Configuring EA2700 as second-level router

I need to front-end my ISP's router with another, giving me a DMZ.  I have bought an EA2700 for this but I can't find how to configure it.  Can someone help?
I plan to have the DMZ network as 10.1.2.0/24, with the ISP's router at 10.1.2.254 and the EA2700's "upstream" connection as 10.1.2.1.  The internal network (where most of the clients reside) will then be 10.1.1.0/24, with the EA2700 itself at 10.1.1.254 and a DHCP range 10.1.1.100 upwards.
On the basic setup screen I've set the Internet connection type to fixed IP, 10.1.2.1; I've set its default gateway and DNS1 as the ISP's router at 10.1.2.254.  Then further down in network setup I've entered the *internal* address 10.1.1.254 and set the DHCP range and netmask appropriately.  I'm getting the error message "The IPv4 address and gateway are not in the same subnet mask".  But the only gateway I've entered is the one by which the *EA2700* knows how to route upstream traffic, viz the ISP's router at 10.1.2.254.  Or am I misunderstanding?
More fundamentally, can the EA2700 be configured in this way?

Thank you for the prompt reply.
The configuration I'm trying to achieve is this (I've left out lots of the downstream connections):
And my latest attempt at the configuration screen is this:
I haven't done anything with the firmware on the EA2700 -- it's whatever it was built with.  PS I'm using Linux so have no access to the Cisco Connect utility.

Similar Messages

  • PR transfer to SRM at second level approval

    Dear Experts ,
    we have classic schenario of SRM 7.0 , we want to transfer PR to SRM before final release from ECC.
    can anybody suggest where it is decided that at this particular level of approval PR got transfer to SRM
    we have badi ME_REQ_SOURCE_CUST implemented to send PR to SRM , but this is happening at final release after all the approvals .
    can we trigger this transfer at second level of approval. we have six level of approvals
    is it poosible

    Hi Muthu ,
    Thanks for the response .
    We are on Classic Scenario SRM 7.0.
    We do not want any approvals in SRM ,  we are carrying out Bidding for the PRs created in ECC through SRM. Our Business requirement is as below -
    PR is created , will trigger 8 levels of approval /Release depending on the configuration set up.
    The level 2 approver will decide whether it is to be transferred to SRM or not. Its a manual decision and we have done development for this and it works fine.
    But, by the approval at level 2 itself, system should trigger the XML i. e Transfer PR to SRM.
    And the next levels of approval should be blocked.
    In SRM, we carry out biddng and quote comparision and after that the level 2 person will initiate the next level of approvals.
    My Business wants ,the quotes ,vendors etc when the PR is getting approved by the SCM Heads i.e. Level 3 approver.
    Appreciate your response on this.
    Regards,
    Akash.

  • Steps required for second level approval Workflow

    Hi,
    Can any one explain me step by step procedure  of how to configure 2 level approval process in SRM.I have activated the second level approval for SC.But after  this what i have to do. Where can i set the value conditions in workflow?How system will decide for one level approval it has to go for a person "Y" and for 2nd level approval it has to go to Manager?
    kindly help me out in this
    regards
    subbramanyam

    I think you have to activate the below workflows in the system which automatically  identifies the number of levels that it should cross.
    WS14000133
    WS10000049
    WS14000134 ---> This Sub workflow determines,  is there any next approver or not?.

  • Help. How to configure ASA5515 as 'one armed router' for access to DHCP server on a different VLAN

    Hi,
    My setup
         router > ASA5515(ver8.6) > 4 SGE2010p switches
     I want to put the guest WiFi users on a separate network. I have layer 2 switches and want to configure the ASA5515 as a 'router on a stick' setup for the guest vlan to have access to the DHCP server on the native vlan.
    I have
    1. created a sub-interface for the inside interface and enabled intra-interface traffic.
    2. A static route on the ASA point the guest network to the switch.
      What else do I need to configure on the ASA for inter-vlan routing?
    ASA related config:
    interface GigabitEthernet0/1
     nameif inside
     security-level 100
     ip address 10.15.xx.1 255.255.252.0 standby 10.15.xx.2
    interface GigabitEthernet0/1.2
     vlan 100
     no nameif
     no security-level
     ip address 10.100.xx.1 255.255.255.0
    C    10.15.xx.0 255.255.252.0 is directly connected, inside
    S    10.100.xx.0 255.255.255.0 [1/0] via 10.100.xx.2, inside

    Thanks for the quick response Reza.
     Actually that command is already there. Didn't include it in my post.
    So I am guessing my ASA config is correct.
    I am having trouble setting up the trunk ports on the layer2 SGE2010P switch for trunk port.
    I am used to command line layer3 switches (CLI is wasy) but not familiar with these switches GUI. I am going through the config guide right now.
    Could you help me with that too?
    Not to bother you with a completely different issue though.
    Thanks again!

  • Want to add second wireless router to network

    I have a Actiontec MI424WR and would like to add a second wireless router, a Linksys Cisco E2000 which has N capabilities. What is the best way to add this second router so that they both work as wireless routers? Thank you for your help.

    If I'm not mistaken, they can leave the SSID on both access points to be the same. You just don't want them to run on the same channel. The devices with either setup see an Access Point by it's MAC Address. It should have no problem roaming onto another Access point if one starts to get too weak for the device's liking. Even with separate SSIDs, that will still happen.
    What the above poster means by setting up the Linksys as an Access Point is the following:
    1: Disable DHCP on the Linksys
    2: Disable the Firewall, UPnP support in the Linksys
    3: Configure BOTH the ActionTec and Linksys to operate on WPA2 Security (The Linksys E2000 is a Wireless N router. Wireless N requires WPA2 to work to it's potential).
    4: Set both the ActionTec and Linksys to separate channels, either 1, 6, or 11. It's best to keep them off each other's ranges due to the distance between the two APs. The Linksys should only be set to use 20Mhz wide channels for Wireless N. DO NOT OPERATE IT ON AUTO/40MHZ!
    5: Connect the Linksys to the ActionTec by plugging the Linksys into the network using one of the LAN Ports. Do not use the Internet port on the Linksys!
    Just keep in mind, if you do set up the Linksys to run on the same SSID as the ActionTec, the security settings (Key, Encryption type, MAC filtering) must be identical. If you go down the separate SSID route as mentioned above, you're free to keep the security settings separate. Just keep in mind my pointer with WPA2, though.
    ========
    The first to bring me 1Gbps Fiber for $30/m wins!

  • Can purchasing a second wireless router allow you to have two networks?

    I already have a netgear branded router connected to my modem. Can I  create a seperate network within my house with one of Apple's airport  stations (any one of the three, not sure which one I'm getting yet) by  using the internet connection from my current router? I.e can I connect  the airport base station to my current router (either wirelessly or  wired) and allow it to broadcast a seperate network and share the same internet connection?

    Can purchasing a second wireless router allow you to have two networks?
    Yes, it can.
    If you connect an Ethernet cable from one of the LAN <-> ports on your Netgear router to the WAN "O" port on an Apple AirPort router, you can configure the AirPort router to create a separate wireless network using a different wireless network name and password.

  • Unable to perform  second level release of pr.kindly help

    dear friends,
    my client is facing problem related to pr release.he is unable to do second level release of one particular pr.other pr he is able to release.
    actually,the pr is having 3 level release,the first level release has been ok,but user in the second level release- is not able to release the pr.
    in pr, it is showing small yellow traingle(symbol)
    1)i have checked the release strtegy
    2)basis consultant checked user profile and access issues related to t-code me54n.we are using standard sap configuration and custimazation only.
    3)workflow consultant is telling that -no problem with workflow.
    the pe is having account assignment category-"K".
    is anything special to be checked.
    please provide valuable olution for this issue.
    your suggestion are taken valuable.
    thanks in advance.
    regards,
    FLEMMINGS

    Whe he is able to release other PR's ,I presume the problem should be with value .If it is crossing above prescribed Limit then defenitly there should be a problem.
    Also check Interval Button and multiple button .
    Regards,

  • Problem with open in new window for second level tab

    Hi Friends,
    I am using 2 level tabs in my application. In my second level tab when i right click and select *open in new
    window* it is giving Page not found error. But for the first level tabs it is working correctly. How can i fix this so
    that either i can show the page when right click the tab and select open in new window or disable the right clicking
    for the second level tabs. Please help,
    Thanks
    Jeev

    Hi,
    I don't think its exactly possible, as tabs use javascript:doSubmit('somevalue'); and you can not open javascript in a new window, as javascript usually references the current page you are on, and since you open the javascript in a new window, it doesn't know what to reference. The most helpful thread I found was : Re: Open other tab in a new window (ATD reply, third from the bottom).
    Ta,
    Trent
    Edited by: tr3nton on Dec 3, 2009 4:19 PM; Hari beat me to linking to the correct thread, my bad.

  • Linked report from second level drill-down level

    Hi,
    I have a report with two drill-down levels, Dept Id and Job Id.
    The requirement is when I am on Job Id drill level; I have to call another report when I click on any of the Job Id. This Job Id is passed to another report and the report is filtered based on that Job Id.
    I created a hyperlink on Job Id drill down level successfully. But the problem is I am unable to go to the first level i.e Dept Id. Actually the hyperlink is displayed and the up arrow is not visible to go to the first level.
    Is there any way where after creating a link on second level and opening the report in a new window, the drill up functionality can be maintained?
    I am using Business Objects XI 3.1 version.
    Thank you.

    hi
    there is another way to drill down the report of web intelligence.for that we have to customize in the universe level create a folder in custom hierarchy and add your two objects to that folder, i.e empid. and deptid. the order of these objects should be in the way the drilling happens that means if you want to drill down from empid. to deptid. then empid. should be the first object of the folder,save and export the universe to the CMS.Then it ready to use for webi report.Build the query for the report and enable the drill option in the report.Now the report is ready for your requirement.
    thanks & regards
    Sreekanth K

  • Problems with Second level drop downs

    Hi, I'm having problems with the second level of my drop down
    menu. It's showing up when you hit the first level. Any ideas what
    I'm doing wrong?
    http://www.graphicvisionsinc.com/test/

    Solved it!
    For info, updating from FCS 1.1 to FCS 1.1.1 solved this problem!

  • [SOLVED] ADF BC : View Object "second level" Entity reference issue

    hi
    If I insert a row in a View Object that uses "two levels" of Entity references, the attributes of the Entity on the "second level" don't get a value.
    Consider these tables:
    MY_ROW (MY_ROW_ID, MY_ROW_STUFF, MY_ROW_LU1_ID)
    MY_ROW_LU1 (MY_ROW_LU1_ID, MY_ROW_LU1_STUFF, MY_ROW_LU1_LU1_ID)
    MY_ROW_LU1_LU1 (MY_ROW_LU1_LU1_ID, MY_ROW_LU1_LU1_STUFF)
    Where MY_ROW.MY_ROW_LU1_ID is a "look-up" in MY_ROW_LU1 and MY_ROW_LU1.MY_ROW_LU1_LU1_ID is a "second level look-up" in MY_ROW_LU1_LU1.
    I created default Entities and Associations on these tables and a View Object that uses all 3 Entities (MyRow as Updatable, MyRowLu1 and MyRowLu1Lu1 as Reference).
    See example code in
    http://verveja.footsteps.be/~verveja/files/oracle/ViewObjectEntityReferenceIssue-v0.03.zip
    (contains no Java code, all out-of-the-box ADF BC)
    problem scenario:
    If run the MyRowService Application Module in the Oracle Business Component Browser and "open" the MyRowViewAll View Object instance, I get the rows and their related "look-up values".
    If I click the "Insert a new record" button and fill out values for MyRowId, MyRowStuf and MyRowLu1IdEntity, I only get "look-up" values for the "first level". While the "second level" stays empty.
    For example, a MyRowLu1IdEntity of "2003" gives a MyRowLu1Stuff value of "2003 stuff", but no value in MyRowLu1Lu1Stuff.
    What am I doing wrong? What should I change to also get a value in the "second level" MyRowLu1Lu1Stuff attribute?
    many thanks
    Jan Vervecken

    Jan,
    If you create a view object on Emp and Dept, with Dept as a reference entity, you might choose to build the view object to only include the:
    Emp.Empno (required, since it's the PK of Emp entity usage)
    Emp.Ename (included since you want to show the ename)
    Dept.Deptno (required, since it's the PK of the Dept entity usage)
    Dept.Dname (included since you want to show the dname)
    The wizard enforces the inclusion of the required attributes above.
    When you run this view object, a join is performed and you see the reference data.
    Now, if you want to allow the user to UPDATE the reference data, you need to add one more attribute to the list of attributes:
    Emp.Empno
    Emp.Ename
    Emp.Deptno (To allow user to change Deptno employee belongs to)Dept.Deptno
    Dept.Dname
    At this point, not only is the join performed for you, but the ADF BC reference mechanism reacts to any modification of the Emp.Deptno attribute, correctly showing the reference information for that new foreign-key-referenced department (even before commiting and requerying, at which time the SQL join would pickup that correct, related information).
    The "second level" problem you describe in this thread is simply the same issue described here as a master/first-level-detail situation, taken to its logical next step. If you want the end-user to be able to change the second-level detail to which the first-level-detail is associated, you need to include the first-level-detail's foreign key attributes in the view object's select list. Otherwise, there is no foreign key attribute whose value-change event the framework can react to in order to coordinate the related reference data in the row.
    I've blogged a link to a working example of a four-level reference information view object here:
    http://radio.weblogs.com/0118231/2007/05/09.html#a818
    based on the HR schema.

  • Tree View Second level is not displaying bind parameter

    Studio Edition Version 11.1.2.2.0appears this problem is addressed in
    http://dailydevfixes.blogspot.com/2011/07/setting-bind-parameters-on-hierarchy-of.html
    unfortunately I must be missing something.
    as a test using the hr schema
    I was doing a tree view with hire date as the first level then the employee id, last name and first name as the second level.
    I hard coded employee id of 187 on a bean called by a button.
    the first level is updated unfortunately the second level is not (employee id 107 should not show up)
    --1999-02-07
    ----- 187 Cabrio Anthony
    ----- 107 Lorentz Dianahere is my bean the first level is updated but the second level is not not quite sure what I am missing
        public void ButtonClick(ActionEvent actionEvent) {
            BindingContext bindingctx = BindingContext.getCurrent();
            BindingContainer bindings = bindingctx.getCurrentBindingsEntry();
            DCBindingContainer bindingsImpl = (DCBindingContainer) bindings;
            DCIteratorBinding dciter = bindingsImpl.findIteratorBinding("ParentVO1Iterator");
            ViewObject Parentvo =dciter.getViewObject();
            Parentvo.setNamedWhereClauseParam("empid",187);
            Parentvo.executeQuery();
            AttributeDef attrDef = Parentvo.findAttributeDef("ChildVO");
            ViewObject childvo = attrDef.getAccessorVO(Parentvo);
            childvo.setNamedWhereClauseParam("empid",187);
            childvo.executeQuery();
            AdfFacesContext adfFCtx = AdfFacesContext.getCurrentInstance();
           adfFCtx.addPartialTarget(treeupdate);
        }here is the query for the parent view object.
    select trunc(hire_date) hire_dt
    from employees
    where :empid is null or employee_id = :empid
    group by trunc(hire_date)here is the query for the child view object
    select trunc(hire_date) hire_dt, employee_id, employee_id||' '||last_name||' '||first_name nm
    from employees
    where :empid is null or employee_id = :empid
    order by trunc(hire_date)here is the view link
    <?xml version="1.0" encoding="windows-1252" ?>
    <!DOCTYPE ViewLink SYSTEM "jbo_03_01.dtd">
    <!---->
    <ViewLink
      xmlns="http://xmlns.oracle.com/bc4j"
      Name="ParentToChildViewLink"
      Version="11.1.2.61.83">
      <Properties>
        <SchemaBasedProperties>
          <LABEL
            ResId="model.view.link.ParentToChildViewLink_LABEL"/>
        </SchemaBasedProperties>
      </Properties>
      <ViewLinkDefEnd
        Name="ParentVO"
        Cardinality="1"
        Source="true"
        Owner="model.view.ParentVO">
        <DesignTime>
          <Attr Name="_accessor" Value="true"/>
          <Attr Name="_finderName" Value="ParentVO"/>
          <Attr Name="_isUpdateable" Value="true"/>
        </DesignTime>
        <AttrArray Name="Attributes">
          <Item Value="model.view.ParentVO.HireDt"/>
        </AttrArray>
      </ViewLinkDefEnd>
      <ViewLinkDefEnd
        Name="ChildVO"
        Cardinality="-1"
        Owner="model.view.ChildVO">
        <DesignTime>
          <Attr Name="_finderName" Value="ChildVO"/>
          <Attr Name="_isUpdateable" Value="true"/>
        </DesignTime>
        <AttrArray Name="Attributes">
          <Item Value="model.view.ChildVO.HireDt"/>
        </AttrArray>
      </ViewLinkDefEnd>
      <ResourceBundle>
        <PropertiesBundle
          PropertiesFile="model.ModelBundle"/>
      </ResourceBundle>
    </ViewLink>and here is the tree
        <af:tree value="#{bindings.ParentVO1.treeModel}" var="node"
                                 selectionListener="#{bindings.ParentVO1.treeModel.makeCurrent}" rowSelection="single"
                                 id="t1" binding="#{myBean.treeupdate}">
                            <f:facet name="nodeStamp">
                                <af:outputText value="#{node}" id="ot1"/>
                            </f:facet>
                        </af:tree>

    thanks I am working through that example unfortunately I ran into a problem
    previously (in my real application) I was using bind parameters and my query had the following where clause.
    ( I did this to turn a comma separated list into an in statement)
      WHERE    :Bind_Batch_NM_Comma_Sep_List IS NULL
             OR batch_nm IN
                   (    SELECT REGEXP_SUBSTR (:Bind_Batch_NM_Comma_Sep_List,
                                              '[^,]+',
                                              1,
                                              LEVEL)
                                  batch_nm
                          FROM DUAL
                    CONNECT BY LEVEL <=
                                    REGEXP_COUNT (:Bind_Batch_NM_Comma_Sep_List,
                                  + 1)however in the example presented you are to create view criteria and there is a panel on the right called view object where clause but I can not figure out how to type into it directly
    and I find it unlikely I can recreate this where clause using the add item button.
    is there a way to manually type the where clause in the view object where clause box?

  • Report on second level WBS structure

    Hi,
    Could some one help on this,we need a report which should show second level WBS structure like user  fields.There is one std. report CN41 which gives this information but it is showing whole project instead of only second level WBS and that too is not giving by which i could download and segregate.
    Could some one suggest other report please?
    Thanks,
    Abdul Rehman.

    Try CN43N. You will be able to download it to Excel.

  • Second level Manager Unable to view the leave request

    Hello Experts
    We are using three levels approval leave request, first level manager able to approve successfully, when second level manager approving the leave request is unable to see any contents inside the request, its showing blank.
    Kindly help me on this.
    Thanks
    Neelima.

    Hi,
    I have a requirement in which I have to sent Leave Workflow to three approvers. For that I maintain the approvers in a customising table. What I did is, I took a copy of the standard Leave WF and added a step in loop (to read the table maintained, through a bor method). For the last approver, he has to get the standard leave approval task and for that reason i looped my custom bor for 2 times and put the standard leave approval task outside the loop.
    Now the issue is that, eventhough the first approver gets the workitem and approves that, the next approver is not getting the workitem for him. Workflow is going into an error state stating that the successor node is not found.
    Please tell me whether my approach for customising leave workflow is correct. And if correct, what could be the reason for the error that I get.
    Regards,

  • Determining second level approver for travel expense claim workflow

    Hi Experts...
    In Travel Expense claim workflow,we are using two level Approval.The employee has to enter his data for expense claim through ESS..Then expense claim is submitted and sent via workflow to the Travel department. Travel Dept verifies the expenses against the bill and approves the claim by selecting the next level approver and attaching the scanned copies of the bill.
    I made copy from the standard workflow WS20000040.
    How can i select the next level appover in first level approval step???
    Is there any FM or BAPI or BADI???
    Please help me ...
    Thanks in Advance
    Regards,
    Hemalatha.

    Hi Hemalatha,
    I have small tricky workaround to find out the second level of approver.The Standard Rule available can reused again by passing manager's Position.i.e
    After first level completed , store manager position in container variable and pass it to the same task rule so the task is sent to the manager's approver .
    Message me if needed more details.
    **Award Points if useful

Maybe you are looking for