Compnts in goods mvt. screen in proc. order confirmation in display only

Hi Gurus,
My requirement is , while confirming the process order, in the Goods movements screen, we should not allow the user to change or delete the components. It should be in display mode only.
pls help me in achieving this.
Thanks in advance.
- Gowri

Gowri,
You can create a transaction variant using SHD0 transaction for CO11N and in the defination define these fields output only and deactivate the delete button.
The other option is to control through authorisation object.
There are several post on this..so kindly request you to search this forum for details,
Regards,
Prasobh

Similar Messages

  • How can i get the order form to display only those fields selected by user?

    Hi everyone,
    I'm a newbee so please bear with me.
    I would like to create an interactive form in a multi-page format. I would like to display our fifty odd products, divided into 5 different categories. The client browses through these pages then selects those that he wants to buy.
    The interactive order form at the end should display only the client’s choices along with the Total purchase order.
    In short, a little like a on-line catalogue and cart/basket that we see while buying online.
    Now, I've created my pdf brochure, and I have the order form on page 12-13 at the end with the subtotal, Vat and Total ...all that's fine. My only problem is I want the order form to display only those items selected by the user and not the entire list of items as shown in my current order form.
    Have a look at my pdf here http://www.upperside.fr/vijee/mpls09ex/EXHIBITOR%20SPECIAL%20ORDERS2010.pdf
    Can someone please help me/guide me to the right resources that I need to look up to achieve my end result.
    Thanks a lot in advance.
    Vijee

    The poster already posted at the Acrobat Users Community, Interactive Forms that sums up a client order from catalog. The sample form posted to Acrobat.com was a revision of the sample form that came with Acrobat 4.0. There are some fairly advance scripts, templates, and document level functions involved with this form.

  • Storage Location is not found in Goods Movement Screen in Prod.Order CNF.

    Hi Experts,
    I have create a production order with Auto GI &GR.When i going to confirm it,in Good Movement Screen  storage location entry field is not found thats why i can't enter Sto.Location.
    Can any Expert tell me the solution for this issue?
    With regards.
    Prashant

    Dear,
    In the material master, MRP2 view maintain Storage loc for material.
    Please refer this thread as a reference,
    Storage location not found in MIGO for 101 movement type
    Regards,
    R.Brahmankar

  • Goods movement tab in production order confirmation

    Hi Gurus, please suggest me with the solution for my requirement.
    while performing production order confirmation, some user should be restricted to see goods movements and some can. how is can me done?
    Thanks in advance.

    Dear,
    Please refer my reply from this link,
    [CO15/CO11N  Goods Movement Screen Hide or Non-editable  |CO15/CO11N quantity column should be non editable in Goods Movement Screen]
    Regards,
    R.Brahmankar

  • Make Scrap portion field in production order header as display only

    Hi Experts,
    We have a requirement to make scrap field(CAUFVD-GASMG) in production order header as display field only. We do not want users to enter any values here to denote the quantity scrapped in production orders. I am not aware of any configuration to make this field as display only. Please let me know which user exit or BADI available for this purpose. We do not want to use any screen variants and transaction variants and would like to restrict this at order type or plant level.
    Thanks
    Rijil

    Hello Rijil,
    If not with variants than check with enhancement.
    PPCO0006  Enhancement to specify defaults for fields in order head
    PPCO0012  Production Order: Display/Change Order Header Data
    PPCO0018  Check for changes to production order header
    Regards,

  • Goods movement 101 in Production Order Confirmation.

    Hello Gurus,
    I do the production confirmation via CO15, but when I press the 'Goods movement' button, there are only the components existing on the Goods movement item.
    I can not see the material which I produced with the Movement type 101 'Goods receipt for order into warehouse'.
    Can anyone tell us how to maintain it to allow us do the goods movement for the product?
    Regards,
    Tiger

    Hi Ranga,
    Thank you for your answer.
    I resolve my question according to your solution.
    Select 'Auto Goods receipt' in control key via OP67
    Also thanks to Benny.
    Regards,
    Tiger

  • Limit Orders - Confirmations Vs Invoice Only

    Hello,
    We are using SRM 5.0 and currently have confirmation and invoice set for our limit orders.
    We have various issues with this so I am looking at removing the confirmation option and using the invoice only method. We mainly use limit orders for paying our electricity/telephone bills etc.
    Does any one else use the invoice only option and if so do you have workflow approval or use an alternative, i.e. off-line method for the approval of the invoice or no approval at all? The confirmation is currently acting like an approval/check before the invoice is posted and it is a risk to post the invoice without some sort of approval.
    Any feedback including issues surrounding this would be very useful as Iu2019m struggling to find any good information on limit orders and their functionality.
    Many Thanks
    Lisa Pallas

    Have you tried to create a screen variant (tx SHD0). Search for the proper program and screen. You the have the posibility to hide fields in the screen. The advantage to make use of screen variant is that it is independent of a release upgrade.
    Regards,
    Paulo

  • User Exit  or Abap programming for CO11:Goods Mvt Cancel button

    Hi Gurus,
    We need to directly exit from CO11-Goods Mvt screen without entering screen CO11-Details again (direct to SAP Menu). This need to be done, because we want to restrict from posting the confirmation if there's any error in the Goods Mvt screen.
    Is there anyway that we can rectify this?
    Thank you.

    Zmisnomer,
    I would suggest you to control this through confirmation parameters for the order type/plant combination using customization transaction OPK4. Here for the Order type/Plant combination you need to activate check box for "Goods Movement" and Also "Termination for incorrect goods movement". in the General Individual Entry tab.
    Regards,
    Prasobh

  • PM Order Confirmation list

    Dear all, I have a (PM) Work order against which a number of Internal Activities allocations have been created.
    All the respective confirmations for work carried out show up on the Work Order confirmation list.
    The problem is, some of the Activities have not passed price across onto the Work Order for some reason. Does anyone know a simple/effective way of reposting the line items onto the Work Order.

    hi thyagarajan,
    Thanks. However, I dont understand what I actually need to do.  This was a Work Order created by someone for our company.
    A number of Activities (for labour work carried out) have been posted to the work order confirmation list, however only some of the Internal activity allocations are showing line items on the Work Order (tcode kob1).
    How do I repost the ones not showing on the lilne items. How does this relate to Planning. I do not fully understand if you could kindly explain.

  • Order confirmation output is triggering twice

    Hi Gurus,
    I am facing the issue with order confirmation.After saving the sales order system has giving two outputs for order. I have checked the ExtrasOutputItem the output type for order confirmation has displayed two times.I have checked NACE settings for the output type there it has not checked for Multiple messages.But still I am facing this issue.Please let me know how to rectify this error.
    Regards,
    Hari Challa.

    Hi ,
    Check how output is triggered manual or by scheduled job. Alos check settings in output determination procedure and check if any requirement is set.
    Order confirmation can trigger when ever you make any changes in sales order and save so that the customer can get latest order confirmation.
    Trust these inputs can help.
    vivek

  • Goods Receipt Screen: Purchase Order number stored

    Hi all.
    SRM 4.0, server 5.5.
    When going into the Goods Receipt screen (BBPCF02 for example), the field Purchase Order Number is pre-filled with the latest PO, that a user has searched for. How could I make sure, that this screen is not filled out with the latest PO but just let the screen display the open POs from within the timeframe? I have too many users that have made a GR, return to the GR screen and then their previous PO number is stored, and they believe they still have not made the GR for that PO, so they do it again. I need to make sure, that the purchase order number value is never stored in this field - any ideas?

    OMBT click on the groups button, select the
    Material documents for goods movements and inventory diffs.
    WA WE WF WH WI WL WO WQ WR WS WV WW WZ
    And then select the maintain icon, you need to maintain the number range
    for the year 2010.
    ands OMBA for accounting finance doc number range
    hope this helps

  • Free Goods - Not showing in sales order as subsequent item

    Dear Gurus,
    I have created a Free Goods procedure determination and maintained it at Customer/ Material level in VBN01.
    The procedure is inclusive as follow:
    For every 100 units purchased, the customer gets 10 units free
    However at sales order level there is no indication at all that the Free Goods are being triggered.
    When I check the pricing procedure, the condition record NA00 that I have used doesn't show-up.
    There is no subsequent item in the sales order under the main item showing the Free-Goods discount.
    Could you please help me go through the customizing process to correct the error?
    Many thanks for your help
    Chris

    Hi,
    FYI
    Free goods can be configured in SAP by following two methods.
    (1) Manually
    (2) Automatically
    Manually: By specifying higher level item category for a line item we can determine free goods as a free of charge
    items during sales order processing.
    Automatically: System proposes free of goods automatically in the sales order. In automatic free goods
    configuration system follows two methods.
    (1) Exclusive
    (2) Inclusive
    Exclusive: System configures free goods in exclusive option like free goods quantity is going to be excluded in
    order quantity. Ex: For 10 items 1 item is free. Then system configures free goods as 10 + 1.
    Inclusive: System configures free goods in inclusive option like free goods quantity is going to be included in order
    quantity. Ex: For 10 items 1 item is free. Then system configures free goods as 9 + 1.
    NOTE: In exclusive method other items also can be given as a free of charge items for order item.
    Configuration steps: INCLUSIVE
    SAP follows condition technique to configure free goods automatically.
    Maintain pricing procedure
    Path:
    IMG
    Sales and distribution
    Basic functions
    Free goods
    Condition technique for free goods
    Maintain pricing procedures
    Choose free goods procedure NA0001 and select it
    Click on copy icon on application tool bar and rename it Ex: SRI001
    Condition type is NA00 and Access sequence also NA00
    Save it and Exit
    Activate free goods determination
    Path:
    IMG
    Sales and distribution
    Basic functions
    Free goods
    Condition technique for free goods
    Activate free goods determination
    Go to new entries
    Specify our sales area, document pricing procedure, customer pricing procedure and specify our free goods
    procedure Ex: SRI001
    Save and Exit
    Control free goods pricing
    Path:
    IMG
    Sales and distribution
    Basic functions
    Free goods
    Control free goods pricing
    Control pricing for free goods item category
    Choose item category TAN from position button
    Specify the pricing as X = Pricing standard
    Choose item category TANN from position button
    Specify pricing as B = Pricing for free goods (100% discount)
    Save and Exit
    Maintain condition type for 100% discount
    Path:
    IMG
    Sales and distribution
    Basic functions
    Free goods
    Control free goods pricing
    Maintain condition type for 100% discount
    Check whether condition type R100 is available or not (R100 = is 100% discount)
    Exit
    Maintain pricing procedure for pricing
    Path:
    IMG
    Sales and distribution
    Basic functions
    Free goods
    Control free goods pricing
    Maintain pricing procedure for pricing
    Choose our pricing procedure form position button and select it
    Click on control data icon under dialog structure
    Include condition type R100 between the steps of discounts.
    Specify requirement = 55 and Routine No: 28 (100% discount) in Alt. CBV.
    Save and Exit
    Requirement 55: The Routine No. 55 is assigned to condition type R100. If the user wants to look both revenues
    and sales deductions for the free items since the product that we are going to give as a free of charge item can be
    sold separately in the same sales order. Then the item category of free goods TANN has the pricing value as B.
    Then the system calculates value of the free goods as 100% discount as we discussed above the same material [that
    is going to be given as a free of charge item]. Some times the same item is going to be given as a normal item.
    Then system calculates price for normal item and system should not calculate price for same item [free of charge
    item]. So as to perform this calculation we have to assign Requirement/Routine 55 is to assign condition type
    R100.
    Alt CBV = 28: [100% Discount] Condition type R100 should be taken as a ZERO value. The formula 28
    calculates condition type R100 value as a ZERO.
    Set Transfer of cost to Main item: [Copy control]: Transaction code: VTFL
    Copy control is a concept by which the system copies the data from source document to target document.
    Path:
    IMG
    Sales and Distribution
    Basic functions
    Pricing
    Free goods
    Control free goods pricing
    Set transfer of cost to main item [copy control]
    Choose Billing type F2 Delivery document type LF from position button
    Select it and click on itemicon under dialog structure
    Choose item category Ex: TAN
    Click on details icon
    Click on display or change icon
    Choose item category as TAN again
    Select it and click on details icon
    Check cumulative cost
    Save and Exit
    Cumulative cost controls whether the cost value (VPRS) is to be copied from relevant sub items into main items.
    Sub items cost are not relevant for billing.
    Maintain copying control: Transaction code: VTAA
    Path:
    IMG
    Sales and Distribution
    Basic functions
    Free goods
    Control free goods pricing
    Maintain copying control
    We maintain copy control at item level category for free goods. In this field we can control whether the
    free goods should also be transferred when we copy from one document to another document.
    Choose source document type as QT and target document type as OR from position button
    Select it and click on item control button under dialog structure
    Choose AGN item category from position button
    Click on display or change button
    Again click on AGN
    Click on details icon
    Check Re u2013 explode structure/Free goods
    Save and Exit
    This indicator controls whether the free goods are copied from source document to target document or redetermined
    again.
    Maintain condition records for Free goods [INCLUSIVE]: Transaction code: VBN1
    Path:
    Logistics
    Sales and Distribution
    Master data
    Conditions
    Free goods
    VBN1 u2013 Create
    Specify condition type NA00
    Click on key combination
    Specify all the data
    Choose inclusive by clicking the INCLUSIVE/EXCLUSIVE push button
    Specify the Material No., Minimum order quantity (Ex: 10), Specify [from] the free goods quantity (Ex:
    10), Unit of measure u201CEAu201D (Each), Free goods (are free goods) as u201C1u201D.
    Calculation procedure: We can specify the Routines for calculation procedure as 1 or 2 or 3
    1 = Pro u2013 Rata (Proportionate): Ex: If the customer places order for 100 cases of material u201CXu201D, then customer
    receives 20 cases of same material as free. That means, the business can say that buy 100 and get 20. If the
    customer orders for 162 cases, then system automatically grants 32 cases as a free of cost (162x20/100 = 32 Cases).
    2 = Unit of reference: When customer orders for 100 cases of material u201CXu201D, then the customer receives an
    additional 20 cases as a free of goods. That means business can say that buy 100 get 20 free by granting 200 free
    for every full of 100 cases. The customer places order for 162, then system automatically grants only 20 cases
    (100x20/100=20).
    3 = Whole unit: When a customer places order for 100 cases of material u201CXu201D, then the customer receives additional
    20 cases of material u201CXu201D as a free of goods item. The business can say that buy 100 and get 20 free of charge items.
    If the customer orders for increment of 100 that means 200 (100 + 100) items, then he gets 40. If he placed the
    order for 101 u2013 199 items he gets only ZERO.
    Save and Exit
    Condition record for EXCLUSIVE: Transaction code: VBN1
    Path:
    Logistics
    Sales and Distribution
    Master data
    Conditions free goods
    Specify the discount type u201CNA00u201D
    Click on key combination
    Click on Choose inclusive by clicking the INCLUSIVE/EXCLUSIVE push button
    Specify the sales organization, distribution channel
    Specify customer number and validity periods, material, minimum quantity, order quantity, unit of
    measure, calculation procedure, free goods (3)
    Specify additional material free goods (if other goods is going to be given as a free of charge item.
    Save and Exit
    Go to VA01 and raise the sales order for INCLUSIVE and EXCLUSIVE.
    See the Free Goods effect.
    Condition type NRAB = Free goods: Requirement = 59, Alt CBV = 29: [only for INCLUSIVE purpose]
    Requirement 59: We have to assign requirement 59 to the condition type NRAB. If the customer buys 100 cases
    of product u201CXu201D, then he receives 10 cases of the product free. If the user would not like the additional line item in
    the sales order for free goods rather than the discount of the 10 cases is represent in the same line item as other 90
    cases. If the free goods discount should not apply on credit for returns that do not make reference in the previous
    document.
    Alt CBV 29: The condition type NRAB is to be assigned with 29 formula to support inclusive free goods
    agreement where the user would have to apply the discount to the order item rather than having a sub item
    generated for the free quantity.
    Ex: The customer orders for 100 cases of product u201CXu201D, 10 cases are free instead of having a free sub item generated
    b the system to represent the free 10 cases, the user would like to have a discount applied to the 100 cases line item
    equal to the value of the 10 cases.
    NOTE: Free goods can only be configured on document category type u201CCu201D (OR). That means we cannot configure
    free goods on Inquiry and Quotation.
    Header Conditions
    SAP has delivered two kinds of condition types: (1) Header conditions
    (2) Item conditions
    Header conditions: The value of the header condition applies to the whole items in the sales document.
    Header conditions do not have any access sequence.
    So that, value of the header conditions should be maintained manually.
    Ex: HA00, HB00
    Configuration settings:
    Include condition types HA00, HB00 in V/08 in between the discount condition types.
    Go to VA01 and raise the sales order
    Select line item and go to Go to button
    Header Conditions
    Include condition type HA00 HB00 with values [HA00 is percentage discount and HB00 is absolute
    discount]
    If HA00 = 1%, then system applies 1% on base value on all items in the sales order.
    If HB00 = 100/- Rupees, then system applies 100/- Rupees proportionately to all items in the sales order. If sales
    order has two items, then system applies 50/- Rupees to each item.
    Click on activate button
    Go to item condition screen
    Check how system applied header conditions for line items
    NOTE: Make sure that sales order contains more than one item.
    Condition Scales
    We can maintain scales for each and every condition type. So that we can determine pricing conditions values
    depending upon the range of the order quantity.
    Ex: If you maintain condition record for PR00 for material one as a 100/- Rs. For 1 material, then we can maintain
    scales for this material like below:
    From Quantity Price
    1 u2013 10 1000
    11 u2013 20 999
    21 u2013 30 998
    31 u2013 40 997
    Configuration settings:
    Go to VK11
    Maintain condition record for PR00
    Select line item and click on scales icon on the application tool bar
    Maintain scales and scale rates accordingly
    Save and Exit
    Go to VA01 and raise the sales order
    Enter the order quantity according to the scale and see the scale effect
    Regards,
    Siva

  • Goods issue for plant maintenance order

    Goods issue with ref to plant maintenance order( Componenets of the order) is not possible in transaction code MIGO. Error message " MIGO is not possible for the refurbishment order".
    Goods issue for the same order can be posted with transaction MB!A.

    hi santhosh
    kindly check the order type .i think you are using MB1A for refurbishment process.but it is not possible.only maintenance order can be posted via MB1A
    follow the procedure for goods issue in refurbishment order.
    Choose Logistics ® Plant maintenance ® Maintenance processing ® Completion confirmation ® Goods movement ® Goods movement.
    The entry screen for a goods issue appears.
    Choose the pushbutton For order.
    Enter the relevant order number in the dialog box and choose Continue.
    An entry screen appears.
    Choose Copy.
    The Maintain Serial Numbers dialog box appears.
    Choose Reference document.
    Enter the order number in the Refurbishment order group box and choose Execute.
    A list appears with the planned serial numbers for the refurbishment order.
    Check the selections of serial numbers, for whose material you want to post a goods issue, and choose Copy.
    The serial numbers are copied into the Maintain Serial Numbers dialog box.
    Choose Exit window.
    The goods issue is posted.
    regards
    thyagarajan

  • PPPI PI sheet to trigger HUM goods receipt and PI order confirmation

    Hi gurus,
    We're running into a problem when setting up our PI sheets.
    We're using Handling Unit Management for our finished products and would like to use the PI sheet to post both the goods receipt of handling units and the order confirmation. For now let's assume all activities and ingredients are backflushed.
    For the HUM section we've created a function module that combines transactions COWBPACK and COWBHUWE. When called by itself it works like a dream.
    For the order confirnation we've successfully used standard SAP message category PI13, but also only when called by itself.
    The problem is when we combine them:
    When combining the Z function module to contain both COCI_CONFIRM_ORDER (from the PI13 message) and our ZHUM function modules, it appears that the COCI_CONFIRM_ORDER blocks the process order so the COWBHUWE part of our function module cannot be executed. This has something to do with the way SAP handles the "commit" in the function module.
    Now, I noticed it's possible to include more than one message category in customizing for the PI sheet category (when configuring through the wizard).  The idea is then to process the messages with a background job, filtering through the message category so we do the HUM part immediately and the confirmation only at the end of the shift so they don't block each other.
    However, when I do this still only one message category is created after processing the PI sheet.
    Do you know how to create messages with multiple message categories from the same PI sheet? Or if that's not the way, is there a better way to set up this process?
    Sorry for the long text, just wanted to be precise.  Any help is, as usual, greatly appreciated.
    Kind regards,
    Elt

    Hi
    1. What is quantity of the waste material you get as by product? Do not you wan it to be handled as scrap? What is the %age of scrap you have defined in the BOM for the material? You wll have some data regarding this. Or else how do you arrive at decission that after subcontract processes the waste you are paying him, Is it umpsum basis or material quantity basis. The best way is to have a Subcontract PO, but for that even though you do not weigh the watse quanity you must be having so historical data for the waste quantity generated and the conversion of the sane to other SFG , definitely you can arrive that on a pro_rata basis. Have a Code for the waste mateial. Release Subcontract PO for SFG which is what you get back, and issue the components( waste) to subcontractor.
    Please remember your PO intially will be for Provisional quantity if you are unable to reach a fixed quantity. Amend the PO before GR as per the actual quanity for which you wish to pay the vendor.
    For the waste quanity stock updation you use 262(w/o refe to Prd order) after the FG is confirmed.
    Material price updation happens cirrectly in this process.
    2. You can pay the vendor as you wish by by this process but what about the price updation for the ordered material SFG. When you can receive by product in separate Txn againt FG then why can not you follow the proces no. 1?
    3. I would not liketo suggest 3 rd option as that becomes much comlicated for a simple operation.
    Best Regards

  • No goods receipt possible for purchase order 4000010123 00001

    Hi Experts,
    I created PO with 100 Qty then create GR with 20 Qty with mvt type '101' .
    then I am doing Return PO with 20 then I am creating GR with Reference to return PO with 161 movement type through BAPI 'BAPI_GOODSMVT_CREATE'.but it  giving error as 'No goods receipt possible for purchase order 4000010123 00001'.
    but manual it is working fine and creating GR.Please let me the reason.
    I am unable post GR for first time with fresh return po.but second time after manual posting.i am able to do it.

    Hi,
    have you compare the data you send to bapi with data recorded in GR (mkpf/mseg) tables by the system after manual document posting?
    I would check it first - here usualy is the diference between manual and bapi document creating that causes problems.
    hope it helps
    regards,
    wojciech

Maybe you are looking for

  • Is it possible to set a default Calendar in iCal?

    I use a calender that is served by Kerio. I want to set that as the default, so that when I create a new entry (as in Apple-N) it uses the set calendar, and not the first one in the list in iCal, which is a local file. I cannot delete the local ical

  • Hiding a minimized application in windows taskbar

    Hi, I have a small app (JFrame) running in windows. When it's minimized, I'd like it to go into the right-side of the Start taskbar, as a little icon (Like MSN messenger does). Has anyone impelmented this? If you have, can you tell me where to start.

  • Ipod Nano 1st gen not working

    Hello all I have a Ipod nano 1st gen 2gb. I can restore it, reset it with menu select key, but everytime it starts it loads to the lanuage screen and i can not click to get further into the ipod, it use to work before i upgraded the firmware to the n

  • Samsung 840 Evo incredibly slow in MacBook Pro 2011

    I just got a brand new 250GB Samsung 840 Evo SSD and put it in my MacBook Pro. The drive is incredibly slow. OS X install took hours, and it takes over a minute to boot up. Even small tasks like clicking a button take several seconds to process. I ha

  • T6x: IP Conflict after sleep mode using Symantec Endpoint Protection server.

    Here is the problem I'm having: We have several t6x laptops running various versions of Vista (business, enterprise, ultimate, x86 and x64), and we have Symantec Endpoint Protection server with client distributed to laptops. Every possible thing is a