Confirmation Control

Hello
We have created a New Confirmation control copy 0002- Inbound Delivery and Rough GR.
In the field of Inbound delivery we have assigned a new delivery type copy of Std IBD.
But at the time of Vl31n (create IBD) its giving the error, "DOC NOT MAINTAINED FOR INBOUND DELIVERY"
We have not done any modification except the Number range change in the STD IBD doc type
What can be done, The requirment is such to have three diff number range for IBD
Regards
Niti Narayan

We we can assign confirmation control to delivery type, as the screen is coming out to be gray in
Purchasing - confirmations - define internal confirmation cat
As the main objective of the process is to have diff number range of IBD 3 diff number range

Similar Messages

  • Confirmation Control for Scheduling Agreement

    Hello Experts,
    I have got situation for subcontracting scheduling agreement where client doesn't need confirmation control. They want to perform GR against scheduling agreement after creating delivery schedule without extra activity(Confirmation).
    Process flow is:
    1. Create work order(generates purchase requisition for subcontracting activity)(CO01)
    2. Create delivery schedule against purchase requisition for scheduling agreement(ME38)
    3. Create delivery to supplier through ME2O
    4. Confirm Goods receipt(ME38)
    5. Goods receipt(MIGO)
    I am trying to avoid step 4.
    Standard scheduling agreement setup automaticially fetches confirmation control key 0004. If I am disabling it manually, and not performing step 4, system throws message "no GR relevant item in PO"
    Can somebody suggest settings to achieve my scenarion
    Thanks and Regards
    Gyanesh

    Hello PavanKumar,
    The inbound delivery is one type of confirmation you are receiving from the vendor so I dont think you will be able to create the inbound delivery without confirmation control key.
    Hope this helps.
    Arif Mansuri
    Reward if answre is helpful.

  • Purchase order  does not contain a confirmation control key

    Hi expert
    I have not set any confirmation control key in Purchasare order, still at the Migo, system is showing error  at depot.
    I have check the same thing with manufacturing plant, system dont show me any error.
    Regard
    Nabil

    Hi,
    I f the confirmation control key is maintained in PUR.info record is automatically will fetch into PO though you have not selected manually in PO. The CC maintained in vendor master or PIR can copy into PO. In your case please see whether inbound delivery is needed to perform GR? CC implies many types of confirmations like order acknowledgement, advanced shipping notification or confirmation of delivery dates. Please see specifically to the error. Try to know the type confirmation system needs to post GR. Thanking you.

  • MIGO error 'Purchase Order does not contain a confirmation control key'

    Hi,
    while posting GR to a PO i am getting an error ' Purchase order XXXXXXXXX does not contain a confirmation control key'
    it is true that i have not defined any confirmation control key in PO, Aknowled rerd checkbox is also not ticked
    Still why this message coming, what setting would be bringing this message
    Please clarity

    Hi,
    Until the installation of Note 589422 (with SP SAPKH46C43) you could  due to a program error - create a delivery even though the purchase order did not contain any confirmation control key.                                                                               
    This is now prevented through error message M7394. The transfer of this check (Confirmation control key existing in the purchase order, see Note 589422) was necessary as otherwise you could post a purchase order as desired. (Refer to also Note 616944 -> SAPKH46C44)
    589422 Several inbound deliveries can be created with MIGO :                                                                               
    "Implement the program correction.                                       
    With Transaction SE91 create message M7394 with the message text:        
    Purchase order & & does not contain a confirmation control key".         
    After you implemented this correction, when you want to create an        
    inbound delivery with Transaction MB01 or MIGO or with                   
    BAPI_GOODSMVT_CREATE and if the purchase order does not contain a        
    confirmation control key the system displays error message M7394         
    "Purchase order & & does not contain a confirmation control key".                                                                               
    Hope this can explain the error you met.
    Regards,
    Mauro

  • Confirmation control key check for inbound delivery creation

    Hi,
    Currently, in the Client's company, the process of receiving goods from purchase orders looks like that (SAP-wise):
    - create a purchase order,
    - receive goods using MIGO and automatically create an inbound delivery,
    - pack the delivery and post goods receipt.
    Recently, some patches have been installed, including one described by note 1602047 (which basically enforces checking confirmation control keys if goods receipt assignment and goods receipt relevance are activated for inbound deliveries). Note says that it only affects two-step stock transfer and creation of automatic inbound deliveries using SPED output but it seems it also affects other basic processes like PO receipt in MIGO.
    Now, when using the old control key (that had MRP-Relevant and GR-Relevant fields checked), the system is unable to automatically create an inbound delivery after the goods receipt is posted with MIGO (with message VL148 - Not possible to create an inbound delivery). I learned that this is because the "GR Assignment" field must be checked in the confirmation control key so it's possible to automatically create aninbound delivery after receiving a purchase order in MIGO.
    After changing the confirmation control key to have the missing field checked it's not possible anymore to receive goods from PO in MIGO as the PO requires shipping notification in order to be processed in MIGO thus requiring of manual creation of an inbound delivery.
    Is there any way to skip this check so the process would remain the same (this model has been working fine for few years in the Client's system) and the inbound delievery would be created automatically after posting the receipt in MIGO?
    Thanks in advance,
    Piotr

    Hi,
    don't know if you found a solution, but we received the following message from SAP:
    The advent of the new version requires some attention to the users. It
    was necessary to avoid inconsistencies which in the past version the
    system was susceptible.
    Main Program SAPMM07M
    Source code of MM07MLVS
    sy-msgid VL sy-msgty E sy-msgno 148
    I have checked the process and through debugged I could confirm the
    following information SAP is providing to all similar incidents reportedfor us:
    Error message VL 148 is issued if in the confirmation control key used
    in the purchase order, the fields for MRP-relevance (T163G-KZDIS),
    GR relevance (T163G-WEREL) and GR assignment indicator (T163G-WEZUO)
    are not set.
    The correction of note 1602047 was necessary to avoid inconsistencies
    (table EKES) in the purchase order. Without having the GR assignment
    (T163G-WEZUO) set, there is no unique reference created between the
    purchase order history (table EKBE) and the inbound delivery
    confirmation (table EKES) at goods receipt which leads to a problem if
    several inbound deliveries exist for the same purchase order.
    If you set T163G-WEZUO to 'X', this assures that, for an inbound
    delivery, the confirmation record (EKES) belonging to this inbound
    delivery (EKES-VBELN) is also accurately updated at goods receipt.
    How to solve the issue?
    Use a confirmation control key with the GR assignment indicator set
    and then create the inbound delivery with VL31N. If you want to be able
    to create the inbound delivery with reference to a certain line item in
    the PO, use transaction VL34.
    If you still want to use transaction MIGO, there is the following
    workaround:
    - Create a purchase order without any confirmation control key
    - Create a goods receipt (GR) in transaction MIGO with reference to this PO and post the GR to a non-HU-managed storage location
    - Create a transfer posting with MIGO using movement type 311 to
    transfer the goods from the non-HU-managed storage location to the
    HU-managed storage location.
    As the transfer posting is an additional step for the user, the whole
    process could be automated using a partner storage location
    (T001l-PARLG) for the GR which then triggers (through a modification)
    the BAPI 'BAPI_GOODSMVT_CREATE' to create the transfer posting without
    user interaction.
    I hope to have satisfied you on the reason why it is now happening and
    also I believe you can explain to business that it is a new behavior
    necessary done from SAP side to avoid worse situations, we are aware of
    potential dissatisfaction it might cause. SAP Support is always
    available to clarify any issue.
    Sorry for not having a more positive answer.
    I hope it helps!
    Leentje

  • Confirmation Control Key Should be mandatory for PO document type

    Hi All,
    I want to know, is there any configuration settings to make mandatory "confirmation control key" for the Particular Purchasing document type's.
    If it is not there what should be the best to achieve this requirement.
    Thanks in Advance,
    Shankar.

    Hi
    I think there is no standard setting to make mandatory document "confirmation control key" for the Particular Purchasing document type's.
    Best way is to maintain in Purchasing view of vendor master record since confirmations rare sent by the vendor.If you want for some perticular materials you can maintain in Purchasing info record.
    Regards
    Ramakrishna

  • Confirmation Control Work Flow  in Purchase Order

    Hi Gurus,
       Can anyone explain me about the Confirmation Control Tab Work Flow in Purchase Order.
       If i select the Conf. Control in Purchase Order, next what process has to follow?
       Thanks in Advance
    Regards,
    Prabhakaran M

    Hi Prabhakaran
    The Confirmation Control tab has a field for selecting the COnfirmaiton control Key for the PO Item. This key Determines which confirmation categories are expected for a PO item (e.g. order acknowledgment, shipping notification).
    There are four categories delivered in the standard system, which decides whether you need only a ASN for a PO Item, or ASN with a rough GR, or Rough GR only etc.
    Once you have this key set up, system expects you to create that document for this item before you process the GR or Invoice.
    You can also set up automatic ASN creation if you have EDI Integration with the vendor.
    Benefit of ASN is that you ve the confirmed delivery dates and quantities well in advance and warehouse/Inventory team can plan their operations accordingly in advance...
    I hope this clarifies your questions
    Regards
    Virender Singh

  • Purchase order confirmation control key issue

    Hi,
    We have an issue about vendor confirmation control key in transactions ME21N/ME22N
    We have custom document types defined , ZNB - this is normal purchase order for external vendors and ZSTO - this is stock transfer orders between plants belonging to our corporation.
    For ZNB we can introduce the confirmation control keys with no problem.
    But when we try to introduce the confirmation control key for the ZSTO document type, the value is simply ignored and the field is reset to blank (NO error message)
    My question what can be the reason for this , probably there is some customizing setup that creates this behaviour but I cannot find it.
    Thanks
    H.Z.

    I put this succesive screen shots, first I select the confirmation key and after pressing enter the field is reset to blank .....
    I was trying to find also user exista but with no success so far ....
    Thanks
    H.Z.

  • Confirmation control key issue

    Hi EXPERTS
    I would like to know under what circumstances can the confirmation control key be included in the line item of a PO after GRN is done.
    I am faced with a scenario where the GR of the line item of a PO is done  and their is a confirmation control key attached to this line item But I donot find any inbound delivery details in the line item nor does it look that the inbound delivery is deleted
    This line item now need to be reversed ( but the system doesnot allow stating that their are no suitable line items available
    (I tried 102Mvt  Thru' MIGO)
    Could you pelase guide me regarding this situation and suggest ways and means for PO line item reversal
    Thanks VC

    HI,
    Purchase Order Item Confirmations Tabstrips:
    The confirmation control key controls the process subsequent to the creation of the PO. 
    E.g. For some important materials with long delivery times, you wish to receive advance information (via the shipping notification or inbound delivery) about the expected GR date so that you can include this information in the availability check.
    The confirmation functionality is used to get better visibility & control over the goods receipts. Due to this requirement, when you work with confirmations, the system will not propose any quantity for MIGO unless any confirmations are entered in the PO. Also, MIGO will propose only such quantity for which the confirmation is entered.
    In the purchase order, there is a field confirmation control key, following is its function extracted from text book. 
    1.The confirmation control key governs whether confirmations are expected for specific purchase order items and whether these confirmations are relevant for goods receipt or materials planning.  
    2. If a material document is to be created when the goods receipt posting for the inbound delivery is carried out, then the goods receipt assignment must be defined in the confirmation control.
    How to set this field?
    Configuration path:
    SPRO -> MM -> Purchasing -> Confirmations -> Set up confirmation control or tcode OMGZ
    Explain is there a necessity to fill the confirmation control, order acknowledgement & confirmation requirement. In STO normally we input the data for normal P.O.'s.only. If we input the above said data what happens if not what happens.
    Confirmation gives the details of the shipping data, acknowledgement, delivery details etc......Overall view..
    If it is used then Inbound delivery has to be created else GR is not possible...
    VL31N--Inbound PO wrt PO/STO.(manual)..
    If idoc /edi are configure, then everything will be automatic.
    Confirmation Control is configured in SPRO -> Materials Management -> Purchasing -> Confirmations -> Setup Confirmation Control. The Confirmation Control should be assigned to the Vendor in Purchasing View (MK01/MK02). This it gets copied into the PO.
    How to change the confirmation key in PO?
    I have to change the confirmation key (in me23N) in the confirmation tab. It is working fine if there is no partial GR (entry in delivery schedule tab) against that line item.  But if there is a GR entry against that line item its giving me a message 'confirmation key should not be changed'.
    This is the standard of SAP....once GR is existing for the line then you can't change the confirmation key.  To change, reverse the GR and change the key then Post GR again.
    or
    You can short close the PO line which you already have GR and create new line with remaining qty and enter new confirmation key.
    pherasath

  • Confirmation Control Key Value in vendor master overwritten by Info Record?

    Dear all
    In the standard 3rd party processing, we will use S/O to trigger PR and we then convert PR to PO. And when PO is converted, Confirmation Control Key (CCK) Z01 maintained in Vendor master purchasing view will be adopted for all the items in the PO, and in the purchase infor Record for the combination of material & this vendor, we do not maintain any CCK value there.
    However recently, the system behaves in such a way that the CCK value does not automatically show up in PO item anymore. And I have been thinking can it be the fact that the blank value of CCK in info record will overwrite the Z01 value in the CCK of vendor master? But if so, why all the past PO I have checked does not have CCK value maintained in info record but the CCK was able to appear automatically?
    An interesting fact is that if I create the PO manually by enter Vendor with CCK value Z01, Org Data, account assignment S and Item category S (both for 3rd party processing), and then the material and hit ENTER, the CCK value Z01 will appear in PO Item level under tab: Confirmation.
    However, once I enter the PLANT value in PO Overview, seem like the Empty value of CCK in info record will overwrite the existing Z01 value.
    Please advise if it is how the info record CCK work to overwrite? Also, how do I get back to the stage where the info record CCK will not overwrite as I do not want to spend time to update all the info record CCK to have Z01.
    Thanks

    Dear Manohar Raju Kanchanapally
    I do not understand why this OSS note SAP Note 909885 - ME21N: Confirmation control key not
    from vendor mentions the following:
    Symptom:
    When you create a purchase order using Transaction ME21N, the confirmation control key from the vendor master is not used, although it is maintained.
    Cause and Prerequisites:
    The symptom occurs if no confirmation control key was maintained in the existing purchasing info record.
    Solution:
    Implement the attached correction instructions as a modification.
    It is totally contrary with the General Rule that the most specific will always prevails, meaning if I do not maintain CCK value in the Info Record, it will overwrite the CCK value I maintain vendor master when I create PO using same vendor, material, purchaisng org and plant!
    Please help!
    Edited by: Daimos on Sep 17, 2009 1:22 PM
    Edited by: Daimos on Sep 17, 2009 1:22 PM

  • Default values for confirmation control key

    Dear forum
    I am using a confirmation control key 0004 Shipping notification (standard SAP) in the Purchase order line item (created with ME21n).
    When I enter the confirmation data (with transaction ME22n) in the purchase order line item (confirmations tab), I have to type in delivery date, quantity and so on manually, which is standard.
    But, what if I want to copy the original delivery date and quantity from the line item in the order, and use this as default value for the line item confirmation data...is it possible somehow?
    The reason why I want to do this is for the user not having to go in and update this date manually all the time, but only when the confirmed dates/quantities differ from the desired delivery date and quantities in the purchase order line item. We are not on EDI or using Inbound deliverys for Purchase orders.
    Thanks
    Ola

    Hi,
    The Confirmation is nothing but the acknowledgement.So, its usually entered manuallly by the authorised User allowing follow on documents for Purchase Order.
    You can chesk once the customisation of Confiramtion control keys for automatic update indicator.
    Yes, you can use User Exit and develop with the help of ABAPERS.
    Hope it will help you.
    Regards,
    Smitha

  • Mass change for field Confirmation control Key in PO / SA

    Dear All,
    There is a need to do mass change in value for field Confirmation control Key in PO / SA. Some of them have PO history. If we have PO history system wont allow to change conf. ctrl key. Also since it is a production system we can not cancel previous po histories. This is in SAP 4.7 where we dont have mass change tcode for Scheduling agreements.
    Can we maintain the values thru table entries. like using se16n maintain entries check box. This option is greyed out. can we activate that & do this requirement.
    please suggest.

    hi Greetings!
    The confirmation control key can not be changed in the scheduling agreement if GR for item had already been posted. If the GRs can be canceled , it is possible to change the confirmation control in the SA item.
    Version 4.7 do not support Mass change of scheduling agreements, hence you have to either create a SCAT or BDC to perform the task.
    Gobinathan G

  • Automatic filling of 'confirmation control' field

    Hellow!
    I need to fill confirmation control field in schedule line in purchase order by default value '0004 - inbound delivery'. I have done it early samewhere in spro but now I can not found this customazing.
    Could you mention the path/

    Hi
    Alternatively you can maintain it in Purchasing Info record at purh org level ( ME12). It will populate automatically during creation of PO.
    Here you have control over vendor/Material combination.
    Hope it helps
    Karthik
    Edited by: Karthik on Jun 28, 2011 11:09 AM

  • Confirmation Control Process Flow

    My Dear Gurus,
    I want to know the actual confirmation control process in material manangement. Becoz of one of my client having the following scenerios.
    PO is created only by PR reference with confirmation tab enabling in po. Once he created the PO again he come back to change mode in PO and enable the confimation control (0001) and the confirmation category as AB.
    Once the vendor is received the PO and the delivery date is accepted by vendor and he manually over phone tell the final delivery date.
    So our client wants to update the final delivery date given by vendor.
    My question is either he need to do *the inbound delivery through VL31N* then only do the MIGO (GR) or directly without doing VL31N do the MIGO transaction.
    Kindly xplain process flow for the above case.
    Regards,
    Vimal

    You can define and do the required confirmation control key under
    SPRO -- > Materials Management --> Purchasing --> Confirmation .
    Confirmation control Key "AB"  is  refers to Order Acknowledgement.
    Based on configuration under " Set up Confirmation Control " system decides whether only Order Acknowledgement is required or subsequent operation is required prior to GR.
    Suppose " Inbound Delivery is required" then one need to do Inbound delivery under VL31N.
    Then GR. You can remove the inbound delivery steps by making blank key  under Confirmation tab.

  • Confirmation Control Key

    Hi
    Do anyone know if it is possible to use "Confirmation Control Key" in SRM Contracts and Purchase Orders?
    We are running Externat Scenarios in SRM7.0
    We want the same functionality as the key in MM Contracts and PO to determines which confirmation categories are expected (e.g. order acknowledgment, shipping notification).
    Thanks in advance
    Br
    Jesper

    Hi Jesper,
    what do you mean by External Scenarios in SRM ? is this standalone or Extended classic ?
    If its extended classic then just do settings in ECC and in the PO you will get the confirmation control key as desired.
    Best Regards,
    Anil

  • Confirmation control key determination In PO

    Hi Experts ,
    Kindly suggest how confirmation control key is determined in purchase order ?
    My requirement is like ,  if i have  PO  with different document type i need to have different confirmation control keys
    How can i achieve this ?
    Thanks in advance
    Jinoy

    Hi,
    Condition control keys are setup generic to the purchasing documents, viz. PO, Outline Agreements.
    The control key defaults on the purchasing document from the record source assigned for the purchasing line items. Control key defaults from Info. Record or Outline Agreement or from Vendor Master Record, if the control key is specified in these.
    Eg. If There is no info. record or Outline agreement exist as a source for a particular Purchase item, then the control key would default from Vendor Master record of the Purchasing document.
    Regards
    Prasan

Maybe you are looking for

  • Configuration error opening video file.

    i get the configuration error that says the software requires certain hardware or software, which is missing. AGP graphic card i had an ati 9800 graphic card on my g4, now i get the error code. how can i solve this since my g5 duel has the apple grap

  • Can't buy Medium or Small book in iPhoto

    I'm trying to purchase a iPhoto "book".  Whenever I click "buy book", it only gives me the option of purchasing a large (8.5 x 11), softcover book.  Has anyone else had this problem?  Any suggestions?  I need medium and small books.  I have a feeling

  • Am I missing something in Apache2 ??

    I have already asked in the forums before, and I have received a few posts, I have read over many other posts, but I just can't figure it out. So I've added a lot more detail this time, please help me out if you can. I love Leopard, and this is one o

  • Picklist Demo doesn't display records

    I tried the picklist demo, and substituted a query on my DB for the employee one in the example. When I run the form, the message line shows "Record: 1/17" and I was indeed expecting 17 records to be selected by my qualified query. But no data is dis

  • I'm trying to open an AVI from a disc, but QT says that a codec is missing.  Any ideas?

    All my systems are up-to-date, and I've tried opening with Flip4Mac, but the file just opens in QT anyway.  Any help would be appreciated.