Conf Qty 'Zero' in Schedule line for order with header block

Hi,
Am facing with a suituation where the confirmed quantities are set to '0' when there is a delivery block at header. was this issue been experienced by any and if so what was the solution sought? pls share
there are active user exits but none are handling the change in the quantities.

Hi,
I think this is config at the item category / schedule line category level.  Check with your functional consultant.
Regards,   Andy

Similar Messages

  • Fix Date & Qty Field in Schedule Lines Sales Order

    Dear Friends,
    I want to understand the need and use of the Fix Date & Qty field check in the sales order -> Item -> Schedule Lines.
    Can anybody explain me the need of the same.
    Regards,
    Harsh

    If the availability check for an item determines that the item cannot be delivered fully on the requested delivery date, and, as a result one or more schedule lines have to be created for later delivery dates, the customer can decide whether to accept these delivery dates and quantities.
    You can record the customer's decision either by setting an indicator in the Fixed date and qty field or by leaving this field blank. The field is displayed both on the schedule line overview screen and on the availability screen.
    <b>Customer Accepts the Schedule Line Proposal</b>
    If the customer accepts the schedule lines which are proposed by the system, mark the Fixed date and qty field. The system then transfers the requirements for the schedule lines to material requirements planning.
    <b>Customer Requires Goods Earlier</b>
    If the customer requires the goods earlier than the date that the system can confirm after the availability check, leave the Fixed date and qty field blank. The system then only passes on the requirements for the requested delivery date and does not take the quantities and dates confirmed by the system after the availability check into account. In this case, it is assumed that the requested delivery date can be kept to because, for example, additional production capacity may become free. The system only confirms the sales order once the entire order quantity can be delivered on the requested delivery date. In the subsequent delivery processing, the sales order is only considered to be completed when the entire order quantity has been delivered or when all partial delivery agreements have been fulfilled.
    A fixed item is considered to be completed once the entire confirmed quantity (which can be smaller than the originally requested order quantity)has been delivered. Therefore, it does not make sense to fix the confirmed quantity to 0 as the item is considered to be completed from the start.
    During rescheduling, the fixed quantities and dates are no longer taken into account.
    The same info u can get easily from help.sap.com
    Message was edited by:
            sam masker

  • Multiple Schedule Lines for Individual Qty in Standard Order

    Hello All,
    I have a Client Requirement to Set up the Standard Order for a Material which will be sold on Single Quantity every Month.
    This will have to occur from the same Order. For this Multiple Schedule Lines are required to be generated as per Monthly Delivery Schedule.
    I know this functionality comes under Scheduling Agreements where we can deliver goods as per confirmed Schedule Lines for the Month.
    But Client Requirement is to set up this functionality in Standard Order Only as setting up scheduling agreements calls for mapping of New Order Types which is not feasible.
    So Can you provide with your valuable Inputs as to whether this can be possible through Standard Order in the system.
    Looking forward to your esteemed reply!!
    Warm Regards,
    Onkar Khedekar

    Dear Onkar:
    If you don't want to use Schedule agreements, you can enter several schedule lines for each item in "Schedule line" tab at  item level.
    Enter in this tab each schedule line per month.
    But be aware which date you enter becuase this requirement will be transfered to MRP.
    Check it and revert.
    Jose Antonio Martinez

  • Unable to enter multiple Schedule lines for BOM material in Sales Order

    Hi All,
    We have a Sales Order where in which we cannot add additional schedule lines for BOM material.
    The schedule lines are greyed out, user was able to add schedule lines earlier.
    I have checked all assignments in VOV6, VOV7 and everything seems to be fine and no changes have been made to item category being used.
    Please provide a solution for this.
    PFB link in which similar situation posted in this community but the final resolution method is not discussed.
    http://scn.sap.com/message/13201504#13201504
    Regards,
    Samiksh

    Hi Samiksh,
    Pls check for that particular customer, only complete delivery allowed(c) is set in the CMR or CMIR. If so, you can't enter multiple schedule lines for that customer.. it would be grayed out in the sales order schedule lines except confirmed line.
    or check the problematic sales order at item level shipping tab if the par del/item is set to 'C'
    With regards
    S.Siva

  • Schedule lines for an external operation in a production order

    Hi All,
    I have an external operation defined in a production order and a scheduling agreement is assigned to it in the Routing operation details.  Now, i want to generate schedule lines when a production order created but the system always generating a purchase requisition.  Do we need something to be configured in the background?  Please help!
    The idea is to have the goods receipt done against the same agreement always.
    Regards,
    Sravan

    Hi Sravan,
    As per my view point, this is standard SAP behaviour. System will generate PR only in case of external operation.
    If you go to OPL8 (Order type dependent parameters) for your respective order type & plant combination you have option of maintaining setting related to PR only and there is no option of using scheduling agreement or generating schedule lines.
    I don't see any possibility to use scheduling agreement using to have schedule lines for external operation.
    Regards,
    Tejas

  • Duplicate records in PO scheduled line for framework order (going for dump)

    Hi all,
    i am creating framework purchase order with item category B. I am assigning external number range for PO. This PO is created with respect to expense PR. i just found there is duplicate records are appearing in schedule line for the same item.
    Then, after i save the PO, it is going for dump & sending some message to SAP inbox that there is duplicate records.
    later i can not find those PO in the system. Please let me know where i am doing mistake ? why duplicate records are appearing in PO scheduled line ?
    Thanks a lot
      pabi

    Hi,
    Once you please debug the particular program with the help of ABAPer. That may resolve your issue. Thanking you

  • How to execute ATP check and update schedule lines for existing sales order

    Hello all,
    After stock quantity has been updated, we’d like to perform ATP check and update schedule lines for sales documents which have not been delivered yet.
    Is BAPI_SALESDOCUMENT_CHANGE useful to do so?
    If so which fields should I set ‘X’?
    At the moment, I called BATCH INPUT and execute ATP check.
    But I'm wondering if this is not a smart way.
    Thank you
    Yuko

    Hi arnab
      one way of achieving your requirements is
    after creating the sales order you can execute the SALEs order MRP using MD50 transaction enter the order # and MRP control parameters 1,3,1,2. and execute.
    Ensure the following before MRP.
    1. All the master data are maintained for the schedule line creation for the components ( Source list, Scheduling agreements)
    2. Material master with valid MRP data.strategy group having MTO strategy.
    after sales order MRP you will get the schedule line created for the components
    also MRp will create the cpacity requirements as we run the MRP with Lead time scheduling.
    Hope this helps
    SK
    Reward your points

  • Schedule Line for Make to Order Item.

    Hello
    In make to order scenario,  there are 2 schedule lines for the MTO item in create mode of Order. 0 confirm quantity on the req
    When I save the order, i can see only one schedule line with confirm quantity 0.

    Hi,
    Make-to-order production is controlled by the requirements type. The requirements type is
    determined on the basis of the MRP group and the strategy group in the material master record.
     Create material by specifying item category group as 0001 = Make u2013 to u2013 order (Normal item)
    In MM01 Basic data tab, General item category field [0001] = Make u2013 to u2013 order, 0002 for configurable
    material
    Make u2013 to u2013 order checking group for availability check should be [02] = Individual requirements in Sales:
    General/Plant tab.
     Go to VA01 and raise the sales order by specifying this material that we created in the previous step
    Item category is TAK
    Schedule line category = CP
    Requirement type = KE [Sales order Header  Procurement  Requirement field]
    KE = Individual customer order without consumption
    (For standard items item category group = NORM)
    System determines requirement type 041-order/delivery requirements. This requirement type points requirement
    class where we can control whether the system has to carryout TOR, Availability check, and Product allocation
    functions.
    Hope this helps.
    Regards,

  • Fields update in "Schedule Lines for FRC sched." in a scheduling agreement

    May I know how the following fields in the "Schedule Lines for FRC sched." section in a scheduling agreement are being updated?
    We have already a new inbound delivery with goods receipt (last June 1, 2010) but the following fields still show the previous inbound delivery details:
    For example:
    Date of last del. 08.10.2009
    Last d. note no. 91011
    Last GR 21.10.2009
    Last GR qty. 54.500
    I wish I can show some screenshots here.
    Thanks a lot in advance for your answers.

    Hi Sravan,
    As per my view point, this is standard SAP behaviour. System will generate PR only in case of external operation.
    If you go to OPL8 (Order type dependent parameters) for your respective order type & plant combination you have option of maintaining setting related to PR only and there is no option of using scheduling agreement or generating schedule lines.
    I don't see any possibility to use scheduling agreement using to have schedule lines for external operation.
    Regards,
    Tejas

  • No Schedule Lines for Delivery upto selected date

    Hi,
    I have a scenario for Repairs order. Following are the steps of my scenario:
    1. Create a Repair Order.
    2. Create return delivery to recieve the faulty item.
    3. Create Outbound Delivery to send a loaner item to customer (This item would be returned once the returned item is repaired and sent to customer)
    4. Send the item after repairing.
    5. Receive the loaner item.
    When I am trying to create outbound delivery for Loaner item, i am getting an error "No Schedule Lines for Delivery upto selected date".
    I have checked and verified the schedule line date.
    I have checked for Confirmed Quantity.
    Below are the screenshots. Please let me know how can this issue be resolved.

    Hi,
    With reference of your screens,I can see there is no qty in the field loner hence you are getting issue.
    1.May I know ,why you have checked indicator -Repair?
    because ,you are not going to repair the goods.You are just sending loner items to customer.In this case what is the use of to indicate repair ?.
    Thanks,
    Naren

  • Deletion and creation of Schedule line for Line Item

    Hi BW Experts,
    In P.S.A. when i have checked for first schedule line 001 reqdelqty is 50 , after deleting 001 and after creation of second schedule line in R/3 there are two records transferred from R/3 for schedule line 002 first with reversal indicator 'X' and delivery quantity -50 and next record with Reversal Indicator blank with value 50. which in turn results Reqdelqty zero.
    Reason of wrong data in BW: -
    Schedule line category for an item is being deleted forcefully. R3 doesn’t allow deletion of a schedule line category if delivery is already created. Here user is creating one same schedule line and then he deletes the order quantity from earlier one. This forces system to pick up schedule line 2 in the document flow
    · User shouldn’t delete schedule line.

    Hello Ganesh,
    Schedule line number sequence will not be in control of the user.
    once delivery for a schedule line is completed, no way you can delete the schedule line (except renumbering case). This is general SAP logic relates to schedule lines.
    Let me know how they are deleting the schedule lines even though delivery is completed.
    Now coming to Data load problem in BI.
    When you delete schedule line 001, the generated record should be with schedule line 001 with Reversal Indicator as R and delivery quantity -50.
    And for new schedule line 002, reversal indicator as blank and delivery quantity 50
    Regards,
    Nandakumar.A

  • Automatic confirmation of schedule line in order

    Hi Guru
         I have requirement to configure, While craeting a sales order of 500 TO I have only 400 to in stock so i can only confirm schedule line pertaining to 400  TO, after creating a order another 100 TO has been logged as production. How auto confirmation of schedule line for rest of qty. can be done in system
    Edited by: AMIT CHOUBEY on Feb 23, 2010 9:40 AM

    solved by own

  • Is there a way to track the delivered qty at the schedule line level in R3

    Hello Gurus,
    Is there a way to track the delivered qty at the schedule line level in R3.  I spoke to al ot of functional guys on this and the answer is NO. If NO,then, how does the 2LIS_11_V_SSL extractor extract the delivered qty at schedule line level. Help is really appreciated.
    Thanks
    Simmi

    Hi Simmi,
    I have used this extractor for the purpose you describe at more than one customer without problem. My understanding is that it links the order schedule line with the delivery, but I haven't tried to work out the mechanism.
    Regards,
    Ken

  • How to put schedule lines for one year  in a schedule line agreement

    dear all
    thanks for the support till now from the forum
    now i need some seetings by which the scheduling agreement will autoumatically take the schedule line for one year automatically
    in my client we are getting open PO so
    we have to make one agreement acording to that PO and thats for one year
    and this one yr will have same quantity to be produced everyday
    means 12nos of material every day for 12 month and this will be for every day
    and as per that it should generate a sales order.i need to put schedule line automatically not mannually one by one for each date.so wat is the settingand how to reffer this scheduling agreement we can produce sales order.
    please help
    subrat
    Message was edited by:
            subrat panda

    Dear Subrat,
    you cannot create a yearly schedule line in the scheduling agreement. It is not possible due to format restrictions of the date field. But what you can do is the follows (it is the modification, but it should work with the help of user-exits):
    1. You can split the year schedule line to the monthly schedule lines. There are two ways to do it. If you apply the DELINS IDOC, then you can do it already during transfer of the data to the application (itr is the best way). Here you can use, for example, user-exit USEREXIT_ZUORDNEN_IDOCS (include LVED4FZZ) or customer function EXIT_SAPLVED4_002, called from the subroutine USEREXIT_DYNPRO (Include LVED4F0U). Alternatively, you can use the user-exit USEREXIT_MOVE_FIELD_TO_VBEP (Include MV45AFZZ) within the call transaction, then it will work also in the dialog case.
    2. After getting the monthly schedule lines, you can create a planning delivery schedule, where you can split mothly schedule lines automatically to daily schedule lines according to the customer factory calender.The settings for generation of planning delivery schedules can be found under:
    Customizing SPRO: Sales and Distribution => Sales => Sales Documents => Scheduling Agreements with Delivery schedules => Maintain Planning Delivery Sched. Instruct./Splitting Rules
    It is the only ways, how you can reach your aim. I hope, this information will help you further.
    Kind Regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • Schedule Lines for Sales BoM Material

    Hi All,
    When i trying to maintain the multiples schedule lines for the Sales BoM Material(Both Header and Item), system is not allowing to maintain it.Please guide me how to achieve this?

    Hi,
    "Schedule Line allowed" is enabled at Item category. The Requirement is If we have multiple schedule lines for BoM Line Item, we are not able to maintain. Suppose the Order Quantity is 50 Units and we need schedule line of 10 Quantity each month. We are not able to maintain. System takes the complete 50 quantity and do the availability check and proposes the availablity Date. We are not able to maintain different schedules manually.

Maybe you are looking for