For stock transport orders, you can use condition type P101 to pull the standard cost of the shipping plant into the purchase order.  Is there a similar condition type or routine that can be used for make-to-order product where we can pull the value from the EBEW table of the shipping plant?
thanks,

Hi,
For transfering sale order stock to sub-contractor the movement type is 311-E. Here, you have to create the sub-contractor storage location & then transfer the stock (of BOM material) to sub-contractor storage location by movement type 311-E in transaction MB1B. While posting GRN of the upper material, system posts the consumption of the BOM material against the upper material.
Hope this works.
Regards,
Prashant
- Reward points if answer is helpful

Similar Messages

  • Item category determination for make to order item

    Hi experts,
    how can I determine item category(tak) for make-to-order. mean what should I put in ITEM CAT.GRP, USAGE AND HIGHER LEVEL ITEM CATEGORY GROUP. Please advice.
    Thanks in advance.

    Neel,
    Goto VOV4 and create new entry with
    your sales doc type + itm cat group + usage + higher leve item cat = TAK
    Just check your item cat group in material. If you have created TAK without copy then also check your SL assignment with VOV5.
    Suhas

  • Forecast Consumption in SNP for Make-to-Order products

    We are working on using APO-SNP for Make-to-order products (PlngStrategyGroup = "81" in R/3). We want to achieve normal forecast consumptino on FinishedGoodLevel and generate PlndOrders which shall derive component demand for purchasing (such PlndOrers wont be released to production - they should only function as demand driven on component level)
    What we have done so far: Forecast in APO-DP on Finished good level exists and has been released to SNP. The product gets "ciffed" from R/3 into APO material master with planning strategy group "20" (which is basically "make-to-stock") --> we were hoping this would allow us to use "normal" forecast consumption but nothing happens (FCST is not being consumpted by open Sales orders). Within the product view of such products APO is still "realizing" that this is a make-to-order product.
    Any other ideas / thoughts what could be done to achieve "normal" forecast consumption on FGI level for make-to-order products in APO-SNP ?
    Tks !

    I checked in /n/SAPAPO/RRP3 (Product View), unfortunately only FC exists there
    Seems that the open Sales Orders from R/3 are being created within another segment (the "element" Tab of RRP3 shows 2 segments:
    1) "Make-to-stock" (which contains the FC)
    2) "Make-to-order" (which contains the Sales Orders)
    That might explain the issue I see (FC and SOs are in different planning segment --> no consumption). Reading about planning segments in the help sounds like I need to find a way to bring Sales Orders for Make-to-Order products into the Make-to-stock segment  ... jus a thought .. any idea how to do this ? Does that mean I need to modify the CIF for Sales Order transfer for Make-to-order products ?
    Tks
    Thomas

  • Which T code is used for entring the pricing condition P101 for purchase or

    which T code is used for entring the pricing condition P101 for purchase order

    Hi jitendra ,
    if you are looking for T-codes use:
    SE16 and scan table TSTCT.
    Regards Mario

  • Customer return for make to order material

    Dear All,
    I am doing return process for make to order material.
    while doing return delivery, delivery qty has not come.
    when i enter it manually it shows error
    Only 0 NOS of material ABC001  available
    Message no. VL150
    Can anyone tell me the solution for this................
    Thanks in advance.............
    Babs

    Dear Babs,
    Pls go thru following thread:
    https://forums.sdn.sap.com/click.jspa?searchID=20199089&messageID=5745458
    Regards,
    Abhee.

  • Serial Number assignment in Delivery Note for Make-to-order

    Hi experts,
    In our current design, we have made it obligatory to enter the serial number in the delivery note for make
    to order stocks.
    We are also implementing PP and we would like to capture
    the serial number specified in the production order and
    automatically populate the serial number in the delivery.
    Any suggestions on how I can do this is greatly appreciated.

    Hi Karun,
    Thank you for your kind advice all the time. 
    I have been looking into it but the LIPS structure does not contain the serial number field...
    I have been looking for the routine in the copy control
    but have no luck finding such routine...
    Thanks for your continuous help and assistance.

  • Explanation on use of Strategies for Make to Order/ Make to stock scenario

    Hi Gurus,
    I have a scenario. In the BOM, the final Finished Product was to be made for make to order. There are two semi finished material below that. One I want to use it for make to stock and another for make to order. There is one more raw material at the bottom level which I want for make to stock. So I want to know what are the strategies I can use in the material master at all the levels for this scenario. Can anyone explain how can I do it in SAP?
    Regards,
    Brijesh

    Dear Brijesh,
    This indicator will determine the component how it should get produced either individually or collectively
    Example
    Fert 1 - strategy 20, requirement for this fert Via sales order is 10
    Fert 2 - strategy 40  requirement for this fert Via sales order/demand management is 10
    ROH is used in both Ferts and mainatined in BOM and also set to indicator 2 ( Colletive ) in MMR
    ROH requiement for fert 1 -1 ( BOM )
    ROH requiement for fert 2 -1 ( BOM )
    after MRP system will create only 1 PR for total qty 20
    If ROH is set to 1 ( individually ) then
    after MRP system will create 2 PR's as 10 each
    Hope it answers your query
    Regards
    Madhu

  • Material Training of AC520 (Controlling for Make to Order/Stock Production

    Hi,
    Is there anybody have the documentation (beside from SAP Doc) or training material of AC520 (Controlling for Make to Order/Stock Production ) ?
    I really need it urgently.
    Thanks

    Hi,
    I got the training material for other than AC520. Send me message to [email protected]
    regards,

  • Invoice Correction Requests for Make to Order

    Dear Gurus
    I am creating an Invoice Correction Request for an Invoice which was generated for Make to Order material. I am using Document type RK . I can save Invoice correction Request. But when I generate a Credit Memo it gives message that
    000010 "Create billing document" not allowed (Sys. status Cost, object VB0060000100000010)
    000020 "Create billing document" not allowed (Sys. status Cost, object VB0060000100000020)
    It should not ask for costing here in Credit memo Request.
    Even if I do costing for Line 20 it copies only Line 20 in Credit note  which gives wrong calculation. Because I  cannot change line 10 in Invoice Correction Request.
    Pl can you advise whether costing is required in Credit memo request. If not how can I handle this scenario.
    Regards,
    Neeraj Srivastava

    Hi,
    Just check if you attached status profile to either your sales order header or item.
    Just release that first and try again.
    Let me know if it helps.
    Regards
    Ravi

  • User Steps for Make to Order & Make to Stock

    Hi Sapians,
    Please guide me as to the users steps to be done in product costing for make to order & make to stock.
    Regards,
    Viki
    Moderator: Please, read the rules of SDN before posting. You can search for Wiki material or explore help.sap.com for basic process description

    Hi there,
    Make to order is when you manufacture or procure the material only upon order. Stocks are not maintained for those items in the storage loc. As & when the order comes, a production run is triggered through MRP. After the production, stock is posted as reserved sales order stock. Stock is then made available to fulfill the delivery.
    Other items are make to stock. Usually for fast moving or consumer goods, stocks are always mainatined in the plant storage loc. As & when the order comes, availability check is done. If stock is available to meet the delivery date, delivery is proceesed or a confirmed delievry date is proposed basing on the replenishment lead time in availability check.
    Regards,
    Sivanand

  • Mrp for make to order scenario

    hi gurus,
          I have got a different and challenging scenario in make to order planning. production planning has to be made on sales order basis.for eg : a particular finished product, a sale order of 100 nos is generated. but all 100 nos cannot be produced in single plant. so it has to be distributed to 2-3 plants. one more thing is, for make to order scenario, there is no fixed lot size. based on sale order quantity, planned order is created irrespective of fixed lot size maintained in material master. IF my batch size is fixed, for make to order also based on fixed based size, planned order has to be created.
      Can anybody suggest a better solution for this scenario?
    Thank you all in advance. all useful replies will be rewarded.
    regards,
    senthil

    Hello,
    For MTO, Lot for Lot order quantity is defaulted..
    So your receipt element will be as per your Sales Order.
    Try this:
    In T. Code : OMI4, for Lot Size : EX
    Change the MTO Lot size to "1" Lot-for-Lot with rounding.
    (Which is Blank by default - lot-for-lot)
    Maitain the Rounding Value in MRP-1 Screen or Use Rounding Profile..
    This Helps..
    Regards,
    Siva

  • Schedule line disappears for Make to Order Item

    Hello,
    In make to Order process, there are 2 schedule lines created, while creating the order in VA01 transaction.
    But when i save order and see it change mode (VA02), only one schedule line with 0 quantity confirmed for the requested delivery date is seen. the order schedule line with 120 confirmed quantity for the futhur delvery date disappears.
    Can some body please comment why this is happening. I am not able to understand this.
    Will this schedule line be created after MRP run. I have also executed MD02 for MRP run, as well as created the planned order to Production order. But still the second schedule line is not getting created which was seen at the time of creating the order. 
    Regards
    Prashant

    ANy updates on this Thread............

  • Overdelivery shipping for make-to-order production

    Hello,
    I have the following business scenario example:
    We have a make-to-order production of carton boxes.
    A customer places an order for 1000 UN.
    Production is always planned with an overdelivery tolerance so the actual produced quantity for that particular order is 1050 UN.
    The customer allows an overdelivery of 10% so it should be fine to ship the 1050 UN.
    When I create the outbound delivery, the system creates it for the exact sales order amount: 1000 UN, even though there are 1050 UN produced for that order and item. So right now, the user has to manually modify the delivery quantity to match the actual stock.
    Is there a standard way of configuring the system so that in the delivery creation the system selects the entire produced quantity (respecting the overdelivery tolerance)??
    Do I need a user exit for this? In that case, which one should I use and what would be the logic for it?
    Thanks for your help!

    Hi,
    Unfortunately there is no easy way to influence delivery quantity in delivery processing by user exit or customer function.
    At creation of an delivery FORM USEREXIT_BATCH_DETERMINATION in include MV50AFZZ would be the best option to influence the delivery quantity. Despite the name of this user exit it could be used for changing normal items as well and the main advantage of this user exit is that the ATP check is done afterwards.
    If you change the delivery quantity please be aware that you have to ensure the consistency of all delivery quantity fields at item level (LIPS-LFIMG, LIPS-LGMNG, LIPS-LFIMG_FLO, LIPS-LGMNG_FLO). You could use FORM LIPS_QUAN_SET (Include FV50XFLP_LIPS_QUAN_SET) to synchronize all the quantity fields.
    Regards,
    Harry

  • MRP for make to order

    Dear All,
    I have a material with make to order strategy 20. now when sales order comes, MRP plans material on the basis of that order. but client wants that when order comes then they can start production. but in sap, after order mrp plans material then procurement starts and after procurement production is started.
    Now my requirement is that though material is make to order but is it possible that we can plan materials before order. otherwise guide me how can i cater client's requirement.

    now when sales order comes, MRP plans material on the basis of that order. but client wants that when order comes then they can start production.
    assuming:  once the production order is received, they will start production means, Dependent material   have stock, In that case use Strategy 82. once sale order received, production order will  create automatically.
    For dependent material use strategy 70
    Or use strategy 50, Enter PIR to start producing Dependent material, once the sale order received, you can convert the plan order into production order

  • HALB costs are not shown in Itemisation for Make to order

    Hi
    We are facing a problem in Make to order. When a production order is created with respect a sales order, semifinished costs are not appearing in Itemisation or cost component structure of Production order.
    In other cases like make to stock and planning with final assemble costs are appearing.
    Please provide us solution for this problem.
    Thanks and regards,
    Deepa

    Hi,
    Please check with Costing relevancy ind for Semei material at "General data Tab" in component over view of Production order (co02)
    Do u mean to say for same sale order material Number ,  semi material cost will not be added  forPG20 and is added for PG 10 at Prod order.Please confirm
    Regads
    Pradeep

Maybe you are looking for

  • Corporate connectivity not working for some users

    Hi, I'm having an issue that started about a month ago but is getting worse.  A select group of users are no longer able to connect using DirectAccess, even though these users have been using their computers for a few months without issue. BACKGROUND

  • RH 9 - Not able to edit project settings (styles)

    Hi. Once I import my FM 9 files I'm not able to edit my project settings via the Project Settings dialog. I can access the dialog, but when I try to edit the Style settings, none of the current style settings display. I followed the directions in Onl

  • Does the optical audio out work?

    I have the ATV HDMI connected to a HDMI switcher. The switcher output connected to an Asus 27" monitor. The other 2 units on the HDMI switcher is a PS3 and a Tivo. I also have a TosLink switcher for the audio on all the units. The output of my TosLin

  • Error message when hyperlink page not found

    I have setup hyperlink for one of the field. I would like to display error message when hyperlink page is not exists. Currently it displays standard page not found error. Message was edited by: user448086

  • Adding more Ram DV6815NR. HELP!!!

    Hey all, I have an HP DV 6815NR laptop and wanted to add in more ram. It came with 2 sticks, one is a 1 gig, the other is a 2 gig, total of 3 gigs. I have an identical laptop, same model # that died, no picture comes up on the screen so I thought I w