Hi Experts,
                 I have 2 operations, 1 is cutting and 2 nd milling(sub-contracting), but I have only one raw material I far as I know we can only issue it to only one operation.
if I issue it to 1 st operation while sub-contracting I see it has no material is sent , but I am sending 10 pieces  after cutting.
Please suggest me how to issue to both operations.
Thanks
Satya

HI
sub contracting
Operation subcontracting: Within in-house production if some capacity bottlenecks exists in any operations then you can this job to some vendors to carryout this job at his premises and supply us the semi-finished part. This can be done via control key example PP02 (external processing).
Assembly subcontracting: Total product can be given for subcontracting. We have to give the raw materials to vendors and they would supply the assembly.  This can be done with special procurement type 30 with procurement type F.
Assign the BOM material to first operation and then for second operation go for operation sub contracting
Check and revert
Regards
Anupam Sharma

Similar Messages

  • Custom component issue

    Custom component issue
    According to customer requirements, we want to get such an effect in the development of custom components:
    Drag and drop custom components to the Flex builder work area, it can generate more than the default properties, not just generate "x", "y" attribute.
    【Details are as follows】
    We design a custom panel "CustomPanel.mxml" in the project development, then drag it into the workspace in the Flex builder development environment.
    View the source code found that it can only generate "x", "y" attribute in default. That is:
    <ns2:CustomPanel x="105" y="74">
    </ns2:CustomPanel>
    【Issue】
    How can we do that when drag the 'custom component' into Flex builder workspace,  we can generate "layout" attribute in addition to "x", "y" attributes?
    That is:
    <ns2:CustomPanel x="105" y="74" layout="absolute">
    </ns2:CustomPanel>
    【Note】
    The following code will be generated when the "panel component comes with Flex builder environment" is dragged into workspace.
    <mx:Panel x="121" y="134" width="250" height="200" layout="absolute">
    </mx:Panel>
    How it is done?

    I am sorry to bother you again.
    I have tried the web site content, but it can't helped!
    There is a custom component called 'Basket', source code is as follows:
    package picnic
    import mx.containers.Panel;
    public class Basket extends Panel
      public function Basket()
       super();
       layout = "vertical";
       setStyle("backgroundColor", 0x00FFFF);
       setStyle("horizontalAlign", "center");
    Here it is worked when the attribute "layout" is set to "vertical", but it isn't when "layout" is set to "absolute" !
    When the property is set to "absolute" phenomenon is as follows:
    Drag component such as 'Button' into "picnic component". It will automatically go to the top left corner position,
    just like the 'layout-attribute' is not set.
    Why is there such a phenomenon?

  • Component allocation in routing

    In CA02 (Sales order routing) when I go to component allocation more than once then i get following message. It is ok that you only go once in component overview??
    Component overview for routing cannot be called up
    Message no. CM022
    Diagnosis
    You want to call up the component overview for the selected routing (group 50000637, counter ). However this is not possible, because earlier you clled up a material component overview for another routing that had the following properties:
    It belongs to the same group as the routing you have now selected.
    It has been allocated another material or material BOM as the routing you have now selected.
    Procedure
    As long as you do not call up the component overvierw for the selected routing, you can go on working as usual. To call up the material component overview, proceed as follows:
    1. If you have made any changes in the selected plan that you want to save, do so.
    2. Cancel editing the routing
    3. Start editing routings with the selected routing (group 50000637, counter ) and call up the material component overview

    all u have to do is, go to ca02 operation overview. highlight the operation and click on component allocation. there u can see assignment tab. click on that and assign the components from the bom of that header material. it is as simple as this. dont forget to save the routing at the end.
    pls try this and come back with more clarity.
    cheers
    vinay

  • Subcontracting Component  Issue Error

    HI,
    i am creating Sub contracting Purchase order.component qty is issued for unlimited, accepted for PO.
    my option is Po Parent qty against Component issued Excess qty not Allowed.
    Purchase Order Qty A: 100Pc
    Child Qty               B : 100PC
    Issued qty             B :150 Pc is Allowed.
    this Child qty are maintained for BOM.
    Plz, Explain and Advise the Issue.
    By,
    Jeevan

    Dear,
    You can not issue the quanity more than the BOM component quantity with respective to the PO.
    Transaction ME2O uses the component quantities from the individual purchase order items. However, it does not set up a stock based on purchase orders (POs). The system therefore does not assign POs directly to quantities either. The evaluation of the SC stock is therefore always a cumulative analysis of all the requirements of a material over time. The "Closing Stock" for each material displays whether there is excess stock or a stock undercoverage at that time, or whether requirements and stock are balanced.
    You can set up the SC stock with larger quantities than component requirements exist at that time. This option is often used if, for example, you want to set up buffer stocks for the subcontractor for subcontracting works that frequently recur.
    Hop clear to you.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on May 19, 2009 12:26 PM

  • BAPI For CA02 - Assign Component allocation for routing

    Hello Gurus,
    I m searching for the bapi for the component allocation in routing.
    Since  routing is already created my work is to assign component allocation to the operation.
    i tried with the BAPI_ROUTING_CREATE  and /SAPMP/BAPI_ROUTING_PROCESS
    BAPI_ROUTING_CREATE can be used only to create new routing.
    But the /SAPMP/BAPI_ROUTING_PROCESS is going to short dump.
    So any alternate please suggest.
    Please provide sample code to assign component allocation.

    Please have a look at following thread:
    http://scn.sap.com/thread/2084329
    Also,check tcode :CWBQM
    Regards

  • Negative Component Issue

    Hi
    It is mentioned in the oracle inventory management material that There are different ways we can receive inventory in to stock: for instance from manufacturing shop floors by :
    - Component Return
    - Negative Component Issue
    - Assembly Return
    My question is:
    what is "Negative Component Issue" ? and how could it be performed?
    Thanks
    Walid

    HI,
    negative component issue is used to issue negative components from job to inventory.
    they are normally used in denoting by products that are produced in a job when performing a job, and usually by products are returned to inv from job.
    so negative component issue type is used.
    is it clear?

  • SAP R/3 application component issue

    Hi all,
    My issue: SAP R/3 application component hierarchy node in RSA6 got saved in $TMP package as local object. When iam transporting the request from Dev to QA this hierarchy is not getting transported and all the application components in ECC QA are assigned under not defined node as individual node.
    Not only this when i replicate the data sources in BI side in QA these data sources are replicated but come under unassigned nodes because of the missing main node.
    So can any body help me in removing this main node from the $TMP folder and save this in a transpotable package to transport that to QA ECC and the same to replicate in BI.
    Regards,
    Prabhakar.

    Hi Markus,
    This issue iam facing in ECC side. Unless untill i transport this application component hierarchy all my application components in ECC QA will be under a not defined nodes.
    So please suggest me the approach to resolve this issue.
    Regards,
    Prabhakar.

  • Ibase/Component issue while creating a message from satillite system

    Hi experts,
    we have implemented the service desk functionality in solution manager system.
    User is able to create message in solution manager directly.
    While creating message from a satellite system IBASE/component fields are filled with incorrect values.
    Because of this user unable to create message from satillite system.
    Has someone any ideas where we do some settings to get correct Ibase/Component values while creating message from satillite system?
    Thank you in advance,
    Babu

    Hi  Babu,
    For Creating messages in SOLMAN make sure that in T code SM30  under the table BCOS_CUST data is maitained
    OSS_MSG     W     NONE     CUST620     1.0
    First your should make your solman ready for posting issues within.
    Then connect it to ECC systems and try posting issues there.
    Do not user Tcode NOTIF_CREATE for posting issues  always use HELP- Create Support message.
    Thanks
    Nand

  • ABAP Runtime error when doing component assignment in routing creation.

    Hi All,
    I have a problem in component assignment while creating routing (CA01) by using Copy from function. We are creating a Sale order specific routing for a finished material by copying it from the same material. The Transaction runs very slow and when it goes to component assignment it is taking more than 2 hrs and going to dump.
    This finished material is having  very high no. of compoents in its BOM. (14000). Pls suggest why this is happening.
    Regds
    Mahesh

    Hi,
    You can analysis the Dump error using t-code ST22 with the help of your ABAP consultant. He will be able to explain you why the dump you are getting.
    Regards,
    V. Suresh

  • LOADER COMPONENT ISSUE

    I noticed that when using the Loader component in Flash 8 -
    the following issue:
    I have a thumbnail gallery that uses the Loader component to
    view the large image.
    when i view the site in fire fox it works perfectly (scaling
    the content and centering it within the loader component shape)
    but when i view it in IE - no scaling or centering occurs!!??
    any idea why this is happening and how i can rectify
    it?

    Hey why don't you try adjusting the permissions and hot
    linking protection on your servers control panel? This might be the
    problem.

  • "No valid material component found" when Routing upload using LSMW RCPTRA02

    I want to upload routings through LSMW RCPTRA02 incluing routing headers, sequences, operations and component allocations. But systems appears error CM 101 "No valid material component found" . Does anybody occurs the same error before?
    The materials truly exists in BOM component.
    Sincerely thanks,
    Alina

    Hi,
    What is the status of the BOM? There should not be any problem if the material BOM exists.
    Regards,
    Krishnendu.

  • Import Fail crm 2011 to crm 2013 Legacy component issue

    Hi All
    We are getting issues during organization import from crm 2011 to crm 2013 , the error is 
    "We have detected the presence of legacy component(s) during upgrade, these components are not supported in Dynamics CRM 2013. Please refer to upgrade log file C:\Users\Administrator\AppData\Roaming\Microsoft\MSCRM\Logs\LegacyFeatureCheck.xml
    for more information."
    when we check log file it shows the error "ISV folder under CRM Website contains one or more files"
    Even we removed everything from ISV folder , Iframe urls from app , solution which is using ISV urls ,plugins and custom workflows but still the error is same
    Please help to resolve this issue .
    Thank you
    Sharique

    Hi,
    Please refer below blog having details about "Removal of the 2007 Endpoint and Legacy Features"
    http://blog.simonjackson.info/2013/07/whats-changing-in-crm-2013-from-sdk.html
    The following legacy Microsoft Dynamics CRM 4.0 features will be removed or will no longer be supported in the next major product release:
    ISV folder support for custom web applications
    Microsoft Dynamics CRM 4.0 plug-ins
    Microsoft Dynamics CRM 4.0 client-side scripting
    Microsoft Dynamics CRM 4.0 custom workflow activities
    Also you can download a tool that can detect legacy feature on your server
    http://go.microsoft.com/fwlink/p/?LinkID=309565
    Entire documentation is available at below article.
    http://msdn.microsoft.com/en-us/library/dn281891.aspx
    Hope this helps.
    Ajay Chawla

  • Issue in Router Configuration

    Hi All,
    While configuring Router we are facing an issue attached. please help me where to recity this dump.
    Thanks in advance...
    Regards,
    Krishna.M

    If your router has to renew it's IP Address as required by the ISP very 12 hours then the ISP modem would need to trigger the IP renewal on the router by disconnecting from the router and reconnecting triggering the IP renewal on the router.
    Very unusual; what is typically the case is your ISP modem is periodically loosing it's connection to the ISP unregistering either itself or the router.
    Please remember to Kudo those that help you.
    Linksys
    Communities Technical Support

  • Mass reversal of one component issued  to many production orders

    Hello SAP GURUS
    One of the common component is issued  to many production orders from wrong storage location ie instead of 0002  storage location it got issued from storage location0001,
    Is there any way to mass reverse of this common component  that got issued to multiple production orders
    Thanks & Regards
    Himakar Raigir

    Dear Himakar,
    In my understanding,There is no standard T Code to do this mass reversal.
    But in MIGO/MB1A you can do 262 movement to the same storage location from which it was consumed for one single
    production order if required or else you have to cancel all the documents using MBST.
    Check and revert
    Regards
    S Mangalraj

  • Operation subcontracting - excess component issue to vendor

    Hi gurus,
    Operation subcontracting
    Issue of component to operation subcontractor with excess material.
    After goods receipt from subcontracting what is the impact at subcontractor vendor stock , costing and financial for excess issue stock.
    example
    As per BOM component qty (suppose to issue) is                10
    After altering in PO issue component qty will be issued          15
    At the time of receivable of subcontracting (GRN) where and what is the status of 5 qty?
    Regards,
    RAM

    Do MB1B - Matl Movement Type  - 542 w.ref. to  P.O(excess 5 qty).
    Check stock of subcon. using MBLB.

Maybe you are looking for

  • SharePoint 2013 error while opening listing page

    Dear All, I have upgraded my SharePoint 2007 to SharePoint 2010 and SharePoint 2013. Currently I m facing problem whenever I click on any list pages (eg. Press Release) on Sharepoint 2010 and 2013 application. Attaching the error message. Please help

  • Automatic clearing fro customer using SAPF124(f.13)

    Dear All, I would like to know if can we clear open items of one time customers using F.13 . I have configured in table TF123 (OB74) still the open items were not picking in f.13 and specifies that No clearing procedures were carried out. Let me know

  • Rest API v1 Getting Error 400 bad Request

    Hi, we have a very strange problem. We are using a custom JAVA WebDynpro UI for doing our approval workflows, and are making an upgrade from NW Version 7.0 to 7.31 (finally ). We have upgraded the DEV System without any troubles everything works fine

  • Popping noise while sleeping

    I started to notice a "popping" noise (about 1 Hz) when I got external speakers for my Mac Mini. It occurs when the Mac is sleeping and the external screen is on (but sleeping its own "sleep"). If I disconnect the analog audio out (from where the ext

  • Nvidia FX5700 N-view problems?

    I've installed a FX5700 (MSI) video card. I need to use the three outputs provided for it(simultaneously). -two outputs(VGA y DVI) used by two LCD monitors. -one output (S-Video) used by a TV My question is: Are there any N-Vidia driver that allow us