COMPONENTS TOTAL REQUIREMENT

HI
IF THE COMPONENTS ARE USED MORE THAN ONE FINAL PRODUCT . WHERE WE CAN FIND THE TOTAL REQUIREMENT FOR THE COMPONENTS.
HOW TO CHECK FOR ALL THE COMPOENNTS IN THE T.CODE.

Dear Raj,
If you want to find out in general from the BOM means,you can find the total requirement quantity as per the BOM details in
CS15,by summing up the requirement quantity.
And regarding the receipts and requirement's,you can check in MD04.
Come back with your further queries.
Regards
Mangalraj.S

Similar Messages

  • TOTAL REQUIREMENTS TABLE FIELDS

    HI ALL,
    I WOULD LIKE TO DEVELOP A CUSTOMISED REPORT ON THE TOTAL REQUIREMENTS (INCLUDING SALES REQUIREMENTPIRDEPENDENT REQUIREMENT+RESERVATIONS)
    AGAINST A MATERIAL FOR THE GIVEN DATE.
    CAN YOU GUIDE ME THE STEPS & TABLE FIELDS.

    HI
    For Dependant requirements and Reservations , use table RESB
    For PIR  use Tables PBIM ,PBED
    For Sales order requirements use Table VBAP, VBEP
    Regards,
    krishna Mohan
    Edited by: Krishna Mohan N on Jan 24, 2008 11:06 AM

  • Hyperion Planning Fusion Edition, what components are required?

    Hello,
    Currently we're planning to install Hyperion Planning Fusion Edition, but we're not certain what components are required if we want to use Planning with EPMA/BPMA. Can someone post a list of components/applications required?
    Additionally, where from can we download Oracle Hyperion Enterprise Performance Management Architect, Fusion Edition, v11.1.1.1.1? The documentation states that such a version exists, however we're unable to locate it on Oracle's web pages.
    Thank you
    Regards
    Marcin Stawny

    Hi,
    You will need the following :-
    Oracle Hyperion Enterprise Performance Management System Installer, Fusion Edition Release 11.1.1.1.0
    Hyperion Enterprise Performance Management System Foundation Services Release 11.1.1.1.0 - Part 1-3
    Oracle Hyperion Enterprise Performance Management Architect, Fusion Edition Release 11.1.1.1.0
    Oracle Essbase Client Release 11.1.1.1.0
    Oracle Essbase Server Release 11.1.1.1.0
    Oracle Hyperion Provider Services Release 11.1.1.1.0 (if you want to use SmartView)
    Oracle Hyperion Planning, Fusion Edition Release 11.1.1.1.0
    Oracle Hyperion Smart View for Office , Fusion Edition Release 11.1.1.1.0
    You can find the files on Oracle edelivery or here
    Cheers
    John
    http://john-goodwin.blogspot.com/
    John

  • Operation wise total required hours for planned order in given date range

    Hello Experts,
    My client wants the report to check the capacity utilization of the work centers for the all planned order in particular date range.
    Is their any standard report which gives the work center wise operation wise total required hours? or which table should I use to make the customize report so that I will get total required capacity & available capacity.
    Thanks in advance for use valuable suggestions.
    Sagar

    Hi Mario,
    Thanks for your reply,
    In CM01 or CM05, we are getting requirement on weekly basis.How to get that report on daily basis? I want to give the input as a date range of the planned order.How to go for that?
    Edited by: SAGAR GOLIWAR 226 on Jul 3, 2011 8:16 AM

  • Running total required but with different timing

    Hi All:
    I am using Oracle9i Enterprise Edition Release 9.2.0.6.0
    I want to write a query to display the statistics report with running total.
    I have written following query that return last 60 minutes activities.
    SELECT se.tserv_id,
    sum(decode(eu.category,'I',1,0)) Imp,
    sum(decode(eu.category,'E',1,0)) Exp,
    count(*) Total
    FROM service_events se, equipment_uses eu
    WHERE se.performed BETWEEN trunc(sysdate-60/1440,'mi')
    AND trunc(sysdate,'mi')
    AND se.tserv_id IN ('EXM','GROUNDED')
    AND eu.gkey = se.equse_gkey
    AND eu.category IN ('I','E')
    GROUP BY se.tserv_id;
    now I want to write a query that shows me the result of above query and running total as well
    But the different between current activity and running total is as follows
    Current Activity = Last 60 minutes activity
    Running Total = Total activities from the 08:00 am till sysdate.
    for example if this query executed on 11:00 am then the current activity values must be from 10:00 am to 11:00 am and the running total values must be from 08:00 am to 11:00 am
    The reason for running total starts at 08:00 am is that the shift starts from 08:00 am to next day 07:59 am.
    Can I write one single query for this?
    Similarly running total values must be start from last day 08:00 am to current date and time when I executed this query from 00:00 to 08:00 (12 midnight to 8am)
    if difficult then plz let me know that how can I find that if the time is from 00 hrs to 08 hrs then start time must be the last date 08:00 am to the current date and time.
    Thanks
    Hassan

    Dear Frnak
    Thanks for your reply and help
    Its really did what I want
    I mean to say that the result format is correct but the value of Total_day column is not correct.
    Following is the sample data from 19-Jun-2008 08:00 AM to 20-JUN-2008 08:00 AM
    TSERV_ID  EQUSE_GKEY     PERFORMED
    ===============================================
    EXM       5188958     19-Jun-2008 8:00:32 AM
    EXM       5185586     19-Jun-2008 9:03:34 AM
    EXM       5181960     19-Jun-2008 9:03:35 AM
    EXM       5173333     19-Jun-2008 9:03:35 AM
    EXM       5188263     19-Jun-2008 9:08:49 AM
    GROUNDED  5174055     19-Jun-2008 9:10:29 AM
    GROUNDED  5152887     19-Jun-2008 9:10:29 AM
    GROUNDED  5187512     19-Jun-2008 9:10:29 AM
    GROUNDED  5196303     19-Jun-2008 9:27:41 AM
    EXM       5196370     19-Jun-2008 9:29:50 AM
    EXM       5172045     19-Jun-2008 10:01:23 AM
    GROUNDED  5196269     19-Jun-2008 11:11:29 AM
    GROUNDED  5200219     19-Jun-2008 11:24:39 AM
    GROUNDED  5185246     19-Jun-2008 12:06:30 PM
    GROUNDED  5190134     19-Jun-2008 12:09:27 PM
    GROUNDED  5190475     19-Jun-2008 12:09:27 PM
    GROUNDED  5156065     19-Jun-2008 12:26:49 PM
    GROUNDED  5132287     19-Jun-2008 1:56:44 PM
    EXM       5189203     19-Jun-2008 2:29:17 PM
    EXM       5180158     19-Jun-2008 3:27:03 PM
    EXM       5149310     19-Jun-2008 3:37:31 PM
    EXM       5196303     19-Jun-2008 3:42:48 PM
    EXM       5192768     19-Jun-2008 4:03:51 PM
    EXM       5174055     19-Jun-2008 4:14:23 PM
    EXM       5200231     19-Jun-2008 4:45:51 PM
    EXM       5157151     19-Jun-2008 4:51:06 PM
    EXM       5159930     19-Jun-2008 5:01:36 PM
    EXM       5185237     19-Jun-2008 5:01:37 PM
    EXM       5195434     19-Jun-2008 5:01:37 PM
    EXM       5152887     19-Jun-2008 5:06:49 PM
    EXM       5196269     19-Jun-2008 5:06:49 PM
    EXM       5187512     19-Jun-2008 5:17:26 PM
    EXM       5190134     19-Jun-2008 5:59:24 PM
    GROUNDED  5101919     19-Jun-2008 6:44:36 PM
    GROUNDED  5101918     19-Jun-2008 6:44:37 PM
    GROUNDED  5101913     19-Jun-2008 6:44:37 PM
    EXM       5185735     19-Jun-2008 6:46:38 PM
    GROUNDED  5195475     19-Jun-2008 6:47:11 PM
    GROUNDED  5195361     19-Jun-2008 6:47:12 PM
    EXM       5132608     19-Jun-2008 7:02:23 PM
    GROUNDED  5195334     19-Jun-2008 7:10:32 PM
    GROUNDED  5190558     19-Jun-2008 7:10:32 PM
    EXM       5183029     19-Jun-2008 7:33:53 PM
    EXM       5183480     19-Jun-2008 7:39:12 PM
    EXM       5189566     19-Jun-2008 8:00:11 PM
    EXM       5181825     19-Jun-2008 8:15:57 PM
    EXM       5183537     19-Jun-2008 8:15:57 PM
    EXM       5180210     19-Jun-2008 9:08:27 PM
    GROUNDED  5193136     19-Jun-2008 9:58:23 PM
    EXM       5171510     19-Jun-2008 10:21:59 PM
    EXM       5185615     19-Jun-2008 10:48:14 PM
    EXM       5184737     19-Jun-2008 10:53:29 PM
    EXM       5195475     19-Jun-2008 11:51:16 PM
    EXM       5195476     20-Jun-2008 12:01:46 AM
    EXM       5190558     20-Jun-2008 12:12:17 AM
    EXM       5196473     20-Jun-2008 12:54:19 AM
    EXM       5183204     20-Jun-2008 1:20:34 AM
    GROUNDED  5192844     20-Jun-2008 1:28:24 AM
    GROUNDED  5174238     20-Jun-2008 1:28:24 AM
    GROUNDED  5193127     20-Jun-2008 1:28:24 AM
    GROUNDED  5185794     20-Jun-2008 1:29:09 AM
    GROUNDED  5192895     20-Jun-2008 3:04:23 AM
    GROUNDED  5193039     20-Jun-2008 3:04:23 AM
    GROUNDED  5195447     20-Jun-2008 3:04:23 AM
    GROUNDED  5190228     20-Jun-2008 3:04:24 AM
    GROUNDED  5179370     20-Jun-2008 3:04:24 AM
    GROUNDED  5190289     20-Jun-2008 3:04:24 AM
    GROUNDED  5174065     20-Jun-2008 3:04:24 AM
    GROUNDED  5192862     20-Jun-2008 5:04:42 AM
    GROUNDED  5199903     20-Jun-2008 5:04:42 AM
    EXM       5178176     20-Jun-2008 6:30:29 AM
    EXM       5185161     20-Jun-2008 6:46:14 AM
    EXM       5180226     20-Jun-2008 6:46:14 AM
    GROUNDED  5202026     20-Jun-2008 7:03:14 AM
    EXM       5101912     20-Jun-2008 7:07:14 AM
    GROUNDED  5176763     20-Jun-2008 7:25:27 AM
    GROUNDED  5185494     20-Jun-2008 7:25:27 AM
    EXM       5185295     20-Jun-2008 7:38:46 AM
    EXM       5173837     20-Jun-2008 7:49:15 AM
    GKEY     CATEGORY
    =================
    5101912     I
    5101913     I
    5101918     I
    5101919     I
    5132287     I
    5132608     I
    5149310     I
    5152887     I
    5156065     I
    5157151     I
    5159930     I
    5171510     I
    5172045     I
    5173333     I
    5173837     I
    5174055     I
    5174065     I
    5174238     I
    5176763     I
    5178176     I
    5179370     I
    5180158     I
    5180210     I
    5180226     I
    5181825     I
    5181960     I
    5183029     I
    5183204     I
    5183480     I
    5183537     I
    5184737     I
    5185161     I
    5185237     I
    5185246     I
    5185295     I
    5185494     I
    5185586     I
    5185615     I
    5185735     I
    5185794     I
    5187512     I
    5188263     I
    5188958     I
    5189203     I
    5189566     I
    5190134     I
    5190228     I
    5190289     I
    5190475     I
    5190558     I
    5192768     I
    5192844     I
    5192862     I
    5192895     I
    5193039     I
    5193127     I
    5193136     I
    5195334     I
    5195361     I
    5195434     I
    5195447     I
    5195475     I
    5195476     I
    5196269     I
    5196303     I
    5196370     I
    5196473     I
    5199903     I
    5200219     E
    5200231     E
    5202026     EAnd I used the same query suggested by you.
    WITH     s     AS(     
    SELECT     se.tserv_id     ,     eu.category     ,
               CASE
                 WHEN     se.performed     BETWEEN     
                                    to_date('&target_dt','DD-MON-RRRR HH24:MI') - (1/24)
                                  AND     to_date('&target_dt','DD-MON-RRRR HH24:MI')
                          THEN     1
              ELSE     0
              END     AS in_hour     ,
            CASE
              WHEN     TRUNC (se.performed - (8/24)) =     TRUNC (to_date('&target_dt','DD-MON-RRRR HH24:MI')
                                                     - (8/24))
                THEN     1
              ELSE     0
              END     AS in_day
    FROM     service_events     se     ,     equipment_uses     eu
    WHERE     eu.gkey          = se.equse_gkey
         AND     eu.category     IN ('I', 'E')
      AND se.tserv_id in ('EXM','GROUNDED')
    SELECT     tserv_id,     
            SUM (DECODE (category, 'I', in_hour))     AS imp_hour,     
            SUM (DECODE (category, 'E', in_hour))     AS exp_hour,
            SUM (in_hour)     AS total_hour,
            SUM (in_day)     AS total_day
    FROM     s
    GROUP BY     tserv_idNow you have the sample data for almost 24 hours
    Let me clear it again
    When I executed this query at 20-JUN-2008 09:00 AM it gives me following result (that is accurate)
    TSERV_ID  IMP_HOUR  EXP_HOUR  TOTAL_HOUR  TOTAL_DAY
    EXM        2         0           2               3
    GROUNDED   1         0           1               8When I executed this query between 20-JUN-2008 00:00 to 20-JUN-2008 08:00
    then system must show the Total_Day value from 19-JUN-2008 08:00 to current date and time. e.g
    I executed this query at 20-JUN-2008 06:00 AM it gives me following result:
    TSERV_ID  IMP_HOUR  EXP_HOUR  TOTAL_HOUR  TOTAL_DAY
    EXM             0     0     0        44
    GROUNDED     2     0     2        35Now here you can see that the value of Total_Day is not as accurate as I required:
    EXM = 44 and GROUNDED = 35
    these values are between 19-JUN-2008 00:00 to 20-JUN-2008 06:00 (that is wrong in my case)
    The values of total_day should be as follows as 8 hours from 00:00 to 07:59 AM fall in the shift of 18-JUN-2008 not in 19-JUN-2008
    From 19-JUN-2008 08:00 to 20-JUN-2008 06:00
    EXM: 38
    GROUNDED: 32
    Plz note that this result is required because in our company the shift starts from 08:00 AM and ends 07:59 AM next day
    I hope you will be more clear now and there is no confusion anymore.
    Plz let me know if you still confused.
    Brgs,

  • Components Required for CIC Web Client

    We have a question about CIC installation components for CRM 5.
    When we check the "Upgrade Master Guide" for "mySAP™ Customer
    Relationship Management" ( Pages 58 - 61 ) for all CIC components, we
    do not find that JAVA components are required for CIC ( Like JCRM).
    When we see details from Best Practices Doucment for CRM component matrix, we see that its required.
    We are not sure what to do. We were under the impression that Java
    components are not mandatory for CIC forCRM 5. All we need is TREX and IPC.
    Can someone please clarify/confirm ASAP as system needs to be build
    accordingly. If we do need JCRM, what functionalities is this required for?
    Thanks for help in advance.

    Hi Nikhil,
    With 04s all required installations will be completed by default. Just that you have create a domain and the track to make use Webdynpro Components in NWDI.
    Following are the SCs that are required.
    DI Build Tool 7.00
    SAP J2EE Engine 7.00
    SAP Java Tech Services 7.00
    This u can download from Service Market Place
    Support Packages and Patches - SAP NetWeaver - SAP NETWEAVER - SAP NETWEAVER 7.0 (2004S) - Entry by Component - Development Infrastructure
    Regards,
    Nagarajan.

  • Internet Sales Framework - Required Components

    Hi,
    I would like to learn more about the Internet Sales framework. Could anybody tell me which would be a minimal configuration to be set up in order to run the framework? Which components are required: IPC, CRM...???
    Would a laptop be sufficient to run the a minimal suite?
    Thank's in advance for any comments and regards,
    Heiko Nolte

    Hello,
    You need to set up an 6.20/6.30 J2EE Engine on your local laptop and deploy Internet Sales (e.g. b2b or b2c). You can then connect either to R/3 (ISA for R/3) or to CRM. Without R/3 or CRM you will hardly be able to do much in the web shop. Connecting to R/3 has the advantage that you do not need to install TREX. You can run ISA without IPC in both cases.
    Regards Marek

  • Assignment of components to operations using LSMW

    Hi
    i created routing using LSMW.
    i created all the operations using direct nput methode
    and  material to group assignmebt using batch input methode.
    but i was not able to assign my components of the BOM to my routnig operations.
    How to do this.
    which one is the best and easy way. direct or batch input methode.

    Dear,
    Now I am clear.
    You need to create different 2 BOM and with BOM items, as below,
    example - total requirement of material A is say 10.
    Semi finished Product- X BOM
    BOM item 1 - material A-qty 8
    BOM item 2 - material B-qty -5
    Finished material Y - BOM
    BOM item 1 - semifished material X-qty 10
    BOM item 2 - material C-qty 10
    BOM item 3 - material A-qty 2
    BOM item 4 - material D-qty -2
    You need to create above 2 BOM's if you want to see semifished product into inventory, if not proceed as below
    Finished material Y - BOM
    BOM item 1 - material A-qty 8 assign it to routing operation 10
    BOM item 2 - material B-qty -5 assign it to routing operation 10
    BOM item 2 - material C-qty 10 assign it to routing operation 20
    BOM item 3 - material A-qty 2 assign it to routing operation 30
    BOM item 4 - material D-qty -2 assign it to routing operation 30
    I think this is the only way you can map it.

  • Forecast consumption by dependent requirements

    Hi All,
    We have a requirement here that independent planning would be done for the header components and some of the BOM components.
    For Eg.
    BOM  of Matl A = 100 units
    has
    - Matl X = 100 units
    - Matl y = 100 units
    Now a total production of 1000 units of Matl A is forecasted
    and a total of 1500 units of Matl X is forecasted
    In a normal scenario....1000 Units of Matl X would come as dependent requirement from Matl A.
    So there would be a total requirement of 1500 units (independent) and 1000 units (dependent ) = total demand of 2500 Units.
    However they only want to produce 1500 units of Matl X
    Please suggest a possible way to solve this scenario in APO
    Thanks,
    Nalin

    Hi Nalin,
    I don't know why the option suggested by Bipin didn't work.
    It is possible to make it work, but I am not really sure how...
    Anyway there might be an easier option for you: if you don't want to plann with dependant demand at all you can potentially exclude it from the "total demand" key figure.
    This way your projected stock will not be reduce by this demand, and SNP will not plan for it.
    This option is not as nice as the original one but should work.
    However you need to pay attention to consistencies with other planning process (deployment and TLb for example, and ATD)
    Note also that you can either:
    1. Create a smore ophisticated macro, who will exclude the dependant demand for some products only
    2. create a specific planning book, that will be used only for this calculation.
    Again best will be to get the consumption working... good luck
    Thanks and Regards
    Julien

  • Assignment of components to more than one operation in routing.

    Hi to all,
    I am trying to allocate components of material BoM to more than one operation in routing. I know one way to do it is to define that components again & agin in material BoM & assigned them to operations in routing. Are other ways available to do the same.
    Thanks & regards,
    Abu Arbab

    Dear,
    Now I am clear.
    You need to create different 2 BOM and with BOM items, as below,
    example - total requirement of material A is say 10.
    Semi finished Product- X BOM
    BOM item 1 - material A-qty 8
    BOM item 2 - material B-qty -5
    Finished material Y - BOM
    BOM item 1 - semifished material X-qty 10
    BOM item 2 - material C-qty 10
    BOM item 3 - material A-qty 2
    BOM item 4 - material D-qty -2
    You need to create above 2 BOM's if you want to see semifished product into inventory, if not proceed as below
    Finished material Y - BOM
    BOM item 1 - material A-qty 8 assign it to routing operation 10
    BOM item 2 - material B-qty -5 assign it to routing operation 10
    BOM item 2 - material C-qty 10 assign it to routing operation 20
    BOM item 3 - material A-qty 2 assign it to routing operation 30
    BOM item 4 - material D-qty -2 assign it to routing operation 30
    I think this is the only way you can map it.

  • List of materials with total PR, PO qty, and stock

    Dear All,
    Is there any std report to check the list of materials along with total PR qty, PO qty and Current stock.
    This is to check, what is the total requirement of the materials and whether Purchase team has raised the PO or not ?
    Please advise.
    Regards
    Vinoth.

    Hi,
    MD04 gives us the details of individual part no.
    But, we would like to see similar details in the form of list of materials, with cumulative demand, cumulative OPEN PR Qty, Open PO Qty and Stock.
    Please help.
    Regards,
    Vinoth.

  • Sales orders collective material requirment report .

    Hi,
    Is there any STD report that will give me:
    Total requirement of Mat XXXXX for the specific period:
    Means collective total req on basis of Material of all sales order that had been entered over specific period
    Thanks In Advance.

    hi
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/SDISREP/SDISREP.pdf
    Sales summary - VC/2
    Display Customer Hierarchy - VDH2
    Display Condition record report - V/I6
    Pricing Report - V/LD
    Create Net Price List - V_NL
    List customer material info - VD59
    List of sales order - VA05
    List of Billing documents - VF05
    Inquiries list - VA15
    Quotation List - VA25
    Incomplete Sales orders - V.02
    Backorders - V.15
    Outbound Delivery Monitor - VL06o
    Incomplete delivery - V_UC
    Customer Returns-Analysis - MC+A
    Customer Analysis- Sales - MC+E
    Customer Analysis- Cr. Memo - MC+I
    Deliveries-Due list - VL04
    Billing due list - VF04
    Incomplete Billing documents - MCV9
    Customer Analysis-Basic List - MCTA
    Material Analysis(SIS) - MCTC
    Sales org analysis - MCTE
    Sales org analysis-Invoiced sales - MC+2
    Material Analysis-Incoming orders - MC(E
    General- List of Outbound deliveries - VL06f
    Material Returns-Analysis - MC+M
    Material Analysis- Invoiced Sales - MC+Q
    Variant configuration Analysis - MC(B
    Sales org analysis-Incoming orders - MC(I
    Sales org analysis-Returns - MC+Y
    Sales office Analysis- Invoiced Sales - MC-E
    Sales office Analysis- Returns - MC-A
    Shipping point Analysis - MC(U
    Shipping point Analysis-Returns - MC-O
    Blocked orders - V.14
    Order Within time period - SD01
    Duplicate Sales orders in period - SDD1
    Reward if USeful
    Thanx & Regards.
    Naren..

  • Mac Pro (Early 2008) periodically crashes in unusual way, requires reinstall

    Mac Pro (Early 2008), 2 x Intel Quad-core Xeon 3.2 GHz (8 cores), 14 GB RAM, 3 TB hard drive, NVIDIA GeForce GT 120 and/or ATI Radeon HD 4870), OS X Lion 10.7.4
    OK, I've got a weird one here.  Every few days, my machine crashes in an unusual manner.  Examples:
    * the first time this happened, any attempt to play a video file (either from within iTunes or externally using Quicktime) would result in a blank, black video window, but I could still hear the sound from the video.  If I moved my mouse within the black window I'd get playback controls and when pressed, I could hear the audio rewind/fast forward/etc. (but of course the video window would remain black)  Also, any attempt to use screen sharing would result in a completely white window where the remote screen should be.
    * another time this happened, I would constantly get the error message that VTDecoderXPCService quit unexpectedly, even if I wasn't playing a video.  Trying the suggested fixes from https://discussions.apple.com/thread/3193904?start=15&tstart=0 did not fix the issue.
    * another time this happened, the machine appeared to work fine, except any attempt to access System Preferences resulted in the spinning beach ball of death and would completely lock up the machine.
    In any case, rebooting the machine does not result in the problem being fixed -- in fact, it gets worse.  After I reboot, I am unable to log in to my machine at all. Either the desktop window flashes briefly but then it goes back to the login screen, or the login screen never appears.  I have tried both the "guest" account as well as a standard "test" user I set up when I first installed OS X (i.e. a "clean" user), and none of those help.
    What *does* help, however, is completely reinstalling OS X Lion (including running the combo updater to get back to 10.7.4).  Once I do this, the machine becomes usable again, and I can use it error-free for a few more days - after which it fails again in some strange manner.
    At first I thought my hard drive might be failing; however replacing the hard drive did not help.  I then thought that I might have a glitchy graphics card (the black video windows and the VTDecoderXPCService crashing suggested this to me).  However replacing the video card didn't help either.  (I tried another GeForce GT 120 as well as an ATI Radeon HD 4870, both of which were known to be good in other machines).  I have also tried countless times fixing permissions, clearing cache files, etc. and none of that helps.  The only thing that brings this machine back from the dead is, like I said before, reinstalling OS X - but only for a few days.
    I didn't see anything out of the ordinary when checking the system log files.
    In case there was some sort of hardware problem going on, I tried running Apple Hardware Test overnight in loop mode.  The hardware passed all checks.  I also tried running Memtest86+ overnight, again with no failures or errors.
    The machine doesn't seem to me to run particularly hot - typically temps hover in the 40-45 C range, and can jump to 55-60 when doing heavy activity (mostly video encoding).  Voltage levels look good as well.  (I'm using iStat Menus for both the temperature and voltage readings)
    I'm about at my wit's end here.  Unfortunately the machine is out of warranty (AppleCare too) and I don't really have the money to take this into a shop and get it diagnosed.  So does anyone have any ideas?

    Results from Step 1:
    com.rogueamoeba.InstantOn (5.0.2)
    com.squirrels.driver.AirParrotSpeakers (1.7)
    com.squirrels.airparrot.framebuffer (3)
    com.attotech.driver.ATTOiSCSI (3.4.1b1)
    com.avatron.AVExVideo (1.6.1)
    com.makemkv.kext.daspi (1)
    com.blackmagic-design.iokit.DeckLinkFrameBuffer (9.5.2)
    com.blackmagic-design.iokit.DeckLinkHD_Driver (1.0.0)
    com.blackmagic-design.iokit.DeckLinkDriver (9.5.2)
    com.kensington.trackballworks.driver (1.1.0)
    com.Cycling74.driver.Soundflower (1.5.3)
    net.telestream.driver.TelestreamAudio (1.0.5)
    com.avatron.AVExFramebuffer (1.6.1)
    foo.tun (1.0)
    foo.tap (1.0)
    com.parallels.kext.prl_usb_connect (7.0
    com.parallels.kext.prl_hypervisor (7.0
    com.parallels.kext.prl_hid_hook (7.0
    com.parallels.kext.prl_netbridge (7.0
    com.parallels.kext.prl_vnic (7.0
    Results from Step 2:
    com.agilebits.onepassword-osx-thumbs
    com.parallels.vm.prl_naptd
    de.bernhard-baehr.sleepwatcher
    com.squirrels.kextinstaller
    com.parallels.desktop.launchdaemon
    com.microsoft.office.licensing.helper
    com.datarobotics.ddserviced
    com.datarobotics.ddservice64d
    com.blackmagic-design.streaming.BMDStreamingServer
    com.bjango.istatlocaldaemon
    Results from Step 3:
    com.agilebits.onepassword-osx-helper
    net.culater.SIMBL.Agent
    com.parallels.vm.prl_pcproxy
    com.parallels.DesktopControlAgent
    com.parallels.desktop.client.launch
    com.delicioussafari.DeliciousSafariAgent
    com.blackmagic-design.DesktopVideoFirmwareUpdater
    com.bjango.istatlocal
    com.google.keystone.user.agent
    com.adobe.AAM.Scheduler-1.0
    Results from Step 4:
    /Library/Components:
    total 0
    /Library/Extensions:
    total 0
    drwxr-xr-x 4 root wheel 136 May 31 12:21 fuse4x.kext/
    drwxr-xr-x 3 root wheel 102 Apr 27 13:45 tap.kext/
    drwxr-xr-x 3 root wheel 102 Apr 27 13:45 tun.kext/
    /Library/Frameworks:
    total 24K
    lrwxr-xr-x 1 root  wheel  71 Jun  4 14:47 AEProfiling.framework -> ../../Applications/Motion.app/Contents/Frameworks/AEProfiling.framework
    lrwxr-xr-x 1 root  wheel  74 Jun  4 14:47 AERegistration.framework -> ../../Applications/Motion.app/Contents/Frameworks/AERegistration.framework
    drwxr-xr-x 6 root  wheel 204 Apr  6  2011 Adobe AIR.framework/
    lrwxr-xr-x 1 root  wheel  74 Jun  4 14:47 AudioMixEngine.framework -> ../../Applications/Motion.app/Contents/Frameworks/AudioMixEngine.framework
    drwxr-xr-x 6 root  wheel 204 Jun  4 17:20 NyxAudioAnalysis.framework/
    drwxr-xr-x 6 root  wheel 204 Jun  4 17:20 PluginManager.framework/
    drwxrwxr-x 6 dburr admin 204 Aug  9  2011 Turbo264.framework/
    drwxrwxr-x 6 root  admin 204 May 14 23:19 iLifeFaceRecognition.framework/
    drwxrwxr-x 7 root  admin 238 May 14 23:19 iLifeSlideshow.framework/
    /Library/Input Methods:
    total 0
    /Library/InputManagers:
    total 0
    drwxr-xr-x 4 root wheel 136 Oct 27  2011 DeliciousSafari/
    drwxr-xr-x 5 root admin 170 May 15 07:05 Ecamm/
    /Library/Internet Plug-Ins:
    total 16K
    drwxr-xr-x 3 root wheel  102 Oct 25  2010 AdobePDFViewer.plugin/
    drwxrwxr-x 3 root wheel  102 Jun  1 17:48 Flash Player.plugin/
    lrwxr-xr-x 1 root wheel   80 Jun  4 15:30 JavaAppletPlugin.plugin -> //System/Library/Java/Support/CoreDeploy.bundle/Contents/JavaAppletPlugin.plugi n/
    drwxr-xr-x 3 root wheel  102 Jun 16  2011 Quartz Composer.webplugin/
    drwxr-xr-x 3 root wheel  102 Jun 19  2011 QuickTime Plugin.plugin/
    drwxrwxr-x 3 root admin  102 Aug 25  2010 SharePointBrowserPlugin.plugin/
    drwxrwxr-x 3 root admin  102 Aug 25  2010 SharePointWebKitPlugin.webplugin/
    drwxrwxr-x 3 root admin  102 Apr 11 10:26 Silverlight.plugin/
    -rw-rw-r-- 1 root admin  856 Apr 27 12:13 flashplayer.xpt
    drwxrwxr-x 3 root wheel  102 May 15 10:27 npContributeMac.bundle/
    -rw-r--r-- 1 root wheel 2.4K Jun  4 14:46 nsIQTScriptablePlugin.xpt
    /Library/Keyboard Layouts:
    total 0
    /Library/LaunchAgents:
    total 64K
    -rw-rw-rw- 1 root wheel 612 May 15 10:11 com.adobe.AAM.Updater-1.0.plist
    -rwxr-xr-x 1 root wheel 456 May 15 07:08 com.bjango.istatlocal.plist*
    -rw-r--r-- 1 root wheel 574 May 24 22:05 com.blackmagic-design.DesktopVideoFirmwareUpdater.plist
    -rw-r--r-- 1 root wheel 576 Oct 27  2011 com.delicioussafari.DeliciousSafariAgent.plist
    -rw-r--r-- 1 root wheel 721 Apr  5 10:21 com.parallels.DesktopControlAgent.plist
    -rw-r--r-- 1 root wheel 565 Apr  5 10:21 com.parallels.desktop.launch.plist
    -rw-r--r-- 1 root wheel 797 Apr  5 10:20 com.parallels.vm.prl_pcproxy.plist
    -rw-r--r-- 1 root wheel 508 May 17 21:18 net.culater.SIMBL.Agent.plist
    /Library/LaunchDaemons:
    total 104K
    -rw-rw-rw- 1 root wheel  634 May 15 10:15 com.adobe.SwitchBoard.plist
    -rw-r--r-- 1 root wheel  421 Jun  4 14:44 com.apple.remotepairtool.plist
    -rw-r--r-- 1 root wheel 1.1K May 15 08:53 com.attotech.iscsid.plist
    -rwxr-x--- 1 root wheel  597 May 15 07:08 com.bjango.istatlocaldaemon.plist*
    -rw-r--r-- 1 root wheel  471 May 24 22:05 com.blackmagic-design.streaming.BMDStreamingServer.plist
    -rw-r--r-- 1 root admin  488 Jan 18 22:50 com.datarobotics.ddservice64d.plist
    -rw-r--r-- 1 root admin  484 Jan 18 22:50 com.datarobotics.ddserviced.plist
    -rw-r--r-- 1 root admin  510 May 23  2011 com.econtechnologies.ChronoAgentRemote.plist
    -rw-r--r-- 1 root wheel  568 Aug 25  2010 com.microsoft.office.licensing.helper.plist
    -rw-r--r-- 1 root wheel  567 Apr  5 10:21 com.parallels.desktop.launchdaemon.plist
    -rw-r--r-- 1 root wheel  675 May 17 21:43 com.squirrels.kextinstaller.plist
    -rw-r--r-- 1 root wheel  517 May 15 09:45 de.bernhard-baehr.sleepwatcher-20compatibility.plist
    lrwxr-xr-x 1 root admin   74 Apr  4 17:45 org.macports.rsyncd.plist -> /opt/local/etc/LaunchDaemons/org.macports.rsyncd/org.macports.rsyncd.plist
    lrwxr-xr-x 1 root admin   72 Apr  4 23:19 org.macports.slapd.plist -> /opt/local/etc/LaunchDaemons/org.macports.slapd/org.macports.slapd.plist
    /Library/Mail/Bundles:
    total 0
    drwxr-xr-x 4 root admin 136 May 17 16:43 GPGMail.mailbundle/
    drwxrwxr-x 4 root admin 136 Jan 11 12:54 OMiC.mailbundle/
    /Library/PreferencePanes:
    total 0
    drwxr-xr-x 3 root admin 102 Feb  6 15:03 Air Display Preferences.prefPane/
    drwxr-xr-x 3 root admin 102 Jun 27  2010 Choosy.prefPane/
    drwxr-xr-x 3 root admin 102 Feb  3 11:21 ChronoAgent.prefPane/
    drwxr-xr-x 4 root admin 136 May 15 09:13 Cursorcerer.prefPane/
    drwxr-xr-x 3 root admin 102 May 24 22:05 DesktopVideoPrefsPanel.prefPane/
    drwxrwxr-x 3 root wheel 102 Apr 27 12:14 Flash Player.prefPane/
    drwxr-xr-x 3 root admin 102 May 20 12:13 Hazel.prefPane/
    drwxr-xr-x 3 root admin 102 Jul 23  2011 Perian.prefPane/
    drwxrwxr-x 3 root admin 102 Jul 18  2011 TrackballWorks.prefPane/
    drwxr-xr-x 3 root wheel 102 Aug 30  2011 Tuxera NTFS.prefPane/
    /Library/PrivilegedHelperTools:
    total 168K
    -rwxr-xr-x 1 root wheel 102K Aug 25  2010 com.microsoft.office.licensing.helper*
    -r-xr--r-- 1 root wheel  59K May 17 21:43 com.squirrels.kextinstaller*
    /Library/QuickLook:
    total 0
    drwxr-xr-x 3 dburr staff 102 Feb 12 12:36 QLMarkdown.qlgenerator/
    drwxr-xr-x 3 root  wheel 102 Jun 16  2011 iWork.qlgenerator/
    /Library/QuickTime:
    total 0
    drwxr-xr-x 3 root  admin 102 Jul 23  2011 AC3MovieImport.component/
    drwxrwxr-x 3 root  admin 102 Sep 12  2011 AppleAVCIntraCodec.component/
    drwxrwxr-x 3 root  admin 102 Sep 12  2011 AppleHDVCodec.component/
    drwxr-xr-x 3 root  wheel 102 Jun 13  2011 AppleIntermediateCodec.component/
    drwxr-xr-x 3 root  wheel 102 Jun 13  2011 AppleMPEG2Codec.component/
    drwxrwxr-x 3 root  admin 102 Sep 12  2011 AppleProResCodec.component/
    drwxr-xr-x 3 root  admin 102 May 24 22:05 Blackmagic Codec.component/
    drwxrwxr-x 3 root  admin 102 Sep 12  2011 DVCPROHDCodec.component/
    drwxrwxr-x 3 dburr admin 102 Aug  9  2011 Elgato Turbo.component/
    drwxrwxr-x 3 root  admin 102 Sep 12  2011 FCP Uncompressed 422.component/
    drwxrwxr-x 3 root  admin 102 Sep 12  2011 IMXCodec.component/
    drwxr-xr-x 3 root  admin 102 Jul 23  2011 Perian.component/
    /Library/ScriptingAdditions:
    total 0
    drwxrwxr-x 3 root  admin    102 May 15 10:54 Adobe Unit Types.osax/
    drwxr-xr-x 3 root  wheel    102 Oct 27  2011 DeliciousSafari Addition.osax/
    drwxr-xr-x 3 dburr macports 102 Jan  5 06:45 SIMBL.osax/
    drwxr-xr-x 3 root  admin    102 Apr 26 00:00 TotalFinder.osax/
    /Library/Spotlight:
    total 0
    drwxr-xr-x 3 root wheel 102 Jan 21  2009 Microsoft Office.mdimporter/
    drwxr-xr-x 3 root wheel 102 Jun 16  2011 iWork.mdimporter/
    /Library/StartupItems:
    total 0
    drwxr-xr-x 5 root wheel 170 Apr 27 13:39 tap/
    drwxr-xr-x 5 root wheel 170 Sep  1  2009 tun/
    /etc/mach_init.d:
    total 0
    /etc/mach_init_per_login_session.d:
    total 0
    /etc/mach_init_per_user.d:
    total 0
    Library/Address Book Plug-Ins:
    total 0
    drwxr-xr-x 3 dburr admin 102 Mar  5 02:01 SkypeABDialer.bundle/
    drwxr-xr-x 3 dburr admin 102 Mar  5 02:01 SkypeABSMS.bundle/
    Library/Fonts:
    total 0
    Library/Frameworks:
    total 0
    drwxrwxrwx 5 dburr staff 170 Aug 24  2010 EWSMac-GC.framework/
    drwxrwxrwx 5 dburr staff 170 May 17 22:42 EWSMac.framework/
    Library/Input Methods:
    total 0
    -rw------- 1 dburr staff 0 May 14 15:18 .localized
    Library/Internet Plug-Ins:
    total 0
    drwxr-xr-x 5 dburr staff 170 Feb  4 04:26 Google Earth Web Plug-in.plugin/
    Library/Keyboard Layouts:
    total 0
    Library/LaunchAgents:
    total 32K
    -rw-r--r-- 1 dburr staff 697 May 15 11:01 com.adobe.AAM.Updater-1.0.plist
    -rw-r--r-- 1 dburr staff 618 May 15 08:13 com.apple.AddressBook.ScheduledSync.PHXCardDAVSource.AA278322-D5AB-4321-B4ED-D9 0478690405.plist
    -rw-r--r-- 1 dburr staff 886 May 14 15:18 [email protected]ist
    -rw-r--r-- 1 dburr staff 802 May 14 18:47 com.google.keystone.agent.plist
    Library/Mail/Bundles:
    total 0
    drwxr-xr-x 4 dburr staff 136 Jan 23 09:53 MailActOn.mailbundle/
    drwxr-xr-x 4 dburr staff 136 May 11 10:08 MailTags.mailbundle/
    drwxr-xr-x 3 dburr staff 102 Apr 26 08:28 SpamSieve.mailbundle/
    Library/PreferencePanes:
    total 0
    Library/Services:
    total 0
    drwxr-xr-x 3 dburr staff 102 May 15 10:04 ToastIt.service/
    Library/Spotlight:
    total 0
    drwxr-xr-x 3 dburr staff 102 May 11 10:08 MailTags.mdimporter/
    Results from Step 5:
    Cobook, ScreenSharingMenulet, PhotoSync, Growl, PinPoint, EvernoteHelper, Caffeine, TrackballWorksHelper, Alfred, DropCopy Pro, Fantastical, Moom, TextExpander, ChronoSyncBackgrounder, TotalFinder, Yoink, AirDisplayStatusItem, Choosy, AirParrot, Melo, Synergy, Cursorcerer, ScreenCapture, HazelHelper, PleaseSleep, SMARTReporter, iTunesHelper, DDAssist, Dropbox

  • AC 10.0 - necessary components

    Hi all,
    I'm getting conflicting information on which parts are necessary (mandatory) for the AC 10.0 installation.
    We have a
    - newly set up machine with an ABAP stack only
    - Adobe Document Services running on a different machine
    It was mentioned, version 10.0 is purely ABAP based, however the installation guide also lists the following JAVA components as "required":
    - Portal 7.02 - only if using an Enterprise Portal as frontend?
    - Integration Kit XI 3.1 - only for PC & RM reports??
    - IGS Version 7000
    Is the SAP GRC Portal equal to the above "Portal 7.02"? As a mandatory component?
    Thanks in advance,
    Daniela

    Hi Daniela,
    I know there are some bits and pieces not too clear in the guide, we are working on updating those.
    I can confirm that the Java stack is optional as it can work without one. There are some limitations though.
    -No print using PDF functionality. You can use an Adobe Document Services from another server in the landscape.
    -If you use Portal as your client you need obviously Java, but again this can be another server. If no portal is used you can use NWBC 3.0 or the web-based NWBC provided in ABAP.
    Hope that helps.
    Luis

  • Total operation hours in routing

    Dear Experts,
    Please suggest me what is the way to tackle the following scenario :
    We are having 3 Work Centers say WC1, WC2, WC3 to carry out the different operations. Each work center requires 6 hours. It means if I use the standard sequence then total required hours will be 18 hr to produce 1000 pcs of FG X. But My client is producing 1000 pcs of FG X in 8 hours as second operation at WC2 begins when 1st operation on WC1 is being carried out on some quantity say 100 pcs. 7 same for the WC3.
    How to control this situation as I am using the lead time scheduling in MRP run,this data gets coppied to planned order giving wrong finished date.
    Thanks in advance.
    Regards,
    Sagar

    Dear,
    In Routing work center is maintain for an operation and each operation has different base quantity or production rate.
    Work center      Operation detail                Production rate
    W1                    Operation          1                 200 Each/Hour
    W2                    Operation          2                 100 Each/Hour
    W3                   Operation           3                  90 Each /Hour
    Now select first two operations and go to operation detail, In detail find a radio button Overlapping required and mark as required.
    For first operation
    Now maintain Minimum overlap time 30 Min
    and send ahead quantity          100 Each.
    For 2nd operation
    Now maintain Minimum overlap time 30 Min
    and send ahead quantity          50 Each.
    I hope this will solve your issue.
    Thanks
    Muhammad Ashfaq