Componenet availability check / ATP

Dear All,
We have created a purchase Order for subcontractor who produce an assembly for our product. We have attached a Bill of material which has three to four material as an Alternate material. We have set the Alternate group , priority , strategy as 2 check for 100% availability as well as probability also based on the requirement.
When we explode the BOM from the same Purchase order / Job work order to check the Requirement. System displays the entire list of component along with the Alternative materials alongwith the Requirement as per BOM.
When we check the Component availability ( selecting from menu) , system shows the available Qty against One material and other alternate material requirement qty becomes zero.
But the problem is when we check the stock of the component / Altenate material. through MMBE , it shows zero quantity in stocks, But there is Purchase order for the original  component alternater material  of more then required qty.
Our requirement is that System should not consider the pending PO qty while doing ATP / component availabity check at the time of creating reservation for the material defined into Jobwork / Subcontractor Order.
Pending PO qty which is not received  at plant, then how the same can be used allocated to Reservation.
May tyou please let us know that what parameter we have to set into SAP system  so that system should not consider the pending po qty for availablity check.
thanks
harish

I have run OPJJ but in this the checking rule "02" is defined for PP - " Production Order" while running MRP.
We want to apply the checking rule for Purchase Order where we can exclude the same.
We would like to know that how can we define the new checking rule for Purchase Order and assign the same to it.
We have seen that checking rule which is showing in the ATP list of component is PP and availability check " 02".
In Checking rule " PP " and 02 , Purchase Order is included. If we remove the same then while running MRP  , system will not consider the purchase order.
let us know that how can we create new purchase rule for Purchase order.
thanks
harish

Similar Messages

  • Availability check, ATP, RLT, Back Order Processing

    Gurus,
                Can you pls do explain me about the Availability check, ATP, RLT, Back Order Processing,   with real time senarios
    Thanks & Regards
    Allen

    Gurus,
                Can you pls do explain me about the Availability check, ATP, RLT, Back Order Processing,   with real time senarios
    Thanks & Regards
    Allen

  • Availability check/ ATP

    Dear Gurus,
    Please suggest ur solutions for this scenario:
    I have stock against a certain FG sitting in my warehouse of 200kg which was manufactured agains 5 orders (5 batches) and they all have their individual batch charecterstics,.. Suppose some one from sales is keying in a saleorder and they have to see if any of these batches available in stock can be delivered to the customer, If not a fresh batch has to be triggered as a demand element and subsequent production orders should be created to satisfy this demand.
    Regards
    Sri.

    Hi!,
    For determination of batch at delivery level (VL02N), you can carry out batch determination after setting the required configuration for batch management. Please carry out following steps for the same:
    1. Go to IMG > Batch management  > Batch Determination and Batch Check > Batch Search procedure Definition > Batch Search Procedure Allocation and Check Activation > Allocate IM search Procedure/ Activate check
    Set your IM batch search procedure for movement 601 and 602.
    2. Go to IMG > Batch management > Batch Determination and Batch Check > Batch Search procedure Definition > Batch Search Procedure Allocation and Check Activation > Allocate SD Search Procedure/Activate Check
    Assign your SD batch search procedure (E. g. SD0001) to the required search area and click check batch.
    3. go to SAP easy access> Logistics > Central Functions > Batch Management > Batch Determination > Selection and Sort  > For Sales and Distribution > Sort Rule > CU70 - Create.
    Create the sort rule with the characteristic you want to sort your batches.
    4. Now go to SAP easy access> Logistics > Central Functions > Batch Management > Batch Determination > Batch Search Strategy > For Sales and Distribution > VCH1 - Create
    Select the strategy type, key combination and define the search strategy for the combination. While defining the strategy please assign the batch class in selection criteria and sort rule in sort.
    Once you are done with these steps system will allow you to determine the batch at delivery level after entering the pick quantity. There you have to actuate the batch determination by clicking the batch determination button on the screen.
    Suppose if the sales person doesn't find the suitable quantity available so he should put that quantity as schedule line in sales doc. If you are using planning strategy like 40, system will automatically generate an procurement proposal on MRP run.
    I hope this will help in solving your problem. Please revert back in case of any further issue.
    Regards,
    Uday

  • Availability check for STO?

    Hi,
    While doing Stock transfers order (PO) plant to plant with in the company code, there is no controlling on availability check, though stocks are not available in the supplying plant, while making delivery thro VL10B,  delivery is creating with '0' Qty. This system want to stop the delivery when quantities are not available in the supplying plant.
    The following steps are configured for availability check for STO
    Schedule line Like NN activated for availability, Assigned schedule lines to item category like NLN and determined rule for STO document type, plant, Delivery type and checking rule in MM.
    how to control the delivery,  when stock are not available in supplying plant? (Means, when stock are not available in the supplying plant, delivery creation should stop through VL10B)
    Is there any more configuration is required, pl guide.
    Rao
    Edited by: R Rao on Aug 22, 2008 1:42 PM
    Edited by: R Rao on Aug 29, 2008 6:03 PM

    Alexandro,
    During delivery creation, the system performs an availability check (ATP).  You can assign the Delivery notice type for a stock transfer order delivery notice at OMGN.  The ATP for DN will be the standard ATP rules for SD delivery notices (checking rule B).You can determine which elements are used for availability checking in OVZ9. 
    To meet your goals, I suggest you use:
    Check w/o replenishment lead time ticked
    Include deliveries ticked.
    Optionally, according to your company's policies
    Include safety stock ticked
    Include quality inspection stock ticked
    Everything else unticked.
    Regards,
    DB49

  • BADI for Automatic Availability Check

    Hi all
    I was working with the BADI CRM_ATP_INFO_BADI. In the method TRIGGER_EXECUTION I set the parameter CV_TRIGGER_AUTOMATICAL = 'X'. But in CRMD_ORDER, an error is coming: Availability check: ATP check could not be carried out.
    I have checked out in the OSS notes and I got a relevant note 810342. But whatever was mentioned in the correction instructions were already done.
    Can anyone plz help me with this BADI?
    Thanks and regards
    Debolina

    Hi,
    For Strategy 60 , Availablity check is carried out "Check against planned independent requirements" , inthat case Only planned independent requirements are taken into accout and Confirming. There is no ATP check logic.
    Do u mean to say, system has to confirm , considering the requirement qty from  future Receipt  .
    I think , Check against a replenishement lead time (RLT) is possible only  ATP available  check.
    Pradeep

  • Error in va01 for transfer of reeqirement and availability check

    hi every one when i have done TOR and availabilty check configuration it is not reflecting in va01 can any one help out with configuration step by step

    HI
    Kindly check the Google with Same text so you can find out so many documents which is related to Availability Check & TOR
    Coming to your Question , try to check the Schedule line Category (VOV6) , you need to TICK the Field *"Availability" * Requirement/Assembly"*
    and also kindly check the Below
    link [Availability Check (ATP) and Transfer of Requirement (TOR)|http://wiki.sdn.sap.com/wiki/display/ERPLO/AvailabilityCheck(ATP)andTransferofRequirement+(TOR)]
    [Available to Promise (ATP)|http://wiki.sdn.sap.com/wiki/display/ERPLO/AvailabletoPromise+(ATP)]
    Regards,
    Prasanna

  • Availability check badi

    Hi experts
    I need a badi for the availability check (ATP) when i insert an item on a order in crm...
    i must call a function on R3 system, for redefine the schedule line......and the ATP check...
    Can anybody help me??
    Thanks in advance
    Marco.

    You can read this documentation link:[Possible System Landscapes for ATP Check Using SAP APO|http://help.sap.com/saphelp_crm52sp01/helpdata/EN/45/b69dd5d40f47f3e10000000a114a6b/content.htm]
    it can be done via customizing,

  • How to incorporate availability check into Capacity Leveling

    Dear All,
    Is there a way to incorporate availability check (ATP) into capacity leveling process for planned/production orders?
    To make SAP check components availability on new dispatched dates: 
    - if components are available then to do dispatching,
    else, find next available date for capacity, check components availability
    To continue such search this until all components will be available on dispatched dates.
    Thanks in advance,
    Regards,
    Andrey

    Hi Andrey,
    Actually, the function can't be realized exactly according to your requirement, but you may check the following link to see if it is a workaround for you:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/8a/a58df74adc11d189740000e8322d00/frameset.htm
    Regards,
    Rachel

  • Availability check disabled in order

    Hi,
    If we disable availability check, ATP in sales orders and deliveries, what happens in the delivery creation. Normally when there is availability check in the delivery creation the confirmed quantitiy and the confirmed delivery date in the schedule line is controlled and if the quantity is not confirmed then system does not allow to create delivery. If we disable the ATP, availability check in order how the system act?
    The need of the business is that they plan ithe production n a 3. party and they don't update SAP with the planning result because their shipment schedule is not related with the production planning. Their customer decides the shipment schedule even if the materials are in stock sometimes their production plan change and they can even try to create the delivery of a product whihc is still being produced.

    Hello
    The best way to check this is in your development server...(Take off the availaibility check and transfer of requirements indicator of schedule line category...and also the delivery item category)
    You should be able to create an order and will be confirmed immediately and should be able to create a delivery.You will need stock before you can post goods issue....
    I do not know if in such a scenario they will be manually able to control the product allocation...because in case you have several deliveries then the users can select any delivery and post goods issue as long as the  stock exists....
    Thanks
    Vikas

  • TOR & Availability check

    can any one tell me the step by step process flow and how the system checks and confirm the ordered quantity and delivery date by using the TOR and Availability check and what is the difference between the RLT and WIth out RLT in the Availability check
    Edited by: prasanna_sap on Sep 7, 2010 12:42 PM

    Hi,
    this common topic
    TOR & Availability check
    is already discussed many times on forum please read related thread and for steps already a well written wiki is on SDN - [Availability Check (ATP) & Transfer of Requirement (TOR) |http://wiki.sdn.sap.com/wiki/pages/viewpage.action?pageId=29323]
    please search the forum before asking already discussed concept. while you can discuss any term or problem which you facing under that concept.
    difference between the RLT and WIth out RLT in the Availability check
    RLT  - Replenishment Lead Time
    the concept is nicely explained in this thread - [RLT  - Replenishment Lead Time|RLT;
    for example go thru this wiki - 
    [ATP with RLT|http://wiki.sdn.sap.com/wiki/display/ERPLO/AvailabletoPromise+(ATP)]
    please let me know your detail scenerio if you are facing any problem.
    REgards,
    Rajeev

  • ATP Buckets of Global settings for Availability check

    Hi ALL
    I have changed the Bucket Parameters and activated ATP time series in Global Settings for Availability Check in Devolpment Server.
    I try to transport these settings but ATP Buckets (Active) are not transprting to the Quality.
    Please give your suggestions , how to transport these settings to the quality and prodction envirorment?
    Thanks
    Kanth

    Hi Datta,
    Thanks for your time and reply.
    There is a requirement before you transfer changes to ATP bucket paramters .
    >Can you please eloborate your above statment.
    Make sure that the updating of ATP time series is activated in Quality and also in production system.
    You set this indicator in Model and Planning Version Management from the SAP Easy Access screen by choosing Master Data -> Planning Version Management -> Model and Version Management.
    >You mean that i need to activate ATP Time series in all envirorments for which i need to delete the version.In our process already PPDS was implemented and  running in Production.We cannot delete the active version.
    These settings are not transpotable?
    Regards
    Kanth

  • Availability check with atp

    hello friends,
    please send any body "Availability check with atp" configaration steps.
    mail id "[email protected]"

    hello friends,
    please send any body "Availability check with atp" configaration steps.
    mail id "[email protected]"

  • Availability Check with ATP Logic  or  Against Planning-reg

    hi gurus,
    what is the difference between
    Availability Check with ATP Logic
           or         
    Against Planning
    means can we have two types of check?
    how can we do against planning?
    rajendra

    Hi Prasad,
    I think it would not possible to maintain to procedures at the same time for single material.
    availability check against ATP is  allowcation of material based on certain rules like which we set under basic functions - AC.
    In this process you cant allocate the stock for specific customer.
    In case of AC against planning you can allocate each and every material along with qty to specific customers.
    Please see the configuration required for planning.
    1. Allocation Procedure (OV1Z) the product allocation procedure is the parent of the entire allocation process. All materials that are to be included in the allocation scheme are required to have an allocation procedure assigned to it in the material master. In addition, as of release 4.0, it is in the procedure that the method of allocation is defined. The user has the opportunity to set an indicator to identify their choice of two different methods (discrete and cumulative allocation) to evaluate the quantities to be considered for product allocation. 
    2. Allocation Object (OV2Z) the allocation object is the root level of the allocation process where actual data is entered and planned in LIS. The object allows the user to further break down a procedure into smaller parts for future validation of components comprising a specific material 
    3. Allocation Hierarchy Mapping (OV3Z) Primarily, this transaction permits the assignment of an allocation procedure to an LIS information structure. Secondly, a character is assigned to the information structure to permit collective planning. Finally, the user can assign a step level to the procedure and information structure to sequence the order in which allocation quantities are checked. This functionality allows the user the opportunity to check product allocation against several product allocation scenarios, before the required quantity is confirmed 
    4. Define Consumption Periods (OV5Z) The allocation consumption periods functionality is only valid if the allocation method flag has been set (OV1Z). If you have de-selected the method field, this functionality is not available. The consumption window indicates the number of past and future periods to be used in the allocation check. 
    5. Control Product Allocation (OV4Z) In order for the allocation process to function properly, allocation control records are created primarily to map allocation procedure steps to their corresponding objects so that the allocation data records can be located for validation. Secondly, validity periods must be established to indicate when the allocation control records are active. Finally, the user has the option of establishing a conversion factor per allocation control record to accommodate BOM listings of constrained materials 
    6.Activate Allocation for Requirement Class (OVZ0) In order to turn on allocation in the standard order processing functionality, the requirements class must have a flag indicating that allocation is relevant. 
    7. Activate Allocation for Schedule Line Category (OVZ8) In order to turn on allocation in the standard order processing functionality, the schedule line must have a flag indicating that allocation is relevant 
    8. Create Planning Hierarchy (MC61) In order to adequately establish allocation quantities, the user must initially determine the level at which the allocation is to take place and the aggregation factor of the allocation quantities. In this step, the levels for the collective allocation search procedure are also identified. 
    9. Generate Masking Character (OV7Z) Upon completion of the level determination for the planning hierarchy, the collective allocation masking character must be generated to allow aggregation indicators to be established. This transaction simply reads the hierarchy established in the planning table and then generates a collective mask character for each level of the hierarchy 
    10. Modify Planning Hierarchy (MC62) This step is a repeat of MC61 where the initial hierarchy was established. In order to complete the hierarchical set up, the collective allocation (mask character) hierarchy must now be maintained with the appropriate aggregation factors 
    11. Allocation Procedure Assignment to Material Master (MM02) At the root level of the allocation process are the materials. Each material that is to be considered in allocation scenario must be mapped to an allocation procedure. In order entry, then, when a material is entered with a valid allocation procedure in the material master, the allocation data is verified prior to confirming the line item ordered 
    12. List of Suitable Structures (OV9Z) This report is used to identify potential LIS information structures that can be used in the product allocation process. This report simply reads through the data dictionary and selects all the active information structures that contain the field product allocation object (KONOB) as the first field. This data can then be utilized in the mapping transaction (OV3Z) to link the allocation procedure step to an information structure (previous step).
    Reward if helpful.
    Regards
    Raj

  • ATP-Availability check

    Hi gurus,
    Please add ur valuable contributions over the ATP check on materials. How and when it is performed, what are the effects of it etc. This could be a learning experience to people like me who have just started a career in SAP.
    Thanks & Regards,
    Deepak Prasanna S

    Hello Deepak,
    In the availaibility checking group you can define which stocks (quality stock, safety stock), firmed receipts (production order, purchase order) are need to checked against a requirement (issues like sales orders) as available stock in the net requirement calculation.
    suppose you have requirement in the next month and current the stock is nil but at the same time you have incoming receipt (firmed planned order) then during availibilty check MRP will not create one more planned order. (if you have defiend to consider the firmed reciepts into availaibity check).
    Manually you can always create receipts for the requiremnts...Manual creation has no influnce of the availibility check.
    With the availability check you can also carryout the check for the missing parts and committed quanityt againt the requirement from CO24 and MDVP transactions.
    Hope this will help you.
    Regards
    TAJUDDIN

  • Availability Check configuration

    Hi All,
    I want to configure availabiliy check but I am a bit confused with the config part. Soneone plz explain the config process.
    Also tell me what is the exact link ( in config ) by which the availabilty check gets triggered.
    Regards,
    Danny.

    Dear Danny,
    Hope the material pasted here helps you... :
    Availability Check & Transfer of Requirements
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). To examine stock on hand (T-Code - CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    ATP
    Types of Availability Check in Sales and Distribution
    Processing
    There are three types of availability check:
    _ Check on the basis of the ATP quantities
    _ Check against product allocation
    _ Check against planning
    The following SD-specific control features need to be maintained in Customizing:
    _ Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can also be used to deactivate the availability check. This option was created especially for the assembly order so that when the bill of material is exploded in the assembly order, the individual components, if necessary, can be classified as non-critical parts as far as procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the availability check. It is proposed in the material master record on the basis of the material type and the plant, and copied into the sales and distribution documents. _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules define by transaction, which stock and inward and outward movement of goods should be taken into account for the availability check. _ Schedule line category
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents. The possible settings for this at schedule line level are dependent on the settings in the requirements class which is determined from the requirements type of the material. _ Delivery item category
    The delivery item category can be used to control whether an availability check takes place in deliveries. Requirements type
    The various requirements are identified by their requirements type. The requirements type refers to the requirements class and its control features.
    _ Requirements Class
    The requirements class contains all control features for planning such as relevance for planning, requirements planning strategy and requirements consumption strategy. In addition, it is specified at a global level whether an availability check is to take place for the material in the sales and distribution documents on the basis of the ATP quantity (ATP = available to promise) and whether requirements are to be passed on. A finer degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the ATP quantity.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    _ The control elements described above for the availability check must be maintained in Customizing for Sales and the relevant assignments made to the sales transactions
    _ The availability check must be switched on at requirements class level and - for the availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found
    _ A plant must be defined. It can either be proposed from the customer or material master record or can be entered manually in the document.
    _ A checking group must be defined in the material master record on the Sales/plant data screen in the Availability check field
    Configuring entries of the Availability Check
    IMG > SD > Basic fncs > Availability check and TOR > Availability check with ATP logic or against planningAvailability check > Define checking groups
    You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
    The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
    Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
    Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.
    Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
    Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery.
    TOR
    IMG > SD > Basic fncs > Availability check and TOR > TOR
    A line item in the sales order creates a schedule line. The schedule lines in the sales order transfer the requirements through to MRP. You can select the docs on which you want the TOR to happen. For ex, not for quotations.
    The TOR aims to ensure the ordered materials are available for the requested delivery date. The TOR can be set for individual or for collective requirements (materials sales/plant view).master
    The TOR is dependent on the following data:
    The reqts type, reqts class, checking group and schedule line category.
    The reqts type and class are determined in the strategy group MRP3)(material master
    For TOR to be carried out, a few criteria need to be met:
    Plant assigned to line item level, schedule line category should be switched on at TOR, TOR must be switched on at the reqts class level, checking group must be defined and allocated to the material master record (sales/plant view in the availability check field)
    The reqts class is the controlling factor for the availability check and the TOR for all sd types.
    Configuring the TOR:
    1) Use std 041 reqts class or copy and rename it. Use the indicators to select if this reqts class must carry out an availability check and/or a TOR.
    2) Define the reqts types. A reqts type is allocated to a single reqts class and not vice versa. It is based on the item category and the MRP type of the material.
    3) Assign the rqts type to the relevant item category in the sales order and the MRP type found on the material master record.
    You can select an alternative search strategy where u assign the reqts type to item category and MRP type. Can select source as 0, 1 or 2. (1 = Item type and MRP type strategy).
    4) The TOR and Availability check can be selected/de-selected at the schedule line category level.
    5) Block qty confirmation in delivery blocks. This is used to block the reservation of the TOR from MRP.
    6) Maintain requirements for TOR. Requirements can be used to determine that the TOR to MRP is not carried out unless a number of conditions are met.
    Availability Overview = CO09 > order qty, sd doc no, item no, requirements class.
    sd no or dly no, lineStock requirements list = MD04  item, schedule line placing the demand
    Stock overview = MMBE > total stock per company, then plant followed by storage location, and finally a breakdown per batch.
    Transfer of requirments:
    for TOR to happen the folowing control elements must be defined
    1. requirmrent type.
    2.requirement class.
    3.checking group
    4.schedule line category.
    apart from the above the TOR must be switched on at
    1.reqt class level.
    2.schedule line level
    3.checking group level.
    4.plant must defined at the document item level
    once order is raised the requirments are transfered from order to MRP by TOR,
    various reqts are identified thru reqt type, reqt type are identified in the system thru
    1. strategy group--MRP1 --mmr
    2.MRP group.
    3.material type.
    4. ITEM category +mrp type
    5.item category
    once reqt type is identified it points to reqt class.
    reqt class contains all the control factors suchas planing strategy,consumption strategy etc
    basing on the item category group+ mrp type-- schedule line categories are identified.
    if it is relevant for availability check, then the system does ATP CHECK(warehousestockplanned ordersproduction ordersconfirmed receiptsconfirmed goods issues) and decides whether goods are availabile on
    the requested delivered date of the customer, if not system does a backward scheduling and confirms when material is available (materual availability date),
    so if material is not available then system proposes 2 dates
    1.customer delivery date
    2.material availability date.
    for availability check to happen the following pre-requistes must be there:
    1.availability check must be swithched on at the requirment class level
    2.schedule line level itmust be switched on
    3.reqt type must be defined
    4.checking group must be defined.
    5.plant must be defined
    6. the system takes by default checking group if not defined as material type and plant.
    from SD the following componenets are importants
    1.checking group:defines whether indivual orcollective req are to be passed
    2.checking rule: defines scop of the check(what type of stock+with or without RLT)
    3.schedule line category: this fine tunes whether availability check should be carried on at the sales document level or not.
    4. delivery item category.
    for config:
    SPROSALES&DIST-BASIC FUNCTIONS--TOR&AVAILABILITY CHECK.
    In material master the below mentioned must be defined also
    1.strategy group.
    2.scheduling margin key.
    3.in house production time.
    4. RLT time.
    5.MRP group
    Hope this above helps...
    Give points if userful...
    Thanks,
    Jignesh Mehta