Configuration process (after installation) of Microsoft Project Professionnal 2010 fails

On Windows Vista Business 32 (English, SP1), I downloaded en_project_professional_2010_x86_515560.exe from MSDN and installed it.  The installation process completed successfully and asked to reboot my computer.  After rebooting, I start Microsoft
Project 2010 from the start menu and it starts an initial configuration process which goes into a repeating loop 3 times and fails.  Here are the details (when starting Project 2010):
1. Microsoft Project Professionnal 2010 popup: Configuration Progress splash screen with progress bar and yellow wave at bottom.
2. Microsoft Office Project MUI (English) 2010 popup: Please wait while Windows configures Microsoft Office Project MUI (English) 2010, then disappears.
3. Microsoft Project 2010 logo popup with green wave at bottom.
4. Steps 1-3 repeated 3 times.
5. Microsoft Project popup: There is not enough memory to complete the operation.  To free up available memory, close programs, projects, or windows you aren't using, and try again.
I suspect this is a false error message because all my applications are closed and I have over 1GB of free memory.
If I retry:
- Microsoft Project popup: Project failed to start correctly last time.  Starting Project in safe mode will help you correct or isolate a startup problem in order to successfully start the program.  Sme functionnality may be disabled in this mode.
 Do you want to start Project in safe mode?
I click Yes, but the same sequence of popup occurs and it fails with the same error message.
I then installed Microsoft Office Project 2007, as a work-around.  But starting Project 2007 gives identical results, except with 2007 popups instead of 2010 popups.
I called Microsoft Technical Support for a case, but they suggested I try posting my question to this forum first.  
Thanks for any assistance.

Hi all,
To my experience, this kind of problems is typically caused by a conflict with another software component. That is why a reformat and re-install will most likely fix the problem. In most cases this is caused by the virusscanner or firewall.
For those of you who cannot or do not want to reformat and reinstall everything (which I can understand), find below some steps to troubleshoot the issue and find the conflicting piece of software:
 Make sure your computer is up-to-date with all service packs and updates for Windows, Office, Project, Internet Explorer, ...
If this doesn't fix your problem:
Go into add/remove programs, select your office version and do a repair
Into add/remove programs, do a repair of Microsoft Project (or uninstall and reinstall)
If this doesn't fix your problem:
Try to run Microsoft Project with different compatibility settings (e.g. Windows XP SP3). Make sure to reset the compatibility setting after performing your tests!
If this doesn't fix your problem:
Perform a full system scan for viruses and other malware
Remove any malware/virus that has been found
If this doesn't fix your problem:
Disable all 3rd party security products (virusscanner, firewall, anti spyware, ...). If you don't feel comfortable leaving your computer unprotected while being online, simply disconnect your pc from the internet (unplug the cable).
If this doesn't fix your problem:
Uninstall all 3rd party security products (virusscanner, firewall, anti spyware, ...). (Yes, this is different from disabling it as some programs have anti-shutdown protection and still have low-level protection even when disabled).
If this still doesn't fix your problem:
Restart your computer in safe mode and try to open Microsoft Project.
If this still doesn't fix your problem:
See if you have a similar computer available with Project installed that doesn't has this issue. Compare the software installed on both computers and remove the software on the computer having the issue one-by-one to try to find the conflicting software.
And if the problem still exists, please report back onto the forum with detailed information about the problem (version of Windows, Office and Project + Service Pack level), exact error messages you receive and steps you have taken to try to troubleshoot
the issue.
Also keep in mind that these forums are not an official Microsoft support channel, so if none of the above fixed the problem, you might want to open a case with Microsoft Support to have them look into the problem.
I hope this helps,
Hans
My EPM blog: Projectopolis

Similar Messages

  • Dropdowns and many buttons disabled in PWA 2007 after Microsoft Project Professional 2010 has been installed

    Hi Team,
    I have Microsoft Project professional 2007 installed and also using PWA for 2007.
    I recently installed Microsoft Project Professional 2010, and since the time i installed 2010 all the button in PWA 2007 have been disabled.
    1. I could not select a project from "Project Center"
    2. I could not select resources from "Manage Resources"
    3. I could not select dropdowns in the project properties even if the project is selected.
    ALl the other team members are able to use both without any issues.
    I also uninstalled IE8 browser and re-installed, that didn't help.
    I could use PWA normally after 2010 is uninstalled.
    Please suggest a solution for this.

    Try running a repair on Project Professional 2007. You always have to do this after installing a newer version of project. Always run a repair on the previous version. What's happening is that PWA is not seeing 2007 on your machine because 2010 overwrote
    some of the shared objects.
    Gary Chefetz, MCITP, MCP, MVP msProjectExperts
    Project and Project ServerFAQs
    Project Server Help BLOG

  • Loss of FN-Keys after installation of Microsoft security updates on L500

    I'm using a satellite L500-19U
    After installation of Microsoft security updates the FN keys lost their functin except the Brightness + / - function.
    also the soft keys which appear at the upper monitor border by pressing the FN key didn't appear after the security packages were installed.
    I solved The problem by removing the update by means of the roll-back function (Wiederherstellungs punkt) of W7.
    The following security packages are selected to be installed:
    Security update for Windows 7 for x64-based Systems (KB978601)
    Security update for Windows 7 for x64-based Systems (KB979309)
    Security update for Windows 7 for x64-based Systems (KB979683)
    Security update for Windows 7 for x64-based Systems (KB980232)
    Security update for Windows 7 for x64-based Systems (KB981332)
    Windows MRT x64 - April 2010 (KB890830) (malicoius software removal tool)
    Which of them are unsuspicios, which shall be posponed, which updates are necessary after installation of the updates?
    Message was edited by: JoJo58

    hi,
    If you read about these update on the Microsoft site: (Non of them should influence on FN-Keys)
    http://www.microsoft.com/downloads/details.aspx?displaylang=en&FamilyID=998164b7-4b8c-468b-8d39-f242633c8838
    I have checked the history of updates on my computer and all of them are installed except for Windows MRT x64 - April 2010 (KB890830) (malicoius software removal tool). Everything works fine, try to remove this update.

  • Installation of Microsoft Visual C++ 2010 Redistributable Package (x86) appears to have failed

    When installing the PowerDesigner client we receive the message below that a Microsoft Visual C++ package is required.  When we select INSTALL, the operation fails due to a higher version already being present on the machine.  We continue with the installation and we do not encounter further errors.  Can this C++ Redistributable install failure safely be ignored?  (We would prefer not to remove a higher version of the Redistributable in order to install an earlier version for PowerDesigner.)
    "Sybase PowerDesigner 16.5 requires the following items to be installed on your computer.  Click Install to begin installing these requirements."
    Status              Requirement
    Pending          Microsoft Visual C++ 2010 Redistributable Package (x86)
    "The installation of Microsoft Visual C++ 2010 Redistributable Package (x86) appears to have failed.  Do you want to continue the installation?"
    Viewing the Microsoft install log:
    Installation Blockers:
    "A newer version of Microsoft Visual C++ 2010 Redistributable has been detected on the machine."

    You should be fine.  The redistributable should not update a newer installation.
    Which version of PD were you installing?
    Chris

  • Windows 7 professional backup and restore stop working after installation of acronis true image 2010

    HI,
    windows 7 professional backup and restore stop working after installation of acronis true image 2010. it generates a error code 0x81000019. please help.
    thanks
    Song

    Sankalp,
    I too have the error 0x81000033 when running the full system image backup.  I could not assign a drive letter to my 100mb drive with the Disk Management.  So, I went into the diskpart and ran the following commands:
    diskpart
    list disk
    DISKPART> list par
      Partition ###  Type              Size     Offset
      Partition 1    System             100 MB  1024 KB           ( 78.2 of 96.0MB free )
      Partition 2    Reserved           128 MB   101 MB
      Partition 3    Primary             73 GB   229 MB
      Partition 4    Recovery           423 MB    74 GB
    sel dis 0
    list par
    select partition 1
    assign letter=q
    fsutil usn queryjournal q:
    fsutil usn deletejournal /D q:
    After diskpart, I opened the "My Computer" and see that I have 78.2 of 96.0MB free.  Despite that, I ran these commands on the new q: drive:
    C:\Windows\System32>q:
    Q:\>fsutil usn queryjournal q:
    Error:  The parameter is incorrect.
    The FSUTIL utility requires a local NTFS volume.
    Q:\>fsutil usn deletejournal /D q:
    Error:  The parameter is incorrect.
    The FSUTIL utility requires a local NTFS volume.
    Q:\>
    Any help is appreciated.

  • Double Spaced PDF after exporting from Microsoft Project

    As of recent, every time I save my Microsoft Project Schedule to a PDF version the output is double spaced.Within Microsoft Project there is no double spacing. I've been unable to find any type of setting or configuration to correct this problem. Any ideas? Any help would greatly be appreciated. Thanks!

    Hi Austin ,
    I would like to know few things before we assist you further .
    Which version of Acrobat are you using?
    It could be file specific.Is it happening for any specific project you are working on ?
    What happens when you try to print it?
    Try updating it to the latest version .
    Launch Acrobat>Navigate to Help>Check for Updates .
    Try this once if you are using any of the previous versions of Acrobat and see if this helps .
    Regards
    Sukrit Dhingra

  • How to query Process Status from database in Project Server 2010

    Hello All,
    I am using Project Server 2010. 
    I need to query Process Status  from SQL. 
    where can I find Process Status in Database. 
    Thanks,
    Rohit

    Hi Rohit,
    you will not be able to find this information in reporting DB - the only database queries are supported.
    If you really want to go for an unsupported solution, you should be able to find related tables and how to join them in stored proc "MSP_WEB_SP_QRY_Statusing_ReadStatus" in published database.
    Regards
    Barbara
    To increase the value of this forum, please mark the replies that helped to solve your issue as answer. If you find answers to questions from other forum participants to be helpful, please mark them as helpful. Your participation will help others to find
    an appropriate solution faster. Thanks for your support!

  • Timesheets in Microsoft Project Server 2010

    Our team is starting this year using timesheets for collecting actual work from all of our vendors.  I am having a problem seeing the actual work in project professional once the time has been entered into PWA, processed and approved.  Would
    someone with timesheet experience be able to help me with this issue?  Resource has entered actual hours in PWA, saved and submitted.  Timesheet manager approved.  No actual hours show in the project professional schedule.  Any ideas
    or suggestions would be appreciated.
    Jan Whitehead

    Hi Jan,
    Actually you have to differenciate the timesheet manager with the status manager.
    Status manager (who should be the project owner, ie the project manager) will approved submitted tasks updates. Once approved, it will be "pushed" to the project actual work.
    Timesheet manager will approved the complete resource timesheet, including administrative work.
    Note that if you activated SEM (single entry mode) in PS2010, both timesheet and task update are made from on single operation by the resource.
    Thus in your case, since you're talking about timesheet manager approval, it is normal that the actual is not send to the project. The project manager (status manager) must approve the task updates in order for the actuals to be shown in the project plan.
    Please find more information here:
    http://technet.microsoft.com/en-us/library/gg597642(v=office.14).aspx
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Microsoft Project Server 2010 - Need a query/report to show everyone who did not submit timesheet last week

    I need to create a MSPS 2010 query/report to send out to my project managers that show them everyone who did not submit their timesheet for the previous week.  I would like to be able to filter it by project/client but would settle for just a list
    of all unsubmitted timesheets at this point.  Every link I have found point to old reports for MSPS 2007 and the queries do not work because of schema changes between MSPS 2007 and 2010.  Please help!

    Thanks Elli!  Is there any way to also pull in the active resources that have not created a timesheet in the timeframe I am filtering on as well?
    Here is the query I had came up with.  Looks like I was on the right track...  I did two actually.  First one to give me a roll up list of employees with outstanding time sheets for last week and the hours, then the same data with an explosion
    by employee by project and also pull in their associated time sheet manager:
    --Everyone with an timesheet for last week where status  is not 'Approved' or 'Submitted'
    SELECT DISTINCT
            CONVERT(varchar(10),b.StartDate,1) + ' - ' + CONVERT(varchar(10),b.EndDate,1) as [Timesheet Date]
          , [ResourceName]
          , [TimesheetStatus]     
          , SUM([ActualWorkBillable]) as [Hours Entered]
      FROM 
        [dbo].[MSP_TimesheetLine_UserView] a
      , [dbo].[MSP_TimesheetPeriod] b
      WHERE
          a.PeriodUID = b.PeriodUID 
      and [TimesheetStatus] NOT IN ('Approved', 'Submitted')
      and DATEADD(dd,-7,GETDATE()) BETWEEN b.[StartDate] AND b.[EndDate]
      GROUP BY 
        b.[StartDate]
      , b.[EndDate]
      , [ResourceName]
      , [TimesheetStatus]
    GO
    --Everyone with an timesheet for last week where status  is not 'Approved' or 'Submitted' w/ Project/Customer explosion
    SELECT
     CONVERT(varchar(10),b.StartDate,1) + ' - ' + CONVERT(varchar(10),b.EndDate,1) as [Timesheet Date]
    , r.ResourceName AS [Resource Name]
    , [TimesheetStatus]     
    , [ProjectName]     
            , ([ActualWorkBillable]) as [Hours Entered]
    , isnull(rm.ResourceName,'<No Timesheet ManagerInformation Available>') AS [Timesheet Manager]
    FROM
          dbo.MSP_EpmResource_UserView r 
     LEFT OUTER JOIN
          dbo.MSP_EpmResource_UserView as rm 
       ON r.ResourceTimesheetManagerUID = rm.ResourceUID
    ,[MSP_TimesheetLine_UserView] as a
    ,[MSP_TimesheetPeriod] as b
    WHERE
          a.PeriodUID = b.PeriodUID 
      AND a.ResourceUID = r.ResourceUID
      AND  [TimesheetStatus] NOT IN ('Approved', 'Submitted')
      AND  DATEADD(dd,-7,GETDATE()) BETWEEN b.[StartDate] AND b.[EndDate]
      AND (r.ResourceIsActive = 1)
      AND (r.ResourceType = 2)
      AND (r.ResourceIsGeneric = 0)
    ORDER BY 
       r.ResourceName
     , ProjectName
    GO

  • MS Project Professional 2010 - Configuration Failure - There is not enough memory to complete the operation

    Windows 7 64, MS Office Pro 2010 installed add working - 4 gig of memory 500 gig +  of free disk space.  I  get the below results when trying to start project the first time.  
    Tried usual admin rights stuff and turning off norton and firewall.  Same results after re-install, restart,
    repair, you know all the usual.
     Note I borrowed the steps below from another thread that was never answered. 
    http://answers.microsoft.com/en-us/office/forum/office_2010-project/ms-project-crash-after-configuring/e6c67a84-5749-4b19-8cbd-562189d9785c
    1. Microsoft Project Professionnal 2010 popup: Configuration Progress splash screen with progress bar and yellow wave at bottom.
    2. Microsoft Office Project MUI (English) 2010 popup: Please wait while Windows configures Microsoft Office Project MUI (English) 2010, then disappears.
    3. Microsoft Project 2010 logo popup with green wave at bottom.
    4. Steps 1-3 repeated 3 times.
    5. Microsoft Project popup: There is not enough memory to complete the operation.  To free up available memory, close programs, projects, or windows you aren't using, and try again.

    I located a solution, finally!  It was solved back in 2007. It is NOT a memory issue nor a conflict with other software as most of the forum advisers suggest. It is a pure MICROSOFT problem with Registry permissions. And as they provide no solution
    (as of 2014 yes 7 years) one has to use a registry hacking tool to take command  of the registry. The solution that worked perfectly for me is located here :
     http://www.techtalkz.com/microsoft-office/157044-unable-install-project-standard-2007-a.html
    Full thanks to David Chatfield for finding the answer back in July of 2007!

  • OBIEE 11g installation got struck in "Configuration Process"

    Hi
    I am trying to instal OBIEE 11g 11.1.1.5.0 on Win 7 computer on MS Sql server Express.
    Every went smooth with RCU, and OBIEE 11g installation upto step 12.
    Now in Step 13, 'Configuration Process', the installer got struck forever showing:
    BI Configuration -> 0%
    Creating Domain -> In Progress
    and rest of all the items in 'Recommended' status.
    How can I make this move forward?
    I see no activity going on in logs etc. Looks like installer got struck 'creating domain' activity forever.
    Thanks for any inputs.

    Please find the error messages from log: Thanks for any inputs.
    Creating a new AdminServer Object ...
    AdminServer port is 7001
    Starting the domain ...
    LOADING DLL : C:\obiee\obieemiddlewarehome\Oracle_BI1\install\config\\StartUtil64.dll
    DEBUG : Loading DLL : C:\obiee\obieemiddlewarehome\Oracle_BI1\install\config\\StartUtil64.dll
    DEBUG : Loaded DLL : C:\obiee\obieemiddlewarehome\Oracle_BI1\install\config\\StartUtil64.dll
    oracle.as.provisioning.util.ConfigException:
    Error while starting the domain.
    Cause:
    An error occurred while starting the domain.
    Action:
    See logs for more details.
         at oracle.as.provisioning.util.ConfigException.createConfigException(ConfigException.java:123)
         at oracle.as.provisioning.weblogic.ASDomain.startDomain(ASDomain.java:3179)
         at oracle.as.provisioning.weblogic.ASDomain.startDomain(ASDomain.java:3039)
         at oracle.as.provisioning.engine.WorkFlowExecutor._startAdminServer(WorkFlowExecutor.java:1645)
         at oracle.as.provisioning.engine.WorkFlowExecutor._createDomain(WorkFlowExecutor.java:635)
         at oracle.as.provisioning.engine.WorkFlowExecutor.executeWLSWorkFlow(WorkFlowExecutor.java:391)
         at oracle.as.provisioning.engine.Config.executeConfigWorkflow_WLS(Config.java:866)
         at oracle.as.install.bi.biconfig.standard.StandardWorkFlowExecutor.executeHelper(StandardWorkFlowExecutor.java:31)
         at oracle.as.install.bi.biconfig.standard.DomainProvisioningTask.doExecute(DomainProvisioningTask.java:48)
         at oracle.as.install.bi.biconfig.standard.AbstractProvisioningTask.execute(AbstractProvisioningTask.java:70)
         at oracle.as.install.bi.biconfig.standard.StandardProvisionTaskList.execute(StandardProvisionTaskList.java:61)
         at oracle.as.install.bi.biconfig.BIConfigMain.doExecute(BIConfigMain.java:112)
         at oracle.as.install.engine.modules.configuration.client.ConfigAction.execute(ConfigAction.java:335)
         at oracle.as.install.engine.modules.configuration.action.TaskPerformer.run(TaskPerformer.java:87)
         at oracle.as.install.engine.modules.configuration.action.TaskPerformer.startConfigAction(TaskPerformer.java:104)
         at oracle.as.install.engine.modules.configuration.action.ActionRequest.perform(ActionRequest.java:15)
         at oracle.as.install.engine.modules.configuration.action.RequestQueue.perform(RequestQueue.java:63)
         at oracle.as.install.engine.modules.configuration.standard.StandardConfigActionManager.start(StandardConfigActionManager.java:158)
         at oracle.as.install.engine.modules.configuration.boot.ConfigurationExtension.kickstart(ConfigurationExtension.java:81)
         at oracle.as.install.engine.modules.configuration.ConfigurationModule.run(ConfigurationModule.java:83)
         at java.lang.Thread.run(Thread.java:662)
    Caused by: oracle.as.provisioning.util.ConfigException:
    Error while starting the domain.
    Cause:
    Starting the Admin_Server timed out.
    Action:
    See logs for more details.
         at oracle.as.provisioning.util.ConfigException.createConfigException(ConfigException.java:123)
         at oracle.as.provisioning.weblogic.ASDomain.startDomain(ASDomain.java:3149)
         ... 19 more
    oracle.as.provisioning.exception.ASProvisioningException
         at oracle.as.provisioning.engine.Config.executeConfigWorkflow_WLS(Config.java:872)
         at oracle.as.install.bi.biconfig.standard.StandardWorkFlowExecutor.executeHelper(StandardWorkFlowExecutor.java:31)
         at oracle.as.install.bi.biconfig.standard.DomainProvisioningTask.doExecute(DomainProvisioningTask.java:48)
         at oracle.as.install.bi.biconfig.standard.AbstractProvisioningTask.execute(AbstractProvisioningTask.java:70)
         at oracle.as.install.bi.biconfig.standard.StandardProvisionTaskList.execute(StandardProvisionTaskList.java:61)
         at oracle.as.install.bi.biconfig.BIConfigMain.doExecute(BIConfigMain.java:112)
         at oracle.as.install.engine.modules.configuration.client.ConfigAction.execute(ConfigAction.java:335)
         at oracle.as.install.engine.modules.configuration.action.TaskPerformer.run(TaskPerformer.java:87)
         at oracle.as.install.engine.modules.configuration.action.TaskPerformer.startConfigAction(TaskPerformer.java:104)
         at oracle.as.install.engine.modules.configuration.action.ActionRequest.perform(ActionRequest.java:15)
         at oracle.as.install.engine.modules.configuration.action.RequestQueue.perform(RequestQueue.java:63)
         at oracle.as.install.engine.modules.configuration.standard.StandardConfigActionManager.start(StandardConfigActionManager.java:158)
         at oracle.as.install.engine.modules.configuration.boot.ConfigurationExtension.kickstart(ConfigurationExtension.java:81)
         at oracle.as.install.engine.modules.configuration.ConfigurationModule.run(ConfigurationModule.java:83)
         at java.lang.Thread.run(Thread.java:662)
    Caused by: oracle.as.provisioning.exception.ASProvWorkflowException: Error Executing workflow.
         at oracle.as.provisioning.engine.WorkFlowExecutor._createDomain(WorkFlowExecutor.java:686)
         at oracle.as.provisioning.engine.WorkFlowExecutor.executeWLSWorkFlow(WorkFlowExecutor.java:391)
         at oracle.as.provisioning.engine.Config.executeConfigWorkflow_WLS(Config.java:866)
         ... 14 more
    oracle.as.provisioning.exception.ASProvisioningException
         at oracle.as.provisioning.engine.Config.executeConfigWorkflow_WLS(Config.java:872)
         at oracle.as.install.bi.biconfig.standard.StandardWorkFlowExecutor.executeHelper(StandardWorkFlowExecutor.java:31)
         at oracle.as.install.bi.biconfig.standard.DomainProvisioningTask.doExecute(DomainProvisioningTask.java:48)
         at oracle.as.install.bi.biconfig.standard.AbstractProvisioningTask.execute(AbstractProvisioningTask.java:70)
         at oracle.as.install.bi.biconfig.standard.StandardProvisionTaskList.execute(StandardProvisionTaskList.java:61)
         at oracle.as.install.bi.biconfig.BIConfigMain.doExecute(BIConfigMain.java:112)
         at oracle.as.install.engine.modules.configuration.client.ConfigAction.execute(ConfigAction.java:335)
         at oracle.as.install.engine.modules.configuration.action.TaskPerformer.run(TaskPerformer.java:87)
         at oracle.as.install.engine.modules.configuration.action.TaskPerformer.startConfigAction(TaskPerformer.java:104)
         at oracle.as.install.engine.modules.configuration.action.ActionRequest.perform(ActionRequest.java:15)
         at oracle.as.install.engine.modules.configuration.action.RequestQueue.perform(RequestQueue.java:63)
         at oracle.as.install.engine.modules.configuration.standard.StandardConfigActionManager.start(StandardConfigActionManager.java:158)
         at oracle.as.install.engine.modules.configuration.boot.ConfigurationExtension.kickstart(ConfigurationExtension.java:81)
         at oracle.as.install.engine.modules.configuration.ConfigurationModule.run(ConfigurationModule.java:83)
         at java.lang.Thread.run(Thread.java:662)
    Caused by: oracle.as.provisioning.exception.ASProvWorkflowException: Error Executing workflow.
         at oracle.as.provisioning.engine.WorkFlowExecutor._createDomain(WorkFlowExecutor.java:686)
         at oracle.as.provisioning.engine.WorkFlowExecutor.executeWLSWorkFlow(WorkFlowExecutor.java:391)
         at oracle.as.provisioning.engine.Config.executeConfigWorkflow_WLS(Config.java:866)
         ... 14 more

  • Error during configuration process while installing obiee 11.1.1.7.0 in windows server 2012

    HI..
    I'm having an issue while installing obiee 11g(11.1.1.7.0) in windows server 2012 and using the database as ms sql server 2008. During configuration process after the installation process is completed , here the process is stopped at "Step:executing opmnctl start configuration_obisch1" status "failed"
    Here is the error:
    Error
        opmnctl task failed
        Step Executing: opmnctl start coreapplication_obisch1 failed
        Configuration Action "Executing opmnctl start coreapplication_obisch1 " has failed. please check log files...
    any help would be great
    thanks..

    Friend,
    Installer file size is:
    Size: *1.23 GB (1,323,085,837 bytes).*
    Size on disk: *1.23 GB (1,323,089,920 bytes).*
    I tested also disabling antivirus on my PC and disconnect the power cord before starting the installation of JDeveloper. In both tests the result was the same.
    Some additional recommendations to solve this case.
    Thank you for supporting.
    Edited by: Luis_vkacito on Nov 15, 2012 6:48 AM

  • Best practice for patching ( Feb 2014 CU) of Project Server 2010

    Hi,
    Please advise.
    Thanks
    srabon

    Hi,
    My current environment is,
    # VM -1 (Project Server 2010) Enterprise Edition
    - Microsoft SharePoint and Project Server 2010 SP1
    - Configuration Database Version 14.0.6134.5000
    - Patch installed - KB2767794
    # VM -2 (SQL Server 2008 R2)
    Now my plan is,
    - Taking Snapshot for the VM-1
    - Should I also take VM snapshot for VM-2 ?
    - Taking Farm Backup
    - Taking /pwa site collection backup
    For your information I do see in your articale MS says that I may have SP1 or SP2 before running this patch but you mentioned I have to have SP2 as well ?
    Fyi....
    Prerequisites
    To install this cumulative update, you must have one of the following products installed:
    Microsoft Project Server 2010 Service Pack 1 (SP1) or Service Pack 2 (SP2)
    Microsoft SharePoint Server 2010 Service Pack 1 (SP1) or Service Pack 2 (SP2)
    Microsoft SharePoint Foundation 2010 Service Pack 1 (SP1) or Service Pack 2 (SP2)
    Please advise if I miss something in my plan.
    Thanks
    srabon

  • Email Notifications from Project 2013 has Project Server 2010 in the subject

    When Project 2013 sends out task reminders it has "Task reminders - Microsoft Project Server 2010
    notification service" in the subject line.  Anyone know how or where this can be changed from 2010 to 2013. 
    New On premise installation of Project 2013 sp1

    I think it is a known bug, not sure if it has been corrected in the latest CU. Contact MS, they should help you with a script:
    https://social.technet.microsoft.com/Forums/en-US/6441b337-785e-48a6-a40a-6406a141001d/task-reminder-emails-for-project-server-2013-have-subject-line-task-reminders-microsoft-project?forum=projectserver2010general
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Error Message while Approving Tasks in Project Server 2010

    Hi All,
    While performing Tasks approvals in MS Project 2010 I am getting below error message:
    An Error Occured while processing one or more items. This was caused by one of the following:
    A timesheet job is failed and blocking coorelation in the queue.
    The approval item no longer exists or has already been approved
    The host server is unreachable.
    Following are the details of the error message found in Event Viewer:
    Standard Information:PSI Entry Point:
    Project User: <domain>\<windowsuserid>
    Correlation Id: 417dce51-740f-46f0-8f1e-182b4e0c635c
    PWA Site URL: http://<servername>/<projectserver>/
    SSP Name: spsusfiprojwebappservice
    PSError: GeneralQueueCorrelationBlocked (26005)
    Operation could not completed since the Queue Correlated Job Group is blocked. Correlated Job Group ID is: 2ae5d5f9-b554-4a44-93f0-f815d36976cd. The job ID of the affected job is: 82dce1fb-be71-4c4a-8d16-4516ea8c887d. The job type of the affected job is:
    TimesheetReview. You can recover from the situation by unblocking or cancelling the blocked job. To do that, go to PWA, navigate to 'Server Settings -> Manage Queue Jobs', go to 'Filter Type' section, choose 'By ID', enter the 'Job Group ID' mentioned in
    this error and click the 'Refresh Status' button at the bottom of the page. In the resulting set of jobs, click on the 'Error' column link to see more details about why the job has failed and blocked the Correlated Job Group. For more troubleshooting you can
    look at the trace log also. Once you have corrected the cause of the error, select the affected job and click on the 'Retry Jobs' or 'Cancel Jobs' button at the bottom of the page.
    In Server Settings>Manage Queues>Erro Details following information is listed
    General
    Timesheet:
    TimesheetIncorrectMode (3204). Details: id='3204' name='TimesheetIncorrectMode' uid='e53139e1-66cb-4b4a-a948-cbeda21340b8' mode='1'.
    Queue:
    GeneralQueueJobFailed (26000) - TimesheetSubmit.SubmitTimesheetMessage. Details: id='26000' name='GeneralQueueJobFailed' uid='4c09d375-cad0-4b61-be16-49abbdc149e4' JobUID='b3737c2a-11f4-4799-9fd7-1d018e4c73d1' ComputerName='JSIDBWPRJA02' GroupType='TimesheetSubmit'
    MessageType='SubmitTimesheetMessage' MessageId='1' Stage=''. For more details, check the ULS logs on machine JSIDBWPRJA02 for entries with JobUID b3737c2a-11f4-4799-9fd7-1d018e4c73d1.
    Background:
    We are gearing up to upgrade our Project Server from 2003 to 2010; as part of this process we have installed MS Project Server 2010 on our dev environment. We created Test Project plans and assigned ourselves (we admins) to these plans and all of us have
    admin privileges.

    Hi, Can you give a bit more detail on how your generating the task approval. Are you going into myTasks and doing self assignment to your test project plans or are you generating these approvals via outlook or are you updating a timesheet and sending status?
    If you're using your timesheet have you created all your timesheet periods within server settings, time and task management...Donald R. Landry

Maybe you are looking for

  • Suggestions for Safely Installing Snow Leopard

    Many users seem to be having problems upgrading to Snow Leopard. Here is a suggested installation procedure to minimize problems: 1. Repair your hard drive and permissions: Repairing the Hard Drive and Permissions Boot from your OS X Installer disc.

  • How do i find out what type of pgm i need to view a video?

    sometimes i cannot watch some videos..how do i find the program to let me view them?

  • Can't wake G5, odd black square on left side

    I've been having intermittent problems when trying to wake my G5. I have a KVM switch and everything has been work with no problems up until the last Security Update. Now, on occasions, when I switch to the G5, the desktop is still showing, when it s

  • Validation between Bank GL and House Bank

    Dear Experts, At present in FCH5 there have no restriction for Bank GL and House bank. Suppose in my payment document I paid my vendor through ICICI Bank G/L, but in FCH5 we can assign House Bank HDFC or others against my above payment document. The

  • CC Lightroom Desktop Activation/Serial

    Hi, I just purchased Photoshop CC with Lightroom 5 Desktop and mobile. Lightroom 5 and PS CC show up as App in CC as updated versions but every time I start LR 5, it still runs the testversion and wants me to enter a serial number. The Testversion st