Confirmation CO11N - Activity Type

Hi Gurus
Is it possible to modify CO11N (Time Ticket)  screen to include Activity Type while entering confirmation for the operation.
The reason I’am asking this is because I have a situation at my clients place that the same operation can be performed by Operator as well as Engineer. Since Operator and Engineer have different activity rates, is it possible that they can enter Activity Type while confirming the Operation.
Any solutions for this would be deeply Appreciated.
PS: I know this can be done if we have HR Module implemented where in we can link personnel number to capture cost, but right now client is not going for HR Module.
Regards,
Aravind

Hi Pradeep,
Thanks for the advise.I thought of this too and suggested client about this.
They were apprehensive that what if they didn't select the right activity type while confirmation, meaning to say that if Operator selects Engineers activity, it could have lot of repercussions from costing point of view.
One more point to clarify is that the Operation will be done either by Operator or Engineer but not by both at the same time.
So i was working on this line whether they can select activity type directly at CO11N rather than entering time in respective activity.
SAP has this kind of option for network confirmation(CN25 , Project System Module) where in they can select the activity type in the confirmation screen. I was looking for the same kind of option in CO11N.
Not sure why SAP has not given this option in CO11N, i don't see any contradiction of logic here.
Regards,
Aravind

Similar Messages

  • Confirmation of activity types in CO11N

    Dear Experts,
    I have a small issue, while confirmation of production order in CO11N the activity type for the actual quantity is confirming but our requirement is that if we are confirming the half quantity means partial quantity, activity should also be confirmed for the half quantity.
    Thanks & Regards,
    Alok Tiwari

    Dear Bhupendra Singh,
    First of all thank you very much for your reply.
    I am trying to do the way you said but it is not happening.
    My requirement is if the production order quantity is 10 each and planned activity is 10 min for labor and if i want to confirm partially 5 each then the activity to confirm for labor should automatically propose me 5 min.
    Regards,
    Alok Tiwari

  • Confirmation of activity type in Process order -Impact in FI.

    Dear All,
    On doing a confirmation of a activity type for a process/ Production order - values get posted to secondary cost element which has been assigned to a acitivity type.  This means only a impact in controlling but not in FI
    How woould the booking happens in FI ?is it not required to book in FI, if yes, why.
    Please suggest.
    Thanks.

    Hi Daya
    1. You can calculate activity price for plan in KSPI and for actual KSII for respective CCtr and activity type...but some times people manually update price at KP26 directly which in my opinion is not right way because price is either more or less than the real calculation in KSPI and KSII...
    2. However in your case price is directly updated in KP26 against activity type..when confirmation is done in order this rate * activity qty is your value posted in order level and at the same time respective CCtr is also credited by this amount which you can see in CCtr report
       Example:  CCtr  XXXX01
                       Activity type 999999
                       Sec cost Element for activity type 999999 (43 cat)
        Suppose you have booked FI entries for some expenses like Salary in F-02/FB50...against CCtr XXXX01   So your CCtr XXXX01 is debited by Salary amount and this amount will be absorbed in product through activity for which you need  activity price and confirmation.
        FI entry is booked your expense in GL a/c Salary and same time debited your CCtr through CE salary....Now when you charging this expense in product through prod order you are doing it through confirmation of activity qty which in turn calculating value by taking price from KP26 and qty from confirmation.
    Kamal

  • PDC interface - PM/CS confirmation without Activity type

    Hi,
    We have a problem with PM/CS PDC confirmations in our ECC6 version of SAP.  For PS & PP, the default activity type is populated automatically when doing the confirmation.  But for PM/CS, the activity type is left blank.  All three CONFXX idocs have no activity type specified.
    The only thing I found regarding this problem/behavior is a OSS note, dated from 2001. OSS number is 0000381846.  Is this note applicable for our system?
    Is there someone who knows about this?
    Thanks
    Eric

    Hi,
    what you are willing to implement is not a supported functionality in the current Yard management.
    If this is not yet the case, I would encourage you to open a SAP Customer message so that your question gets checked and analysed at development support.
    BR
    Alain

  • Eliminating the use of Activity Types -- what are the impacts and risks?

    Our primary FI stakeholder wants to eliminate the use of Activity Types in our ERP 6.0 system.  He would prefer the use of cost elements and cost centers.  I know that the elimination of using Activity Types will impact our planning processes plus our ability to segregate costs within a cost center.  What else am I missing?

    Hi,
    I can't understand the idea of "eliminating the use of activity types"...
    What about direct activity allocation (based on time confirmation using activity types)? Is there no need to do so? Don't you use production orders?
    best regards, Christian
    Edited by: Christian Ortner on Mar 29, 2010 8:19 PM

  • CRC3 shows six activity type

    I want to confirm eight activity type in order confirmation, do i need to use 2 orders? because CRC3 only allow six activity types.
    any better solution? thanks
    I was given eighty process order which are already confirmed, is there any report which can show activity confirmation hours for these orders and then download to excel?

    In Process Industries you need to add setup as standard value, in order to calculate costs for this activity.
    The activities you can confirm in a phase are related to the standard value key of the resource of the phase / operation.
    So, if there are 8 or 9 different activities, you should need to define two different standard value keys
    first , for activities 1 to 6
    second for the 7th and 8th activity.
    Crete two resources, the main wiht the first SVK and the sceondary with the second.
    Use both in the master recipe / order , in the same phase, the second as secondary resource. You will confirm up to 12 activities.
    Hope this helps.

  • Operation Sequence & Confirmation Type  checked at PO Confirmation-CO11N

    Hi All,
    Thanks in Advance for solution.
    My client wants that, at the time of Production order Confirmation - CO11N, SAP should check Operation Sequence and its Type of Confirmation (Partial or Final)
    For Operation Sequence I have done necessary Configuration (SPRO) settings in Confirmation parameters. But how to check for Confirmation TYPE??
    For Example, I have production order with 5 operations, now if I confirm First (1st) operation with PARTIAL CONFIRMATION, then when I confirm Second (2nd) operation with Final Confirmation, it should check that previous operation is Partially Confirmed and thus allow me to confirm Second operation only Partially. Currently I am able to do Final Confirmation for Second operation in above scenario.
    How can the above thing be restricted please let me know?
    Regards,
    Ravi Davda

    During  configuration  the confirmation parameters are set as per the follow IMG path
    Production> > shopfloor control >> operation >> confirmation >> Define confirmation. Here we have 3 views in the first view of generally valid setting we will
    give check 1) error when operation sequence is not adheredto
                    2)  & 3) Error If over delivery & Underdelivery tolerence is not maintained as per Workscheduling view of Material master record
                    4) Error if the quality inspection value not exist
    In the 2nd view ONLY we have General individual screen in that we have
                    1) confirm type : choices are Partial / Full confirmation
                    2) Goods movement : If the indicator is set the system will give log screen message and ask you to say Y or N to correct the errors in goods movement
                 An other indicator for Quantity / activity as  control indicator
                 I think this will help
         Regards,
         Raj

  • Activity Type in CO11N

    Hallo
    I need help in transaction CO11N.
    I need in CO11N dynamically to change type activity or work center but I do not see the type activity and work center is gray.
    Thanks

    Hi
    Changing of work center & activity type  amounts to changing of master data.
    These are not allowed after releasing of the order.
    Changes of master data can be effected in production order by the functionality "Read PP master data"  even after release also provided :
    1.you have not made GI
    2.you have not confirmed any operation.
    This is Standard SAP functionality.
    Hope it is clear to you.
    Regards
    YMREDDY

  • Yeild and Activity Types are not coming on confirmation

    Dear Sir's
    Hope everyone fine by the grace of GOD.
    Friends i am facing a problem while doing Confirmation of production order in T.Code Co11n .Yeild(net production) is not picking from the Production order and also Activity types are not coming while doing confirmation.
    please help me out in this problem
    Best Regards,
    HAFIZ ABDUL HASEEB KHAN
    SC.PP Consultant

    Dear
    There are 3 possibilities to populate the activity  and yeild field:
    1) The system can propose them based on quantity, using the standard
    formula, directly after entry of the operation being confirmed please check it in your order first
    2) The system can propose them at the time of saving
    3) They can be manually entered ~ however using this option, formula
    will not recalculate using the settings from the Standard value key,
    set for the work centre.
    To set one of the above as default in customising, follow these steps:
    - Call transaction OPK0
    - Select the default Confirmation Profile SAP001 is being ticked marked. - Default Values , Qty and Service in OPK0
    - Select the Default tab and set the default for Quants and Services
    to 'Immediate Proposal' or 'Propose When Saving'
    These options allow you to choose whether the activity  and yeild proposal in
    C011N is given immediately after entry of the operation to be
    confirmed or upon saving the confirmation. However note that if
    you subsequently override these proposals by maually entering activity
    details, the formulae will not be recalculated and manually entered
    data will take presidence.
    Hope this is clear
    Regards
    JH

  • PM Order Confirmation using Personnel's Cost Center and Activity Type

    Hi All,
    Is it possible to have PM Order confirmation (IW41) using Cost Center and Activity type from Personnel instead of default from Work Center?  If it is, can it be done with some configuration or user exit?  Please advise.  Thank you.
    Dai

    Hi friend,
    Order confirmation will be done for order operations.While doing confirmation we post the actual work done by the repective work center and respective activity type assigned to the same workcenter.
    But these activity types are assigned to cost center for cost calculation.confirming the respective operation in maintenance order through workcenters gives the report of planned work and actual work done by the respective workcenter.
    We cannot confirm the operation using costcenter and activity type directly through transaction IW41.
    If you want to develop new confirmation screen and making confirmation of the respective order operation with only costcenter and activity type fields, you can do it .
    Regards,
    Pardhreddyc
    Edited by: Pardhreddyc on May 17, 2011 12:45 PM

  • Activity Type Mandatory in Repetitive Confirmation

    Dear guru ,
    When I run confirmation (MFBF/MF42N) i can post actual activities for a specific operation.
    I have one of this activity not relevant for controlling , itu2019s only used as statistical object for PP.
    Why the system consider the activity type as mandatory for every standard value parameters ?
    Can I have a chance to avoid that all the activities are relevant for controlling ?
    Thanks.

    Dear ,
    For the same operation i have one standard value relevant for CO and one standard value not relevant for CO.
    For the not relevant in view costing of work centre if I set no activity , in MFBF the standard value isnu2019t displayed and I cannot enter any value.
    If I set an activity in view costing of work centre the system required an activity type in MFBF.
    How can avoid in MFBF (posting actual activities view)  to enter an activity type but to confirm a quantity for a value not relevant for CO ?
    Thanks

  • Confirmation of PM activity types in Plant Maintenance or Controlling

    Hi,
    Can anyone tell me if there is a possibility to Confirm activity types of PM workers on PM orders? Which transaction is used for this?
    I would like to settle indirect costs of PM Cost center to PM orders. The tracing factor in this case would be the PM activity types confirmed by the PM workers.
    However, I don't know the PM module and I don't know whether it's possible to confirm activity types using some PM T-code?
    Should I use for this purpose KB21N (enter direct activity allocation) in Controlling, or is confirmation done somewhere in PM module?
    Best wishes,
    Karol

    Hi,
    You are right...
    Confirmation of the activites are always done thorugh PM module transaction only... if i am not worng T.code IW41.. any how check the t.code otherwise consult to your PM consultant
    Only very rarely KB21N is used to rectify or to add some xtra cost
    In day to day lifr the confirmation is done by PM department not by costing department.
    As suraj written for planning activity you use KP26.
    Yah..for allocating the indirect cost to PM order where the basis of allocatio is on confirmed activity cost...this is a simple case of using costing sheet in PM order... where in Base put the activity allocation cost element which you have used in activity type master data and in over head key put % and in credit put cost center which incurrs the indirect expenditure and
    the costing sheet assign in the valuation variant of the order type of the PM order..
    Hope i am clear to you...
    IF helpful assign the points..
    Cheers
    PK

  • Mapping confirmed Activity type

    Can anyone tell me how to map the confirmed activity type with material number to fetch material description from makt table ?

    Hi Arvind,
    i don't understand your Question. Can you explane it
    a little more in detail?
    Regards, dieter

  • Activity types in time confirmation (IW41)

    Hi,
    I create an activity type and assign it to cost center with price using transaction KP26. This activity type is being included in the work center. When I create a time confirmation for the specific work center which has been used in a work order I have in the selection list of activity types in IW41 several options of activity types. How can I restrict to use only the ones I require?
    What is the logic behind the selection of activity types in the time confirmation transaction?
    Thanks
    Ed

    Dear,
    It is not possible to change the activity type this with Enhancement  CONFPM04 PM/SM order conf.: Customer specific input
    or CONFPM01 fields are AFRUD-LEARR (activity type) and AFRUD-LOARR (wage type)
    Regards,
    R.Brahmankar

  • How to pick activity type from HR mini master during activity confirmation

    Hi,
    How to pick activity type from HR mini master during activity confirmation via BAPI "BAPI_NETWORK_CONF_ADD".
    I have confirmed activity via bapi BAPI_NETWORK_CONF_ADD, and it is picking activity type from activity. but i wants from HR mini master. In BAPI i am passing Personal no.
    Thanks in advance.

    Hi,
    Did you mention Activity type information in HR Master-315 InfoType (TimeSheet Default value).
    then you can get the value.
    Vemula

Maybe you are looking for

  • After bios update, will not boot, says install an operating system

    I have a amd hp 2000 notebook. i replaced the hard drive with an ss drive, windows 7.  been working fine until the bios update, I bleieve, which lost the boot up parameters. how do I get it to boot. hard drive works well in another system so not that

  • 3 drop down menu issues

    I have two issues here. www.newstribune.com. I know some of this may be css issues, but I am aweful with css and could use a cheat sheet for the css that dreamweaver makes for these drop down menus, so I know what controls what... ok.. IE 6.0 will sc

  • HT201250 Time machine backup permission issue

    Hi, We setup time machine backups in an office environment which is managed by a mac OS X Lion server. Each device on the network (all mac minis) is configured to take hourly backups to the drive on our server. On some occasions, a device requests an

  • Adobe form with sqlserver 2008

    I had create an Interactive form to show data form Sqlser 2008 using sql server native client 10.0. I want it show all data form database but it only show first record, Any one help me ? My query : select * from Item Adobe form : Subform : page1    

  • MacBook for field-/location audiorecording (film & video)

    Searching for tips about a recording setup for field/location use. My purpose is to record 4-5 wireless + 1-2 boom mikes in the field. The ability to timestamp files by incoming TC would be a strong plus. Also syncing to the cameras sync/blackburst v