Component allocation to Euipment Task list

Hello frinds,
I have a query related to Plant Maintenence.
We have a euipment task list with different counters . In each counter we have operations and components assigned to those operations.
When order is created some of the operations are not getting copied and hence few components as well.
Please tell me tables where i can find the allocation of compoenents to operations.
Thanks
Rohit

Thanks Mahee,
The table i was looking for is PLMZ (allocation of components to operations)
I found that deletion indicator is set for certain operations in PLMZ and those components are not picked which are assigned to operations with deleltion indicator (LOKEZ-PLMZ).
Can any one tell me how this deletion indicator is set for component allocation to operations and how do i remove this ?
Thanks for help.
Rohit

Similar Messages

  • General task list with component : creating standard BOM

    Hello,
    When adding a component to a general task list , i get a "create standard BOM" screen , see below for example :
    Standard object PA00000212            
    Plant                                 
    BOM Usage       4                                                          
    Change Number                        
    Valid From           07.09.2009      
    Can someone explain to me the relation between standard BOM and component within a general task list ?
    Thanks,
    P.

    Hi,
    Pls find some of the points below for your referece
    Standard BOM:
    Can used for assigning the material from the BOM to Task list operation
    That is, BOM  components for the object (Equipment, Functional Location , Assembly) can be retrived and assigned to maintenance Task list of the operation
    Condition: BOM corresponds exactly to the content of the structure list
    Free Material Assignment:
    Assigning Stock Material (Material number) those are not listed in the BOM of maintenance object directly to the maintenance task list
    Condition:  Setting to be done as BOM usage for Plant Maintenance (4)
    Path: Maintenance plans, work centers, Tasl Lists and PRTs>>>>>Tasl Lists>>>>>Control Data>>>>Define Presetting for Free Assignment of Material-----BOM Usage as 4
    Pls note that, while making free assignment, system creates an internal BOM  and this can not be processed from application.
    Hope this may useful
    Thanks
    Siva

  • DB table holding the component materials in task list

    Hi all,
    I'd like to find out the relationship of the component materials inside a task list (IA07).
    I've found DB table PLKO and PLPO holding the data for task and operations respectively. Inside an operation, there are components.  I just can't find the DB table holding the components by F1 and where-used list ...
    Any advice?
    Thanks a lot.
    Message was edited by:
            Macy Lo

    PLMZ-PLNTY = PLKO-PLNTY
    PLMZ-PLNNR = PLKO-PLNNR
    PLMZ-PLNAL = PLKO-PLNAL
    PLMZ-ZAEHL = PLKO-ZAEHL
    PLMZ-PLNTY = PLPO-PLNTY
    PLMZ-PLNNR = PLPO-PLNNR
    PLMZ-ZUONR = PLPO-PLNKN
    PLMZ-ZAEHL = PLPO-ZAEHL
    if helpful, reward
    Sathish. R

  • Make a field Unchangeble in Task List

    Hi Friends,
                    Can anybody help in making the field RIHSTPX-MEINS (which is basiccaly the component Unit of Measure field ) in the Component page of a Task List.The Issue here is that the users are able to change the UOM value and can be modified.My clinet wants to make these unchangeble once created.
    Please help with your suggestions
    regards
    leo

    hi
    your requirement is when use enters  say 8 it will be hours  only H
    suppose the work is 4 days
    currently if he puts 4 days system will conver into H as 96 H & entry will be made without any error
    your Agenda is he should not select days at all if he want to enter work for 4 days
    he will conver as 96 H
    is the requirment is like this or something other please let us know
    Regards
    chandrashekhar

  • Lsmw for general task list (IA05)

    Dear Experts,
                        I am developing lsmw for general task list (IA05). For that I have created two recordings one for header item and another for its operation respective to that group (PLNNR). I had created 2 flat file for it, one for Header Data and one for Operation. I am linking files with respect to its group (PLNNR).
                      This lsmw works for its header data perfectly but at its operation level it will not get group counter(PLNAL) for the respective group(PLNNR). I have to select group counter and click on opertaion manually, after that it fills the opertation perfectly.
                      So can anybody suggest me how to link header and operation data in lsmw.
                     Thanks in advance.
    Regards,
    Sunil.

    Hi Sunil,
    I guess you are using object type 490 to create tasklists.
    To do this create one flat file and not two flat files.
    The flat file structure has to be like this..
    TCODE Record Name  Data
    for first task list
      IA05       IBIPTLST       Header data
    for single operation
                    IBIPTLOP        Operation data
                    IBIPTEXT         Long text data
                    IBIPTMAT        component data
    for second operation
                    IBIPTLOP        Operation data
                    IBIPTEXT         Long text data
                    IBIPTMAT        component data
    for second task list
      IA05       IBIPTLST       Header data
    for second task list - 1st operation
                    IBIPTLOP        Operation data
                    IBIPTEXT         Long text data
                    IBIPTMAT        component data
    for second task list - 2nd operation
                    IBIPTLOP        Operation data
                    IBIPTEXT         Long text data
                    IBIPTMAT        component data
    Regards,
    Arun Prasath Kumar

  • Routing-LSMW-Component Allocation to task list

    Hi Gurus,
    I'm creating LSMW to Routing using Standard-Batch Input method, have mapped the required structures.
    But I was unable to map the Component allocation to task list.
    Is it possible in the standard one else I need to go for some sort customisation.
    Can anybody throw some lite on this issue ?
    regards
    Ram Kumar

    Hi,
    You will find BIPMZ Batch input structure for component allocation to task list in the standard structure relations (no customizing required). Use the same for your need.
    Hope it clarifies your query.
    Regards,
    Vivek

  • Add component in task list

    Hello All,
    I have an issue with adding component in task list (for example task list number EIMN-68) via transaction IA05.
    When I try to add component to operation, I get the message *
    Standard BOM PAEIMN-68  4 already exists
    Message no. 29771
    Diagnosis
    You want to create a standard BOM for standard object PAEIMN-68 with usage .
    A BOM already exists for this standard object and usage. You cannot extend a standard a standard BOM.
    Procedure
    Check whether the standard BOM is suitable for standard object PAEIMN-68 and usage . If it is not, you need to create the BOM for another standard object.
    Is there any special way to create material master for such components.Whats the solution.
    Please help
    Cheers
    Sunny

    Hi Pithan, how are you..
    I want to add components.
    Just now I was able to add components. I explain how:
    When i added component number in operation, and press enter, system gave me the error that standard bom already exist. In the same screen I changed the BOM usage to 3 as universal usage. After this usage only, system allowed me to add components. No other bom usage allowed me to do so.
    Also, why system took me to BOM screen if I just want to add components.
    I wait for your reply.
    thanks and regards
    Sunny

  • Mass component substitution in Task List

    Hi Gurus,
    I'have so many Task Lists, and total have hundreds of line operations.
    But, now there material substitution. Let say, previously in Taks List using Material/Component "A", and now material "A" substituted become material/compenent "B".
    How could we do change (mass change) to all Component in Task List that previously using "A" and than replaced by "B" and how about if there are unit of measure differences .
    How do we do it ? Any T-Code to do this ?
    Regards,
    Tri W

    Tri W,
       The material will be replaced, with the follow up material,  once there isnt sufficient quantity available to satisfy the demand from the reference date entered on the MRP screen.
        However, it looks like this replacement of the follow up material only works if you manually enter the orginal material in the components tab or if you import the material from a BOM.This doesnt seem to work if the material is directly associated to the Task list(Even though this is also assigned a BOM number of Type "standard") . When you import the task list into the order, the Original material is not replaced with the Follow up material if there isnt sufficient stock available.This looks like a bug to me, you may want to consider raising a OSS note to see where that leads you, otherwise my apologize for misleading you. We had used the BOM and this worked perfectly for us,hence i was pretty sure this would work for materials assigend directly to task list(Since this also had a BOM number and type assigned to it).
    Best Regards
    Narasimhan

  • Mass change of component in Task list

    Hi Experts
    I have thousands of material and there are changes done for them to use them in maintenance order task list as stock or nonstock.
    The task is to change the item category (from L to N or from N to L) of those materials used as components in task list and also find out those materials in BOM , Equipment TL and FL TL and change the item category.
    1.can this be done using a BDC (checking all task list / BOM for that material and change the item category)
    2. table to check component assigned to which operation in task list.
    Any help for this requirement
    Thanks
    Jey

    There is no standard transaction for the changing of components in the task lists this would have to be a bespoke program.
    If you are looking to change the components allowcated to the Bills of Material you can use transaction CS20 where you can replace the exisitng component category N with the new component category L.
    There is transactions for changing the PRT and Work Center if you get your ABAP consultant to have a look at the PRT transaction/program (transaction CA77) he may be able to copy and ammend this to make things a little easyer.
    Jim

  • PM:Task list Component addition

    Hello Guys,
    We are facing below issue.
    1. In task list component screen, if we add a component via Direct entry, system create Standard BOM.
    2. If we add the component via component selection from BOM, it creates the material BOM.
    The second method is preferable as changes in BOM is reflected in task list as the link is maintained. This is not an issue if we are creating task list manually as we can select the component manually. But however, if we create task list via LSMW or load program, the issue arises.
    When contacted SAP on OSS, SAP advised to use BADI IMRM_COMP_PROCESSING, method SET_COMP_PROCESSING with
    E_CORRECTION_ACTIVE = ' '. This seems to resolve the issue. But I am not sure of the side effects.
    Has any one implemented this BADI earlier and can share the experience?
    Thanks
    Ashish Barsagade

    hi,
    U can assign material BOM in Tasklist header... there is a Assembly field... just enter the name of Material BOM. and Material BOM would be attatched to task list.
    it will solve ur problem
    Regards,
    Amit kushwaha
    Edited by: amit kushwaha on Feb 25, 2008 10:45 AM

  • General task list: component selection from BOM - possible in batch input?

    Hi experts,
    for the assignment of non-stock material to general task lists I have followed the advice from message[6115684|Re: General Task List Components;.
    So what I have done is:
    - Include non-stock material in BOM
    - Assign BOM to general task list header
    When clicking on the "Component selection" button in the task list components, I can select a component.
    When entering the material number of the component directly though, I get an error: "Material type X and line item type L not compatible" (CO135).
    I would like to upload the general task lists with a batch input recording, but I can't figure out how to select components.
    Any thoughts?
    Kind regards,
    Andreas

    Hello,
    We have the same requirement to load tasklists (change & create).  We are using the function modules EAM_TASKLIST_CREATE and EAM_TASKLIST_CHANGE.  However, i cannot get a non-stock BOM item to process.  Has anyone got this working?
    Thanks,
    Clay.
    EDIT: Found the answer - simply fill in the fields for BOM on the component (STLTY, STLNR, STLKN, and STLAL). 
    Message was edited by: Clayton Mergen

  • Task list component...

    Client wants to see task lists that have components on them and what the components are. Could any on please help me to get the Task list. Any pointer from any side will help me a lot. Thanks in Advance.
    Thanks
    Azizur

    Hi,
    Pls check Tcode IA17 (Task List Printing List) with Output volume parameter selection as Material, Long Text Material etc.,
    Regards
    Siva

  • Problems while uploading Task List - Service Pack with LSMW

    We are trying to upload General Maintenance Task List using LSMW. We are using Standard Batch/Direct Input method with Object 0490.
    We need to upload task list header, operations, maintenance pack, component and service pack for operations.
    We have created separate files containing data for different structures and they are linked using Group, group counter and operation number according below
    Header
    |----Operations
    .......... |----Long Text
    ..........|----Maintenance Pack
    ..........|----Components
    ..........|----Service Pack
    We have multiple operations per task list and multiple services per operation. The service pack is required only for a specific control key - PM03.  As per the configuration this screen (PROGRAM - SPLMLSP, Screen Number - 0200) is accessible only when the value PM03 is entered in the operation. We are able to upload all other details except service pack details. We have tried using structure IBIPBDCD for the same.
    While uploading the task list in foreground, when control key is entered as PM03 in an operation, service pack screen is displayed with error u201CNo batch input data for screen SAPLMLSP 0200u201D. The data provided in structure IBIPBDCD does not get processed at this time.
    On exiting the screen using back button, the data in IBIPBDCD structure is passed incorrectly to fields in screen 3400 (SAPLCPDI)
    Are we doing something incorrect? Is there a way to use this standard functionality to upload task lists with service packs?
    Thanks
    Edited by: jvalitp on Dec 15, 2011 12:46 PM

    Hi,
    When loading the tasklists you need to define a source structure as per the IBIP structure. You have different levels for example level 1 - header then below that level 2 - Operations, Header Long text then below that you have level 3 - Operation Long text, Operation Package assignments, operation component allocation.
    For each of these levels you need an identifier that links then together. In your source file specify identifier 1 for header, Identifier 1 and Identifier 2 for operations, identifier 1 identifier 2 and identifier 3 for packages. This way the system can create the correct structure when it reads the data from the text file.
    The identifiers are numeric and will dissapear once the files are loaded. specify then in the source structure as 2 characters and remember to set the xcel file up to have a 2 character field.
    For the header file each line will be a new identifier 1,2,3,etc.
    The operations are assigned to the header and have 2 identifiers. The first corresponds to the header identifier the next is a sequential number stating at 1 and incrementing for each line e.g Header 1 op 1, header 1 op 2, header 2 op 3, header 2 op 4, header 2 op 5 (this would be 2 header records. The first with 2 operations on it the second with 3 operations)
    The package is assigned to the operation and as such needs to have a third identifier. Header (identifier 1), Operation (identifier 2), Package (identifier 3) Example Header 1 op 1 pack 1, header 1 op 2 pack 2, header 2 op 3 pack 3, header 2 op 4 pack 4, header 2 op 5 pack 5
    I have a loading file for each of the items i.e. Header file, Operation file, maintenance package file. This is then assigned to the respective source structure.
    Regards,
    ravi

  • Routing component allocation

    Hi All,
    A material routing have 6 operations, 0010,0020.....0060.
    We have allocated one BOM component A to operation 0020 & another component B to operation 0040.
    Production order created for the material.
    Can anybody tell from which table/tables we can get the component allcation details for the production order?
    Regards,
    s.g

    Hi , Srijit
        Table PLMZ stored the relationship between operation and component ,but if you want get more detail ,you have to connect to table STPO .
         The relationship as below:
          Table PLMZ ,key field :
            PLNTY  Task list type
            PLNNR  Group
            PLNFL   Sequence(it may have more than 1 sequence in a routing due to alternative or parallel sequence)
           PLNKN  TL Node -  Task list node (it stand for Operation , but not simply equal to operation no,  Say in a routing ,there are 3 operations 0010 /0020/0030 ,in here ,for operation 0010 the TL node  is  1, but  if you delete it and create an new operation 0010 ,it may become to 4. pls link to table PLPO to get the operation no. )
            you can get below information :
            STLTY  BOM category
            STLNR BOM
            STLAL Alternative
            STLKN  Nodes
            WERK_STL Plant
           Connect to table STPO ,then you can get the material no and other things .
           Hope this can help you .
    Joe.Li

  • Solman Change Request Management Issue - about create task list

    Dears,
        We are now using Solman ChangeRM. I have created a maintainance project and maintained its logical component and IMG project. when I want to create a task list for this project, a message"The project is not released. Hence cycle can not be created" poped. The message no. is /TMWFLOW/CONFIG_UI017. Where can I release the project?
    Thanks
    Roger

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

Maybe you are looking for

  • Downgrade HP ENVY 15-u010dx to win 7, or duala boot win 7 and wind 8

    i have brand new HP ENVY 15-u010dx with windows 8.1 installed. Because of my needs (worrk related) i need win 7 installed. Is it possible to install win 7 dual boot with win 8.1 ? Does win 7 work on this machine, do you have drivers for win 7 x64 i'm

  • Can't type apostrophes on Photoshop CS4

    I have a problem when using Photoshop CS4 on a MAC where when I type an apostrophe or single quotation mark it comes out as an i with an acute accent above it. When typed not next to a letter it comes out as e with dotted accent about it. This doesn'

  • Create Descriptive Flexfield Structure

    All, I am wondering if it is possbile to create a descriptive flexfield structure to be added to a form flexfield instead of having the flexfields segments added seperately. Example: Currently: Flexfield 1 Yes Flexfield 2 Yes Flexfield 3 Yes Flexfiel

  • Use SVN build number in my pom.xml in JDeveloper

    I wonder if someone has already used the buildnumber-maven-plugin or any other way to insert the SVN revision number into their builds in JDeveloper. The way I have found requires svn to be installed separately because there is a commandline call to

  • Can't use phc-intel with 3.9.3

    I installed the AUR package for phc-intel, changed the VIDS in /etc/phc-intel.conf and rebooted. Running /usr/bin/phc-intel start doesn't have any effect (status still shows as "Stopped") I'm running a custom Zen kernel, acpi-cpufreq is built as a mo