Component in BOM with Split Valuation

Hi all,
Can anyone tell me how to assign component in BOM for which split valuation is activated.
Example:
Material ABC has two source 1) Domestic and 2) Import
Now for production material ABC is used in following ratio:
Domestic 10 kg
Imported   5 kg
Now as stock of material having valuation split will be handled individually i.e. domestic stock and imported stock, how it is to be differentiated in BOM?
Thanks and regards

Hi,
What kind of differentiation you are looking for?
If the stocks (of Domestic and Imported Product) are maintained at different storage locations, you can give two line items (with same material code) in the BOM.
Now in the item details for components, you can specify the respective storage locations. Then while GI the system would pick accordingly.
Hope that helps.
regards,
Rohit.

Similar Messages

  • Raw materials on MAP with split valuation used in standard cost estimate

    We have a few raw materials which are purchased from different vendors and of different brands. We have opened split valuations for these raw materials. These raw materials are later used in manufacture of different finished goods. We use MAP for raw materials and Std. for finished goods. What configuration and processing steps will be required to run standards cost estimate and what will be standard price for a finished good considering the following example:
    Material X is finished good
    Raw Material A with split valuation @ USD 5 (brand aplha)   &   USD  10 (brand beta)
    Raw Material B without split valuation @ USD 1
    It is expected that we used brand aplha 60% of the time and brand beta 40% of the time and production batch size is usually 100 Kg.
    Please reply
    Edited by: Chris SAP on Sep 29, 2011 7:56 AM

    hi chris
    Hope you have configured the material A for split valuation. while calculating standard cost estimate for the material C. through ck11n, the system will pick up the header price from material master.
    But here you are saying that you have chances of using the material A, 60% of brand alpha and 40% brand beta
    Instead of using split valuation use mixed costing concept. create the material A with separate Ids and create two boms one with alpha and the other with beta.
    create procurement alternative in CK91N and mixed ratio with Ck94 and release the mixed cost estimate
    please go through this thread also
    Re: Difference between Split Valuation and Mixed Costing
    Krishna

  • High volume of batches with Split valuation - impact on system performance

    Hi!
    I have a client that is intending to load a new material type from their legacy system which will be automatically batch managed with split valuation.  So, Valuation category will be 'x' and the valuation type will also be the batch number as automatically created on GR.
    The concern of the client is the impact on system performance.  Having up to 80,000 batches per material master record (so, 80,000 valuation types will be mainatined with a unique price in the Accounting 1 tab of the MMR) and overall around 1 million batches a year.  I'm not aware of any system performance issues around this myself but there seems to be anecdotal evidence that SAP has advised against using this functionality with high volumes of batches. 
    Could you please let me know of any potential problems I might encounter, having 1 million batches with split valuation may cause?  Logically, this would increase to tens of millions of batches over time until archived off via SARA.
    Many thanks!
    Anthony

    I currently have about 1.5 million batches with split valuation in my system (but it is not the X split), and we archive yearly.
    having many batches for one material ( lets say 1000) causes dramatic performace issues during automatic batch determination.
    it took about 5 minutes until a batch was returned into a delivery. if the user then wants a different batch and has to carry out batch determination again, then he just works for 10 to 15 minutes on one delivery.
    This is mainly caused by the storage location segment of the batches. if one batch gets movedd within a plant thru 3 different locations, then the batch has 3 records in table MCHB. But SAP has a report to reorganize the MCHB table that have zero stock.
    The X split has more effect, it is not only the batch table that makes issues in this case. With the x-split SAP adds an MBEW record (material master valuation view) for each new batch.
    However, if the design is made to get a certain functionality (here valution at batch level),   then you have to get a proper hardware in place that can give you the performance that is needed.

  • Automatic STO for materials with split valuation

    Hey Gurus,
    Our client uses plant-to-plant STO to do transfers among internal plants. The current process: Run MRP in receiving plants --> MRP generates PReq --> Release PReq --> Assign Preq and create STO(from here, buyers manually check stock at issuing plant to see if there are "New" or "Rebuild" stock available, Rebuild stock always take the priority. Buyers manually assign Rebuild or New to ME21N).
    The client tries to automate the STO process, ie, using ME59 or ME59N instead of ME21N. The problem is how the system does stock check and automatically enters"Rebuild" or "New" for materials with Split Valuation, which are done by buyers manually?
    Thanks
    JM

    Hello,
    Your client's request can be met with an user exit i guess. I have not used this but this is a suggestion that you can try if you wish.
    The following things need to be done.
    1. New PR type needs to be created and assinged to the STO document type.
    2. When running a MRP at receiving plant, the system uses the special procurement key to create the STO requisition, hence we can write the relevant code in user exit in the MRP program. (please find the user exit for MD01)
    3. If the special procurement key is 40 in the material master (MRP view), then system has to create the PR using the new PR type for STO. Also for those PRs the default batch should be "Rebuilt" entered while creating the PR.
    4. As the batch is already entered in the PR, converting them to PO automatically will not be an issue.
    if you feel that the above solution is little tough to implement, then please write a program to fetch the STO PRs and update the PRs one by one using the BAPI PR update or BDC with the batch "Rebuilt". This program you can ask the users to run before using ME59.
    Regards,
    Sakthi

  • Error when doing two step transfer between Plants with split valuation

    Hi expert,
    I´ve activated split valuation for Material X , it has three Valuation types ( NEW, REPAIR and DAMAGE ) . The problem arose when i tried to do a two step transfer between plants ( mov 303 ) and i got the following error msg :
    Use one-step procedure for transfer posting to mat. subj. to valuation
    Message no. M7048
    Diagnosis
    In the receiving plant, the material is subject to split valuation. For this material, a stock transfer cannot be carried out using the two-step procedure.
    Procedure
    Use the one-step procedure (movement type 301) or a stock transfer order for the stock transfer.
    The message is very clear itself , but... i just wonder if there`s actually any way to avoid this, I tried to change the error msg into a warning but couldn´t find it in customizing. Thanks for any comments on this !

    Hi,
    What do you mean with "inconcistent to my storage type definition?", is that mean i can process two step transfer without using PO/delivery process or one-step movement? coz according to business requirement, we must use two step transfer considering to the distance between plants is so far and we want to make it the simple way so that PO/Delivery process isn't better solution. I think, this is an standard procedure all company over the world can use but just the reason of split valuation the system can't execute the transaction.
    Is there any config i miss to? is there any user exit i can use for this requirement? please help me..
    thanks,
    AJ

  • Canu00B4t use two step transfer with split valuation ?

    Hi people , i´ve activated split valuation for MaterialX , it has two Valuation types ( Production and Purchase ) . The problem arose when i tried to do a two step transfer between plants ( mov 303 ) and i got the following error msg :
    Use one-step procedure for transfer posting to mat. subj. to valuation
    Message no. M7048
    Diagnosis
    In the receiving plant, the material is subject to split valuation. For this material, a stock transfer cannot be carried out using the two-step procedure.
    Procedure
    Use the one-step procedure (movement type 301) or a stock transfer order for the stock transfer.
    The message is very clear itself , but... i just wonder if there`s actually any way to avoid this, considering that having to create a transfer order for each movement will duplicate work and using a one step transfer won´t be practical. I tried to change the error msg into a warning but couldn´t find it in customizing. Thanks for any comments on this !

    First of all , thanks everyone for the help.
    Csaba Szommer, Kunal ingale  , i read the OSS note and the pdf and indeed everything confirms it´s not possible to do the two step movement. So , i tried the stock transport order and something else appeared here. When creating this type of order , the system first ask for a Supplying Plant , then you can populate the material , quantity and the destination plant. But then it asks for the Valuation Type of the material involved, and it seems this field is Mandatory . Is it possible to make this field on the transport order as optional ? I couldn´t find this field at SPRO-MM-Purchasing-Purchase Order-Define Screen Layout at Document Level .
    I need this field to be optional for the following reason. In my company there´s a relation between two plants , Plant A ( from where products are dispatched to the customer ) and Plant B ( where the material is produced with valuation type "Production" and sometimes is buyed from vendors with valuation type "Purchase" ) . The idea is to run an MRP which will generate the material needs on Plant A considering the Sales Orders. This need will be then transformed (automatically by MRP ) in Stock Transport Orders with Supplying Plant "Plant B" and receiving "Plant A". The problem here is that , at the moment of the transport order creation it´s no possible to know which will be the valuation type of the material that will satisfy the need. I mean , Plant B ( production and buying plant ) will check the list of needs for Plant A and then will decide which material ( with which Valuation Type ) they will provide considering the actual stock levels at the time of the MRP run.
    In a few words, i see the only way to do a two step transfer of a split valuated material is using Stock Transport Orders , is there a way to make the field "Valuation Type" optional ?. The idea would be to choose the Valuation Type of the material at the moment of the Good Issue.  Thanks a lot , once again.
    Edited by: Christian  Len on Jul 7, 2008 3:16 PM

  • GR for a STO with SD delivery and Batches with split valuation X

    Hello,
    We have a problem with the Goods Receipts for Stock Transfer Orders between plants for materials subject to batch split and split valuation with valuation type X.
    The scenario is very similar to the one explained on this thread: STO:problem with batch valuated material
    When creating the the STO, it automatically sets a valuation type that is not be the appropriate one, we cannot use only one valuation type per position because we can use more than one batch (and valuation type). The outbound delivery has the correct valuation types for each batch and material but when doing the GR at the receiving plant, it only takes into account the valuation type indicated in the STO with no chance to change it.
    I have seen the Note 212532 but we are not working with active ingredients.
    Does anybody know a useful EP to use?
    Thanks in advance for your help.
    Regards,
    Javier.

    Well, we can change the valuation type before Posting the goods issue of the delivery, but in most cases we need more than one batch (each batch has a different valuation type) for each item (material) in the purchase order.
    We can do this at delivery level but the GR only takes into account the valuation type of the purchase order.
    Thanks.

  • VPRS shows no Value with Split Valuation - Valuation Category X

    After configuring Split Valuation - Valuation Category X (http://wiki.sdn.sap.com/wiki/pages/viewpage.action?pageId=193693045)
    VPRS is no longer showing any Value in the Sales Order. I have assigned a Batch in the Sales Order and tried to Deliver and VPRS still shows as 0.
    VPRS is working correctly for Material that are not maintained at Valuation Category X.
    Also, I have the Price maintained as Moving Average Price for the Materials with Val Cat = X.
    Does anyone have any ideas? Please I would appreciate the feedback.

    Thank you for the quick response.
    After check MBEW i was able to see that my new Batches were being assigned a Standard Price instead of MAP.
    I changed the settings in the Attributes of my Material Type to set the Price to MAP instead of Standard.
    Now it works perfectly - Thanks!

  • STOs with split valuation by batches

    I have split valuation by batches activated.
    The system forces me enter a  batch number(valuation type)  when i am creating the STO.
    It does not make sense, as the batch is really known at the time of shipping.
    wE have reviewed all the relevant oss notes , nothing seems to work.
    i appreciate if anyone has valuable inputs on this.
    best regards

    Hello,
    Note 66953 explains that during the creating of stock transport orders,
    you must enter the receiving 'valuation type' (not the batch number).
    The valuation type in a stock transport order is always mandatory in accordance with the following: (w/o OMF4 configuration of either ME21 or ME27 or ME21N)
    The first step after posting the stock transfer PO is the goods issue.
    In this step, the user is only able to type in the issuing valuation type.  But the system also needs the receiving valuation type to post the value correctly.
    This information can only be taken from the PO
    item.  So the valuation type in stock transfer orders is mandatory.
    As you have pointed out other valuation types are proposed eventhough they are deactivated. This is normal.
    In contrast, the first step after posting normal POs is NOT the goods issue, but the goods receipt. So the receiving valuation type can be typed in and you need not specify the valuation type in the PO item.
    For normal POs the valuation type field 'required' can be configured using the field selection reference keys in transaction OMF4 (e.g. ME21 NBF), thereby making the field a required entry.  However, a similar
    customizing for field reference keys ME27, UBF is not effective.
    Note 216904 describes the correction only for standard PO´s (w/o item category 'U').
    Also, your description 2 describes the standard system
    when creating PO's with split batch valuation and note 66953 addresses this.
    I hope this information helped you!
    Regards
    David Merino

  • 541 & 543 Mvt for Sub Contract Process with Split Valuation

    Hi all,
    We have activated SPLIT VALUATION for sub contracting in ECC 6.0
    We have clasified into 3  Valuation Catergories as New,Repaired & Faulty.
    The logic & naming convention of the materials are
    New Material : C1
    Repaired : C2
    Faulty : C3
    The details are as.....a faulty material can be converted into Repaired by the external  Vendors,for which we raise a PO and do MB1B with 541 mvt type with ref to this PO.
    The Acing Entries are
    PK      GL Code        Material     Value
    99         117000         C3            10
    89         117000         C2            100
    93         600530                           90
    While in process the GR w.r.t the above mentioned PO ,we are getting 6 accounting entries (which is delivered by Stand SAP) they are as
    PK      GL Code       Descrip     Value
    89         117000        Stock        100
    96         117400        GR/IR         150
    91         600530        Sub Cont    100
    86         600863        Sub Service 150
    99         117000        Stock          100
    81         600530        Sub Cont     100
    Can any please explain me how the system calculates the above Accounting Entry.
    We are confused why the system calculates ( entries) for the 91,81,86 Posting Key.
    I have uderstood that PK 89 for goods inward, 96 is for GR/IR clr, 99 is for reversal of 541 mvt type.
    Other 3 entries i have the confusion ........
    Can anyone please guide me and explain in detail how ,why andfrom where the system is calculating the entries.
    Hope that you will help me in this regards
    Take Care
    God Bless
    Regards
    Praveen.
    Edited by: Praveen Singh on Sep 16, 2008 8:07 PM

    Go to OMWB and click on simulation and here enter you mateirla number, plant and Mtype 101
    Then click on account assignment
    you will see all the entries
    Posting Lines Text              VlGCd AGC  VCl   PK Acct D      PK Acct Cr   
    Gain/loss from revaluation      -e-   -e-  -e-   83 440700      93 440700    
    Inventory posting               -e-   -e-  TRA1  89 130000      99 130000    
    Incidental costs of external a  -e-   -e-  -e-   86 460820      96 460820    
    External activity               -e-   -e-  TRA1  86 460960      96 460960    
    Change in stock account         -e-   -e-  TRA1  81 460820      91 460820    
    Purchase offsetting account     -e-   -e-  -e-   40 --Missing-  50 --Missing-
    Purchase account                -e-   -e-  -e-   40 --Missing-  50 --Missing-
    Materials management exch.rate  -e-   -e-  -e-   40 440600      50 440600    
    Cost (price) differences        -e-        TRA1  83 440000      93 440005    
    GR/IR clearing account          -e-   -e-  TRA1  86 210005      96 210005    
    Inventory posting               -e-   -e-  TRA1  89 130000

  • Material Ledger with Split Valuation Type 'X' with FIFO

    Hi,
       The requirement from the customer is to have Raw Material, Intermediary and Finished Products valued at Actuals and on a FIFO basis. According to me, this is possible only if we activate Material Ledger, have batch split valuation u2018Xu2019 as the valuation type and have a batch search strategy which does a FIFO. Are there any technical issues with this solution? Or is there a better solution? Is any organisation ever using this solution for a similar requirement? As an extension of this requirement, how does commodity trading companies running in SAP handle their inventory and COGS valuation?
    Thanks and Regards
    Shivram.

    Hi,
    Using Material Ledger with batch management and split valuation of each batch ("X") leads to most aaccurate FIFO valuation result, however, depending on how many material and batch the customer has, huge number of materials will be processed and it will affect the performance issues. You should check the number and expected period-end time frame scheduling at least.
    Financial responsible tell you to need this kind of solution (detailed FIFO calculation)?
    They usualy needs to get simple FIFO valuation, meaning they don't care each individual logistic material movement as FIFO, but only care of periodic FIFO. I know, it depends on Finacial responsibes or their auditors, so it's also not general.
    Please double-check the new FIFO valuation function for Material Ledger with using Periodic Closing and AVR. Some information is in SAP Note 1431829 and 1247053. Related transactions are there, CKLMBB_xxxx under Actual Costing/Material Ledger -> Balance Sheet Valuation Procedures. I couldn't find any official documents for Material Ledger + FIFO valuation (like Release Notes).
    Hope this will be an additional option to yours.
    Best regards, Takashi

  • RepManuf - Backflush with split valuation

    Hallo Gurus,
    i am looking for some hints on my problem. Standard transaction (MFBF) works, but i have to enter a batch when it is asking for it (which is ok,Previous bapi_repmanconf1_create_mts is useless because of split valuation now. ). I tried to rebuild the thing with mb_create_goods_movement and rm_backflush_go. Also debugged MFBF. I just doesn't work every way i try, currently some connections to serial numbers are missing too. I hope someone who did this before has some hints or advices!
    Thank you all very much in advance.
    Birdy
    Message was edited by:
            Bird Nerd

    Thank you for your answer.
    This connection is clear to me, profiles are checked before the backflush. But i didn't find a way to transfer them to one of the backflush function modules. And i think i need them as in bapi_repmanconf1_create_mts. Further on a equipment structure will be created through it.
    mb_create_goods_movement with movement type 131 and 261 for subequiptments doesn't do anything, (yes i commited ), neither create material document nor make the backflush. Therefore I am looking more advices on how the process should normally look like.

  • STO with split valuation

    Hi friends,
    When i am creating STO (Split valuation is activated) system is asking me to enter valuation types. its a mandatory field. how can i make this in to optional when the time of STO creation and enter in the GR process time..
    and batch also enabled how do i get my batch number as valuation type?.
    Thanks
    Rajan

    The "goods receipt" is already done with the goods issue, as the goods issue posts the stock into in-transit stock if the receiving plant.
    when the receiving plant performs MIGO, then it just transfers the goods from in-transit to normal storage location, for this movement no accounting document is created (the accounting document was created with the goods issue)
    Because of that you cannot make the valuation type field optional. If you dont know the valuation type at order creation, then you may need to use a userexit to update the PO with    the correct valuation type when you do the picking in the supplying plant.

  • Price change for Material Maintained with Split valuation

    Hi Gurus,
    Scenario is like this :
    Material with Valuation type is : Rs.50.
    Material W/o Valuation type is : Rs. 0 ( This is done at the time creating material master).
    Now i want to correct Rs.0 to Rs.40.
    When i try to change price through MR21, system is asking to input valuation type.
    Is it not possible to change price for material W/o Valuation type (ie blank one), if material is Split Valuated ?
    Thanks

    Hi,
    if the materila is split valuated then u have to enter valuation type because inthe accouting view you hav edefined valuation type and at that level only it stores the price.
    I think you wants to change the price at valuation category level , if this is so then it gets updated automatically thru prices maintained at all the valauation type levels.
    Hope it clarifies ur doubt.
    reward if useful
    Rohit

  • Batch Management with Split Valuation

    Hi
    We have a scenario in which we have split valuation for a material and it is also batch managed. In the business process there is regrading step where the material from one valuation type (A) needs to be transferred to a different valuation type (say B). Before regrading each of these grades have different batch nos.
    I tried to do a transfer posting (mvmt type - 309) and put the material (from Val type A to B). It asks for batches for both A and B.
    We can give batch of A (the from material), but we want a new batch to be created for the "to" material.
    How does one go about that?
    Deepak

    Deepak
    I think that you will find that the batch managemenmt is either internal or external at either plant or material level and so if you are changing the valuation in the same plant I do not think that the system will allocate a batch number for you and that you will have to tell the system what the batch is.
    I hope that this helps

Maybe you are looking for

  • Transfering Photos from an IPod into a Mac Computer

    Help! On a recent trip I've downloaded photos from my camera (Panasonic Lumix) onto my IPod using a camera connector..............I was under the impression I could then transfer them into my computer once I was home................and I HAVE done th

  • Movie rental freezes, then cannot exit in fullscreen, then after forced restart I cannot find the rental in iTunes!

    This has happened a few times before, and iTunes has always refunded me, but I am attempting to understand more about how to locate the rental on my computer or in my account in a way that will allow me to at least finish watching the movie! I don't

  • Is there a way to install Mountain Lion from my laptop to my MacPro Tower without a disc?

    I erased my drive on my mac thinking I could migrate my stuff from my Mac Mini to my Mac Pro Tower.  The mac mini won't let me migrate it. The drives aren't being recognized in Migration Assistant (while being hooked up via firewire 800).  I was wond

  • Xi file to rfc scenario

    hi, I have to pass an excel file from  server pass , all the contents and name(both are changing everyday) as a string to a filed of wrapper ZRFC(bapi ),based on return code of zrfc (return code for error )it will shoot mail to concerned person

  • C# Script Task - MessageBox Variables

    I dont know C#, so I thought I would start simple and try to do message box a variable. I am struggling even with that. In VB.net I would print a value of the variable in a message box using the following syntax.                 Msgbox(dts.variables(