Component requirement date in subcontracting case

Hello All,
I have subcontracting PR having delivery date as 26.11.2010 and release date as 17.10.2010 and planned delivery time as 40 days. I change the PR release date to 10.10.2010 and it shows the requirement date for the components as same as 10.10.2010 which is my requirement. But when I convert PR to PO it is showing the component requirement date as 19.09.2010 and release and delivery date same as in PR. I want system should not change the component requirement date.
How system is showing requirement date in PO as 19.09.2010? Is some one has any idea?
Mayur Phalak

Hi Mayur
The requirement date for component in subcontract is Delivery date of the item minus planned delivery time -This is what SAP library says. But in your case I see a huge difference. Is your PR manually created or MRP generated?
Have you maintained info record? Is planned delivery time is copied from info record? You can see planned delivery time in PO delivery tab. (find out which value has been copied).
As per SAP standard when you press enter button in PO requirement date is redetermined based on planned delivery time in the PO delivery tab. So try giving Planned delivery time in PR or info record to adjust requirement date
Write to me if you are not clear.
Regards
Antony

Similar Messages

  • Component requirement date in subcontracting PO

    Hello All,
    I have subcontracting PR having delivery date as 26.11.2010 and release date as 17.10.2010 and planned delivery time as 40 days. I change the PR release date to 10.10.2010 and it shows the requirement date for the components as same as 10.10.2010 which is my requirement. But when I convert PR to PO it is showing the component requirement date as 19.09.2010 and release and delivery date same as in PR.
    How system is showing requirement date in PO as 19.09.2010? Is some one has any idea?
    Mayur Phalak

    Hi,
    Can you upload screenshots of what you see in ME53N & ME23N with details as seen in component list & the dates to picasaweb or some portal?
    Regards,
    Vivek

  • Requirement date for 3 level  Component in BOM

    Iam having Multilevel  Sales order bom
    Header material requirement date and receipt date given by system is 23.04.2009
    first level assembly requirement date and receipt date given by system is  is 07.04.2009
    second level assembly is phantom
    Third level componant requirement date is 31.03.2009 and receipt date given by system is 19 June 2009 .
    Gr proceesing time of 2 days is maintained and no planned delivery time is maintained.
    Why Third level componant receipt date given by system is 19 June 2009 ?
    Edited by: mayuresh  bhurke on Jan 19, 2009 6:31 PM

    Mayuresh,
    It seems the 3rd level component has a long planned delivery time in material master. Hence the system  has pushed the receipt date forward to 19 June 2009  from 31.03.2009. Please check material master time for the 3rd level component.
    Hope this helps.
    Thanks,
    Ram

  • Requirement date

    Hello,
    With the MRP run and BOM explosion the requrement date for the components are set to the start of the order.
    Now I want to change this for one component. The requirement date should be the end of the order.
    I tried with the distribition key END in BOM and in production version. But this don't work.
    How can I move the requirement date to the order end date?
    Kind regards.

    Dear ,
    Compoenet Requirement date through MRP based on the Stock availability , Planned Delivery Time , GR procesing Time .It is independent of Production Timing  .
    I think you need this material in the last operation in your production order .How ever , one work around will be , goto co02-Production Order -Operation Overview-Select Operation -Goto Header -Operation -Dispatch  and SAVE .Then select the operation line item  and double click -Select date option -Here Change the Operation Start and End Date as Production Finish date and adjust the time  (Set up /Processing /Tear Down date )  and SAVE .Now check the Component Overview -Slect the Compoenet and Requirement date will be Order Finsih Date .I have tested and working fine .
    Or else Did you get any PR for that particular Component .I  think , if MRP generates PR , then you need the PR/PO reciept date should be Production Order Finsiah date , No GR time  .So PR reciept date will be your requirement date in that case .
    In that case , you goto-MD4C with Production Order -Execute the report -Select the Item you need to have PRODUCTION FINSIH DATE -Change the PR Delivery date as Production Finsih Date .
    Try and revert
    Regards
    JH

  • Off set for component requirement  in PM order

    Dear Experts,
    In my PM order,  offset date for component requirement date is working only for the first component. for the next component it is taking basic start date( i e order generated date by default) as the requirement date even though i entered offset for some days.
    Experts, please explain me how to come out of this problem.
    Thanks & Best regards,
    Praveen

    Dear Praveen,
    Its working Praveen.
    Please check this way: 1st operation>double click operation no.>put component>double click item no. of component>now set offset
    2nd operation>double click operation no.>put component>double click item no. of component>now set offset
    Now suppose you taking two component for same operation then for the second you can have different offset by clicking item no. of that componet.
    Please check and let us know again.
    Regards,
    Kaushal Rai

  • Is it possible to change the requirement date of a component?

    Hello Gurus,
    When a non stock material is defined as a component of service order a requirement date is automatically determinded (RESBD-BDTER) on the current date. Does someone knows if one can be able to influence this field?
    It means that I would like to be able to fill it by myself.
    Kind regards
    Chris

    Hi Paul,
    As you said "
    The requirement date is calculated as follows:                          
    1. The start date (earliest scheduled start) of the operation minus     
    2. The goods receipt processing time of the component and minus or plus 
    3. The lead time offset for the component in the order                  
    The above values (point 2 and 3) can be adjusted to manipulate the      
    delivery date."
    I have checked for stock & non stock item, but this calculation is not working for work orders. only i can change the date with offset. i checked material master record and change the GR processing time and planned delivery time but its not working. Do you have any idea why its not working?
    Thanks.
    Shahyan        

  • How can i make requirement date in component take the actual day date??

    hello evry one >>>
    why requirement date in component ( service order ) dose not take the
    actual day date when we Withdrawn part from stock >>>> how can i make
    the requirement date take the day date automaticly without change it
    from offset field
    for example :
    when i withdrawn apart in (old service order) .. the requirement date
    take the old date or ( the service order date ) and it dosen't tack
    the day date ( day when i withdrawn part )
    please i whant help & thank you . good luck
    .... omar gamar ...

    Wrong forum:
    http://www.microsoft.com

  • NWDS does not open Webdynpro Component's Data Modeler

    Hi,
    All of a sudden my kindly Tool does not open any of the Component's Data Modeler for Mapping attributes. It happened all of a sudden. I cleaned everything and reinstalled from a proper software.
    If any one has a solution kindly let me know or if you can direct me to appropriate forum or Weblog  to recover it will be a great help.
    -Shekhar

    HI Shekher...
    May be following link will helpful to u...U see some basic tutorial in this link that will help u abt webDynPro.....
    https://www.sdn.sap.com/irj/sdn/developerareas/webdynpro?rid=/library/uuid/49f2ea90-0201-0010-ce8e-de18b94aee2d
    Also I m Giving U some Basic IDEA abt Data-Modular.
    Data Modeler
    Features
    The Data Modeler is a graphical tool and part of the range of Web Dynpro tools. Using the Data Modeler provides you with efficient support for a number of central development tasks.
    ·        Creating a View
    ·        Controller definition
    ·        Declaring a Model to the Component
    ·        Nesting Components
    ·        Creating a Data Link
    ·        Working with View Templates
    ·        Working with the Service Controller
    The perspective area that displays the Data Modeler is the Diagram View. The entities of a Web Dynpro application are created using graphical means. A selection list of Data Modeler actions is available from which you select the relevant entity and insert it in the design area of the Data Modeler.
    Starting the Tool
    Prerequisites
    You have created a Project and a corresponding root Web Dynpro Component.
    Procedure
    To open the Data Modeler, choose Open Data Modeler from the context menu for the component name in the Web Dynpro Explorer. To create an application entity, choose the corresponding Data Modeler action in the tool selection area. Then click on the relevant area in the Data Modeler editor. The corresponding wizard is then started and you can make the required entries.
    For example, to define a custom controller, choose Create Custom Controller and then click on the area Custom Controllers. The definition wizard is started automatically.
    If This is not the case then plz check ur WebDynPro Installation Manual....
    Hope So ur problem will Solve.....:-)
    Regard's
    Dheerendra Shukla

  • Error activating CIF model for subcontractor PO w/component requirements

    Hello CIF experts,
    I'm having a problem with the CIF POs and PReqs between ECC and SCM.  If the CIF model is already active, then a subcontractor PO with component requirements is created (the material exists in SCM but the components do not exist in SCM) then the order CIFs successfully to SCM. 
    However, if the CIF model is deactive, then a subcontractor PO with component requirements is created (the material exists in SCM but the components do not exist in SCM), then when the CIF model is activated, it fails.  The error is "Product x for location y in model z does not exist". 
    We do not want to send all components to SCM because we do not plan components and do not want to overload SCM with additional data. 
    Can anyone answer why the order CIFs successfully if the model is active but why it fails when trying to activate the model?
    Much thanks,
    Elizabeth

    Elizabeth
    You have mentioned that you get an error that product X - loc Y does not exist in APO. Does this " product X" refer to the parent material or component material ?  If the product X refers to component material then check your PO integration model and make sure the component is not included in the filter criteria by mistake - CFM5 tcode .
    I understood your scenario and i believe that you must be able to transfer the parent subcontracting PO successfully to APO . Please delete the error queue and check your master data again in APO. Check if the parent material - location exists in APO and then create the integration model and activate it.
    Thanks
    Aparna

  • Missing parts if GR date is past requirement date

    why am i getting a missing parts message if the GR date / delivery date of the material is past the requirement date of component in the order? couldn't it be possible to make these components available, for more flexibility in the system?

    Hi!,
    Please check your "availability check control" for the combination of your checking group (e.g. '02') and checking rule (e.g. 'PP') on trnx OPJJ.
    There do the following settings:
    1. Incl. Purchase orders: Select
    2. Incl. purchase requisitions: Select
    3. Incl. Planned orders: select' X'
    Or
    On OPJK, for your plant and order type combination and avlb check '2' set release material as '1' or '2''. This will help user to release the order even in case of material shortage.
    I think this may solve your issue. Please revert back in case of any further issue.
    Regards,
    Uday
    Edited by: Uday Parchure on Oct 3, 2008 7:30 AM

  • Material requirement date...please clarify

    Hello friends,
    Whenever we create a SUBCONTRACTING PO for 1 quantity  of finished product....the system proposes a REQUIREMENT DATE for the component item. I am unable to understand what drives the calculation of this requirement date. I mean how is this calculated.Please clarify
    Regards,
    Sanjay

    Hi,
    The planned delivery time (in calendar days) is deducted from the delivery date, the resulting date is converted to the last workday before it (if necessary) and afterwards the purchasing processing time (in workdays) is deducted. Consequently, the purchasing processing time is used as a float for the provision of components.
    Regards,
    Ramakrishna

  • Scheduling problem with delivery date in purch.req and requirement date

    Dear all,
    I have the problem, that the calculated delivery date in the purchase requisition does not correspond with the requiement date of the production or planned order.
    I would like to use planned delivery times in the material master.
    Example:
    Planned delivery time: 20 days
    Todays date 01.10
    Case 1)
    Requiement date of planned order 10.10
    Case 2)
    Requiement date of planned order 20.09
    This situation can happen in our envirnoment, as the engineering process still continues after start of production. In this case I would like to have the following result:
    Case 1)
    Delivery date is 10.10 minus the goods receipt time
    Case 2)
    Delivery date is day of MRP or one or two days more
    I made the setting that dates in the past are not allowed. This solves my first smal problem. I tried to set the scheduling margin key but these settings do not help me, as they are relevant for all materials. I need of course individual planned delivery dates per material.
    So, I want to change the standart MRP procedure that in the case of the "wished requirement date" not the calculated date is beeing taken, but the "wished date". Usually you receive an exeption for this case and you would need t solve this manually. But this we dont want to do.
    Can s.o. please help me? Thank you all very much, I really dont know what to do in this case.
    With best regards,
    Bjoern

    The question cannot be answerd by SAP standart as I see. We will go through a workaround.

  • Update column data to Upper Case in parent and child table

    Hi ,
    I am facing issue while updating column value to upper case in parent table and child table. How can i do that ?
    when updating parent row:
    ORA-02292: integrity constraint (XXXXXXXXXXXXXX_FK) violated - child record found
    When updatng corresponding child row:
    ORA-02291: integrity constraint (XXXXXXXXXXXXXXXX_FK) violated - parent key not found
    how can i update on both the places ?
    Regards,
    AA

    I am facing issue while updating column value to upper case in parent table and child table. How can i do that ?
    Why do you need to do that?
    That is just ONE of several questions you should answer before you start modifying your data.
    1. What is your 4 digit Oracle version? (result of SELECT * FROM V$VERSION)
    2. If both values are the same case what difference does it make what that case is?hen you don't need to alter your original data.
    3. What is the source of the column values you are using now? If you change your data to upper case it will no longer be identical to the source data.
    4. What is your plan for enforcing future values to be stored in UPPER case? Are you going to use a trigger? Have you written and tested such a trigger to see if it will even work the way you expect?
    5. Why aren't you using a surrogate key instead of a 'business' data item? You have just demonstrated one reason why surrogate keys can be useful: their actual value is NOT important.
    You should reexamine your problem and architecture and consider other alternatives.
    One alternative is to add a new 'surrogate key' column to use as the primary key. Just create a new sequence and use a trigger to populate the new column. Your current plans will require a trigger to perform the case conversion so instead of the just use the trigger to provide the value.
    If the change is being done to facilitate searching you could just add a VIRTUAL column UPPER_MY_COLUMN and index that instead. Then you could search on that new virtual column and the data values would still be identical to the original data source.

  • Mass change requirements date

    Hello,
    Running ESC SRM 5.0
    Is there a way to mass change the requirements date in a shopping cart?
    The business requirement is to have a template with ie 100 items. When they copy this template into a new shopping cart, the requirements date is set to todays date. They then need to be able to set this date to whenever they require the goods.
    Is there a way to mass update all 100 items?
    It is not very user friendly to have to change every line!
    Please note that it is not an option to change the default date to ie todays date + 3 days. The number of days will vary and due to that will have to be set manually
    rgds
    GAR

    Hi,
    if you have varying dates among the 100 items, it is not possible to do a mass update right unless you have some rule logic behind based on product or product category? In this case, you can considered to use the change BADI BBP_DOC_CHANGE_BADI to adjust it.
    As long as human intervention is needed to provide a date, it is not possible to do a mass update in background mode but to do it over dialog mode.
    Just a opinion.
    Regards.

  • Required Data Elements

    Hi
    I am working on a Proxy to Web service scenario in PI 7.1 Version
    I have SAP Pre defined message on Source side, and External Parter Message on the target side,
    Some of the data elements on the Target side are required fields, I am passing the values to Required Data elements based on the certain condition,
    For example: If Category code which is on the source side is 2 then I am passing the Organization First name:Second name to Commerical name which is required Data element on the target side, If the Category code is other than 2 then I am moving the Blanks to Required field, and eventually I am receing the following error
    Please let me know what value I can assign to the required fields in the exceptional Case, (i.e if the category code is other than 2)
    <?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
    - <!--  Request Message Mapping
      -->
    - <SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="">
      <SAP:Category>Application</SAP:Category>
      <SAP:Code area="MAPPING">EXCEPTION_DURING_EXECUTE</SAP:Code>
      <SAP:P1>com/sap/xi/tf/_MM_ECC_Claimsinfo_to_ISO_</SAP:P1>
      <SAP:P2>com.sap.aii.mappingtool.tf7.IllegalInstanceExcepti</SAP:P2>
      <SAP:P3>on: Cannot create target element /ClaimInvestigati</SAP:P3>
      <SAP:P4>onAddRq/ClaimsParty/GeneralPartyInfo/NameInfo/Com~</SAP:P4>
      <SAP:AdditionalText />
      <SAP:Stack>Runtime exception occurred during application mapping com/sap/xi/tf/_MM_ECC_Claimsinfo_to_ISO_; com.sap.aii.mappingtool.tf7.IllegalInstanceException: Cannot create target element /ClaimInvestigationAddRq/ClaimsParty/GeneralPartyInfo/NameInfo/Com~</SAP:Stack>
      <SAP:Retry>M</SAP:Retry>
      </SAP:Error>
    Thanks a lot for the inputs
    PR

    I am using Blanks in the Constant Map (  ). Not any values, If I assign any constant value then the error will not occur
    Without assigning any Values how can I get rid of this error 
    Thanks
    PR

Maybe you are looking for

  • FM or logic to retrieve Open order quantity for below parameter

    Hi Gurus, I have a typical requirement for development of 1 function module and below are the details for it: I want to have the open order quantity for materials by entering ship-to-party and sales organisation. Can i get list of all the materials w

  • Custom InfoObject for date, problem with offset

    Hi all, I have a BEx reports presenting 0CALWEEK and another IO I created for dates. This IO has the same properties as 0CALWEEK (but it was not created as a reference of 0CALWEEK). In my report I'd like to use offsets for both IO's. It works perfect

  • Uncompressed 8-bit Preset problems

    Hi, I'm trying to solve a jaggy text problem by creating a new uncompressed 8-bit sequence (which I've never used before). I try using the preset for Uncompressed 8-bit and click OK... but then I get the following message: "Video Compressor Uncompres

  • Blue Tint Started after I set up TV monitor: dual g5 2.0Ghz

    Machine: Dual 2GHz PowerPC G5 10.4.6 with Lacie Electron Blue 22 connected to it. ATI Radeon 9650 Driving it. Problem: It was working fine. Now it has blue tint (haze) to it. It looks like somebody put a piece of blue plastic wrap in the front of the

  • How to open bwf files on a bwf formatted disc

    Hi I use Fostex CR-500 to record. I can record fine when formatting this to Audio-CD. These files is easily imported in Logic. But when I want to record in 24/44,1 I have to BWF format the disc. But then I can´t import the files to logic. When openin