Configuration material of CRM

Dear SAP Gurus,
could anybody provide me configuration material belongs to CRM. i am new to CRM.
Thank you
krishna

Hi Chow,
Here is some useful information regards,
Muralidhar Prasad Chatna[WF|http://help.sap.com/saphelp_46c/helpdata/en/04/926f8546f311d189470000e829fbbd/frameset.htm]
Edited by: Muralidhar Prasad Chatna on Feb 15, 2008 3:22 PM

Similar Messages

  • External product configurator within a CRM-ERP LORD2 scenario?

    Is it possible to use an external product configurator within a CRM-ERP LORD2 scenario?
    My customer has a running webshop with an own configuration UI (java based) which is connected through badis with the ECC.
    And now we implemented in SAP CRM the ERP Quotation.
    Instead of rebuilding the varionatfunctions ord attributes seting the customer thinks about to intgrate the existing "konfigurator" of his web shop.
    Is there anyone who knows the interface
    Basic Functions -> Product Configuration -> Settings for External Configurators.
    more detailed.
    Where can I find an Interface declaration?
    Is the planned approached in general a valid way (from your point of view).
    thanks,
    Dirk

    Hi Stuart,
    You have to notice that in order to user R/3 BOM in CRM,
    you have to download object BOM (tcode R3AC1).
    But downloading object BOM into CRM only possible if
    your R/3 is Retail scenario (unfortunetly mine is not).
    Next thing I am going to test is, create Knowledge Base
    in R/3 (choosing the type = BOM). after that in CRM
    download using standard configurable object SCE.
    If this successfull, we can see the configurable in
    the Material Master CRM.
    I am going to try this in couple days, please try it
    first and let me know the result.
    Hope this give you some information.
    Cheers,
    Gun.

  • Configurable products in CRM - Error ASSERTION_FAILED

    Hello Experts,
    I'm trying to use configurable products in CRM. To do this we have decided to replicate the configurable products from ERP to CRM.
    We were able to replicate the products into CRM, but when we try to use these in sales quotations we get the following error:
    Category               ABAP Programming Error
    Runtime Errors         ASSERTION_FAILED
    ABAP Program           SAPLCRM_ORDER_API
    Application Component  CRM-BTX-BF
    Date and Time          28.09.2011 11:17:11
    The first time we tried to create a quotation, configuration of item category determination was missing, so we added the following configuration:
    Tran.Type/ Description TransTyp/ Item cat.Group/ MainItemCty/Decription item cat./ Item Cat./ Description Item cty
    ZAG          Quotation          0002 Config.at Mat.Level                                                            AGC        Quotation Config.
    ZAG          Quotation          0002 Config.at Mat.Level         AGC       Quotation Config.         AGE        Quotation Config.
    ZAG          Quotation      0002 Config.at Mat.Level         AGM       Normal Item Quot.        AGC            Quotation Config.
    Since we added the configuration of item category determination for Configurable material, we get the error described above.
    Could you give us any advice to resolve this problem?
    Thanks in advanced.
    Susana Morgado

    Update: I just found out, to set the proper IPC settings we have to use http://<host>:50000/ipc/admin/xcm/init.do. This one has a JCO-component inside. But unfortunitely it shows a runtime error when it is started. I did change the SSL/security settings to use http. Any idea what this could be, or where to find a detailed error-log?

  • Creation of Sale Order for configurable material with availability check.

    Hi,
    We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
    Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
    1.     While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
    2.     While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
    Regards,
    Umesh

    Hi Umesh,
               1.Create material master for configurable material and variants in mm01.
               2.Maintain BOM for the configurable material in CS01
               3. Configur the variant configuration steps
                  a. Create charecteristics T.code CT04
                  b. Create values and assign classes
                  c. assign the values to charecteristics
                  d . Maitain dependence  T.code CU01
                  e.create configuration profile t.code CU41
                  f.stimulate the configuration profile.
    4. Do the availability check configuration through this path
    IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
    5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
    I hope it will help you
    Regards,
    Murali.

  • Variant Configuration / IPC in CRM 7.0

    Hi experts,
    We are getting runtime errors when we access the Configuration tab in CRM transaction CRMD_ORDER for a configurable product. These errors do not occur when we simulate the model in COMMPR01 for the same product. Any ideas? Here are a couple of things to note:
    - The runtime errors occur in the Configuration page itself and does not provide any more information; i.e. we only receive a page with the lines saying "Runtime Errors", "Contact the Administrator", and "Log In". The Log In link does not work and there is nothing in ST22.
    - Simulating the model in the product master consistently works.
    - When using CRMD_ORDER, the configuration has worked on rare occasions but will timeout rather quickly; i.e. after a characteristic is changed it might give the message to log in again.
    - Custom versions of both CRMORDERMAINTAIN and CRMPRODUCTSIMULATION are maintained in COMM_IPC_PROP, and the URL is correct in COMM_IPC_URL.
    - The product was replicated from ECC as a knowledge base via object SCE.
    Thanks in advance!
    John

    HI ,
    Are you using a secured port?
    Try making the SSL enabled setting in the XCM as "FALSE", you can find this under the General  Application Setting of the XCM,
    let me know if it works.
    Restart the java and application once the change is done.
    Thanks
    Dushyanth
    Edited by: vishwas sahu on Sep 23, 2009 8:49 AM

  • Issue in consumption of forecast for configurable material

    Hi,
    we have a issue in consumption of forecast by sales order for a configurable material.
    Please find the below details for the settings maintained and the steps followed.
    Please let me know how we can overcome this issue.
    settings in R/3
    1. Class and characterisitcs are created in R/3
    2. standard material was created and class assigned
    3. planning strategy used is 56
    4. material, class, characteristics,ATP check, ATP customizing , sales order were integrated to APO
    Settings in APO
    1. CBF table, CBF profile, Consumption group were created in APO
    2. Consumption group is attached to the product master
    following steps were followed.
    1. Forecast was created in DP for a certain characterstics ansd relaesed to SNP/PPDS
    2. forcast is visible in product view
    3. sales order was created in R/3
    4. slaes order is visible in APO but it is not consuming the foreacast for the same set of characteristics.
    Please let me know how we can overcome this..are we missing any customization ...?
    Thanks
    Ram

    Hi Srinivas,
    thanks for your response.
    The forecast consumption problem was solved after correcting the entries in requirement strategy.
    have one more query.
    when the sales order for a configurable material is transferred from R/3 to APO, we should be able to see the values under "descriptive characteristics tab" in APO product view.(when we click on the green triangle representing the configuration).
    However, we could see the values under "descriptive characteristics tab" for some of the characterisitcs and not for other characteristics.
    we tried comparing the characteristics but could not figure out the reason.
    any pointers / clues to come over this issue would be helpful.
    thanks
    Ram

  • Error message while creating configurable material for variant configuration.

    Dear All,
    I want to create configurable material for the purpose of variant configuration. When trying to create configurable material using mm 01 or mm k1, it is displaying an error message that internal number assignment is not possible for the material type configurable materials as well in using external number also. Can anyone specify the steps to be done in creating the configurable material. Thank you all.
    Regards
    Akula Sivaji Kumar Madhu Kiran

    If you want to set these material type to another group (Which has a internal number and external number range), then you can do it.
    In MMNR, Click on the Edit Group.
    Then select the material type and click select element.
    Then mark a tick option in another group and then press Element/Group.
    Then you can see the material type will come under this group.
    Now save your entry, and create a material with this material type.

  • Configurable Material : error while creating value contract

    First snapshot of our Configurable Material  'Material 01'
    In MM03 > Basic Data 2
    under Client specific configutarion
    Cross-Plant CM : (material 01)
    Varient (checkbox checked)
    In MM03 > MRP1
    MRP Type: PD
    In MM03 > MRP3
    Plant-specific configuration
    Configurable Material : Material 01
    Varient (checkbox checked)
    Planning Varient (checkbox checked)
    When we are raising value contract, we are getting error
    'Material 01 has status: Configure to Order'
    In Item category assignment we have assigned Zw1 (value contract doc type) on lines of 'OR doc' type  as follows
    SaTy ItCGr Usg   HLevltCA Difftc MltCa
    Zw1  0002  blank blank    TAC    TAM
    Zw1  0002  blank TAC      TAE   
    Zw1  0002  blank TAE      TAE   
    Zw1  0002  blank TAM      TAC   
    Still we are getting same error .how to resolve this.
    Thanks
    Rohit

    closing...

  • Make to Order for Configurable Material & Error in Confirmation

    Hello, PP Gurus,
                       I am doing one MTO for Fabric business but during the confirmation I am getting error that
    SALES order Stock does not Exist as well Please inform me Costing procedure in this scenario.
    *is it necessary to run MRP in this scenario?*
    Please see the all Details of Business so that U can give answer properly.
    One is raw fabric (Raw material) which has to passed different process to convert Colored fabric as my Finish product as well I can sale Raw fabric also.
    is it possible to maintain raw fabric and Colored fabric with same mat.code?
    I have configured the material as well all pricing BOM, Recipe its working properly.
    How can I assign the material to Operation? I am getting GRAY field in New Assignment in change recipe mode ..
    Is it possible to use Material type other than KMAT? I want to use Finish material type. If yes How?
    Right now I can create Process order from the Sales order but I am facing error in confirmation that Sales Order stock does not exist than I have to transfered stock to Sales order and error get solved temporarily but  I want to avoid this manual transaction to remove this error. Any configuration is required please inform.
    My configuration is given below.
    MRP Type : PD
    BOM item Category:  L Stock Item.
    In dependency & Profile I have set radio Button as Single level Bom explosion.
    Order Bom selection in profile.
    Strategy : 25 make to order for configure material.
    How can I do ? please suggest any changes
    I have only 9 months of SAP experience within short time I have gain lot knowledge from this site and other reading material as well my learning Learning thirst.
    thanks to all SAP gurus..
    THANKS IN ADVANCE .... Definitely I will reward points even if my some questions get solved...
    Regards,
    Bhavik dangi.

    Hi,
    You can use variant configuration for selling the colored fabric. Use the basic fabric as raw. and maintain variant configuarations to have many variants.
    Please use strategy 25. When you run MRP the planned orders will be generated and will be assigned to the sales orders. You can see it on the account assignment tab.
    In material master pleasse maintain Individual collective requirement indicator to 1-individual in the MRP-4 view.
    Then the stocks will be reserved to the specific sales orders.
    Thanks and regards
    Murugesan

  • Configurable material in scheduling agreement

    When I use DS scheduling agreement with LPN as item category with configurable material, I cannot input value for configuration. But if I use normal TAN instead of LPN, I can input value for configuration.
    Why?
    Does SAP do not allow configurable material in scheduling agreement or quantity contract?
    Thanks in advance for any suggestion.

    Deat Amy,
    Please check the item category settings related  to configuration through VOV7 transaction.
    Go to VOV7 transaction then select item category LPN then go in to the detain here you check the configuration related settings under Bill Of Material /Configuration tab.
    If want you refer the standard Config.at Mat.Levl itemcategory TAC settings, same way you can do settings for your item category then try.
    Note:- Not advaisable to change the standard one, so you copy the standard itemcategories do the changes,
    I hope this will help you,
    Regards,
    Murali.
    Edited by: Murali Mohan.Tallapaneni on Nov 13, 2008 5:20 AM

  • Material variant replacement in sales order for Configurable Material

    HI
    I am using variant configuration. In this i have created material A as configurable material and have Preconfigured Material B as its variant by assigning configurable material in MRP 3 view.
    Now when i am creating Order for material A i.e. Configurable material and the characteristics values are same as that of Preconfigured material system is not replacing Configurable material with Preconfigured material.
    Please help me out.
    Regards,
    Anand.

    Even after maintaining the item category MTAC(Mills Make to order config at mat level), the configurable material is not getting replaced in the sales order (va02). It is just showing material variant exists for the configurable material.
    The setting in item category for configuration is.
    Config. Strategy     01(Sales Order Strategy (TAC, TAM))
    Mat. Variant Action  4 (Replace configurable material (Append and change))
    ATP material variant 2 (Do not substitute if not completely available)
    Structure scope      D (Configuration, poss. with BOM explosion)
    I have maintained the stock for material variant as well to take care of ATP material varinat setting shown above.
    Please suggest if missing something.

  • Configurable Material as BOM component in SALES Order BOM

    Hi Gurus
    I have following
    1. Material ABC is a configurable material (variant)
    2. BOM of this ABC has further configurable materials
    Is it possible to maintain requried charasterstic of the compoents which are configurble at the time of SALES ORDER BOM CREATION.
    If yes, how. please explain.
    Thanks in advance
    sunil

    Dear Sunil,
    Please refer to the following link:
    http://sap-img.com/sap-sd/sales-bom-implementation.htm
    I will suggest you to visit  http://sap-img.com/sap-sd.htm. It will give you the overview of SAP SD module.
    Moreover there is a separate section of FAQs with answers which will help you in great deal.
    Do let me know in case of any queries.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • Configurable material - Error converting plan order to production order CO6

    While I am coverting planned order to production order with configurable material, I am getting the follwoing error:
    You cannot make an assignment to make-to-order stock
    Message no. CO684
    As read in previous forum messages I am check settlement profile assigned for  new order type (ZSD01) with standard sett profile (SD1) at OKO7 and set "Valid receivers" with value "1" in Order, Material, Profit.segment, Sales order and Order item.
    Configurable material have item category group "0002", MRP type "PD", Lot size "EX", Strategy group "25" and "Individual requirements".
    Sales order with configurable materiale have item category "TAC".
    Where is the problem?
    Thank you in advance
    Oscar

    Hi,
    There are some OSS Notes to address this problem..(OSS Note: 311651, 432109 etc..)
    But all ae for older versions of SAP.
    Regards,
    Siva

  • Create a configurable material with reference to another config material

    Hi,
    I want to create a configurable material with reference to another configurable material from different system.
    Please tell me what data i need to check to see if that material has been created (copied manually) successfully.
    Thanks.

    Hi,
    In case of configurable material most important thing is configuration so please check weather the configuration is copied perfectly with all characteristics or not. Similarly check the valuation class and price control is proper or not.
    Regards,
    Umesh

  • Error in Configuration of Sales CRM BAPI

    Hi Experts,
    I am using the BAPI BAPI_SLSTRANSACT_CREATEMULTI to create a quotation with configured material. The quotation was created successfully, but with only the header material ( there are no sub-configurations present(the BOM is not exploding) ).
    It gives a error as configuration is incomplete.
    When the configuration tab of order is clicked in the change mode, then the required sub-configuration (BOM explosion) is created automatically without doing any changes to the order.
    Please let me know for any solution for this ASAP.
    Thanks in Advance
    Regards
    Suthagar.

    Hi Shuja
    I guess the message is just a warning eventhough the order is created. The warning message states that Auto-Delivery can not be created.
    Please check below to understand how the customer is blocked:
    1. Manual Block -> Transaction XD03
    -->Menupath: Extras->Blocking Data
    2. Credit Block -> Transaction FD33
    --> In the overview screen check the difference of value between Credit Limit & Credit Exposure
      I guess in the case whereby Credit Limit value is less than Credit Exposure also this can happen.
    Please try using a different Customer. Also simulate via transaction VA01.
    Hope this helps.
    Kind Regards
    Eswar

Maybe you are looking for

  • I keep getting error message when trying to sign in for iMessage with my Apple ID since upgrading to iOS 7

    I keep getting error messages when I try to activate iMessage on my iPad since installing iOS7. Anyone else having this issue or a solution. I can obviously sign in with the same Apple ID information/password as I have done here and I am connecting w

  • Iphone 5 not working when plugged into widows

    i have an iphone 5 around 6 months now, it charges perfectly and when i plug it into my laptop it does not show up at all, at the start this was not an issie and i now can now sync music or even charge it on the laptop. i have tried a different lapto

  • How to use byte[] in EJB Model

    Hi Colleagues, I have problem with binding byte[] to model attribute. So I have methos myMethod(byte[] byteArr). byte[] in the model is represent as Byte_Item type. So I fill this attribute in this way: inputFile is of type byte[] for (byte b: inputF

  • Dynamic select list with displaying a description

    Hi, I want to have a select List, my list refer to a lov, and the lov refer to a table contaning 2 columns : code and description, The list must display only the code, but I want having an item beside the list dispaling the description.... I have use

  • Illustrator CC 2014 Cintiq Issues after upgrade?

    I recently upgraded to Illustrator CC 2014 - and now I am having issues drawing with the Blob and Pen tools on my Cintiq. When I hover over areas where art exists the cursor freezes until I go to a blank area of the artboard. Off the art, even then,