While I am coverting planned order to production order with configurable material, I am getting the follwoing error:
You cannot make an assignment to make-to-order stock
Message no. CO684
As read in previous forum messages I am check settlement profile assigned for  new order type (ZSD01) with standard sett profile (SD1) at OKO7 and set "Valid receivers" with value "1" in Order, Material, Profit.segment, Sales order and Order item.
Configurable material have item category group "0002", MRP type "PD", Lot size "EX", Strategy group "25" and "Individual requirements".
Sales order with configurable materiale have item category "TAC".
Where is the problem?
Thank you in advance
Oscar

Hi,
There are some OSS Notes to address this problem..(OSS Note: 311651, 432109 etc..)
But all ae for older versions of SAP.
Regards,
Siva

Similar Messages

  • Error while converting planned order to production order for config materia

    Hi experts,
    While converting a planned order to production order for a configurable material.I am getting the following error meassage. Message No.CO684,
    "You cannot make an assignment to make-to-order stock"
    ( DiagnosisThe component cannot be allocated to an individual stock because make-to-order production and engineer-to-order production cannot be executed with this order.
    A possible cause is that you are trying to create an order with reference to a sales-order/project, where an account assignment to a sales order/project is not allowed in the settlement profile that is assigned to the chosen order type. This is inconsistant.
    System ResponseThe following responses are possible:
    Order processing is cancelled.
    The system resets the special stock indicator back to the original value.
    Procedure
    Choose another order type).
    I have checked some of the threads related to this error. But no where there is any solution.Please tell me if there is any settings to make so as to work on this scenario.
    Thanks,
    Sham

    Hi,
    This will be a MTO scenario. Please check your requirement type,Requirement class and strategy type config along with your Item category and schedule line category from SD.
    Also check your Production order type config and settlement profiles.
    I mean to say that you need new production order type to be configured for specific above mentioned combination.
    Are you working on a production system..?? is it the first time you are creating the order for this config material..??
    Regards,

  • Error when converting planned order to production order

    Dear Gurus,
    I am working on ECC 6.0 for MTO scenario for a configurable material.
    When I run MD50 and then try to convert planned order in production order it gives me following error:
    error message CO684: 'You cannot make an assignment to make-to-order stock'.
    I am using requirement class 46 and strategy is 25. In the requirement class, the account assignment is M and valuation is also maintained as M.
    Also for the production order type, the settlement profile assigned has settlement rule optional for sales order, profitability segment, cost center....
    Also in the controlling area, Sales Order is activated.
    Kindly advice and thanks in advance.
    Regards,
    Niraj

    Dear,
    Please check your planned order under "Assignment tab" whether the sales order is visible?
    Find out what is the settlement profile assigned in your Order Type; TC: OPJH
    and in customizing see for that settlement profile whether for Sales Order : settlement is allowed or not. If not change accordingly. And check again.
    Please refer to SAP Note 861670 and 432109 or 311651
    Also refer this thread,
    Error in make to order
    Regards,
    R.Brahmankar

  • Error in converting Planned Order to Production Order (Urgent)

    Hi All,
    I am facing an error when i am trying to convert a planned order to production order.
    +Error message:
    "Assignment order/WBS" is not allowed (WBS L.XXXXXX-XXXX)
    Diagnosis:
    The current status of object 'WBS L.XXXXXX-XXXX' prohibits business transaction 'Assignment order/WBS'.
    Procedure:
    To process business transaction 'Assignment order/WBS', you first have to change the status of object 'WBS L.XXXXXX-XXXX' to allow the transaction 'Assignment order/WBS'.+
    I have another planned order identical to this one & for that i am not getting this error. So i checked the network for these 2 WBS elements, but could not find anything different in status.
    I am unable to figure out what might be causing this error. Hope my problem is clear, await inputs.
    Vivek

    Hi,
    I checked the planned order, the assignment exists. I compared the planned order for which i am not facing any issue in converting to work order & the one for which i am facing the error & i see no difference.
    So i am not able to trace what might be the reason. Is there anything which can be deciphered from the Diagnosis & Procedure which i have posted in my initial qns?
    Vivek

  • Reg error when trying to convert planned order to production order

    Dear all,
    While trying to convert planned order to production order we are getting error  CO684,( you cannot make an assignment to make to order stock---create an order with respect to sale order where account assignment  to sales order or project is not allowed in settlement profile to chosen order type.
    What is to be done to correct it.
    Thanks in advance
    Regards
    madhav

    Hi
    Check which settlement profile maintained in your order type using OPJH.
    Then go to the t.code OKO7 and select the same settlement profile which is there in your order type.
    In receivers
    Change the sales orders settings to
    Sales orders 1 Settlement Optional
    If in your scenrio not using sales order the change to Settlement not allowed
    try this
    Thanks
    S.Murali

  • Getting Error when convert the plan order into production order

    Hi Experts,
    When i converting the planorder into production order i am getting this error
    could you please suggest me hoew can i resolve this issue.
    Message no. CK466
    Diagnosis
    The system could not calculate a price for the internal activity with activity type 20000 of cost
    center 110TUP002 because none of the valuation strategies in valuation variant 006 was successful.
    System Response
    If the system issues a warning message or an information message, the costing item will be
    used in costing with a value of zero.
    If the system issues an error message, it sets the status "KF" (costed with errors).
    If the system issues a termination message, the cost estimate cannot be processed.
    Procedure
    1. Check the master data for activity type 20000 of cost center 110TUP002.
    2. If you have authorization for Customizing, check the valuation strategy for internal activities
    in valuation variant 006.
    Thanks&regards.
    Sateesh.C

    Hi,
    For the orders for which you get the error, note the dates, then check in KSBT, whether there is price maintained for that period.
    Eg: If the order has a start - 2nd Aug, 2010 & end 10th Aug, 2010, then check if price exists for period - 08, year - 2010
    Regards,
    Vivek
    Added
    If the values are maintained, then check the costing variants specified for the order type in OPL8 for plant - order type combination in cost accounting tab. Then in OPL1, check the details specified for the variants. If you're not sure on this, take help from your FI-Co colleague.

  • Error in Conversion of Planned order to Production Order

    Hi,
    I am getting error while converting the planned order to Production order.
    Error is " Scheduling parameters not defined for the production orders"
    I have maintained the parameters in Prod-> Shop Floor Control -> Operations -> Scheduling....but after that also the same error is coming.
    And also I have maintained in the Capacity Req Planning
    Kindly assist me where I can define the scheduling parameters for the production orders in MTO cycle.
    Regards
    Toshi

    Hi ,
    My production order has been created ....but now m getting error while releasing it.
    Its saying that "No checking rule maintained for operation"
    I have maintained the checking rule in OPJK. But still m getting the same error.
    Kindly assist me for the above error.
    Regards
    Toshi

  • Conversion of planned order to production order resulting into Runtime error

    Hello Gurus
         I am trying to convert Planned order into production order in MD04,  but I am getting ABAP Runtime error; for details please see image here posted.
    Please help me to resolve the issue.
    Thanks in advance!
    # If anybody wants remote access of my system through Team viewer I am ready to share my desktop for same.
    Regards!
    AKSHAY

    Hi Akshay,
    Overflow during arithmetical operation type P COMPUTE_BCD_OVERFLOW comes when the maximum of the internal ABAP field that is 99,999,999,999.99 many be quantity, cost value UoM conversion etc.
    Please check how this UOM (unit of measure) is defined in transaction CUNI. In this transaction, you may have set the Value-based commitment indicator. This indicator controls whether commitments for the chosen unit of measure are recorded on a quantity basis or a value basis.
    Please search OSS note for this dump and also raise this to OSS.
    Regards,
    R.Brahmankar

  • Partial conversion of planned order into production order of AFS material

    Dear Experts,
    I am working with SAP 6.0 EHP4 with AFS add-on. My material is AFS specific material. I am not able to convert planned order into production order partially from MD04 screen as all the fields in the CO48 screen is grayed out. 
    Please help...
    Regards,
    Alok Tiwari

    Hi,
    I am not able to get what is passing the start date.
    Second thing is how you are generating the serial number - manually or automatic?
    If you are generating serial number automatic, then it is not possible to generate it considering the basic start date.
    But if you are entering the serial number manually, then there should not be any problem as system will accept that serial number which you enter at the time of conversion of planned order to production order.
    Regards
    Amit parkhi

  • Order type settings for  convert planned order to production order

    Dear sir,
    I have 1 company code ,under 2 virtual plants are there.My scenario is plant 1(main plant)and plant 2 (virtual plant)
    both plant same FERT material.in plant 2 i am creating sale order and atual production will be done in plant 1.
    FERT material plant 2(strategy-40 sp.procurement-40 setting in spro ref plant (plant1) )and  plant 1 material (strategy 82)
    run the MRP MD50.panned orders are created but iam not getting production orders directly not getting the production orders
    .i have done settings in spro OPPE order type is given.in MD04 manual conversion planned order to production order system asking order type ,but i given order type in OPPE
    What are the settings for  production order directly from sale order at the time of RUNNING MD50
    Regards,
    Naresh.

    Hi,
    You will not get a production order out of MD50. That would have to be set up in the SD customizing for the sales order item, but I am not sure that would work with your two-plant setup.
    After MD50 you need to run CO41 for the collective conversion (and I also recommend the mentioned production scheduling profile customizing and then maintain this profile in the material master work scheduling view)
    BR

  • BAPI for converting planned order to Production Order(in PP)?

    Hi all,
            Is there any standard BAPI for converting Planned order to Production Order?
    Thanks in advance,
    anjaly

    hi,
    check this..
    BAPI_PRODORD_CREATE_FROM_PLORD BAPI: Convert Planned Order into Production Order
    for more details check this link..
    Create a production order
    <b>reward points if it is helpful..</b>

  • Conversion planned order to production order without BOM - no message

    Hello
    Problem: during conversion planned order to production order system does not inform (warning or error) that BOM is not exist. Is it possible  to force system to any reaction by standard configuration ?
    Everything is ok if production order is created by CO01, but during conversion there is no any reaction - production order is created, released etc. I only see by system status that something is wrong (NMAT - No material components). Probably we will have to do it by User Exit but I want to know that all standard configs are exhausted.
    Thx in advance. Reg.
    Joanna

    Hello
    The BOM is not read again when a planned order is converted to production order on the standard system.
    You may implement the modification from note 391846 to force master data to be read again, therefore, an error message will be triggered during the conversion when the BOM is invalid.
    BR Caetano

  • Conversion of planned orders to production orders

    Hi,
    we are doing mass conversion of planned orders to production orders and performing capacity availability check, how system will give log information based on these two things,
    when i perform availability check at time of order creation and will not allow to create if anything is missing (i selected user decides option in configuration), does it show any error log report and where can i see.
    When i perform availability check at time of release, if anything missing it will not allow to release and give a choice for a user to release in normal production order creation process, how it will work in mass conversion. is there any standard report to look at missing planned orders so that users will come to know and then decides whether to convert to production order or not.
    thanks in advance.

    Dear ,
    In SM38-Enter PPBICO40 -Execute -Here you need to Mark the Output log option with Erros only or Error Folder for each MRP controller  .Frist you do it in test mode and then remove test mode , mark the Output log option as per requured field and check the result .
    refer this useful thread : Program PPBICO40 for conversion of planned orders to production order
    Regards
    JH

  • Planned order to production order conversion problem

    Hai All,
    I am converting a planned order to production order during which following error is coming and system is not creating production order.
    You can not make an assignment to make to order stock.
    How to solve the issue.

    hai sundaresan
    Thanks for your reply. As you mentioned i am using strategy 25 for this Material. I have tried all the settings and changes mentioned by you. But not able to convert the planned order to production order. But when I changed the strategy to 20 and created a new sale order then did MRP run and then tried to convert the planned order to production order and it worked. Now my question is when it is working with 20 why it is giving problem with 20. Actually I am doing VC for material and while creating sale order selecting the values from characetristics. Can you help out why it is not working with strategy group 25.

  • Conversion Planned Order to Production Order

    I am trying to convert planned order to production oder with the transaction code: MD04
    I am getting this error when I try to convert planned order to production oder:
    Scheduling parameters are not defined for production orders
    Message no. CT604
    Diagnosis
    No scheduling levels have been defined for production orders  in Customizing for plant T024, order type PP01 and production scheduler * . You cannot conduct any scheduling until a selection ID for detailed planning, rough-cut planning or production rate planning has been entered. The selection ID determines the priority for the selection of the routing according to the criteria task list usage, type and status.
    Moreover the scheduling type must be maintained.
    Procedure
    Maintain the scheduling parameters by entering a selection ID for detailled planning, rough-cut planning or production rate planning and select the scheduling type.
    I have retraced my steps and checked all the configuration for scheduling parameters and they all seem accurate. I am lost as to how to keep going and where to look to correct my mistake. Can someone please guide me further so that I can convert planned orders to production order. Thank you for your time.

    Dar,
    ????  Now I am wondering how you were able to 
         ...checked in the following places:
    Define Production Scheduling Profile
    Define Production Scheduler
    Define Scheduling Parameters for Operations
    At any rate, basic questions by students are best addressed in one of the 'Community Discussion' forums, such ast Test and Playgound  Try SCN Features
    As always, in the T&P forum, like this one, it is expected that the questioner will first perform their own basic research, before posting a question, according to the rules of engagement.
    Best Regards,
    DB49

Maybe you are looking for

  • Problem with InputStream in a MIDlet

    I am doing some client/server networking using a socket connection in a MIDlet. When I make the socket connection I get a 220 reply. i.e "220 smtp.comcast.net" I read the status code from that response and then send the server my next command. (HELO)

  • TS5148 When I try to play a movie on Netflix from my IPad, I get a pop up saying: Cannot play video. "The connected display is not supported".

    When I try to play a movie on Netflix from my IPad, I get a pop up saying: Cannot play video. "The connected display is not supported".  I have updated my Apple TV, tried restarting it, and have tried using my IPod Touch all without any luck. This di

  • ASM on a virtual machine

    Hi Just a quick one... Would it be possible to install 11gr2 with ASM on a virtual machine (running OEL 5.5) - host machine running windows? Or can anyone think of any issues I might have? Thanks

  • Cannot get Acrobat Reader or Pro to open PDF IN FF browser

    I have a Win7, 64 bit laptop. I have Acrobat Pro X, and Acrobat Reader 11. I cannot get FF to open a pdf using either of these readers INSIDE the browser. I do not like the internal PDF viewer and I was trying to get Acrobat to render the PDF in the

  • Unofficial iTunes Complaints - 7.0.1

    So here is a topic where all windows users that have iTunes 7.0.1 installed to post complaints and help other users with thier problems (hopefulyy). So i'l start it off; iTunes 7.0.1 cause my iPod to malfunction, resulting in it being unusable. Once