Confirmation based on Work center

Hi,
Can we do Confirmation of Qty based on Work cetner?
Means that i have Order Qty for 100Pc.
in the same order i want to confirm the Qty in WC1 for 60PC and another Workcenter WC2 for 40 PC.
To check the utilization of Work centers
is there any possibility?
Please let me know
Thanks
Nag

Hi
Thanks for the response.
i made the changes in Single Screen Entry.
Here i need one clarification is that,
I have defined Workcenter in Prod.Order as WC1.
When  i go for Confirmation on the Operation wise, system has proposed WC1 (Which is from Prod.Order) for 100Qty.
While doing confirmation -> below the Personal i have given once WC2 and Qty 40.
I saved the confirmation.
Next time while doing confirmation WC2 and Qty 60.
These data where will be saved and while doing Capacity Calculation how the system is going to calculate the available Capacity or Utilized Capacity.
Please let me know
Thanks

Similar Messages

  • Attendance Report based on Work Center

    Hi All,
    Do we have a standard report of getting the attendances/Abscences of an employee based on Work center.
    Either if it can be done by CATS also is fine.
    Kindly suggest.
    Thanks

    Hi,
    You can run the program RPTABS20 and in the further selection field u can add the org unit for your work cente.
    Regards,
    Kapil Kaushal

  • Confirmation costs and work center link

    Hi Experts
    Can we link the costs in CO document along with line item and to a work center after production order confirmations?

    Dear
    You need to utilise tabel :
    1.AFKO - this is for your basic production header info
    2.S022 - this is for your operation header details - operation number, Work centre etc if you are only after the header details such as activity cost based on the activity type assinged at work centre -cost centre ( refer : AFVC or AUFV)
    3.AUFK - this is for your order master data - Order released flag, order complete flag, technically complete date, you'll need this to filter out confirmed order with order staus based on JEST table.
    4.Work Centre : CRCO-Work centre /cost center relation , CRHD-Work Cenre Header .
    5.Discuss with your CO  for CO document number
    -COVBP
    COSS CO Object: Cost Totals for Internal Postin
    COSP CO Object: Cost Totals for External Postin
    COSB CO Object: Total Variances/Results Analyse
    COSL CO Object: Activity Type Totals
    Hope this will be useful
    Regards
    JH

  • Transfer data after Network Confirmation to another Work Center?

    Hi all,
    let me explain my problem:
    I've defined an activity with 3 activity elements(work). Every activity has it's own Work Center.
    Normally a worker uses transaction CN25 or CN48N to enter a Network Confirmation by typing in Network, Activity and Element.
    After this he types in his Personell Number and the Actual days or hours and confirms it.
    If the user takes for example too much days and confirms it, normally i've to correct the Network Confirmation by using transaction CN29 and tell worker to retry his Confirmation. (Because there are only allowed maximum X hours...)
    Is it possible to transfer this too much days to another Work Center by using an transaction???
    Is it possible to transfer this entry to another Work Center???
    Im not a Cost Specialist, please let me note if there are any Threads which discribe the same Problem...
    Thanks for any Answer...
    Regards,
    Tobi D

    Hello Virendra,
    thanks a lot for your answer.
    First of all... There was a mistake in my explanation-it's not I've defined an activity with 3 activity elements(work) it's  I've defined a network with 3 activity elements(work).
    In our Company every Activity has it's own Work Center. I meant the Identification and view selection in Project Builder (CJ20N) tab Internal --> General Section and here: Work center.
    Well, i think my main problem is that i do not know how to correct Network Confirmations without using the delete transaction CN29. For example: Worker confirms on Work Center of Activity A with CN25 oder CN48N, but should confirm on Work Center of Activity B.
    Regards,
    Tobi D

  • Default employee cost center based on work center

    Greetings,
    How can I default an employee's home cost center in IT0001 based on their work center assignment?
    I've tried linking both the employee's position and their org unit to the work center via CR02. This did create the IT1001 records. The work center does have a corresponding HR work center. I've even tried attaching a cost center to the HR work center with the IT1001-A011 relationship. No luck.
    Seems like OM side is doing what it should, but we want to get the work center's cost center in the costing tab over to the employee.
    Maybe there's an integration switch that I'm missing somewhere?
    Thank you!

    Thank you both for your thoughts. We have tried the ZXPADU0x exits, but it appears that SAP will not allow us to change an existing cost center value in IT0001 via defaults. I think this is because SAP wants to always keep OM and PA in sync, based on the A011 relationships in IT1001 on the position or org unit.
    In terms of OP42, yes, we have tried adding relationships between the work center and position/org unit and also employee. And also have the cost center linked to the work center on the costing tab. But we're still not able to get that cost center to pull into IT0001.
    I'm wondering if the integration between work centers and HCM is limited to relationship links on the OM side?

  • Work center design and operation confirmation

    Hi All,
    In my scenario im grouping the similar m/c to a work center
    say for ex. 4 lathes m/c into a single work center as LatheALL and also the indiv cap as 4
    my customer wants the traceability in which m/c the job is done
    So i had designed in such a way that
    1 LatheALL -4 cap(this will be additional wc)
    2. lathe1 - 1cap
    3.lathe2 - 1cap
    4.lathe3-1cap
    5.lathe4-1cap
    in the routing only latheALL will be given., this will help customer in planning
    when going for operation confirmation i will give confirmation for that operation and will confirm as lathe1or lathe2  or etc.. this will help prodn dept for traceability in which m/c the work is done
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    also suggest by giving confirmation for another work center will the capacity for the original work center will be reduced
    Regards
    Anand Srinivasan

    Hi Anand,
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    yes, during confirmation time to enter the orginal actual work center, this suitable for your client requirement, do the settings for OPK0 - change the confirmations parameters (0410 or 0420)
    Regards,
    Sankaran

  • Work center capacity or WT generic

    Dear All
    Is it possible to have Work center determination based on Bin capacity ,
    if not then as second option
    Is it possible to  have WT generic for work center determination where in the picker based on the available work center will enter the bin and confirm the task.
    Please confirm with the storage type settings/role to accomplish the above..
    regards
    Saravana

    Hi
    Request you guys to validate the Work center functionality summarized below and provide your feedback/clarification if any.
    Case 1: User decides on the bin during confirmation
    It is realized through POSC setting for OB02 ,,either having storage type or type and section without bin.
    Open Points:
    WT generic setting at storage type doesn't need to be generic ( values 1 and 2) , It can still remain as not generic (=with Bin)
    It doesn't work based on work center determination setting(/SCWM/PACKSTDT) and having rule based checked at POSC..
    Case 2: User will drop the picked items in common work center
    It is done by having common Inbound section shared between multiple work centers and then the pack center user drags and drops the items/HU from common bin to working bin .. If required there can be an additional bin to reflect the completed work.
    Case 3: Based on consolidation group
    It is achieved by having Consolidation group as Put away rule and work center determination based on consolidation group.(/SCWM/PACKSTDT)
    System dynamically determines the bin per consolidation group.
    Open Points:
    If there is no work center available during picking for a particular consolidation group ( means all available  work center are occupied with different consolidation groups) then surprisingly the pick is directed to staging area ( Is this expected behavior??)
    Case 4: Work center determination Based on Remaining capacity
    BADI Development..
    Thanks Juergen for your inputs ,, Now i am convinced with the  validation( error message) at storage type configuration of having both storage type role E and capacity check active..
    regards
    Saravana

  • Cost work center A to work center B

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, I want to transfer the cost the work center A to and other work center B.
    I want to keep the history u2018s confirmations on the work center A.
    The first confirmation CO11N on the order 1 and work center A => Quantity 1 hrs.
    Actually we transfer the cost by KB15N by at the level EOTP.
    We want to push the cost down at the work center.
    So we want this situation :
    The first confirmation CO11N on the order 1 and work center A => Quantity 1 hrs.
    The second confirmation on the order 1 and work center A=> Qauntity -1 hrs ( Itu2019s possible and how?)
    The third confirmation CO11N on the order 2 and work center 2 => Quantity 1 hrs.
    Thank you for your answer.
    Regards,
    Géraldine

    Hello,
    The user clock in his time by CO11N, for example 2 hrs, on the posting date 2011.02.01 (on the project A).
    After the cost transfer into CO.
    At the end of the project, on the posting date 2011.06.01 , we want to transfer 1 hrs and the cost to an other project B.
    I try two incorrects solutions :
    - The first : I can't use the CAT5 by negative value.
    - The second : The user don't want to modify or cancel the initial confirmation.
    How can i to deduct one hour from the initial project to the second project, and i want to keep the information work center ?
    Can you help me ?

  • Work center change during MFBF

    Hi,
    In REM scenario, During backflush, i am replacing workcenter while posting actual activities.
    In which report can I check quantities confirmed with new work center.
    Regards,
    Wadajkar

    Mangalraj,
    I checked MCP7, Its not showing any entry. If i check with MCP6, system shows quantities confirmed on different workcenter than planned. However, field of new workcenter name and description is blank.
    Regards,
    Wadajkar
    Edited by: wadajkar on Sep 22, 2011 1:29 PM

  • Automatic change of Work Center during Confirmation.

    Happy New Year to all!
    Just want to ask if anyone of you encountered the scenario during confirmation in which the backflushed work center was changed. The user claims that they did not do any changes during confirmation nor did they change manually the order itself. The confirmation happened last December and they only noticed it this month when they were checking the reports.
    I did not configure their system so that they can change the Work Center during confirmation. By default, the work center is grayed out during confirmation.
    Hope to hear from some of you soon!
    Thanks and regards,
    jLmendoza
    Edited by: John Luis Mendoza on Jan 4, 2011 3:15 AM

    Dear
    If your production order operations are re-scheuled and dispatched after Capacity Avalaiblity check in cm21/cm22/cm31 etc  , then during the dispatch of operation ,  you have option to change Work Cnetre , time , date based on the selection option in Startgy profile (CM31/CM21-Enter the WORK CENTRE /Order )  and check wether work centre is changed.
    One more option may be in Order Change in CO02-Operation Overview -Operation -Work centre -Here user may change the Work Centre .
    If you have Order Change management active then you can trace the same .
    Refer : Production order change history
    Otherwise , there is not such confirguration in SPRO where work centre can be changed automatrically during confirmaiton because it will grade out based on the ste of confirmaiton default screen in OP00.
    Hope it clarifies
    Regards
    JH

  • Production Order confirmation/ work center activity type calcuation

    Hi All,
    In the parameters defined through standard value key in work center, we have defined ZZI_06 which calculates its value based on the other parameter using a formula as shown below.
    change over ZZI_01     ZZI_01     
    startup          ZZI_02     ZZI_02     
    run-time        ZZI_03     ZZI_03 * ZZI_09 / ZZI_08 / ZZI_11     
    overheade    ZZI_06     ( ZZI_03  + ( ZZI_01 + ZZI_02 ) / 2 )     
    After confirmation when we checked in C014 we noticed that the overhead hours calculation ZZI_06 was always picking the planned parameter values(from the routing) and not the actual values from CO11N. 
    Just wondering if the reason for this is the way I defined the formula or am I missing any setting?
    Ideally I am looking for value of  ZZI_06 calculated from values of the ZZI_01, ZZI_02, ZZI_03 which I enter in the CO11N screen.
    Thank You.

    Have u run the over head calculation for your order KGI2?
    Regards,
    Ganesh

  • Estimated Start time in notification based on Time defined in Work center

    Hi,
    Following Satish post- I am trying to find solution to the same  problem so i will appreciate any advise.
    When the notification is created ,the estimated start time should be based on priority .This in iteslf is pretty straight & simple. However if the reported time is after work hours or towards the end of work hours or weekends , the estimated start time should be reflected accordingly based on factory calender & work center time schedule.
    In other words the estimated start time should fall within the window of work hours available.
    Example:
    Presume the the working hours for the Organization are 8:00AM to 5:00 PM & a call comes for service at 4:00 PM. Also say , for high priority the defined response time is 5 hours. In such a instance the estimated start date should be set to next day at 11:00 AM.
    Appreciate your help for the configuration that need to be done
    Shirly

    Hi,
          I think ur talking about notification malfunction start time .. currently it just takes the system date and time by default .. and if you need work center timings i believe first u need the eqpt /F.loc to get the work center data in notificaiton ...
    I think u can get these dates can be modified while saving by using user exit  : QQMA0014 QM/PM/SM: Checks before saving a notification or BADI   IF_EX_NOTIF_EVENT_SAVE , but at the same time the eqpt or F.loc have work center details in master record ...or work center needs to be entered manually in notification ..., pls check up ..
    regrds
    pushpa

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • User exit/Badi for changing operation work center based on service product

    Hi,
    I have an requirement to change the operation work center based on the service product in IW31/IW32 transaction. I am using the BAdi 'IM_SM_BADI_READT399A' for changing the main work center. It changes all the operation work centers except the first one. But I need to change it all the operations.
    Thanks in Advance.

    I am using the enhancement spot 'IWO1_TL_INTEGRATION2' for changing the first operation work center

  • Confirmation - Work Center - Routing

    Hi all,
    I try to understand routings. When i try to confirm an operation with BAPI_PRODORDCONF_CREATE_TT for a work center which is not defined in routings, it returns no problem. But it is not in routing. How can it be confirmed? Or what changes when define the workcenter and confirm with it?
    Thanks,

    Has it relation with standard times ?
    Regards,
    techmaster

Maybe you are looking for