Configuration steps not copied from Template project

Hi All,
We are creating a project using an existing template project (our own defined). The business processes are copied but the configuration steps and documentation in configuration does not come in the new project (SOLAR02).
Could any one help.

Goto solar01 transaction here first choose the business scenario of ur template project which you have added in the structure tab on the right side you have something known as attribute column
Here choose the appropriate one for you
Global
A process is global when it is integrated throughout the enterprise, that is, it is cross-functional or cross-organizational. An element that is flagged as global cannot be changed in a Local Rollout, i.e. the structure element and all associated business content is pre-determined.
Standard Complete
A process is standardized if it must be executed in the same way in the entire enterprise (in all relevant organizational units). A standardized complete element (and its business content) can be seen as a proposition from the Global Template that should be used as delivered. However the local team may extend the structure element with additional substructures and with additional business content.
Standard Partial
A process is standardized if it must be executed in the same way in the entire enterprise (in all relevant organizational units). A standardized partial element (and its business content) can be seen as a proposition from the Global Template that should be used as delivered, but the process consist of sub-processes that are locally regulated by legal requirement and these need to be defined on a local level. The local team can design own process if agreed by the parent company. Therefore the local team may extend the structure element with additional substructures and with additional business content. Template business content may even be changed or deleted by the local team. Whenever a template object is deleted there is a warning message.
Harmonized
These Business Process, Master Data, Organizational Units will be standardized in the future. It is recommended that the Local Rollout uses the harmonized structure elements. A process is harmonized if it is recommended to execute the process in a specific way. Harmonization is a first step towards standardization, but without mandatory elements. One reason can be for organizational readiness or many legal requirements preventing standardization. For the local teaam the same activities are allowed/forbidden as for Standard Partial.
Local
A process is local if it is not possible or it makes no sense to define it as global, standardized, or harmonized. Local units must design this process for their needs. These processes are necessary for obtaining an executable system for testing. For the local teaam the same activities are allowed/forbidden as for Standard Partial.
Note You can use the pass tab available next to +/- button which is used to pass this attribute which you have assign to the lower levels.
Hope you got what you are looking for
Regards
Prakhar
Edited by: Prakhar Saxena on Mar 20, 2009 2:12 PM

Similar Messages

  • Configuration is not copied from CRM to ECC

    Hi,
    We have one contract in  CRM and configuration for the line items are done in CRM. Now when that contract is replicated in ECC, configuration of that line item is not copied. So when we create sales order with respect to that contract in ECC, we will have to do the configuration manually.
    We have observed that the item category for the particular line item in question is active for configuration in CRM and not customized to configuration in ECC. Is it because of that the configuration is not replicated?
    Please help
    Thanks.

    the configuration (variant configuration and not customization) that is done in CRM contract is not copied to ECC contract. Is it because that item category in CRM is activated for doing the BOM configuration and the same in ECC is not activated for doing the BOM configuration?
    My question is that if item category in ECC is not activated for BOM configuration then is it like that the BOM configuration in CRM will not be copied to ECC?

  • Why does text formatting not copy from RH project to RH project?

    In RoboHelp 9, I'm copying text, from one RoboHelp project to another. How come the text formatting is not retained? The indenting is off and the small Roman numerals and small letters are changed to bullets.

    Different CSS files?
    See www.grainge.org for RoboHelp and Authoring tips
    @petergrainge

  • How to migrate changed Business Scenarios from Template Project to Solution

    SAP Solution Manager - How to migrate changes in Business Scenarios from Template Project to Solution?
    Our Global ASAP strategy is based upon a Template Project, Implementation Project, Maintenance Project and Solution with Business Scenarios.
    Changes in the Template Project for existing and new Business Sceanarios, etc. are correctly executed. Up till now we have successfully implemented our Template Project and secondly extended our Business Scenarios from 4 to 14. Our 3rd upcoming change will be changes on Business Scenarios as well. These planned changes for the Business Scenarios need to be consistent, possibly without manual intervention.
    During a Proof of Concept (PoC) in our Sandbox (SXB) we have identified a possible serious problem when trying to publish these changes in Business Scenarios in the Template Project to the Solution. SAP Solution Manager (SSM) does not seem to support a scenario where Business Scenarios in the Solution can be refreshed or updated with changed Business Scenarios in the Template Project.
    We have identified 2 possibillities:
    1.     Manual project upgrade
    1.1.     Synchronize the changes for the Template Project normally;
    1.2.     Delete the changed Business Scenarios from step 1.1 in the Solution;
    1.3.     Add the changed Business Scenarios from step 1.1 into the Solution.
    For this scenario we foresee a big problem because all Content and Issues connected to the old Solution Business Scenarios loose their coupling with the Solution.
    For the Content this may not be a real problem because the Content is also available in the Template Project.
    However the Issues are loosely coupled to the Solution Scenarios and therefore need to be coupled manually to these processes.
    2.     Manual changes using Maintenance Project
    2.1.     Synchronize the changes for the Template Project normally;
    2.2.     Publish all changes from step 2.1 in the Template Project
    2.3.     Add all new Content from step 2.1 to the structure of the Maintenance Project;
    2.4.     Relocate Content and Issues when the Business Scenario has been relocated.
    Because SSM does not support this activity we need to delete this Business Scenario first and secondly re-create it again on the correct spot.
    Our question: How has SAP done this in other customer projects?
    We need to have a working solution by the end of March, 2009.
    Best regards,
    Peter Hendriksen

    Peter,
    Did you get an anwer to this question from SAP?
    Rgds,
    Eamonn.

  • Text is not copied from Customer masterdata to sales document header

    Hi Friends,
    Text was maintained in customer masterdata, that should be copied in to sales order header. In Quality server its working as per requirement. But in production its not copied from customer master data.
    Same configuration settings are in production as well as quality(VOTXN)
    Please suggest me regarding this

    Hi Durga,
    Please go to SD> Basic function > text control> Define and Assign Text Determination Procedures and in that screen, check the customer sales and distribution change view customer sales text and sales note for customer and its assignment .
    I hope these will be helpful for you.
    Regards,

  • Configuration is not replicated from CRM to ECC for configurable product

    Hi,
    We have some materials in the system for which the configuration is not replicated from CRM to ECC.
    We create a quotation in CRM and configure it. In CRM,  the configuration is complete and components are properly exploded but when we check the same quotation in ECC, configuration is incomplete with respect to some characteristics and product references.
    Please find below finding
    1. If the same material is created in another plant/company code, the configuration is replicated properly.
    2. We have also checked that the BOM is completely maintained for plants for which configuration is replicated. But we dont think so it could be an issue since if we create the quotation in ECC instead of creating in CRM, for the plant (for which the configuration is not replicated from CRM to ECC),  it is properly exploded and complete.
    3. variant prices are replicated properly even though components are not replicated.
    We need to know if we can explode the BOM in the configuration even though complete BOM for the particular plant is not maintained. If its not possible to explode, why it is possible for us to explode the BOM in the configuration in quotation.
    Please  advise.
    Thx.

    the configuration (variant configuration and not customization) that is done in CRM contract is not copied to ECC contract. Is it because that item category in CRM is activated for doing the BOM configuration and the same in ECC is not activated for doing the BOM configuration?
    My question is that if item category in ECC is not activated for BOM configuration then is it like that the BOM configuration in CRM will not be copied to ECC?

  • CSS for background image not transfering from template to new page

    I have a gradient .gif in my templates which suddenly no longer transfers from the template to  a new page created from the template.  Everything else about the template transfers.  I'm using Dreamweaver CS5 on a Mac running OS 10.6.  I've pasted the CSS from the template and the new page below.  I've tried the usual voodoo--restart program, restart computer, repair permissions, delete preference file, delete personal configuration file.
    CSS from Template:
    .container {
        background-color: #ececec;
        background-image: url(../images/faux_column.png);
        background-repeat: repeat-y;
        height: 650px;
        width: 650px;
    CSS from page created from Template looks to be the same, but is greyed out in the code, and the background-image entry is not present in the CSS styles inspector:
    .container {
        background-color: #ececec;
        background-image: url(../images/faux_column.png);
        background-repeat: repeat-y;
        height: 650px;
        width: 650px;
    Any suggestions greatly appreciated.

    Unfortunately, I don't yet have a site where I can post the page.  I'm new to this, and doing everything locally for now.
    After careful rechecking, I found that the links for the template and the child were not the same, as you suspected.  So I carefully changed the links to site root relative, which worked for the background CSS in my test image.  I then did the same for all of the links to pages on my site, and checked that all were OK with Link Checker in DW.  I guess that was a mistake, because now most of them don't work when tested in Firefox--I get the message File not found.  Must be doing something wrong.

  • Eq. not copying from Maint. Work order to Work Approval in WCM

    Dear Experts,
    While I am creating Work Approval from Work Order, Equipment number is not copied from Work Order as per screenshot. why?

    Greetings Parag,
    You have "Reference Object" in your Sequence above the "Reference Object with Installed equipment", which makes the transaction first fill the Functional Location only, and afterwards, the Equipment field is grayed out by the time it gets to copying it.
    Swap the Sequences of fields 50 and 200 or delete the field 50 from copy settings in
    SPRO > Plant Maintenance > Work Clearance Management > Master Data > Data Transfer When Creating with Template > Define Fields

  • STO Delivery Date is not copy from Allocation Table Site Date

    Hi,
    I have a problem when Stock Transfer Order created based on the Allocation Table, the delivery date is not copy from Allocation Table. E.g. In Allocation Table delivery date is 26.09.2009, but in STO delivery date is 06.11.2009.
    Check the configuration and also check the stock, there is stock available to be delivered on 26.09.2009.
    Can someone please give me a hint to find out what is missing or wrong, and how to fixed this?
    Greatly appreciate for your suggestion and sharing.
    Kind Regards,
    2tea

    I found the problem finally.

  • Variant config - error Material ZZZ is not copied from the bill of material

    Hello guys,
    I try to obtain a material configurable in a new plant.
    I have more errors and I don't know exactly if the problems are in setting of the variant configuration, or if the problems are in customizing.
    When I try to make a Sale Document (Standard Order VA01), the following error occurs:
    Material ZZZ is not copied from the bill of material.
    Message no. V2003
    Diagnosis
    When the bill of material was exploded, it was established that no sales document item could be created for material ZZZ.
    System Response
    The system ignores the material during bill of material explosion.
    Procedure
    Check if the BOM explosion can be used without material ZZ. If not, delete the main item which lead to the BOM explosion. You may be able to enter an item manually in which the material ZZZ in the BOM.
    What do you think it might the solution for this challenge?
    Thanks in advance.

    hello, friend.
    the issue you presented is very broad and requires some more info, such as:
    1.  what are the item category groups of the material and ZZZ?
    2.  did you check item category determination in your sales doc type?
    regards.

  • Letter of Credit not copying from Quotation to Sales order

    Hello,
    I have attached a LC to a Quotation. When i am making an order with reference to the Quotation, the LC is not copying from Quotation to the Sales order. Kindly help.
    Regards,
    Shahzad

    Hi,
    Did you want to say that you have maintain some text in quotation and that text is not copying to the sales order some thing like that?
    So I suggest you to check your setting by going to the following Tcodes.
    VOTXN over there you can define the text types.
    And you have to assign you text determination procedure to the order also.
    If you want that text to be copied to the billing also then assign the procedure to the billing doc.
    If you have assigned properly your procedure then it will copy the document.
    Regards
    Raj.

  • Item 000002 is not copied from the reference document

    Dear All,
    I am facing a typical problem while creating Price difference sales order w.r.t. invoice.
    Document types in the system are -
    Z2FC - Normal Sales order type, ZPD - Price change order type, Z2FB - Normal invoice type
    My item category determination is -
    Doc. type -  Itm cat. gp.  -  Usage - Hghr itm cat - Default itm cat. - Manual itm. cat.
    ZPD         -   NORM         -  blank   - blank           -  G2N                  - L2N
    ZPD         -   NORM         -  blank   - G2N            -  G2N                  - L2N
    Z2FC       -   NORM         -  blank   - Blank           - TAN                  - TAP
    Z2FC       -   NORM         -  blank   - TAN            - TANN                - TAN
    Copy control is -
    Z2FB to ZPD for item category TAN with proposed item categories are G2N and L2N.
    Z2FB to ZPD for item category TANN u2013 requirement 302 [Do not copy item]
    During my Z2FC sales order creation I was having line items as follows
    Item no. -  Mat. code     -  Qty -      Higher level item - Item category - Amount
    10         -  101329          -  3     -      blank                 - TAN                - 35,000.00
    20         -  MC091234    -  3     -      10                      - TANN             - 0
    30         -  MC091234    -  1     -      10                      - TAN                - 5000
    We are not using the sales BOM. I need to provide line 20 free to the customer. Hence I have manually maintained 10 in the higher level item column for the line item 20. The item category determined was TAN. Then I had changed it to TANN manually. So the amount became zero. Line 20 became the child and line 10 became parent.
    At the same time customer also wishes to buy the material code MC091234. Now the material code MC091234 is of HALB type where as the material code 101329 is of FERT type. There is validation in the system that only FERT type of material could be sold and HALB type of material could be supplied as free. [With item category TANN]. In case HALB type material is also required to be sold then I need to manually maintained value in the higher level item. So I had maintained the value 10 in the higher level item column for the line item 30. The default item category determined is TAN. The invoice is also created properly. [Z2FB type]
    But when I am creating the invoice correction document type ZPD w.r.t. Z2FB type invoice, I am able to get the two line items for the material code 101329 in line item 10. One each for G2N and L2N item category.
    But for the material code MC091234 in line item 30, I get only one line item with item category G2N. I did not get another line item for the material code MC091234 for the corresponding L2N type item category
    At the same time following messages are displayed
    Message no. V1475 Item category for item 000002 cannot be determined and
    Message no. V1476 Item 000002 is not copied from the reference document
    Please help.
    Thanks in advance
    Piyush Ranpura

    Dear All,
    Any help???
    Yet my issue is unresolved.
    Thanks & Regards
    Piyush Ranpura

  • " VL 476: Item 'Official Doc. Number' is not copied from the reference doc"

    Hi Guys,
    When I am doing the Accrual Reversal in F.81 I am getting the following error
    " VL 476: Item 'Official Doc. Number' is not copied from the reference document ".
    I have maintained the number ranges also. I am not able to understand why the system is issuing this error.
    Pls suggest.
    Thanks
    Srikanth

    Hi Guys,
    Can anyone please help on this error.
    Thanks
    Srikanth

  • Discount pricing is not copied from Qoutation to Sales order.

    Hi All,
    Issue:
    Discount pricing is not copied from Qoutation to Sales order.
    Please suggest the correct copy control/Routine programs which i can check to proceed furthur.
    Points will be rewarded.
    Regards,
    neslin.

    kindly check in the price determination  whether you have assigned the quotation document pricing type ? simmilar like the sales order type you have assigned ?

  • PO number  not copied from Contract to Sales order

    Hi Gurus,
    when i try to create a sales order w.r.t a contract the Po number is not copying from cintract to sales order.
    also the PO item is not copying from contract to sales orde.
    Could u tell me the reason.
    Cheers,
    Sumith

    Hi Sumith,
    I'm not sure though but try this one this might jus help.
    Go to VTAA,
    select the target & Source doc type.
    Go to header and check the COMPLETE REFERENCE CHECK BOX,
    Which says it copies the whole of the reference doc from the
    source doc to the target doc.
    I jus hope this will sole your problem.
    Cheers!!
    Nitin

Maybe you are looking for

  • Is it possible to change 10.5.2 to 10.4 Leopard to Tiger for new computer?

    For some reasons I need to start up my new MacBook Pro by OS 10.4 (Tiger). The computer doesn't accept to install Tiger. Is it locked to Leopard and doesn't work with any previous OS? I'd like to install it on my external hard disc but It's not possi

  • [URGENT] Problems Booting from External HD

    I'm at a complete loss on this one. I'm a pretty competent Mac geek, and even I can't figure this out. Bear with me, I'll try and explain my problem as best I can. First, some basic info: My hardware setup: • iMac G3 600MHz • 1GB RAM • 120GB internal

  • Help on adf taskflow scope

    Hi, I am using JDeveloper 11.1.1.4 and ADF-BC in my application. In one of my modules,I have the following scenario. I have a bounded task flow and a page fragment[ex: mainTabs.jsff] on it.I have registered a backing bean with scope pageFlow and some

  • Is spry tool tips supposed to work after inserting it in DW Cs6 ?

    Is spry tool tips supposed to work after inserting it in DW Cs6 or am I supposed to get it from Adobe Labs somwhere. I get a message to GET but clicking does nothing.

  • Understanding App Development and Hosting options