Configuring NAC MANAGER HA - link failure detection

Hello,
I'm configuring HA in NAC Manager and want to enable "eth0 link failure detection based failover". Is this possible in version 4.1.2.1 ?
Where can i configure this in NAC Manager?
See my configurations for the Primary HA on pic attached.
kind regards,
Daniel Stefani

Hi Daniel,
It doesn't look like that's an option in the 4.1.2 line.  You can configure this in 4.1.3 line, however - see the configuration guide here: http://www.cisco.com/en/US/docs/security/nac/appliance/configuration_guide/413/cam/m_ha.html#wp1040221
HTH,
Lauren

Similar Messages

  • Does FabricPath relies only on IS-IS hello exchange to detect link failures or does it implement BFD (Bidirectional Forwarding Detection)?

    I'm trying to understand if FabricPath relies only on IS-IS hello exchange to detect link failures or if it implements BFD (Bidirectional Forwarding Detection) to reduce the failure detection time. I noticed n RFC to introduce BFD in TRILL signed by a person from Cisco, so I was wondering if they adopted that in FP.
    Thanks.

    So.. it doesn't wait for a certain time after which if no hellos are received the link is considered down. It react as soon as a port down notification is received... right?
    So what if aggregated links are used? How does it behave?

  • Cisco NAC: How to configure the NGS as Radius Server & NAC Manager as Raidus Clients !!!

    Hi,
    Kindly let me know that how to configure the NGS (Version 2.0.3) as a Radius Server while NAC Manager (Version 4.8.2) as a Radius Client...
    Moreover,
    1) I want to Create the two User Roles (Guest1 & Guest2) on NGS.
    2) When sponsor will create the users, user will belong to either of roles.
    3) NAC Manager will have an authentication provider (Radius) with the default Role "Deny Role" but users belongs to "User Role = or Group = Guest1" will fall into "Guest1" Role while User Role = or Group = Guest2" will fall into "Guest2" Role.
    I need an assistance to configure this scenario....
    Please advise me.
    BR,
    Mubasher Sultan

    Hi,
    Any idea or suggestion...
    BR,
    Mubasher Sultan

  • Cisco 6880-x vsl link failure

    Hi Guys,
    I have a head scratcher that I'm dealing with.  I have 2x (2 month) 6880-x switches configured with vss with 2 vsl links on each of its sup cards and switch 1 is the active switch on the vss.  Both 6880x chassis also have 2 additional 10g modules each.  I am dealing with 2 issues in this setup.  
    The first issue is,  i have a 3750x with a 10g module thats port channeled to the vss with one 10g link going to each of the chassis.  Within the first 3 days it started dropping the link that's plugged to switch1, then comes back on right away.  It does it randomly throughout the day.  I have changed out the optics on both ends, changed the cable, and also changed the module on the 3750x and I still get the same issue.  The strange part is that when switch2 on the vss becomes the active switch, the problem goes away.  I did notice this before changing out the optics, cable, module on the 3750x.
    The second issue is the one I'm been trying to figure out along with cisco TAC.  This started about a month after bring the vss online.  When switch1 was the active switch in the vss, every couple of days vsl links drop one at a time, eventually killing the vss and putting the standby unit into recovery mode because of the dual active detection.  once I reboot the standby switch, the vss comes back up normally.  it did this a couple of times until I decided to force switch2 to be the active switch on the vss.  when switch2 became active, the vss was stable for about a month then the vsl links died again, and the system failed over to switch1.  after looking at the logs with cisco tac, we see that the vsl links stop responding which causes the failover, but up until now we still can't determine what is causing the vsl links to fail.  cisco tac said that maybe the vsl links were being overloaded but we have been monitoring the bandwidth utilization on the vsl links and they never go beyond 1% utilization.  The last suggestion by cisco tac was to add another vsl link but through another module other than the sup.  This was done a couple of days ago so now i'm waiting to see if the vsl links fail again and since switch1 is the active switch on the vss, i'm having to deal with the first issue above with the 3750x.
    I've included some log entries from the dropped port-channel member and also logs for when the vsl links fail.
    Logs for 3750x port-channel member drops.
    *Jul  5 05:27:10 PDT: %LINEPROTO-SW1-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/2/5, changed state to down
    *Jul  5 05:27:10 PDT: %LINK-SW1-3-UPDOWN: Interface TenGigabitEthernet2/2/5, changed state to down
    *Jul  5 05:27:10 PDT: %LINK-SW1-3-UPDOWN: Interface TenGigabitEthernet2/2/5, changed state to up
    *Jul  5 05:28:10 PDT: %LINEPROTO-SW1-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/2/5, changed state to up
    *Jul  6 11:28:52 PDT: %LINEPROTO-SW1-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/2/5, changed state to down
    *Jul  6 11:28:52 PDT: %LINK-SW1-3-UPDOWN: Interface TenGigabitEthernet2/2/5, changed state to down
    *Jul  6 11:28:53 PDT: %LINK-SW1-3-UPDOWN: Interface TenGigabitEthernet2/2/5, changed state to up
    *Jul  6 11:29:53 PDT: %LINEPROTO-SW1-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/2/5, changed state to up
    *Jul  7 06:27:25 PDT: %LINEPROTO-SW1-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/2/5, changed state to down
    *Jul  7 06:27:25 PDT: %LINK-SW1-3-UPDOWN: Interface TenGigabitEthernet2/2/5, changed state to down
    *Jul  7 06:27:26 PDT: %LINK-SW1-3-UPDOWN: Interface TenGigabitEthernet2/2/5, changed state to up
    *Jul  7 06:27:33 PDT: %LINEPROTO-SW1-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/2/5, changed state to up
    *Jul  7 06:33:43 PDT: %LINEPROTO-SW1-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/2/5, changed state to down
    *Jul  7 06:33:43 PDT: %LINK-SW1-3-UPDOWN: Interface TenGigabitEthernet2/2/5, changed state to down
    *Jul  7 06:33:43 PDT: %LINK-SW1-3-UPDOWN: Interface TenGigabitEthernet2/2/5, changed state to up
    *Jul  7 06:34:43 PDT: %LINEPROTO-SW1-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/2/5, changed state to up
    *Jul  7 07:38:35 PDT: %LINEPROTO-SW1-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/2/5, changed state to down
    *Jul  7 07:38:35 PDT: %LINK-SW1-3-UPDOWN: Interface TenGigabitEthernet2/2/5, changed state to down
    *Jul  7 07:38:36 PDT: %LINK-SW1-3-UPDOWN: Interface TenGigabitEthernet2/2/5, changed state to up
    log for VSL link failures
    *Jun 27 23:59:25 PDT: %VSLP-SW2-3-VSLP_LMP_FAIL_REASON: Te2/5/15: Link down
    *Jun 27 23:59:25 PDT: %VSL-SW2-5-VSL_CNTRL_LINK:  New VSL Control Link  2/5/16 
    *Jun 27 23:59:25 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/5/15, changed state to down
    *Jun 27 23:59:25 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/5/15, changed state to down
    *Jun 27 23:59:25 PDT: %LINK-SW2-3-UPDOWN: Interface TenGigabitEthernet2/5/15, changed state to down
    *Jun 27 23:59:25 PDT: %VSLP-SW2-3-VSLP_LMP_FAIL_REASON: Te2/5/16: Link down
    *Jun 27 23:59:25 PDT: %VSLP-SW2-2-VSL_DOWN:   Last VSL interface Te2/5/16 went down
    *Jun 27 23:59:25 PDT: %VSLP-SW2-2-VSL_DOWN:   All VSL links went down while switch is in ACTIVE role
    *Jun 27 23:59:25 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface TenGigabitEthernet2/5/16, changed state to down
    *Jun 27 23:59:25 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface Port-channel2, changed state to down
    *Jun 27 23:59:25 PDT: %LINK-SW2-3-UPDOWN: Interface Port-channel2, changed state to down
    *Jun 27 23:59:25 PDT: %LINK-SW2-3-UPDOWN: Interface TenGigabitEthernet2/5/16, changed state to down
    *Jun 27 23:59:25 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface Port-channel1, changed state to down
    *Jun 27 23:59:25 PDT: %LINK-SW2-3-UPDOWN: Interface Port-channel1, changed state to down
    *Jun 27 23:59:25 PDT: %OIR-SW2-6-INSREM: Switch 1 Physical Slot 5 - Module Type LINE_CARD  removed 
    *Jun 27 23:59:25 PDT: %OSPF-SW2-5-ADJCHG: Process 1, Nbr 10.253.0.3 on TenGigabitEthernet1/1/1 from FULL to DOWN, Neighbor Down: Interface down or detached
    *Jun 27 23:59:25 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface Port-channel24, changed state to down
    *Jun 27 23:59:25 PDT: %LINK-SW2-3-UPDOWN: Interface Port-channel24, changed state to down
    *Jun 27 23:59:26 PDT: %OIR-SW2-6-INSREM: Switch 1 Physical Slot 1 - Module Type LINE_CARD  removed 
    *Jun 27 23:59:26 PDT: %LINK-SW2-3-UPDOWN: Interface Port-channel17, changed state to down
    *Jun 27 23:59:26 PDT: %PFREDUN-SW2-6-ACTIVE: Standby processor removed or reloaded, changing to Simplex mode
    *Jun 27 23:59:26 PDT: %OIR-SW2-6-INSREM: Switch 1 Physical Slot 2 - Module Type LINE_CARD  removed 
    *Jun 27 23:59:27 PDT: %LINK-SW2-3-UPDOWN: Interface TenGigabitEthernet1/5/14, changed state to down
    *Jun 27 23:59:27 PDT: %LINK-SW2-3-UPDOWN: Interface TenGigabitEthernet1/5/15, changed state to down
    *Jun 27 23:59:27 PDT: %LINK-SW2-3-UPDOWN: Interface TenGigabitEthernet1/5/16, changed state to down
    *Jun 27 23:59:27 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/5/14, changed state to down
    *Jun 27 23:59:27 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/5/16, changed state to down
    *Jun 27 23:59:27 PDT: %LINK-SW2-3-UPDOWN: Interface TenGigabitEthernet1/1/1, changed state to down
    *Jun 27 23:59:27 PDT: %LINK-SW2-3-UPDOWN: Interface TenGigabitEthernet1/1/2, changed state to down
    *Jun 27 23:59:27 PDT: %LINK-SW2-3-UPDOWN: Interface TenGigabitEthernet1/1/3, changed state to down
    *Jun 27 23:59:27 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/1, changed state to down
    *Jun 27 23:59:27 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/2, changed state to down
    *Jun 27 23:59:27 PDT: %LINEPROTO-SW2-5-UPDOWN: Line protocol on Interface TenGigabitEthernet1/1/3, changed state to down
    Press RETURN to get started!
    *Jun 28 07:03:33.421: %USBFLASH-SW2_STBY-5-CHANGE: bootdisk has been inserted!
    *Jun 28 07:03:53.297: %OIR-SW2_STBY-6-INSPS: Power supply inserted in slot 1
    *Jun 28 07:03:53.301: %C6KPWR-SW2_STBY-4-PSOK: power supply 1 turned on.
    *Jun 28 07:04:26.093: %FABRIC-SW2_STBY-5-FABRIC_MODULE_ACTIVE: The Switch Fabric Module in slot 5 became active.
    *Jun 28 07:04:48.497: %DIAG-SW2_STBY-6-RUN_MINIMUM: Switch 2 Module 5: Running Minimal Diagnostics...
    *Jun 28 07:04:48.497: %CONST_DIAG-SW2_STBY-6-DIAG_PORT_SKIPPED: Module 5 port 15 is skipped in TestLoopback due to: the port is used as a VSL link.
    *Jun 28 07:04:48.497: %CONST_DIAG-SW2_STBY-6-DIAG_PORT_SKIPPED: Module 5 port 16 is skipped in TestLoopback due to: the port is used as a VSL link.
    *Jun 28 07:04:55.049: %CONST_DIAG-SW2_STBY-6-DIAG_PORT_SKIPPED: Module 5 port 15 is skipped in TestFexModeLoopback due to: the port is used as a VSL link.
    *Jun 28 07:04:55.049: %CONST_DIAG-SW2_STBY-6-DIAG_PORT_SKIPPED: Module 5 port 16 is skipped in TestFexModeLoopback due to: the port is used as a VSL link.
    *Jun 28 07:05:00.165: %CONST_DIAG-SW2_STBY-6-DIAG_PORT_SKIPPED: Module 5 port 15 is skipped in TestL2CTSLoopback due to: the port is used as a VSL link.
    *Jun 28 07:05:00.165: %CONST_DIAG-SW2_STBY-6-DIAG_PORT_SKIPPED: Module 5 port 16 is skipped in TestL2CTSLoopback due to: the port is used as a VSL link.
    *Jun 28 07:05:06.049: %CONST_DIAG-SW2_STBY-6-DIAG_PORT_SKIPPED: Module 5 port 15 is skipped in TestL3CTSLoopback due to: the port is used as a VSL link.
    *Jun 28 07:05:06.049: %CONST_DIAG-SW2_STBY-6-DIAG_PORT_SKIPPED: Module 5 port 16 is skipped in TestL3CTSLoopback due to: the port is used as a VSL link.
    *Jun 28 07:05:23.309: %DIAG-SW2_STBY-6-DIAG_OK: Switch 2 Module 5: Passed Online Diagnostics
    *Jun 28 00:05:38 PDT: %SYS-SW2_STBY-6-CLOCKUPDATE: System clock has been updated from 00:05:38 PDT Sat Jun 28 2014 to 00:05:38 PDT Sat Jun 28 2014, configured from console by console.
    *Jun 28 00:05:38 PDT: %SYS-SW2_STBY-6-CLOCKUPDATE: System clock has been updated from 00:05:38 PDT Sat Jun 28 2014 to 00:05:38 PDT Sat Jun 28 2014, configured from console by console.
    *Jun 28 00:05:38 PDT: %SSH-SW2_STBY-5-DISABLED: SSH 2.0 has been disabled
    *Jun 28 00:05:54 PDT: %SYS-SW2_STBY-5-RESTART: System restarted --
    Cisco IOS Software, c6880x Software (c6880x-ADVENTERPRISEK9-M), Version 15.1(2)SY2, RELEASE SOFTWARE (fc3)
    Technical Support: http://www.cisco.com/techsupport
    Copyright (c) 1986-2014 by Cisco Systems, Inc.
    Compiled Wed 26-Feb-14 15:30 by prod_rel_team
    *Jun 28 00:05:54 PDT: %SSH-SW2_STBY-5-ENABLED: SSH 2.0 has been enabled
    *Jun 28 00:05:54 PDT: %SYS-SW2_STBY-3-LOGGER_FLUSHED: System was paused for 00:03:01 to ensure console debugging output.
    *Jun 28 00:05:56 PDT: %C6KENV-SW2_STBY-4-LOWER_SLOT_EMPTY: The lower adjacent slot of module 5 might be empty. Airdam must be installed in that slot to be NEBS compliant
    *Jun 28 00:07:36 PDT: %DIAG-SW2_STBY-6-RUN_MINIMUM: Switch 2 Module 1: Running Minimal Diagnostics...
    *Jun 28 00:07:37 PDT: %SYS-SW2_STBY-3-LOGGER_FLUSHED: System was paused for 00:01:29 to ensure console debugging output.
    *Jun 28 00:07:41 PDT: %DIAG-SW2_STBY-6-RUN_MINIMUM: Switch 2 Module 2: Running Minimal Diagnostics...
    *Jun 28 00:08:10 PDT: %DIAG-SW2_STBY-6-DIAG_OK: Switch 2 Module 1: Passed Online Diagnostics
    *Jun 28 00:08:22 PDT: %EC-SW2_STBY-5-CANNOT_BUNDLE2: Te2/1/10 is not compatible with Te1/2/10 and will be suspended (Operational flow control send of Te2/1/10 is off, Te1/2/10 is on)
    *Jun 28 00:08:31 PDT: %EC-SW2_STBY-5-COMPATIBLE: Te2/1/10 is compatible with port-channel members
    *Jun 28 00:08:45 PDT: %DIAG-SW2_STBY-6-DIAG_OK: Switch 2 Module 2: Passed Online Diagnostics
    *Jun 28 00:08:46 PDT: %C6KENV-SW2_STBY-4-HIGHER_SLOT_EMPTY: The higher adjacent slot of module 2 might be empty. Airdam must be installed in that slot to be NEBS compliant
    ELDC1C1-AG01-1 line 0 
    ************************ W A R N I N G ***************************
    * THIS IS A PRIVATE COMPUTER SYSTEM, AND FOR AUTHORIZED USE ONLY.*
    * THIS SYSTEM IS MONITORED, AND ANY UNAUTHORIZED USE MAY BE      *
    * SUBJECT TO CRIMINAL PROSECUTION.                               *
    * IF YOU ARE NOT AUTHORIZED, LOG OUT IMMEDIATELY!!!!!            *
    so according to the logs, it seems like the switch was reloaded or something of the nature but even the cisco tac said that it wasnt the case but couldnt determine whats causing it either.  Tac went through the config on the vss and has said that its configured correctly.
    Maybe someone else has experienced this issue or if someone can point out something that I can look at...  sorry for the very long post.
    thanks

    I suppose, we have the same problem. Only when Switch 1 is the active switch of the 6880-X VSS system, the connection to the FEX-stack breaks suddenly after running fine for some days and the FEX-stack (3 x 6800-IA) get only ready again when I reset the whole VSS-system, both VSS-switches and the FEX-stack.
    All access ports at the FEX can't connect to our infrastructure (DHCP,DNS...). The two connected TenG FEX-stack uplinks sometimes get down and sometimes only the uplink to the active parent switch get down. The SYST LED of FEX 1 lighting amber.
    When parent switch 2 is the active unit the issue never occured.
    6880-X running with 15.2(1)SY, 6800-IA running with 15.2(3)E.
    Cisco TAC is investigating that issue, but till now without any result.
    When the issue occurs, the recorded logging messages are:
    Syslog 6880-X
    Apr  7 07:42:43.182: %PLATFORM_RPC-3-MSG_THROTTLED: RPC Msg Dropped by throttle mechanism: type 3, class 21, max_msg 32, total throttled 1274 (FEX-101)
    Apr  7 07:45:43.181: %PLATFORM_RPC-3-MSG_THROTTLED: RPC Msg Dropped by throttle mechanism: type 3, class 21, max_msg 32, total throttled 1276 (FEX-101)
    Syslog 6800-IA:
    Apr  7 07:57:43.182: %PLATFORM_RPC-3-MSG_THROTTLED: RPC Msg Dropped by throttle mechanism: type 3, class 21, max_msg 32, total throttled 1284
    -Traceback= 5198C4z 21413F8z 1C3B35Cz 1C3C6FCz 1C3CA00z 2654CC0z 26509BCz
    Apr  7 08:00:43.181: %PLATFORM_RPC-3-MSG_THROTTLED: RPC Msg Dropped by throttle mechanism: type 3, class 21, max_msg 32, total throttled 1286
    -Traceback= 5198C4z 21413F8z 1C3B35Cz 1C3C6FCz 1C3CA00z 2654CC0z 26509BCz

  • Fc2/y is down (Link failure: NOS received)

    Please Help
    UCSM : 1.4 (3l)
    Storage FC Ports : fc2/1, fc2/3, fc2/5
    error : fc2/5
    B(nxos)# sh interface fc 2/5
    fc2/5 is down (Link failure: NOS received)
    from UCSM
    fc port 5 on fabric interconnect B oper state:failed, reason:Link failure: NOS received
    disable and enable port
    error : fc2/5
    B(nxos)# sh interface fc 2/5
    fc2/5 is down (Link failure or not-connected)
    wahtis the root cause problem?
    Best regards

    Hello,
    NOS refers to "No operatioal sequence". Fibre channel has primitive seqences which are used to establish and maintain a link among the devices.
    During the initial login phase,
    1.Fiber channel switch sends a NOS signal
    2.HBA connected to it sends an "OLS (offline sequence) signal.
    3.Switch would send  a "Link reset"(LR)
    4.HBA responds with a "LRR (link reset response)"
    When a NOS received condition is met,
    •A signal loss or sync loss condition is detected.
    •The port is administratively shut down.
    •The port is operationally down.
    When the port status is in "link failure or not-connected" state, it means that the physical path is not completely active or no active signals has been sent. Check the cables/SFP's if pluged in properly and check the configuration (port type, speed and vsan settings) for further troubleshooting.

  • Fc port 47 on fabric interconnect A oper state: failed, reason: Link failure: OLS received

    Hi,
    this UCS is connected to a qlogics SAN Fabric. We can see the LUN in ESX 5, but can't write. If we want write something to the LUN, we get the error above. We know that the qlogic Fabric is not supported by UCS, but its NPIV and i have a similar Installation which is doing fine.
    Any Ideas?
    Thanks, Marco

    Hello,
    NOS refers to "No operatioal sequence". Fibre channel has primitive seqences which are used to establish and maintain a link among the devices.
    During the initial login phase,
    1.Fiber channel switch sends a NOS signal
    2.HBA connected to it sends an "OLS (offline sequence) signal.
    3.Switch would send  a "Link reset"(LR)
    4.HBA responds with a "LRR (link reset response)"
    When a NOS received condition is met,
    •A signal loss or sync loss condition is detected.
    •The port is administratively shut down.
    •The port is operationally down.
    When the port status is in "link failure or not-connected" state, it means that the physical path is not completely active or no active signals has been sent. Check the cables/SFP's if pluged in properly and check the configuration (port type, speed and vsan settings) for further troubleshooting.

  • How to configure solution manager service desk knowledge base for customer?

    Hi Expert,
    How to configure u201CSolution Manager Service Desk Knowledge Baseu201D to allow Customer to check on the solution?
    Can we make the Solution Database open for the key user? Can we add one link in the workcenter and the customer can search existing solutions before they create message to us?
    Please advice,
    Thanks
    regards,
    ng chong chuan

    >
    Chong Chuan Ng wrote:
    > How to configure u201CSolution Manager Service Desk Knowledge Baseu201D to allow Customer to check on the solution?
    >
    > Can we make the Solution Database open for the key user? Can we add one link in the workcenter and the customer can search existing solutions before they create message to us?
    Hi,
    It's a good idea, but currently it's not yet supported.
    In Work Center, there is no predefined (nor a hidden) link shipped by SAP to access the Solution Database for key users.
    With a future EhP for Solution Manager, you might get an integration of the Solution Database into the message processing Web UI.
    Best regards,
    Ruediger

  • How to get the custom integrator in Manage Document Links

    Hi All,
    My requirement is "Creating Word Documents Using Web ADI", I am following the document
    Oracle® Human Resources Management Systems
    Configuring, Reporting, and System Administration Guide
    Release 12.1
    Part No. E13509-02
    From page no. 194.In that section, No.8. Use the Manage Layout Document Links page to create a link between the
    integrator and layout and the Word template.
    See: Creating Links between Template Letters and Layouts, page 2-33
    2-33>>
    Select Manage Document Links from the Web ADI menu.
    But when I click on the "Manage Document Links", I couldn't see my custom integrator to associate my word document with my integrator.
    I could see only the standard integrators.
    How to get my custom integrator in "Manage Document Links". I could see my custom integrator in define layout but not in this page.
    Thanks.
    With Regards,
    Kali.

    Hussein,
    Thanks for your reply.
    I followed the
    Note 360105.1 -Understanding and Using Web ADI in Oracle HRMS, and the section "Letters",
    I could follow all the steps, except the following,
    The reason is, when I click on Manage Documents Links, I am not getting my newly created integrator.
    If I link a standard integrator "HR People Details" to my document, that is opening properly.
    But I am not able to link my document with my integrator(which is based on my view).
    c.  Now link the template letter to the Letter Integrator and Layout.
    If not already done so, Add the function WebADI Manage Document Links to your Web ADI menu, and give it a prompt of Link Document.
    Select Link Document option , and Web ADI Mail Merge page displays. Choose your Letter Integrator. Link it to the Layout, and a list of template documents uploaded to the database is displayed. Select the template letter to be linked with the layout.
    Thanks.
    With Regards,
    Kali.

  • ColdFusion 10 - MySQL Communications link failure

    We are migrating some websites onto a cloud infrastructure running Windows 2008 virtual machines.  These websites all run on ColdFusion with MySQL databases.  They currently are running in our CoLo with no problems.  Additionally, they are running on our development network in our offices with no problems.
    We are setting up our cloud to match as closely as possible the configuration we currently use which is, essentially, CF10 + IIS on one server and MySQL on a separate machine.  We are 99% finished and most things are running great.  However....
    We have run into a couple, as in 2, places where we click a link/button and are greeted with:
    Error Executing Database Query.
    Communications link failure The last packet successfully received from the server was 0 milliseconds ago. The last packet sent successfully to the server was 0 milliseconds ago.
    Scanning the stack-trace I also find:
    `Caused by: java.net.SocketException: Connection reset`
    The communications link error is ALWAYS: 0ms.
    What's most puzzling is the Queries that seem to be causing this are *simple* queries that are used ALL OVER the sites with no problems.  Why they are failing at hese 2 particular places has us at wits end.
    Our only clue is, looking at the CF Error description of what scripts are called, we can see the script where the query is failing is getting called twice?  For example, one of the occurences is in our Application file:
        >The error occurred in D:/Our_Web_Sites/oursite/Application.cfm: line 73
        >Called from D:/Our_Web_Sites/oursite/Application.cfm: line 17
        >Called from D:/Our_Web_Sites/oursite/Application.cfm: line 1
        >Called from D:/Our_Web_Sites/oursite/Application.cfm: line 73
        >Called from D:/Our_Web_Sites/oursite/Application.cfm: line 17
        >Called from D:/Our_Web_Sites/oursite/Application.cfm: line 1
    We can find nothing in our CF code that would be causing the script to be called twice so our guess is the first call is failing on the Query so CF tries again...only to fail and error.
    Googling this issue I've found lots of posts about changing the MySQL timeouts.  None of those worked and I didn't expect them to since what we're dealing with doesn't appear to be a timeout issue.  These pages fail each and every time.
    The closest we've come to a solution came from this blog posting:
    http://www.talkingtree.com/blog/index.cfm/2011/1/12/Validation-Query-for-MySQL-communicati ons-link-failure
    If we UNCHECK the "Maintain connections across client requests. " setting in CFAdmin then the error goes away.  The blog suggests leaving that checked, which is our preference, and using Connection Validation of "SELECT 1;".  Try that...same error.
    We've also tried the JDBC AutoConnect=true option.  No effect.
    Downloaded latest JDBC Connector and used it instead of standard CF10-MySQL connector.  No effect.
    Again, 99% of the site works with the exception of these two links, both of which work just fine in all our other environments.  Any other ideas?

    I have some questions.
    1) You talk of 2 calls. However, you show us 5 calls from Application.cfm. What do those line numbers tell us?
    2) Shouldn't that be AutoReconnect=true rather than AutoConnect=true? In any case, it seems that the problem here is that ColdFusion attempts to use a stale connection to the database. It is then usually preferable to change wait_timeout instead. The MySQL documentation says, 'Alternatively[to AutoReconnect=true], as a last option, investigate setting the MySQL server variable "wait_timeout" to a high value, rather than the default of 8 hours.'.
    3) Shouldn't you already convert to Application.cfc?

  • Communcation link failure with HS ODBC to AS/400  (v4r3)

    HI all,
    i have problem when using Heterogeneous Service to connect Oralce to DB2/400 in AS/400 (v4r3).
    I am using HS's ODBC to connect to DB2/400 in AS/400.
    1) first I created a DSN with name AS400 and driver "Client Access ODBC Driver (32-bit)"
    2) then configured HS in %ORACLE_HOME%/hs/admin/initodbc.ora
    3) modified listener.ora as well as tnsnames.ora
    4) restarted the listener and Oracle.
    5) then I created the database link for this service.
    create database link as400
    connect to "USER" identified by "PASSWRD"
    using 'as400';but when I tried to select something from DB2/400. i encountered the following error
    select count(*) from grw99.sitsupp@as400ORA-28500: connection from ORACLE to a non-Oracle system returned this message:
    [Generic Connectivity Using ODBC][IBM][Client Access ODBC Driver (32-bit)]
    [DB2/400 SQL]Communication link failure. COMM RC=0x5 (SQL State: 08S01; SQL Code: -5)
    ORA-02063: preceding 2 lines from HSODBC
    can anyone tell me why?!!
    pls help me!
    Marco

    Sounds like the IBM SQLExtendedFetch bug within the IBM ODBC driver.
    Please add these parameters to your DG4ODBC configuration file initDB2_SID.ora:
    HS_FDS_FETCH_ROWS=1
    HS_RPC_FETCH_REBLOCKING=off
    Then open a new SQL*Plus session and retry the select.

  • How to configure soa manager in ecc 6.0

    Dear Experts ,
    now i faced one problem in my server
    when i execute soamanager, my web page is giving error message ( displayed but it shows timed_out error )
    i have doubt in my comfiguration so please let me how can i configure soa manager
    Regards

    Hi
    Are you getting the "Timed Out Error" as soon as you open SOAMANAGER or when you try to Test your WSDL?
    Follow these steps-
    (I) Checking Domain name of WSDL
    a) Open SOAMANAGER and navigate to "Business Administration" tab.
    b) Click on "Web Service Administration" link
    c) In "Search Pattern" search for your Webservice and click on "GO".
    d) Select the line and click "Apply Selection" button
    e) The details of your service definition is displayed. Click on "Open WSDL document for selected binding" link.
    f) Copy the URL. Make a special note of your domain Name. Eg: "http://xxxxx.com:"
    (II) Checking J2EE setting in SOAMANAGER
    a) Go back to your SOAMANAGER home page by clicking "Back" link.
    b) Select "Technical Configuration" Tab and click on "System Global Settings".
    c ) Select "Access Information J2EE server" Tab and note down your J2EE host settings.
    Note: If there are no J2EE host settings, then you probably get them from your BASIS team. Once you get the details, save the host settings.
    (III) Clearing the WSDL Port Type error
    a) Follow steps (a) thru (d) in Part I and click on 3rd link- "Open Web Service navigator for selected binding".
    b) Now your WS Navigator is open. Your work starts here. Provide the WSDL URL from Part (I).f step when asked for "Enter the WSDL URL of the Web service:". Click "Next" button.
    Possible outcomes-
    i) Overview page of your Webservice is seen. In this case you can click on "Test" link on top and continue ... OR
    ii) You get a error page namely-
    Cannot download WSDL from http://xxxx.com:Port#.
    If this is the case, then you need to provide the domain name noted down in PART I- step (f). and hit <Enter> This will open up the Overview page of your Webservice!

  • Configuring Solution Manager: Alternative Role to SAP_ALL

    This is a general question regarding configuring Solution Manager and note 834534.  I am configuring Solution Manager 7.0 at a client site.  The main components that I am configuring are on the Monitoring and Operations side; for example, System Monitoring,  Service Desk, Issue Management, and Change Management for Maintenance Optimizer.  CHaRM will follow later on.  Additionally, the client would like to use the project side of Solution Manager.
    When I took training for Solution Manager from SAP, the SAP instructor advised the class to have SAP_ALL when configuring Solution Manager  The problem I am having is that the client will not issue me SAP_ALL in the Solution Manager instance, regardless of the recommendation in note 834534.  I can understand the client's reluctance to issue SAP_ALL, even though Solution Manager is not a financial system in of itself, however, I have found that I am constantly having to ask for authorizations as I step through the wizards and the Scenario-specific settings.  When I run into issues which require further investigation by running transactions to check certain settings that are not specifically tiedd to a wizard or scenario-specific setting transaction, I run into further delays as I ask for additional authorizations to troubleshoot issues.
    We have implemented the roles and assigned them to my ID in Solution Manager as outlined by the SAP Solution Manager Security Guide to the fullest extent possible; and I have been issued "Basis Roles" that the client issues to their Basis team.  Regardless of these actions, I still run into authorization issues.
    My question is, apart from the SAP Solution Manager Security Guides recommendations (which does not mention SAP_ALL), is there a role being developed, or has been developed that can be assigned to the Solution Manager configurator in lieu of SAP_ALL (as per note 834534)?  I would think that this issue has been raised before, particularly since many companies have implemented SOX controls and are skittish about issuing SAP_ALL.
    Your feedback is most appreciated.

    Thanks for the reply, Nesimi.
    While I appreciate that you do not use SAP_ALL, is that the case when you are configuring a brand new, clean system?  Are you using the Configuration Wizards with out SAP_ALL? I ask this because when I ran the first configuration wizard, one of the steps is to create a "configuration user", which creates a user with SAP_ALL. However, I cannot use that wizard generated user ID because it has the role SAP_ALL.
    In general, I am operating on 3 sources of information that says I need SAP_ALL to configure the system (not necessarily to operate it):
    1.  An SAP Instructor for the Solution Manager Operations and Monitoring Class
    2.  The IMG Activity "Create Configuration User" documenation in SPRO
    3.  Note 834534
    I will review the english version of the link http://help.sap.com/saphelp_smehp1/helpdata/de/40/8ac473d40943ddb23def12bdb33437/frameset.htm that you have thoughtfully provided. 
    With respect to note 123640, I am not sure if that solves my problem or answers the fundemental question that I have in that given the 3 sources I quoted above.  It seems to me that SAP's approach in indicating clearly that they prefer that the configuration user should have SAP_ALL is flawed given today's corporate governence policies.  Clearly this recommendation is only for the initial configuration, and SAP_ALL can be taken away and replaced by the roles and recommendations in the SolMan security guide; to maintain Solution Manager.  But when it comes down to the question "what do you need to configure Solution Manager, because we won't give you SAP_ALL", I am hard pressed to give an answer despite literally spending hundreds of hours researching "documenation" which does not give clear cut answers.  I think SAP needs to address this issue instead of taking the easy way out and saying you need "SAP_ALL" as illustrated in the 3 sources of readily available information cited above.

  • Facing some problem while configuring Workflow Manager 1.0.

    Hi,
    I am facing some problem while configuring Workflow Manager 1.0. in my farm.
    Scenario is,
    I have installed and configured workflow manager in my farm, it was working well with no issue. But one of team member played with AD and deleted Farm administrator's entry from AD by mistake. So suddenly workflows get affected and stopped working. 
    Then I added administrator entry in AD, uninstalled the Workflow Manager and installed it again. But now while configuring workflow manager I am facing some issues that "Failure to adding user in BUILTIN\Administrative group. Please add it manually" 
    And after sometime it shows another error message that, "Starting service Service Bus Massage broken failed: Timed out has expired, the operation has not been completed" 
    If I go for services then "Service bus Message broker" service is not running properly (Its status is just showing "Starting")  and don't starts.
    I have also added the user in BUILTIN\Administrator, IIS_IUSER, WSS_WPG group of the machine from computer manager - user and groups. 
    Also given permission to databases, and assign role of sysadmin and dbcreator to user
    I also tried following steps    
        1) Stop all services associated to workflows
        2) Uninstalled workflow manager
        3) Deleted all databases associated with workflows
        4) Installed workflow manager and tried to configure.
    But showing same error. 
    If I use another SharePoint server farm to configure workflows, there I am not getting first error of adding user to BUILTIN\Administrator group. but second error remains same.
    We having SQL server and Active directory at another machine and FARM at another machine, if I use local admin for configuration of the workflows (as local admin can start any services) but entry of local admin is not Active directory so can not assign SQL's
    sysadmin, and dbcreator role to local admin.
    I am attaching snapshot of error for better understanding.
    Your help will be very precious to me. 
    Thanks,
    Rajesh
    Rajesh Agravat

    Rajesh
    Check to see what the service accounts are being used for these Workflow Manager 1.0 services:
    Service Bus Message Broker
    Service Bus Gateway
    Workflow Manager Backend
    All of these should be running and your workflow service account should be running all of these.  If any are still configured under the old service account, they'll need to be updated.  Next, check to see what service accounts have access to the
    Workflow Manager 1.0 databases:
    SbGatewayDatabase
    SbManagement
    SbMessageContainer
    WFInstanceManagement
    WFManagement
    WFResourceManagement
    The Workflow Manager service account should be mapped as the DBO for all of these.  if any are still configured under the old service account, they'll need to be updated.
    Given the complete loss of the original workflow service account, and the resultant impact on security configuration throughout the workflow farm, I would recommend performing a re-installation.  Do it thus:
    Launch Workflow Manager Configuration Wizard
    Select the Leave Workflow Manager Farm
    Stop all workflow services (see above list)
    Repeat steps 1-3 for each instance of Workflow Manager 1.0 Server installed.
    Delete all Workflow Manager databases (see above list).
    reboot.
    Start new installation.

  • Extend AD Schema and configure Logon Manager

    Hi,
    i tried to extend schema and configure the logon manager but with no success.
    When i extend schema in ESSO Admin Console a successful message appear, but when i check the Active Directory for the objects that should appear, non of them are in there.
    Can someone please explain me what im doing wrong, or give me a link where the steps to extend and configure logon manager are explained?
    thanks

    I,
    thanks for the answer.
    now the AD is extended successfully.
    But i have one more problem, in the agent installed in the server machine de apps appear correctly and the users are synchronized correctly, although in other machine that the agent is installed i cant connect to AD (i think) the apps not appear..
    When the window "Connect to Active Diretory" of the agent appear i introduce de credentials : Administrator and pass of the AD administrator. Am i right?
    I think theres a problem with the connection with the AD and the machine.
    Thanks..

  • Error while configuring User Management Utility

    Hi All,
    I am trying to configure User Management Utility for messaging server and calendar server. But while doing this it is failing to create service. The utility creates roles, configures with the webserver but fails to create service.
    This was the error :
    PASSED: /bin/sh -c /opt/nicp/ps62/SUNWam/bin/amadmin -u "uid=amadmin,ou=People,o=apollo" -f /opt/SUNWcomm/lib/config-template
    s/amadmin1718 -t /opt/SUNWcomm/lib/config-templates/changeComms.xml : status = 0
    PASSED: /bin/sh -c /opt/nicp/ps62/SUNWam/bin/amadmin -u "uid=amadmin,ou=People,o=apollo" -f /opt/SUNWcomm/lib/config-template
    s/amadmin1718 -t /opt/SUNWcomm/config/createroles.xml : status = 0
    FAILED: /bin/sh -c /opt/nicp/ps62/SUNWam/bin/amadmin -u "uid=amadmin,ou=People,o=apollo" -f /opt/SUNWcomm/lib/config-template
    s/amadmin1718 -t /opt/SUNWcomm/config/createservices.xml : status = 1
    PASSED: /bin/sh -c /opt/SUNWcomm/sbin/config-wbsvr : status = 0
    FAILURE: Number of task failed:1. Please check install log
    /opt/SUNWcomm/install/Iscli-config_20041021221229.log
    for further details.
    It could be useful if someone could throw some light on this.
    Thankx in Advance,
    s2810

    As I said in response to your other, smaller post, I'm not sure where you are, and this snippet of errors doesn't help me.

Maybe you are looking for

  • Table Names for the Contract Budget(PO value) and Invoiced Budget

    Hello Team, Can you please share your ides on the below two queries 1. How can we Identify the Contract Budget from the P.O Number 2. How can we know how much of it has been Invoiced Please provide the Table Names also if you know, where these values

  • Graphing problem with two plots

    I know how to plot two graphs on top of one another but the problem I have is as follows. I have the spectrum of a certain noisy signal which has been averaged. I then change some conditions by pressing a button and the spectrum changes to something

  • What is a transfer curve and what does pre-flight mean when it says "transfer curve used"?

    What is a transfer curve and what does  pre-flight mean when it says "transfer curve used"?

  • Solid State Drive (SSD) for dm4 1160us notebook,,, an SATA II or SATAIII ?

    I would like to go to a SSD and was wondering if this notebook supports SATA III or 6GB/s transfer rate. The HDD that is in there is a Seagate ST9500420AS ATA and research shows it has a 3gb/s transfer rate. I don't know if I should purchase a SSD th

  • Removing Spaces

    I've been using Desktop Manager for quite some time. I use the app all the time, probably 50 times a day. Even though I like Leopard, it screwed up my Desktop Manager app. I NEED to use ALL apps in ALL SPACES, not just one space per app, which is com