Confirm process order problem

hi
   I configure IMG settings under OPK1 for porcess order..I check "imediately proposal" for quantity/service..But when I use COR6N to confirm process order, the duration field is not proposed...Where should I configure in IMG?
  btw,is there any T-code like COHV in discrete planning to mass confirm process orders?thanks..

Dear Monst,
Ensure whether have you made this setting for the standard profile in OPK1 under default tab page check whether for quantity
and services whether for the value is set as 1 - immediate proposal.
check with this and revert back.
Regards
Mangalraj.S

Similar Messages

  • Process order problem in COR2 - Urgent Please

    hi i have a problem in COR2.
    After creating the process order i TECO Technically complete the same,
    and when i save the process order the system just hangs.
    When i debugged the code i found that issue is inside the functional module CO_ZV_ORDER_POST - Create/change end routine order.
    It does not do the commit work properly. this is in PRD so please help me to resolve this
    I checked for other system and the process order gets saved.
    What should i do
    please help

    just  compare the  function  module  in  both  PRD & DEV  so that  see the difference in the code level  or else  in the debug  mode  upto the  hanging  code level  ....
    i think it is because of the performance  issue  ....  so  need to  be   created the index  of the  table which  it gets  updated  .....
    becuase  as your FM is  for create/chande  .... so it  will be an  big  table  .... so see it  and   do the performace trace  and  create the  index ..
    ST05 ,SCI  , SM30    .... These are  some of the  tracscation code for   Code Insecptor , performance trace & SQL trace , Runtime Analysis..
    seee if the code is  same  in both  the system   ... then it is confirmed  as   performance  issue  ....
    if the code is  different   then it is  patch level  issue ...  tell to  basis  to check the  patch level  of that  both system  and apply it.
    reward  points  if it is usefull ...
    Girish

  • Confirmed Process order but with mistake on quantity for material.

    Dear All,
    The case is ,  User make mistake on putting large volume into material quantity within process order,  However, this process order has been released , confirmed and delivery (DLV) status. 
    Since this large vquantity material will make the Cost extra larger than normal.  
    Therefore, is there way to change material quantity and recalcuate the cost again? 
    Many thanks !
    Marco

    Dear all,
    After commuicated with User again,  user has been done as below.
    Step1)
    User has been cancel the process order confirmation by T-code:  CORS,
    Step2)
    Revesed the extra amount Quantity to Block stock to prevent Sales Person touch this extra quantity.
    However,  I checked there is no different on Actual costs after the cancel the Process order confirmation.
    I have some confusing now..
    1) is that once Process order confirmation cancelled,  is that there Must no Actual cost in Accounting view?
    2)  If there is part of physical product produced,  but the Process order has been cancelled afterward. How the cost calcuated?  is that include the cost or exclude the cost? 
    Many Thanks for your help!
    Best Regards
    Marco

  • Sequential confirmation and restricting over confirmation - Process orders

    Hi,
    We have a process orders with phaes 20,40 and 60. Order qty = 100 pc
    1. We would like to have sequenstial confirmations from 20->40->60.
    2. When we confirmation phase 40 , quantity should not exceed the confirmed quantity of phase 20. ( Example , if 20 is confirmed for , say , 10 pc , then user trying to confirm 11pc in phase 40 , should result in an error )
    3.When we enter confirmations in COR6N , we would like to have the previous confirmed quantity to appear as default and if user changes to a higer quantity than the previous confirmation quantity , it should give an error message.
    ( for example , here when user confirms phase 20 - order qty less previously confirmed qty = 100-10=90 pc should come as default ;   for phase 40 , default confirmation qty should appear as 10 pc and user trying to change it to 11pc, shoudl result in an error)
    In order confirmation parameters , we have chosen " error when operation sequences are not adhereed to ".
    and in over delivery tolerance , we have chosen " wanring message"
    How can we achieve this modifitcation?
    Thanks and regards,
    Manohar

    HI,
    In the confirmation parameters OPK4(Customizing for Shop Floor Control, choose Operations -Confirmation -Define Confirmation Parameters) you set the Propose indicator in the quantities area, to stipulate that quantities should be proposed when confirmations are entered under "Operation Individual entry using Indv. scren" tab Page. and test
    If this is not working out
    Check
    Control key for operations (in Customizing for Shop Floor Control by choosing Master Data -Routing Data - Define Control Key), you stipulate whether an operation can or must be confirmed (Confirmations key).
    Checking the Quantity to be Confirmed (Confirmations key).
    If the operation sequence is checked for confirmations, then the following quantity check takes place: If you want to enter a confirmation in which the sum of the yield, rework quantity and scrap is larger than the yield of the predecessor, then the system issues an appropriate message (for example, an error message). The predecessor is determined exactly as described in the graphic.
    Irrespective of whether the operation sequence is adhered to, the quantity is checked against the quantity of the predecessor operation (= expected quantity) and a message is issued (the category is set in Customizing). The following cases can occur:
    The confirmed quantity is larger than the expected quantity.
    You are entering a final confirmation and the confirmed quantity is smaller than the expected quantity.
    The message category determines your next entry option:
    After acknowledging a warning, you can continue entering.
    In the case of an error message, the system terminates the input dialog.

  • Process order problem

    Hi all,
    A process order is created and for all thr materials in the order batch determination is carried out except one material.
    The stock is available in the plant/stoloc and batch combination.
    When i try to run the batch determination of the material , no batch is selected.
    Only one batch is avialbale for that material.
    How can i maintain the batch in the process order.
    Kindly help me.
    Regards
    KK

    Got the solution.

  • Unable to confirm process orders

    Hi,
    I am getting an error - No open operations requiring confirmations exist for the order.
    In the control key, I have selected 2 (confirmation required) in the confirmations indicator.
    In the confirmation parameters, I have + confirmable operations checkbox ticked.
    Are there any settings I have missed? I appreciate your help.

    Hi
    Please go and check operation
    u have to add operation in order
    do u have recipe for material in order
    Please tell me if u face any problem
    please reward points
    Sunil

  • Issue with process order confirmation

    Hi,
      I m doing the testing of SAP EHP4 To EHP6 up-gradation. I tried to confirm process order XXXXXX with T-code COR6N.
    In this process order there 2 phase for 2 activity. Now when I entered the order in COR6N I click on enter its automatically taken 2nd phase.
    Its by-pass the first phase. I have to confirm the 1st phase but its not showing.
    Please let me know where is the problem ...what configuration i m missing.
    Thanks,
    Anurudh

    Hi PP guru,
    Thanks all of you replay my problem is resolve now. 2nd phase not showing there because confirmation is possible but not necessary so when I click on f4 its not showing.  I entered it manually after that it taken it and showing activity also.
    So thank u friend once again.
    Thanks
    anurudh

  • Cannot do the confirmation of process order (CORK)

    Hi experts,
    I entered into CORK tcode I given the Value for Process Order "XXXXXXXXXXX" and performed the enter.
    Now I am "Process Order Confirmation Create : Actual Data" screen. Here I selected the the radio button "Final confirmtn and cliced the check box " Clear Reservation" under the Confirmation Type.
    Now I am trying to "SAVE" at this moment I am getting the below message i.e indicated in bold letters.
    ''Error in determining actual costs for order xxxxxxxxxx.''
    I confirmed process order status.
    Process order has not the status "CSER(costing error)".
    COGI has not records for the process order.
    Why the error happen I don't know....
    Could you please help me to avoid this problem.
    Thanks in advance.
    Edited by: Satoru Miyagawa on Sep 17, 2010 5:08 AM

    Hi everyone,
    Thank you for your help.
    I got the solution of the problem I had!!
    The cause of problem is that target profit center has locked by master. (check the lock indicator)
    Therefore, process order has not costing error when calculated cost in COR2,COR1.
    Thank you!
    Satoru

  • Process order confirmation below tolerance limit, devation to be trigger to QA person

    Hi Team,
    Scenario is related with process order :
    While order confirmation , if we need to confirm process order below tolerance need deviation to be trigger which is approved by QA , allow order confirmation .
    How we can map the above scenario, so that deviation to be trigger to QA person for approval and than order confirmation is done.
    This is related with pharma company.
    Or Should we can map above process in other way.
    Thanks
    Vinu

    Hi Vinod,
    Is this o process order or Production order, if production order I suggest you to use the trigger point functionality, if process order u will need to go for user exit and some coding.
    Regards,
    Amol Kale.

  • Process order operation information

    Dear Experts,
    I want to know the name of table from where I can get information of process order no., process order status and the operations which are still to be confirmed for the order. I think I will have to create a view by using two tables but let me know which tables should I refer.
    Thanks in advance.
    Prashant

    Dear
    Find below the SAP tabel  for your report requirement :
    Order tables :
    AUFK Process  order headers
    AFKO Order header data PP orders
    AFPO Order item
    AFVC Order operations
    AFVV Quantities/dates/values in the operation
    AFVU User fields of the operation
    AFFL Work order sequence
    AFFH PRT assignment data for the work order(routing)
    JSTO Status profile
    JEST Object status
    AFRU Order completion confirmations
    Process Order operation tabel :
    PLAS Task list - selection of operations/activities
    PLFH Task list - production resources/tools
    PLFL Task list - sequences
    Order and Operaton syetm Status :  SAP Table and field  : JEST-OBJNR 
    1.Orders/Operation  with status CRTD : JEST-STAT = I0001 .
    2.Orders/operation  with status REL/PREL : JEST-STAT = I0002 /I0042
    3. Orders with status MSPT  : JEST-STAT = I0004
    4. Orders with status PRC  : JEST-STAT = I0016
    5. Orders with status DLV/PDLV  : JEST-STAT = I0012
    6. Orders/operation  with status CNF/PCNF  : JEST-STAT = I0009/I0010
    7. Orders with status GMPS  : JEST-STAT = I0026
    8. Orders with status TECO : JEST-STAT = I0045
    9. . Orders with status DLFL : JEST-STAT = I0076
    Hope this will help you to include required table in your BI report
    Regards
    JH
    Edited by: Jiaul Haque on Jun 3, 2010 9:12 AM

  • How to delete process order

    Hi Guru's,
    I have created a processorder in T-code COR1..now i want to cancel the confirmed process order..plz tell me the process.
    Thanks & regards
    cherukuri

    Cherukuri,
    Deleting a process order has multiple steps... I would suggest you to just set "TECO" and "CLSD" status in the change mode of the order. This would prevent any further processing of the order in terms of confirmation, goods movment and costs. From menu bar
    You need to follow the steps below for archiving and deleting process order,
    1. Use program "PRARCHP1" to set deletion flag (Can be reset). The prerequiste i would suggest is to create a selection profile to select orders with status "CLSD"
    2. Use program "PRARCHP1" to set deletion indicator (Cannot be revoked)
    3. Use program "PRARCHA1" to archive (Already basis should have setup the database link for storing)
    4. use program "PRARCHD1" to delete and remove the data from the R/3 system.
    Regards,
    Prasobh

  • Calculating Overhead in Process Order

    Hi Gurus,
    We're confirming process orders on a daily basis and we're seeing very odd results in the calcuation. 
    - First, the process orders are being created for the same product, so we're using the same material master each time. 
    - Second, we're using the same resource for making the product. 
    - Third, on the confirmation, we're entering the same times for cleaning, setup, duration. 
    However, if we confirm four orders, we will see the overhead costs calculated on two or three of the four.  One the other one or two, the overhead wont be calculated. 
    Bottom line, sometimes we get the cost, sometimes we don't.  The formula for the costing is in the resource, and we're using the same resource for all the process orders; so we know the formula works. 
    Any ideas on what we can look for? 
    Thanks,
    Xamaica

    HI All,
    Kanapon - I'm using the same product for all four orders.  As you suggested, I checked the orders and the activity types are being copied to the right places.
    Sundaresan - we don't have a CO consultant, unfortunately it's just us.
    kent9999 - I've been checking the orders with the CORT transactions; as far as I can see, there are no differences with the orders.  Also, I checked and there are no goods movement reversals in the order without the overhead costs.
    Thank you all for your help.  Any thing else I can try or look at?
    Xamaica

  • Problem in Process order confirmation ( while doing batch splitting)

    Hi All
    In our Industry we have sceneraio
    we create Internal order and assign internal order to sales order
    Once MRP run take place
    Planned order created and converted to process order
    Process order released
    once we try to do confirmation of process order
    example suppose process order header matl qty : 8
    and in final confirmation while Goods receipt(101) of Fert
    we do batch splitting (example 4 batch : each qty : 2)
    but some time system not allows to do Goods receipt (movement type101)
    system gives "Error confirm order not allowed"
    please need urgent help
    Thanks in advance
    Sunil Singh

    Hi Sunil,
    During your first confirmation you must have activated "Final confirmation" Indicator, probably this is blocking from further confirmation.
    Please check whether current system status of the order contains "CNF" if so, please cancel the previous confirmation and then redo confirmation with "partial" button active. Final confirmation should be activated only when it is the last confirmation for the order.
    Hope this will resolve the problem, reward your points....
    Regards,
    Prasobh

  • Problem with creating Process order confirmation using BAPI

    Hello,
    While creating Process Order confirmation using BAPI_PROCORDCONF_CREATE_TT, material document is getting created. But a line item is inserted in the table AFRU without material document number. When it is created manually using the transaction COR6, the table is getting updated with material doc in the line item. Can anyone let me know what other attributes to be passed in order the update the same?
    Thanks in Advance.
    Regards, Senthil G.

    Hello , I am working with the same Bapi, can you please send me the code to fill the parameters, if I find the same error like you, I will send you the solution if I correct that.
    Thanks for your help.
    [email protected]
    Guatemala, Cempro ADATSA

  • Problem during Process Order Confirmation - COR6N

    Dear All,
    We are into process industries
    Till now we are creating different BOM for each section and different process orders for each BOM.
    For example Pulverize, Acid MIXING, Continuous Rotery, Blending and Packng.
    Now we have created new BOM for FG - showing all input/output of  RM, SFGs.  In Recipe, define operation for each section. and assign operation to material.  I have attached screenshot of Recipe Operation.
    During process order confirmation, system shows movement type of all material perfectly during each phase. But during confirmation of last phase system does not show 101 movemet of FGs.
    I have checked in Recipe, control key is ok i.e. Automatic GR,  in OPK4 setup is also correct.
    We have created new BOM and Recipe. There is no change in other configuration parameter.
    Thanks and Regards,
    Nirav

    Hi Nirav
    The automatic goods receipt is defined by the operation/phase control key.
    Control key PI03 has the automatic goods receipt setting by defaul.
    Analyzing the screenshot I could observe that this control key is assigned to all the opration/phases, however, it should only be assigned to the last operation/phase, where the goods receipt will actually take place.
    For all the previous operations/phases you should use a different control key, without automatic goods receipt, such as PI01.
    BR
    Caetano