Common inspection plan

Dears
I have requirment as below
I need to have a common inspection plan in the system
So i dont want to create any inpection plan against material
when ever inspection lot was created is it possible to assign a common inspection plan
the thing is that i dont want to create more master data in the system
If it is possible please tell me how we can achive this
Thanks in advance
Faisal

Hi Faisal,
Instead of creating inspection plan for every material.
You can create one inspection plan and assign the same plan to all materials.
This can be done  in the Material Assignment in QP02 transaction.
You can keep on adding materials day by day to this for the same group and group conuter.
If you want to create in mass, hope you can create a BDC
Refer the below link
http://help.sap.com/saphelp_46c/helpdata/en/8d/4103aff89511d283de0000e829fdb3/content.htm
Thanks and Regards
Hari
Edited by: Harikris_83 on Aug 18, 2011 5:56 PM

Similar Messages

  • Material specification and Inspection plan - Task list usage

    Dear Friends,
    In inspection type  Task list usage is assigned
    For Example
    inspection type 01  -  usage - 03
    inspection type 05  -  usage - 05
    inspection type 06  -  usage - 07
    inspection type 10  -  usage - 06
    In my scenario i want to use all the above inspection type for a product
    if i use mateial specification there is no any problem with my  Task list usage
    If suppose i use inspection plan do i need to create different inspection plan with different usage
    or is it possible to create one inspection plan with all the above usage
    what about universal usage 03  can i use it
    i try to use but system does not triggering inspection lot
    can any one Suggest some ideas
    Many Thanks & Regards
    Raj

    Hi Raju,
    All of first pls understand the concept of Task list and specification.
    If you need to inspection any material in very systematic manner, where you will have well segregated operations where the appropriate Work Centers will be bind and under that hierarchy MIC will be attached. The inspection will be governed by some inspection points. And according the the same Samples will be calculated. When you wanna go with all these functionality then you must have to use Task list (Inspection plan).
    And if you don't wish to have these functions then simply go with the material specification.
    Now it comes the actual query about task list usage.
    If there is a common inspection plan is supposed to be used for all the inspection types for your material then you can prepare only one inspection plan, put ant of the Usage to it it can be 05 or 03 universal. But what you have to do is,
    Go to SPRO->Quality Management->Quality Inspection->Inspection Lot Creation->Maintain Inspection Types Execute and set the Task list usage as the same it is set in the inspection plan for all those Inspection types for which that common inspection plan is supposed to be used.
    Note:- There is no any link between inspection lot creation and task list usage of inspection plan.
    Regards,
    Shyamal

  • QM-Assign inspection plan to a variant of material (classification view)

    Hello,
    Inspection plans are commonly assigned to materials.
    In my case, I would like to manage, in <b>Classification view</b> (MM01), a new characteristics named "Variant" that could have 2 or more values, depending on which variant I order to my supplier.
    <b>But is it possible to assign an inspection plan at this sub-level ?</b> In QP01 the only possibility I see is assigning a material to the inspection plan. Can I customize something, or does it exist a trip to manager another level of assignment ?
    Thanks a lot for your help !
    Emilie

    Hi Emilie,
    Now I understood your requirement. But I would like to know the exact purpose of this requirement so that I can try to give you correct solution.
    I will consider your example:
    Material : 123
    Classification: Inspection
    Characteristics 1: Variant 1 for Inspection 1
    Characteristics 2: Variant 2 for Inspection 2
    Selection of inspection plan takes place during the creation of inspection lot. So now you have to link this material/classifcation/inspection plan combination at the time of inspection lot creation. I doubt whether this can be done using one user exit.
    The user exits are
    EXIT_SAPLCZCL_001
    EXIT_SAPLCZDI_001
    EXIT_SAPLCZDI_002
    Please let me know whether it helps.
    WR,
    Sanjeev
    Message was edited by: Sanjeev
    Selection of inspection plan takes place during the creation of inspection plan
    changed as
    Selection of inspection plan takes place during the creation of inspection lot
            Sanjeev

  • Error while uploading Inspection plan

    Dear Friends,
    I am creating inspection plans using BDC. The MIChas 2 versions. When i am using version 1, the inspection plan is created. Whereas when i am using MIC version 2 i am getting error "error occured while checking type group".Kindly let me know how do i resolve this.
    Regards
    Vivek

    Hi,
    Thanks for the reply. when i am trying to create a inspection plan in other plant, we have 4-5 sampling procesures to select from. But for this perticular plant where we are having problem, its showing only one. How do i get more options?How do i extend a sampling procedure to a new plant.
    Vivek
    Edited by: vivek mankad on Feb 23, 2010 7:57 AM

  • Error while creating Inspection plan

    Hi,
    While creating inspection plan in QP01, system is showing error  "Material type ZROH is not defined for task list type Q''
    Please help me to solve the error.
    Thanks
    Prasant

    Hi,
    This is due to the configuration error,
    Just use T.Code OP50
    Create an entry for task list type "Q" with material type "ZROH" and save,
    Then try creating a Quality Inspection Plan, it will work
    Regards
    Merwyn

  • Sale Order / Project specific Inspection Plan

    Dear All,
    I want to create Sale order or Project specific inspection plan for a material. This is because, my  customers want some specific inspection requirements for individual materials, which are assigned to Sale order or project. I want to inspect the material after receipt for these specific account assignments. I do not want to assign the customer because, my single customer may give different sale orders with different inspection requirements.
    But in inspection plan, i can not see the assignment of sale order / project as i can see in Rate Routing.
    Can anybody tell me about this?
    Regards,
    Prashant Kolhatkar

    Create a Material ONE as Configurable Material. Assign 300 Class Type Class with Charcateristics created through CT04 Transaction which in turn linked to MICs.
    Create another Material TWO with same Class but not configurable but is a Variant of Material ONE (MRP 3 View)
    Maintain Configuration Profiles for both Materials.
    In Material TWO, for insp. type details click on Insp. by Config indicator.
    Whenever a Sales Order is created, maintain the requirements from the Customer in Characteristics and save the Sales Order. Against this Sales Order whenever a GR is made for respective Production Order inspection lot is created against the specifications given by Customer and not that maintained in inspection plan.
    Best Regards,
    K. Raghavendra Nayak

  • How to block deletion of Inspection Plan

    Dear Experts
    Accicendatally, our users are deleting the Inspection Plan,
    Is there any authorisation object to make Restriction on this,Transaction is QP02.
    Regards
    Sandeep patil

    Hi Sandeep,
    As you said User's are deleting inspection plans. They must be putting it for deletions by clicking on deletion flags.
    If you want to restrict this then you have to get help of security team. They will find role for this transaction -
    > then they will find out the objects matanined in this role -
    > this will display all the activities in that object -
    > then they can cancel deletion activity from object list.
    Then when User will access QP02 then this checkbox will appear grey. Then they will not be able to delete inspection plan.
    Hope this resolves your issue, reward points if helpful.
    Regards,
    Avinash.

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Errors while creating Inspection plan using BAPI_INSPECTIONPLAN_CREATE

    Hi All,
    I am writing an upload tool for inspection plans. In this program I use bapi: BAPI_INSPECTIONPLAN_CREATE.
    I made an extraction of a excisting inspection plan with SXDA_TOOLS which uses the same bapi and filled the bapi structures with the similar data. Now I am getting strange messeges in the return structure as below.
    1. Material is not maintained for plant NNNN. But the material is mainained for that plant.
    2. Consistency check not successful when creating operation
    3. Inspection characteristic cannot be uniquely assigned to one operation
    Let me know your suggestions
    Thanks,
    Sabu

    Hi All,
    Have any one used this BAPI, BAPI_INSPECTIONPLAN_CREATE to create Inspection Plan ?
    Can you help me on above errors?
    Thanks in advance,
    Sabu

  • ERROR WHEN CREATING INSPECTION PLAN

    HI GURUS,
    WHEN CREATE AN INSPECTION PLAN GET THE FOLLOWING ERROR
    Op. 0010, CH 0180: Char. ident. SMS used for QDI several times in task list.
    THIS BECAUSE MY CLIENT WANTS TO REPEAT THIS M.I.C TWICE.HOW CAN I SOLVE THIS
    REGARDS
    AMIT

    Hi,
    It is not a error message It is a warning message for Use the Same MIC in Multiple time, No problem just you can save the Inspection plan, It will not reflect any problem any where.
    Regards,
    S.Babusingh

  • Inspection plan creation error....

    Hello gurus,
    I am getting error while creating inspection plan....
    'Work center ABC plant ABC does not exist for task list type Q'
    what should be the solution......?

    Double check that the plant for the inspection plan matches the plant for the work center. If you created the work center in plant ABCD but are creating the plan in a different plant, they may not match.
    This usually happens when you create a plan by using an existing plan in another plant as the template.
    FF

  • Error while creating the Inspection plan by T.C QP01

    Hello Friends,
    In QP01, When i am trying to create a inspection plan system throwing the error message "The inspection plan identifier exists already. Enter another."
    Message no. QP054
    But in QP02, When i checked  for that material, Plant, Group Number, Group counter, Usage, Status, i didn't find the entry over there.
    Actually my requirement is to create a inspection plan for a material and plant combination with speicfic Usage as 61(customer requirement and status 4) but when i am trying to create that system throwing the error message explained above.
    Thanks and Regards,
    Jitendra Chauhan.
    Edited by: jitendra chauhan on Jun 1, 2010 4:28 PM

    Hello Friends,
    Thanks for your valuable answers.
    I checked in table MAPL, for a particular material, Plant, Group Number and Group Counter, there is no entry.
    Where as in table PLKO, for a particular Group Number and Group Counter, entry is there. Actually this Inspection Plan Group Number and Group Counter is assigned to multiple materials through Material Assignment. If i delete the entry for this in table PLKO, than for all rest of the materials also entry will be deleted.
    Hence how to resolve this?
    Actually for other material number, same plant, same group number and same group counter, entry exist. So can i simply go in the inspection plan of other material,same plant,same group number,same group counter and than inside the material assignment to assign the required  material code, plant and the group counter number?
    Looking ahead for valuable inputs from the genius.
    Thanks and Regards,
    Jitendra
    Edited by: jitendra chauhan on Jun 2, 2010 8:09 AM

  • Long text problem while uploading Inspection plan through BDC.

    Hi,
    I am facing some problem while uploading the inspection plan. There are few MICs for which we are having long text, while uploading the inspection plan through BDC - some other long text is getting copied into the MIC's long text. After checking I came to know that in function module, read_text - some text which is stored in ABAP memory is getting copied into the inspection plan.
    I am working in SAP release 4.7. I have checked with SAP notes: 97419, but it is also not satisfying.
    Waiting for quick solution.
    Thanks in advance.
    Fahié

    Hi a®s,
    Thanks a lot for your kind reply.
    My requirement is I want to maintain long text for few MICs (which are not having long texts at MIC level) in inspection plan (QP01).
    When I am trying to manually assign the MIC's to inspection plan (QP01), long text is copied whereas I am not clicking the long text icon in (QP01). Long text is not maintained in MIC level, still some long text is copied to this MIC. This was also happening while uploading the inspection plan thro' BDC.
    I believe what you have mentioned about function module SAVE_TEXT cannot be used here since long text is already copied before we pass the long text. Also if we pass some long text, still apart from the long text what we have passed there is some other long text copied (extra long text).
    Waiting for quick solution.
    Thanks in advance.
    Fahié

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Inspection plan selection based on production workcenter for Inspection typ

    Dear QM Guru's,
    I have requirement of automatic inspection lot creation based on production work center.
    For example :- I have Inspection Plan A, Plan B and Plan C for Material XYZ. My requirement is that, when inspection lot created for material XYZ ,when we release production order (Early lot creation) , it should create inspection lot based on production work centers in the order. In this case, if production workcenter A is in the prodiction order, system automatically assigned inspection plan A, when workcenter B,it should choose inspection plan B and same for C workcenter.
    Can we have this set up in the system?
    Let me know if u need any other details.
    Thanks in advance.

    The workcenters in QM and PP don't have to be the same.  In the user exit your going to code in the logic you want to use to select the inspection plan.
    I suggested creating the workcenters the same and the code can use that info to match up the correct task list group to assign the inspection lot. But if that doesn't work pick something else.
    Your code can use any logic you want.  You can put a description in the short text if you want. 
    You can just have an understanding that task list group 10 is always used for production work center XYZ and task list group 20 is always used for production work center ABC and task list group  30 is always used for production work center 123.  In the user exit you check which production line and just change the group to 10, 20 or 30 then.
    I don't care what you pick or how you do it, neither does the function module.  I believe the function module will pass in the parameters of the task list it is planning to assign.  You then have the ability to use the code to pick a different one and pass back new parameters for the task list.
    Craig