Confirmation at QM operation

Dear All,
My client wants confirmation of the QM operation through Quality results recording.
for the same I have done the settings as below.
Control Key - Insp Char req, Auto GR,Confirmations - 2 (req)  
now I want to confirm the production qty through QM lot 03
I set a Insp point at header and sampling procedure for insp points also in operations details mentionedI Inspection point completion - Qty, Valuation and ticked the radio butten Qty related.
But still i dont get the pop up for qty confirmation for the Inspection lot.
I used customized insp point and valuation is maintained but the tab for Function module is not maintained.
Pl suggest whats missing?
Regards,
Anil

Hi anil,
Use RR worksheet QE51N
In this work sheet, click on the save button after you valuate your Characteristic for the operation. A samll window will appear named "VALUATION". Here you need to select the Radio Button :"Final Confirmation" to proceed further.
Ifyou fails to do this refer these notes
Note 88740 - QE11 for process orders
Note 82959 - QM: Activity confirmation for process order from QE*
Regards,
Shyamal
My problem is resolved. I'm closing the thread.
HOW?? pls share if you can!!!!!
Edited by: Shyamal Joshi on May 20, 2009 2:35 PM
Thanks for the update, it was good sharing experience.
Edited by: Shyamal Joshi on May 22, 2009 4:59 PM

Similar Messages

  • Confirmation for sub-operation

    Hi Expert,
    As we know that confirmation has to be maintaned for each work order confirmation.
    Current condition, we also have to maintained confirmation for each work order sub-operation.
    Is there any possibility that only operation level of work order that need to be confirmed? instead of sub-operation level? in assumption that work order created with both operation and sub-operation
    illiustration:
    Operation 0010 Greasing
          Sub operation 0010/0011 cleanning
          Sub operation 0010/0012 inspection
    Confirmation conducted for operation 0010 Greasing only, instead of all operation and sub operations
    Thanks
    Pls Help
    Rgds

    Leni,
    There is nothing in the standard system that would force you to create confirmations at either operation or sub-operation level (unless you have done something in your system)
    PeteA

  • Good Movement at the confirmation of an operation

    Dear All,
    I tried to make good movement when I maked an confirmation for an operation.
    I configured whit TC: OPK4 automatic good movement and whit TC: OP67 I choosed option automatic good movement for control key.
    However, when I maked an confirmation (TC: CO1F), the system didn't propose the material from BOM, for issues, or the finished good to get in stock.
    And an additional question: if I have many operations on the routing and each of them have the same control key (PP01, for example) the system cannot accept any automatic good movement.
    What can I do in this case?
    Thank you very much for the answers.
    Regards,
    Marian

    Hi,
    You are trying progress confirmation right...
    As per my knowledge for production order confirmation you could findth egoods movement...
    in CO15 or CO11N...
    For th e second question if u have N number of operations then you could confirm operation wise in CO11n and for first operation goods issue and for the final operation goods recipet will happen
    Regards,
    sravanthi
    Edited by: Sravanthi683 on May 21, 2009 10:34 AM

  • Automatic Time Confirmation for an operation in a Maintenance Order (IW41)

    Hello,
    We have a requirement to do automatic time confirmation (while saving the order) on an operation when the user selects "DONE" standard text key on Operation line item. Is there a user exit or BADI available in Plant Maintenance that can be used for Automatic time confirmation?
    I went through some of the user exist/BADI in PM and didn't find anything for automatic time confirmation. The only thing that I found useful was user exit CONFPM03 (which allows to carry our own checks once and operation is selected for confirmation).
    Appreciate your responses. Thanks

    Hi ,
    Normally thru confirmation we enter actual hrs worked in IW41 .. but if you do not want to run that tcode then not sure of any BADI but i would suggest you to create a Z Programme which runs as a batch job at some 30min everyday . The Z Programme checks all the PM orders of particular order type  which are with  released status and then gets into operations and checks for standard text and if its value is DONE then calls programme SAPLCORU - IW41 Programme .. you can suitably put a variant for that batch job .. plz check the option with ABAPer ..
    regrds
    pushpa

  • Goods movement in QC confirmation for inprocess operation

    Dear Friends,
    I am doing inprocess inspection for routing operations. After results recording, I get the window where I am entering yield.
    If I go to confirmation tab, I can enter the activities and qualntity. But ther I am not getting goods movement tab.
    I want assign batch no. to material in the goods movement tab.
    How can I get it?
    Please help me.
    Waiting for reply!
    Thanks!
    Kiran

    No Inputs?????

  • Partial Confirmations of an operation

    Dear All,
    I created an production order and I want to confirm partial quantity of an operation.
    But when I chose partial confirmation, and I put the partial quantity, the system didn't suggest the new time for confirmation. I must to calculate the time, for this partial quantity, and put the value in SAP.
    It's possible to automate this process?
    Thank you very much for your answer!
    Regards,
    Marian

    Hi,
    Go to OPK0, Single screen entry (sp001)
    Check area of selection :-- header area/ area
    Default Values  confirmation type  ::-partial confirmation
                             quatity and services:-- immediate proposal
    Regards

  • Confirmation for Split operation in Production order

    Hi Experts,
    I have one production order say order no. is "100000000000" and its order qty is 100pcs and in operation no. "20", i have splitted the operation into two individual capacities and allocated 50pcs to each individual capacity. Now can any one explain me or tell me the steps required for confirming the operation quantity by individual capcity.
    Regards,
    Satya.

    Hi,
    Thanks for your response on my post.
    As you mentioned I am using T-code CO11N for Production confirmation, but in this screen if I select operation no. 20, by default, system is read work center from production order "operation overview" screen. Now I want to capture the confirmation quantity against "induvidual capacity" and want to see some reports based on "induvidual capacity" level of the same work center.
    Could you pl. advise on this.
    Regards,
    Satya.

  • Milestone confirmation and scrap operation

    Good morning :o)
    I created a new Control Key u2018ZMILu2019 which is a direct copy from our standard control key u2018PP01 u2013 Automatic Goods Receiptu2019 but with the Milestone Confirmation indicator set.
    I then created a new routing for material X, added 2 operations:
    0010 u2013 V1 u2013 PP02 (No Auto GR)
    0030 u2013 V1 u2013 ZMIL (Auto GR + Milestone) (I made a mistake and had to delete 0020, hence 0030)
    I then processed a confirmation against 0030 and all looked fine, it back-flushed the correct material and attracted the correct costs to the MAC/LAB activities assigned against each operation.
    I then processed a scrap confirmation against operation 0010, it correctly issued another 261 for the appropriate back-flush material/qty but it didnu2019t attract any extra activity cost for the quantity posted in the confirmation, do you know why this is? I assume itu2019s likely a setting against control key ZP02?

    Good evening,
    OK after some testing I have found the following:
    If I scrap via CO11N everything is updated as required but if I go via the SAP console (LM01) and scrap the product I find the following:
    Running transaction CO14, I see the scrap Qty, if I then go into details I can see the Qty has been updated but the activities have not!!
    If I scrap with CO11N and follow the above process the activities are being updated against the scrap qty value.
    A little lost on this one, any ideas would be appreciated.
    Thanks in advance.

  • Confirmation of all operations.

    Hi Gurus
    Is it necessary to  have CNF status for all operations in Production order.?
    Can we add mor activities to already confirmed operation?
    Can we closed production order without all confirmed operations?

    Hi,
    Q.Is it necessary to have CNF status for all operations in Production order.?
    A. You can have PCNF for some opearions or  neither have CNF nor PCNF all possible.
    Q. Can we add mor activities to already confirmed operation?
    A. When you realased the order you can use option read master data and can change the master data  but once you issued material or did the confirmation then you can not change the master data for that particular production order.
    Q.Can we closed production order without all confirmed operations?
    A. Yes you can closed or Teco the production order with out conirming the all operations.
    Regards,
    Farman

  • WM : Confirmation of loading operator

    Dear  All
    Please can you tell me how I can establish who loaded a pallet on SAP. I can see who packed it but it does not show me who scanned it for loading. I really need to know how to do this for a disciplinary matter.
    What I would like is to be able to see which operator actually loaded the HU onto the trailer. Currently using HUMO I can only see the who packed the HU. Once ready for despatch, the pallet is scanned to truck and the despatch paperwork prints off in the office. However, I can not see the ID of the operator who scanned the HU to truck. As this is a different operator, if there are any issues (as there is in the current problem that I am looking at), then I am unable to prove who handled the pallet for loading.
    Best luck to all
    Nitin

    Cannot be done.

  • Final Confirmation of the operation

    Hey Gurus
    Where in the work order we can find out who did the final confirmation, I checked in the action log but didn't find any thing there?

    hi
    Are you refering the confimation of order ,if so then from menu Extras>Change documents>Complete confirmation. you can get the person user id name
    if you are refering to TECO the order you can check in the action log from menu Extras>Change documents>Action log
    regards
    thyagarajan

  • Report for operation confirmations

    Hi
    Product A . production order qty is 100.
    It has 4 operations.10,20,30,40.
    for operation 10     confirmed qty 100 
          operation 20     confirmed qty 80
         operation 30      confirmed qty   85
                         40              100 
    I want a report in which i want pull all the orders with this kind of confirmations so that it is easy  for me to correct it.
    In coois report we can see all the orders and it is very difficult to check each and every order weather it  is confirmed properly or not.Please help.

    Dear,
    Go to COOIS,
    List :- Opertion
    Select Order Type :- PP01
    Plant = 1000
    Syst. Status      REL         and   CNF Exclude Tick
    And execute the report go inside and change lay out Here add two filed Operation quantity and Yield and save the lay out now you will have all required details  that you want  just try and come back.
    Edited by: R Brahmankar on Jan 28, 2011 12:22 PM

  • Confirmation of  production orders with several operations

    Hello,
    I am  using transaction CO11 in order to perform  confirmation of Production orders that has 3  operations...
    with this transaction, I have to enter 3 times the transaction for each  operation...
    could you please tell me a transaction where I can make the confirmation  for all operations in one step ? ( a kind of screen where I can access all operations and manage  the hours and quantities before saving.)
    thanks and regards

    Dear,
    How many such orders would you come across everyday for the confirmation to happen?
    Does the operation sequence remain the same across all the orders?
    Then,i would like to suggest a method,Im not sure how it can be adopted to your scenario
    Try this!!
    We can  group all the production orders on daily basis or in shift basis in a EXCEL spreadsheet.
    Through a BDC,we can migrate the information on a daily basis to SAP.
    Regards,
    Joseph Charles vaikathussery

  • Work center design and operation confirmation

    Hi All,
    In my scenario im grouping the similar m/c to a work center
    say for ex. 4 lathes m/c into a single work center as LatheALL and also the indiv cap as 4
    my customer wants the traceability in which m/c the job is done
    So i had designed in such a way that
    1 LatheALL -4 cap(this will be additional wc)
    2. lathe1 - 1cap
    3.lathe2 - 1cap
    4.lathe3-1cap
    5.lathe4-1cap
    in the routing only latheALL will be given., this will help customer in planning
    when going for operation confirmation i will give confirmation for that operation and will confirm as lathe1or lathe2  or etc.. this will help prodn dept for traceability in which m/c the work is done
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    also suggest by giving confirmation for another work center will the capacity for the original work center will be reduced
    Regards
    Anand Srinivasan

    Hi Anand,
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    yes, during confirmation time to enter the orginal actual work center, this suitable for your client requirement, do the settings for OPK0 - change the confirmations parameters (0410 or 0420)
    Regards,
    Sankaran

  • CO11N operation wise confirmation inconsistency

    Hi all,
    I have a scenario like, 8 operations with last operation milestone confirmation in a production order. Letz say we have 500 as total target quantity and in operation 0010 they confirmed all 500 and from operation 0020 onwards they do partial confirmation say 20, 20, etc. At operation 0040 if they have yield of 19, they enter remaining 1 as quality notification (unplanned scrap)and continue to confirm next operation. In operation 0050 they have to enter yield as 19 only even though yield as 20 'coz they have opn adherence check (OPK4) active. As expected SAP thrown an error 'Up to yield 19, opn/0040 predecessor confirmed'. They just want to have a warning and continue enter 20 at opn 0040 and next successive opns. But I am afraid they can enter anything if they if we simply check that in OPK4 as warning message issued. Do we have any other solution other than changing in OPK4?
    Another thing is how can they confirm 20 in operation 0030 and 40 in opn 0040, and some other number in opn 0050 though the target quantity is 500 which is being  confirmed at the last operation?
    I appreciate 4 your valuable suggestions ..
    Thanks
    Sree...

    Hi Vivek,
    Thanks for your reply  and Sorry for my late response..i Iwill explain the actuual business scenario :
    We have total qty is 200 confirmation is done  in 4 group 50 each.
    For example we have Op10/confirmation optional,Op20/confirmation optional,Op30/confirmation optional and Op40/ milesstoine confirmation..All the Opns are confirmed through milestone atg last operation except in case there is scrap qty is present that particular opn is manually confirmed. For first group of 50, we have 49 yield + 1 scrap at Op20 which is maually confirmed. similarly it requires manual confirmation for all the groups weather are not scrap present for remaining groups. Business does not follow any Opn sequence like they may confirm group 1 at Op20 and froup 2 at Op40 and so on..there may be different quiantities confirmed at different steps of routing. For this I configured adherence check to warning but the requirement also include Op10 to be confirmed whenver Op20 is confirmed though none of them is milestone. Also Op20 to b confirmed whenever Op40 uis confirmed in step 2 or 3 or 4 though it was manually confimred for step 1. I have checked enahancements but none of them seem to satisfy the requirements. I really appreciate your suggestson to solve this one.
    Thanks
    Sree...

Maybe you are looking for

  • Can someone please tell me how to format a new disk to ZFS format?

    I have a Sun v240 with Solaris 10 update 8 installed on a single 73GB harddisk. Everything is working fine. I just purchased a another identical harddisk online. I plugged the disk into my v240 and ran 'devfsadm' and solaris found the new disk. I wan

  • Trex can't be updated to higher levels on windows 2003 server 64 bit

    Hi gurus, We have a portal system (EP 7.0 SP18) and a Trex 7.0 server which are working on windows 2003 server 64 bit on the same server. After upgrading our portal system from sp15 to sp18, we can not see indexes on Index Administration screen. When

  • HT204433 on putting a sound tag in ibooks html5 widget it shows cannot play sound?

    on putting a sound tag in ibooks html5 widget it shows cannot play sound? I tried using m4a format and still the sound is not working in my html5 widget can i get some template to add sound, moreover do i need to make changes in plist in order to add

  • Motion External Audio Problems

    I recently had a major crash of Motion 2. It wiped out my preferences so I had to re-do all of those. My problem is it is only playing my audio through the internal computer speaker. Where is the setting to use my external speakers?

  • Not able to Display Information message fully

    Hi Gurus, Here I hav some problem in displaying a information message in the output. My requirment is to display a information message---> MESSAGE i008(zmsgkc1) with 'Chapter Id is not updated Please log a complain with IBM Helpdesk with ChapterID no