in Bom & material master whether maintained in R/3
2) Horizons in PP/DS tab in APO material master
3) Any false reservations for components based on other planned/process orders
4) All the stocks of components should not be in blocked storage location
Regards
R. Senthil Mareeswaran. -
Commitment dates to be informed to the customer
Dear Experts,
For my clients requirements, we are using strategy 56(characteristics planning) because they use variant configuration. When we create a sales order say for a quantity of 2 nos. the system proposes dates for both the items on the same day. When I goto MD73 to see the allocation, it is allocated on a different date than the one in MD04 screen. Request you to explain as to how the system calculates these dates(on what basis) and how the allocation is made. Since so many dates are there, I am unable to say this is the date which you need to tell your customer as the delivery date.
Regards,
Sridharan MDear ,
Please goto VA03 with your sales order Select the line item and duble click .Select schedule Line and u will find Delivery Date in the schedule line .This is the date you should tell your customer as the committed date .Again , you can also check in change mode -VA02 , select the line item and Hit the Availabilty Check , it will show you confirmed qty and same delivery date , Requested delievery date from customer .Hwoever , schedule line delivery date will the committed date to customer .
Regards
JH
Maybe you are looking for
-
I-photo: I used 2 cameras to take pictures on a trip --- i have put the pictures from both cameras into an album --- when i click on view and then sort by date, the pictures do not sort by date --- any ideas on how to get the pics sorted by date?
-
How do I make a project play automatically
I have recorded 4 presentations, all with a power point presentation first slide. When doing one of them I found somewhere a setting so that it starts playing automatically, the other 3 need the user to either click on the start button on the toolbar
-
Recovering from a partial RT Image
We use the RT Replication VI to setup our RT controllers. Recently we had the imaging process get interrupted due to a network failure. After the failure we could no longer see the RT controller in MAX. In order to get it back up and running, we h
-
Sorry if this is a question that has already been answered a few times, I'm new to Itunes and although the apparently standard prive of £0.79 is pretty cheap, I'd like to know if there are any free downloads. Thanks
-
Converting UNICODE to regular text
I don't know if the subject line really explains my problem. I'm reading some content from a URL and would like to write that content back to a database. This all works fine except when the Html of that URL contains character codes. As an example: "E