Compare settings between plants

Hi,
Is there any transaction code to compare settings between 2 plants.For eg Quantity/Value update was done for plant X but not for plant Y.Or else what are the tables used to compare the settings

>
nevinphilip wrote:
> Hi thanks for the reply..Can you tell me which all tables are to be checked.
Please check this answered link:
plant table

Similar Messages

  • STO ( In between Plants )

    Gud Morning Guru,
    1)STO between Plant
    2)Exicise are mainting in between the plant ( sto with exicise   invoice billing )
    pls sent the configer Guide. Step by Step
    ( if any screen short have forward me )
    Thanks
    Warm Regards
    Sankar

    Hi,
    -stock-transfer-order.htm
    and process is......
    Follow the below steps to to make STO between two plants ( different company company codes).It is also called as Inter Company STO.....
    1)Create one Customer Master in XD01 with respect to Supplying Plant Sales Area and assign this Customer no with Receiving Plant in OLME->PO-> set up STO->Define shipping data for plant and for the supplying Plant assign the above sales area.( Make sure,In Customer Master,sales Area Tab: you are maintaining shipping condition)
    2) For Receiving Plant Pur. Org and Co.Code Combination create Vendor master in XK01 and in this vendor master assign the Supplying plant in Pur.Org.Data screen->Extras--> Add.Pur.data
    3) OLME->PO-> Set up STO------>For your supplying plant assign document type NB, Delivery type NLCC and Checking Rule RP
    4)then For your supplying Plant and receiving Plant assign Document type NB
    5)Make sure you are maintaining Sales View for the material at supplying Plant and in Sales /Gen plant Data view maintain Availability check, Loading group and Transportation group.
    6) In SPRo-->Logistics execution> Shipping->Basic shipping functions->Shipping point Determination>assign shipping points-> For your Loading group,Shipping Condition and Supplying plant combination,Assign shipping point
    these are the configuration settings you have to do in background.
    Then Create STO from Receing Plant in ME21N with document type NB.
    Based on that STO, Create Delivery in VL10B from supplying Plant
    Do PGI in VL02N from Supplying plant
    Do GR in MIGO at Receiving Plant keeping Outbound delivery as a ref. document.
    Now your STO bet. two plants belongs to diff. Co.Codes will be completed.
    STO Bet Plants belongs to Same Company Code...It is also known as Intra-Company STO:
    1)Create one Customer for Supplying Plant Sales area and assign this Customer no with Receiving Plant in OLME---> PO -
    > Set up STO -
    > define Shipping Data for plants. and maintain the same sales area in your Supplying plant.
    2) In OLME---> PO -
    > Set up STO.....for your Document Type: UB and Suppying plant Combination assign Del. Type NL and Checking rule RP
    3) In OLME---> PO -
    > Set up STO...for your Supplying Plant and Receiving Plant combination Maintain Doc. Type : UB
    Make sure you are maintaining Sales View for your Material at Supplying Plant.
    4) Maintain Shipping point at, SPRO----> Logistics Execution -
    > Shipping -
    > Basic Shipping Functions -
    > Shipping Point Determination for Plants.....there for your Loading group,Shipping Condition, Shipping Plant combination maintain Shipping plant..
    Now Create STO in ME21N with Doc.type: UB at Receiving Plant.
    Then Create Delivery in VL10B from Supplying Plant...
    Then Do PGI in VL02N from supplying Plant.
    Then do GR at Receiving Plant based on Outbound Delivery at Receiving Plant...
    : IMG > Logistics - General > Tax on Goods Movement > India > Basic Settings > Maintain Excise Registrations
    Maintain Excise Registration
    Logistics tax on Goods MovementsIndia SPRO Basic settingSAP Ref. IMG Maintain Excise Registrationsgeneral
    APPLICABLE
    1.2 Maintain Company Code Settings
    SAP Ref. Logistics general tax on Goods MovementsIndia  Basic setting SPRO Maintain Company CodeIMG  Settings
    APPLICABLE
    1.3 Maintain Plant Settings
    SPRO SAP Ref. IMG Maintain Logistics general  tax on Goods MovementsIndia Basic setting  Plant Settings
    APPLICABLE
    1.4 Maintain Excise Groups
    SPRO  SAP Ref. IMG  Logistics general  tax on Goods MovementsIndia Basic settingMaintain Excise Groups
    APPLICABLE
    1.5 Maintain Series Groups
    SPRO SAP Ref. IMG  Logistics general  tax on Goods MovementsIndia  Basic settingMaintain Series Groups
    APPLICABLE
    1.6 Maintain Excise Duty Indicators
    SPRO Maintain SAP Ref. IMG  Logistics general tax on Goods Movements IndicatorsIndia  Basic setting Excise Duty
    APPLICABLE
    1.7 Maintain Sub transaction Type with Text
     tax on Goods MovementsIndia  SPRO Maintain Sub transaction Type with SAP Ref. IMG Logistics general  Basic settingText
    APPLICABLE
    1.8 Determination of Excise Duty
    SPRO Select Tax Calculation SAP Ref. IMG  Logistics general tax on Goods MovementsIndia Determination of Excise Duty Procedure
    APPLICABLE
    1.9 Maintain Excise Defaults
    SPROSAP Ref. IMG Logistics general  tax on Goods MovementsIndia Determination of Excise DutyMaintain Excise Defaults
    APPLICABLE
    1.10 Condition-Based Excise Determination
    SPRO Define Tax SAP Ref. IMG  Logistics general tax on Goods Movements PurchasingIndia  Condition-Based Excise DeterminationCode for Documents
    APPLICABLE
    1.11 Condition-Based Excise Determination
    tax SPRO Assign Tax Code to SAP Ref. IMG  Logistics general on Goods Movements CompanyIndia Condition-Based Excise Determination Codes
    APPLICABLE
    1.12 Classify Condition Types
    SPROSAP Ref. IMG Logistics general  tax on Goods MovementsIndia Condition-Based Excise DeterminationClassify Condition Types
    APPLICABLE
    1.13 Maintain Chapter IDs
    SPRO Maintain SAP Ref. IMG  Logistics general tax on Goods MovementsIndia  Master dataChapter ids
    APPLICABLE
    1.14 Assign Users to Material Master Screen Sequence for Excise Duty
    MasterSPRO  SAP Ref. IMG Assign Logistics general  tax on Goods MovementsIndia data Users to Material Master Screen Sequence for Excise Duty
    APPLICABLE
    1.15 Specify Excise Accounts per Excise Transaction
    SPRO Specify SAP Ref. IMG  Logistics general tax on Goods MovementsIndia  Account determinationExcise Accounts per Excise Transaction
    APPLICABLE
    1.16 Specify G/L Accounts per Excise Transaction
    SPRO Specify G/L SAP Ref. IMG  Logistics general tax on Goods MovementsIndia  Account determinationAccounts per Excise Transaction
    APPLICABLE
    1.17 Incoming Excise Invoices
    SPROSAP Ref. IMG Incoming Logistics general  tax on Goods MovementsIndia Business TransactionsExcise Invoices
    APPLICABLE
    1.18 Define Processing Modes Per Transaction
    SPRO Define Processing SAP Ref. IMG  Logistics general  tax on Goods Movements PerIndia  Business TransactionsModes Transaction
    APPLICABLE
    1.19 Define Reference Documents Per Transaction
    SPRO De SAP Ref. IMG  Logistics general tax on Goodsfine Reference MovementsIndia  Business TransactionsDocuments Per Transaction
    APPLICABLE
    1.20 Maintain Rejection Codes
    SPROSAP Ref. IMG Maintain Logistics general  tax on Goods MovementsIndia Business TransactionsRejection Codes
    APPLICABLE
    1.21 Specify Which Movement Types Involve Excise Invoices
    SPRO Specify Which SAP Ref. IMG Logistics general Movement Types tax on Goods MovementsIndia Business Transactions Involve Excise Invoices
    APPLICABLE
    1.22 Outgoing Excise Invoices
    Outgoing ExciseSPRO Assign SAP Ref. IMG  Logistics general tax on Goods Movements Billing Types to DeliveryIndia  Business TransactionsInvoices  Types
    APPLICABLE
    1.23 Maintain Default Excise Groups and Series Groups
     Outgoing Excise Invoices SPRO  SAP Ref. IMG  Logistics general  tax on Goods Movements Maintain Default ExciseIndia Business Transactions Groups and Series Groups
    APPLICABLE
    1.24 Subcontracting Attributes
    SPRO Subcontracting SAP Ref. IMG  Logistics general tax on Goods MovementsIndia  Business TransactionsSubcontracting Attributes
    APPLICABLE
    1.25 Maintain Movement Type Groups
    SPRO SAP Ref. IMG Logistics general  tax on Goods MovementsIndia Business Transactions Attributes SubcontractingSubcontracting
    APPLICABLE
    1.26 Utilization Determination
     tax on Goods MovementsIndia SPRO BusinessSAP Transactions UtilizationRef. IMG UtilizationLogistics general  Determination
    APPLICABLE
    1.27 Specify SAP script Forms
    tax on GoodsIndia SPRO Business  ExciseSAP Ref. IMG Specify SAP script Logistics general Movements Transactions FormsRegisters
    APPLICABLE
    1.28 Number Ranges
    SAP Logistics general tax on Goods MovementsIndia  ToolsSPRO NumberRef. IMG  Ranges
    APPLICABLE
    1.29 Message Control
    SPRO SAP Ref. IMG  Logistics general tax on Goods MovementsIndia  ToolsMessage Control
    APPLICABLE
    J1I2
    Prepare a sales tax register
    J1I3
    Create outgoing excise invoices in batches
    J1I5
    Update the RG 1 and Part I registers
    J1IEX
    Incoming Excise Invoices (central transaction)
    J1IEX_C
    Capture an incoming excise invoice (excise clerk)
    J1IEX_P
    Post an incoming excise invoice (excise supervisor)
    J1IF01
    Create a subcontracting challan
    J1IF11
    Change a subcontracting challan
    J1IF12
    Display a subcontracting challan
    J1IF13
    Complete, reverse, or recredit a subcontracting challan
    J1IFQ
    Reconcile quantities for subcontracting challan
    J1IFR
    List subcontracting challan
    J1IH
    Make a CENVAT adjustment posting
    J1IIN
    Create an outgoing excise invoice
    J1IJ
    Assign excise invoices to a delivery for sales from depots
    J1INJV
    Adjust withholding tax Item
    J1INREP
    Reprint a withholding tax certificate for a vendor
    J1IQ
    Year-End Income Tax Depreciation Report
    J1IR
    Download register data
    J1IS
    Process an excise invoice (outgoing) for other movements
    J1IU
    Process exemption forms
    J1IW
    Verify and post an incoming excise invoice
    J1IX
    Create an incoming excise invoice (without reference to purchase order)
    J2I8
    Transfer excise duty to CENVAT account
    J2IU
    Remit excise duty fortnightly
    J2I9
    Monthly CENVAT return
    J1IG
    Excise invoice entry at depot
    J1IGA
    Create additional excise entry at depot
    J2I5
    Extract data for excise registers
    J2I6
    Print excise registers
    Sail
    Basically CIN is divided in to two types:
    1. TAXINJ - Is a Routine Based that is used in the condition types. it will work on the logic what ever is there in the Routine.
    2. TAXINN: - Is a condition Record based. Means we have to create condition records for each and every condition type that you are going to use in the Pricing Procedure.
    Since Version 4.7 this TAXINN came into picture and start using this.
    Regards Welcome
    Thanks & Regards
    Swathi

  • Cost comparison of common parts between plants

    Hi Gurus,
    Is there a way to do a cost comparison of common parts between plants? i mean we have plant A and plant B and lets say we buy material X at both plants. can we do cost comparison between the plants for that material to see which plant buys the material for a cheap price?
    Thanks
    Anusha

    Hi,
    It is possible to comapre the costs in both the plants.
    But the precondition is the material should be available in both the plants with its accounting view.
    The table related to this MBEW-Material valuation (current prices) and MBEWH for previous period prices.
    You put the material in the table for the two valuation areas and down load the price for the two plants and compare the same.
    Regards,

  • The Creative Cloud application becomes inoperable continually on both my Windows 7 and 8.1 operating systems. I'm tired of re installing the application after deleting the OOBE file to get updates and syn settings between computers for Photoshop. Is this

    The Creative Cloud application becomes inoperable continually on both my Windows 7 and 8.1 operating systems. I'm tired of re installing the application after deleting the OOBE file to get updates and syn settings between computers for Photoshop. Is this an endemic problem with others? I'm using Google Chrome as my browser. Is this an issue with the problem?

    Similar problem just happened to me with the Creative Cloud Update 1.7.1.418—slightly different so I thought I'd share. I have multiple Adobe Creative Cloud programs installed on my computer, all working just fine. I updated the Cloud App to the latest version and then it shows me that I have only one program installed! All my previously installed programs (Photoshop and the like) still work but show as "install" instead of "Up to date". Initially I thought I'd have to re-install the Cloud app or recreate the OPM data base but then I noticed that some of the Cloud app preferences (Apps > Settings > App Language) were different to what I had set previously. I use English (International) language, the update had reverted the app back to English (North American). I flicked back to my previous language and bam, all my apps now show as being installed correctly.

  • Automatic PO from PR from MRP for transfer between plants

    Hi,
    We want to use the automatic creation PO with tcode ME59. this scenario is clear when the purchase is from a supplier. but ¿this can be used also for transfer between plants?
    For example we don´t have info records for transfer this material to one plant to another and this is a requirement in automatic po
    The PO type is also different when transfering the materials between plants
    The PO does not relate a supplier in header, instead it has the plant code.
    However I tried to execute the automatic creation of PO with ME59 and I obtain the error below
    Thanks
    Jorge G

    Use ME59N,
    But before using ME59N, you have to configure something, we know in ME59N, system will take default document type as NB automatically. (Check the sap note 924105, 114213, 994209)
    You have to set the control T for the document type, so system will take the supplying plant instead of vendor.
    Only then you can create automatic PO from ME59N.
    I've tested that and I've done it successfully.
    PO

  • SD billing document (transfer between plants) error in document splitting

    Dear Gurus.
    I have the following scenario.
    New GL activated
    Zero balance on Profit Center.
    SD billing document is created after the shipping of material (internal transfer) between 2 plants belonging to the same company code.
    I have several user exits activated and they are not well documented if activated.
    Case1.
    The billing document is usually created with materials populated with the same Profit Center.
    In Tr VF01/VF02 the function: Release for Accounting is executed and no accounting document is created (OK cause they belong to the same company code), this function is just closing the cycle of the billing document to set the status as completed.
    Case2.
    Billing document containing several materials with more than one Profit Center
    During the execution of the function: Release for accounting the following error is gotten: Position 1 is not populated with Profit Center - apparently caused by the splitting rule - financial document creation -  the status of the billing document is not set to Completed, is kept as opened.
    As I commented In case 1 I do not have any accounting document (no error message)
    Doubt 1
    Is it possible that the splitting rule is being checked even though no accounting document is created (remember billing in a scenario of material transfer between plants belonging to the same company code)?
    Apparently in case 1 I do not have any error cause the splitting rule is deriving the profit center in a passive basis: Inheritance.
    In the other way, in case 2 the splitting rule is trying to derive the profit center in an active basis. In my configuration I actually do not have any configuration for the combination of transaction, variant, position to be derived, position basis.
    Doubt 2.
    Is this the standard behavior of SAP?
    Could this be caused by a user exit not identified?
    thanks in advance for any advice provided
    Regards vpa
    Valentin PA.
    2.
    In case 1 is clear that as only one profit center is shown theoretically the inheritance rule is populating the Profi

    It would be possible, I suppose.  You could generate Idocs from the SD system (or an interface file) and import that info into the FICA system.  Of course the FICA system could not know about the sales order etc - so limited research abilities would exist. 
    For the second question, that would only function in a single system scenario, and yes the SD document flow would reflect its clearing status in FICA.
    regards,
    bill.

  • Stock transfer between plants two steps 303-305

    Dear All,
                    We are using version SAP 4.7 we are using stock transfer scenarion between plants two steps. 303-305 source plant they will remove the stock  with 303 movement in the receiving plant they will receive the goods against the 303 document number.
    at the time with 305 movement type one document generated in that document table MKPF 303 reference number should be updated but in the 305 document the reference document 303 not updated in table MKPF.
    why?...any updations required. because i want to develop an user exit at the time of Goods receipt with 305 movement in the receiving plant now it is allowing posting date as <= 303 document posting date it should be allow only >=303 document posting date at the time of 305 document generation in the receiving plant.
    in MKPF table the reference document is not updating ....any ideas....
    im using the standard Enhancement :MBCF0002
    EXIT_SAPMM07M_001.
    Regards
    Anand..

    Hi..
        then how can control.
    receiving plant 305 document posting date is should be greater than or equal to source plant 303 document posting date how can achieve this?.
    via user exit in the reciving plant 305 document the reference document not updated. how to achieve this?...
    any ideas..
    Regards
    P.Anandhakumar

  • Stock Transfer between plants two steps.

    DearAll,
                 We are using the scenario stock transfer between plants two steps.in the source plant we are issueing the goods  with on 303 movement in MIGO with Remove from storage option. in the receiving plant we are receiving the goods with refernce to 303 material document in MIGO with place in storage option.
              we are using the version SAP 4.7.
    my problem is at the time of goods receipt SAP is allowing to the posting date less than the source plant 303 document date. it should allow the posting date as Greater than equal to source plant document date at the time of GR.
    Any standard pracktise is there.
    for example  source plant 303 document date is 08.06.2009 wrongly i have entered the receiving plant 305 document posting date as 06.06.2009 it is allowing to post it is not throw any information. it should not allow to know.
    i want to control this. any standard controls is there. kindly help.
    Regards
    P.Anandhakumar
    Edited by: Anandhakumar Palanisamy on Jun 9, 2009 10:46 AM

    Except user exit , Is it possible any standard functionality.?
    why SAP not controlled this?.
    this is SAP bug or not?. kindly clarify..
    Regards
    P.Anandhakumar....

  • Error when doing two step transfer between Plants with split valuation

    Hi expert,
    I´ve activated split valuation for Material X , it has three Valuation types ( NEW, REPAIR and DAMAGE ) . The problem arose when i tried to do a two step transfer between plants ( mov 303 ) and i got the following error msg :
    Use one-step procedure for transfer posting to mat. subj. to valuation
    Message no. M7048
    Diagnosis
    In the receiving plant, the material is subject to split valuation. For this material, a stock transfer cannot be carried out using the two-step procedure.
    Procedure
    Use the one-step procedure (movement type 301) or a stock transfer order for the stock transfer.
    The message is very clear itself , but... i just wonder if there`s actually any way to avoid this, I tried to change the error msg into a warning but couldn´t find it in customizing. Thanks for any comments on this !

    Hi,
    What do you mean with "inconcistent to my storage type definition?", is that mean i can process two step transfer without using PO/delivery process or one-step movement? coz according to business requirement, we must use two step transfer considering to the distance between plants is so far and we want to make it the simple way so that PO/Delivery process isn't better solution. I think, this is an standard procedure all company over the world can use but just the reason of split valuation the system can't execute the transaction.
    Is there any config i miss to? is there any user exit i can use for this requirement? please help me..
    thanks,
    AJ

  • HT201320 I have IOS 7 5S and using mail. Receiving works great. Sending mail will not work. Using Centurylink. On my IOS 6 Iphone 4 it works great. Compared settings and they are identical. Now what?

    I have IOS 7 5S and using mail. Receiving works great. Sending mail will not work. Using Centurylink. On my IOS 6 Iphone 4 it works great. Compared settings and they are identical. Now what?

    Well, this is a recurring issue for many users...a small percentage of users but still a bug.  Report the issue here to Apple:  www.apple.com/feedback
    iOS7.0.3 will be released next week, which as of now, I know is primarily for an iMessage but hopefully it will clear up some of these email issues some are also having.

  • How to compare data between two tables?

    Hi,
    My team is trying to develop a SAP data migration tool (DMT) using ABAP.
    One of the functionalities in the DMT is to validate the data in the staging area against the loaded SAP data.
    The tables in the stagin area are customer tables (i.e. user-defined tables starting with Y, Z).
    How do I compare the data in the staging area against data that are loaded into SAP tables? Are there some built-in SAP functions to do this? Or, are there some better ways of doing this (e.g. instead of comparing against data in the SAP tables, we compare with some INTERNAL tables)?
    Any help would be greatly appreciated, thanks!

    Hi Kian,
    Use <b>SCMP</b> transaction to compare data between two tables and you can not use this for comparing internal tables.
    Thanks,
    Vinay

  • Price in stock tranfer order between plants within a company code

    hi, expert,
    may i input a price different from valuation price whent create a STO between plants within a compayn code?
    please give me some clue? thx.
    Best wishes,
    David

    Hi David,
    What is ur query exactly?
    If u want to give any rate in STO, u can configure the condition type used in STO pricing procedure accordingly.
    If u give conditin category as "G" in condition type, then only system will pick up the valuated price of the item.  If u want to create STO with any other rate, maintain condition category as "H" and make "manual entries possible" in condition type
    If ur two plants are in India, as per the Indian Excise Law, there should be some value addition when u do stock transfer from one plant to another plant.  That is the reason, we normally give value addition also in the pricing procedure
    Hope this will resolve ur query

  • How to compare date between 2 file?

    hi there...
    is there any possibility to compare date between 2 file and the file that is latest to open?
    thank you

    i need help urgently..... i type tis code
    <%
    String file = ("C:/");
    File f = new File(file);
    String [] fileNames = f.list();
    File [] fileObjects= f.listFiles();
    %>
    <UL>
    <%
    for (int i = 0; i < fileObjects.length; i++) {
    if(fileObjects.lastModified()){
    %>
    <LI>
    <a href="<%= fileNames[i %">"><%= fileNames[i] %></A>
    <%
    %>
    my purpose is to list out all the file in the folder but not to the user just for the system to check all the files than when i click a link it will open the latest file
    Message was edited by:
    n_dilah</a>

  • Stock transfer between plant to plant in blocked status

    Hi Gurus,
    Can anybody know how to use some mov. type to transfer restricted status between plant to plant?
    Many thanks in advanced.
    Luiz Geraldi

    Luiz,
    You cannot move 'blocked' or 'restricted' stock in this manner. This is not supported in ECC 5.0 and I would not think ECC 6.0 would be any different in this regard as this is a basic rule within standard SAP although I would think that in certain situations it would be beneficial to be able manage this in a simple move. 
    - As others have correctly pointed out, you have to change the stock status to 'unrestricted use', transfer/receive it (either using mvt 301, 303/305, 351/101, 641/101, 643/101 etc depending on the stock transfer mechanism used between the plants) and then finally change the stock status back to 'blocked'.
    - Another option would to be to post an inventory adjustment using mvts 701/702 in both the plants and then change stock status in receiving plant to 'blocked'.
    - Design a custom ABAP program to perform the sequence of movements in a single transaction. I think it would be important to get the timing right to avoid incorrect booking of stock.
    - The movements could be also be linked in a single transaction using a workflow solution although I am not sure how simple or complex the solution might be.
    Unfortunately, the quantity strings associated with movement types are hard-coded by SAP. So, it would not be possible to achieve this move using a custom movement type without any modifications.
    Hope this helps.
    H Narayan

  • Table that gives the relation between plant and company code

    Hi gurus,
    I actually have plant number and using this plant value i need to get the company code.
    Is there any table that gives the relation between plant and company code. So,that i can get the company code details.
    Thanks in advance.

    Hi Bhanuphani,
    Use  T001K  where BWKEY is the plant
    Reward if useful
    Thanks Arjun

Maybe you are looking for

  • Java.sql.SQLException: [Microsoft][ODBC SQL Server Driver]Unspecified error

    Hi All, I am getting the following error when i am running swing program. I have a large volume of data. My resultset is running upto 2 hours. after 2 hours process is stoped and i got the following error on console.I am using Swing and MS SQL Server

  • Overdelivery Tolerance

    Hi, Just a simple query...In PO the overdelivery tolerances acts on total quantity or quantity yet to be received? For example lets say a PO has 100 tones of material with an overdelivery tolerance og 5%. Against the PO already 30 tonnes has been rec

  • Do dual-core proccessors count for minimum spec on Flash Player 11?

    According to the minimum specs for Adobe Flash Player 11 on a Windows computer it needs a 2.33GHz or faster x86-compatible processor.  The majoriity of our computers run dual core, or indeed quad core processors, but each core is less than 2.33Ghz. 

  • Minimum number of Tablespace(s) required to startup a database

    Hi, What is the mandatory number of tablespaces required for the sysdba to open a database? Also what is the minimum number of tablespace required for the users to access the data?

  • Verizon wants to replace my landline

    I have local phone and DSL service with Verizon.  I pay around $45 (including all the taxes) per month.  Generally speaking, I am happy with the service.  I got a call from Verizon service that they offer free of charge service to replace my landline