Hello All,
    We are running on SRM 4.0(Classic Scenario) wherein the PR,PO and Invoice is done in R/3 and the SC  creation & Confirmation in SRM.The prob we are facing is that for cash Purchases,once the Purchase requisition is closed in R/3,the status of the SC is to be updated automatically as closed in SRM or is there any provision wherein we can confirm  the SC?
Regards,
Disha.

Hi Disha,
This is not a common scenario...
However, you have to update PR status (manually or automatically via a custom report) and check that SRM report BBP_GET_STATUS_2 is reading PR and correctly updates SC history else you will have to enhance standard behaviour (PR status management and BBP_GET_STATUS_2 report) to match your requirements.
As i do not have a R/3 system right now, i am not able to check PR status possibility...
Regards,
Yann

Similar Messages

  • Confirmation for Service PO from SRM to R/3

    Hi All,
    We are using SRM 3.0, EBP 4.0 ECS and R/3 4.6C.
    I have posted confirmations for a Service PO successfully in SRM and a GR and Service Entry Sheet has been posted in R/3 correspondingly. However some of the confirmation results in the status "Currently being transferred" and R/3 does not get updated with GR and Service Entry Sheet.
    I have checked that the workflow has processed succesfully and it is in 'Completed" status.
    Our observation -  While posting cofirmation for a Goods PO, the GR is posted in R/3 using IDOC. We can trace the same in transaction WE02. While posting confirmation for a Service PO, GR and Service Entry Sheet is posted in R/3, however not sure how this is posted as we are not able to trace any IDOC for a Service PO confirmation.
    I need to know how confirmation is posted for a Service PO.
    Any pointers to resolve the above issue would be highly appreciated.
    Thanks in advance,
    Francis

    Hi Francis,
    Please refer to the following threads for some ideas:
    Confirmation not transferred to backend R/3
    Re: PO confirmation havinmg status error in transmission
    Re: Coudnt create confirmation or Invoice from EBP
    Cheers,
    Serguei

  • Confirmation for Serialized Materials in SRM

    Hi,
    We have bunch of Serialized materials in SRM. Were able to create SC and PO 's/PR's were getting created.When I am trying to create Confirmation for Serialized Materials, its throwing me error and I dont see any field to enter the Serial Number.
    Am i missing anything on the config side or this is standard bug?
    If I am missing some steps to create confirmation for serialized items, pls od let me know.
    FYI, we are on SRM 5.5.
    Thanks,
    Satya.

    Awaiting some valuable inputs on this.
    Regards,
    Satya

  • Cancel Confirmations for Limits Orders in SRM.

    We are able to Create Confirmations in SRM for Limit orders and It creates a service entry sheet in ECC with Mvmt Type 101.. When we try to cancel these Confirmations from SRM. It a creates a Cancellation document in SRM but it doesnu2019t flow to ECC.. when Checked in the Shopping cart Related documents it is found that the Qty is getting added up even for cancelled Confirmation which got created.
    We are looking for Solution if we cancel the limit order confirmation from SRM , it should cancel the service entry sheet posted in backend ECC..
    And we will be doing confirmations/Cancellations only from SRM
    Please help us with your responses.. we are on SRM 7.0 EHP 1 .

    Hello,
    We have faced same issue in SRM 5.0
    We created a custom program for it using RFC FM BBP_entrysheet_cancel  we have to cancel the Entry sheet in  backend.
    Regards,
    Neelima

  • Generating Inbound delivery based on Vendor Confirmation for Purchase order

    Is there a way to create Inbound deliveries based on Vendor confirmation for a purchase order.
    Here is the complete scenario.
    Buyer Creates the PO for qty 100 and Date August 29
    Vendor Confirms that he can supply a qty of 50 for August 29 and remaining 50 for Sep15th
    Based on vendor confirmation, Buyer creates 2 vendor confirmations (AB) to match with the data received from Buyer, without modifing the PO.
    Requirement:
    Inbound deliveries should get created based on the vendor confirmation.
    As MRP looks at Inbound delivery for Planning purposes once they are available, Inbound delivery should match with vendor confirmation data.
    Is it possible to get this requirement met with standard config available in SAP.

    could you eventually get the answer from the docu Set Up Confirmation Control

  • Cash Purchase

    Dear All,
    How do we map cash purchase in SAP,How do we make GR.
    Plz explain me in detail

    Hi,
    for cash purchase do GR with 501 movement.
    for excise duty capturing
    in J1IEX select option 'capture excise invoice' & ' without purchase order'
    Regards
    Prakash

  • SRM: many confirmation for PO

    In SRM, I'd like to insert a confirmation for a "una tantum services" purchase order.
    Unluckly, SRM allows me to insert many confirmations, exceeding total quantity, even if all PO's quantities are approved.
    For example:
    Purch.order quantity : 3 pieces
    First confirmation:3 pieces (confirmation not approved)
    Second confirmation: 2 pieces (inserted later and in not approved)
    The second one is saved on system, but if the first is approved before, when the approver gives the ok the second, the confirmation goes in transfer error (quantity too high - tolerance limit ).
    I know this is a process error. Also, we know there's a flag on PO's position that finalizes confirmation (last confirmation check box)
    But, does anyone know how prevent situation without activation of check-box flag? Are there any OSS note solving the problem?

    Jagdish,thank you for your help.
    I know SRM doesn't allow you to confirm more qty than the ordered qty.
    My problem is that if i confirm a parzial quantity and the GR goes in approval status, i can insert GR for quantity exceeding the total quantity of order.
    the second GR goes in transmission error after its approvation.
    ex. PO quantity 5
    first GR quantity 4
    second GR quantity 3 (4+3 > 5!!!!)
    After first approvation, nothing happens until the second GR will be approved. The GR goes in trasmission error for quantity exceeded.
    Regards,
    Christian

  • BAPI for Mass Purchase Order Confirmation

    Dear All,
    In standard SAP,it is possible to confirm for single line item only by using confirmation tab.
    We want to confirm Mass PO Confirmation.
    Is there any BAPI for Mass Purchase Order Confirmation?
    Regards,
    Ramesh

    Hi Sumant,
    I have tried with TC:MASS.
    By using this TC we can update quantity but not  delivery date & Confirmation Control (Fields available in the confirmation tab of ME22n for Vendor Confirmation).
    Is there any way to updates all these fields which are available in the Confirmation Tab?
    Is there any BAPI which is tranferring confirmation tab details into EKES table?
    Expecting your valuable inputs in this regard.
    Regards,
    Ramesh

  • ENABLE SRM WORKFLOW FOR EXTERNAL PURCHASE REQUISITIONS

    Hi,
    Iu2019m creating a shopping cart using an external approver.  We require external requisition to be completed by the purchasibg manager.
    The changes were implemented as outlined in the document
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/5082a622-7310-2c10-1a9b-ef31dd69a770
    I create the purchase req in the external system and the transfer the requisition to SRM.  A shopping cart is then created. This  shopping cart goes to the purchasing manager for completion. Upon completion by purchasing manager, a message appears to say 'External requisitions do not require an approval process' and
    the workitem remains in their inbox.
    This workflow processed correctly for normal shopping carts.   I canu2019t understand why it does work for external purchasing requisitions.
    thanks
    Ann

    Hi Any one got answere this issue. I also implemented the steps provided in the document created by Prasannau2019s. The workflow is getting triggered for external requisitions now but when we are changing the PR in ECC and transferring again that time its not gettign triggered neighther its restarting the exisiting approval workflow in process (if any).
    Thanks,
    Swapnil

  • Fast entry transaction for entering purchase order confirmations

    Does anyone know of fast entry transaction for entering purchase order confirmations similar to VL31N for inbound deliveries?
    Thanks

    dear John,
    if i m not mistaken you want to give confirmation control to your existing POs.
    If the case is this you can opt for a BDC to be run for updation.
    Ask your abaper to do this thing.
    revert back if this is not the the case.
    Njoy
    Ashish

  • EDI Confirmation for Purchase Order

    Hi All,
    Scenario : Our vendor is located abroad. The Purchase order is transmitted to the vendor via EDI. The vendor sends a confirmation for the PO as an IDOC via EDI. The suitation we have is that there are instances where there is a miss match( Requested item doesn't match the confirmed item) between the item in the PO and the IDOC received from the vendor as confirmation. But the PO is still confirmed. Is there a method where we identify when there is a miss match in the item.
    Any input on the above would be appreciated.
    Thanks
    Nigel

    Hi Nigel,
    You could control this via customizing purchasing->Confimrations->Setup confirmation using SPRO.
    here ,you can specify the tolerance for price quantity and material.
    The tolerances you define apply to all vendors. Using the enhancement MM06E001 provided by SAP, you can specify that the tolerances do not apply to certain vendors.
    If the acknowledged quantities, prices, and dates vary from those set out in the PO or purchase agreement, the system issues a warning message. In this case, the purchasing document is not updated.
    Regards,
    Karuna

  • Goodnight buy "CREATIVE CLOUD - INDIVIDUALS - FULL" annual plan prepaid debit my credit card for 599.88 dlls year, already authorize and charge the amount the card twice and I never get the confirmation of the purchase by you (ADOBE) as if he had not boug

    Goodnight buy "CREATIVE CLOUD - INDIVIDUALS - FULL" annual plan prepaid debit my credit card for 599.88 dlls year, already authorize and charge the amount the card twice and I never get the confirmation of the purchase by you (ADOBE) as if he had not bought anything despite what the charge generated in TWO OCCASIONS.
    As one refund request and the remaining as active, THANK YOU for your attention.

    Adobe contact information - http://helpx.adobe.com/contact.html may help
    -http://helpx.adobe.com/adobe-connect/adobe-connect-phone-numbers.html
    -orders, returns http://helpx.adobe.com/x-productkb/global/phone-support-orders.html
    -says 800-443-8158 for payment problem in https://forums.adobe.com/thread/1551495

  • SRM Workflow for external Purchase requisitions ECC

    Dear experts,
    We are in SRM 7 Classic scenario , ECC 6. Using SRM process controlled workflow . We want to enable SRM workflow for external Purchase requisitions. As per SAP note 505030 topic 16 , approval is not triggered in SRM for external requirements. So we need to find a new solution as it's a clinet requirement.
    Current  scenario:
    External purchase requisition created from ME51N or Plant maintenance are sent to SOCO for buyer completion. External PRs generate a SC BUS2121 EXTR in status approved.
    Desired scenario:
    We want those external requirements to be sent to SRM for approval (approval with completion + approval)
    After implementing changes suggested in Prasannau2019s document (http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/5082a622-7310-2c10-1a9b-ef31dd69a770 ) , the Workflow is still not triggered for the external PRs, the SC is created but remains in status awaiting approval. No work item is created (neither in BBP_PD not in SWI6, not in SWIA).
    Can anyone provide some guidance on what else need to be changed in order to activate SRM Workflow for external PRs?
    Many thanks in advance,
    Nuria
    Edited by: NuriaUB on Dec 28, 2011 5:14 PM

    Hi Any one got answere this issue. I also implemented the steps provided in the document created by Prasannau2019s. The workflow is getting triggered for external requisitions now but when we are changing the PR in ECC and transferring again that time its not gettign triggered neighther its restarting the exisiting approval workflow in process (if any).
    Thanks,
    Swapnil

  • Why can't I use my Mac Book pro for cashing checks like every one else uses their iPhone and iPad? I am a grandmother and in the past 4 years I have purchased 4 MacBook Pros and 1 iPad for my children and grand children.

    I would like to be able to use my MaBook Pro for cashing checks lie the I phone and I pad. Why isn't this feature included?

    This has nothing to do with Apple.  As BobTheFisherman indicated, your bank needs to create an App for the Mac to do this.  These types of applications tend to be limited to mobile devices as they are a bit easier to maneuver for taking photos.

  • SRM 7.0 Output for changed purchase order documents

    Hi all,
    if we change purchase orders we like to send a PO output document for changed purchase orders only if we change certain PO fields in header or items.
    What is the functionality in PO - Header - Output - Order and Send Immediatelly ? We thought that this function is the solution!
    But independent we press the button <Order and Send Immediatelly > or button <Order> the system creates allways an output document in any cases of PO field changes which will be sent to a supplier (fax, email). How we can control that a PO document only will be created in cases we define ?
    Kind Regards
    Edited by: Hermann-Josef Wessels on Mar 28, 2011 6:53 PM

    Hi Jay,
    we like to control the output because PO changes for G/L account, cost centre or change from account assigment order to cost centre are not interesting for the supplier and in this cases a PO document should not be sent to the supplier. This was the main reason why we like to use function <Order and Send Immediatelly>.
    So I would like to clarify the requirement:
    1. Automatic created output document if a new PO will be created
    2. Automatic created output document if a PO will be changed but no output if the following fields will be changed:
        e.g. for G/L account, cost centre or change from account assigment order to cost centre
    So we come back in our discussion to table: BBPV_COMP_FIELDS. There are entries for POO = PO Output and POR = Version comparison for Purchase Order.
    Question: Can I use structure name: BBP_PDS_ACC for our requirement. If yes which field-names I have to maintain in detail in this table. If possible I need the entries in detail.
    Kind Regards
    Edited by: Hermann-Josef Wessels on Mar 30, 2011 9:20 AM

Maybe you are looking for

  • My music software has stopped working since I installed ios7,what to do?

    When i downloaded the ios7 some of my music has stopped working and come up with a red square and a circle around it, I've tried the suggestions but none of them have worked so far any advice??

  • Archivelink Parameters for Adobe Form

    Hello, I am trying to Archive outbound correspondence (SAP Adobe Form) to a content repository that I set up for Inbound correspondence using Archivelink. Archivelink is configured and working for Inbound corresponence that resides on my local drive,

  • Creating apex instance administrator

    Hi all, Is it possible to create other APEX instance administrator? Thanks Karl

  • My iMessage app stopped working

    When I upgraded to the latest operating system 10.10.2 my iMessage app won't open and creates a dump to send to apple (which I do every time).  How do I correct this?  Also my App Store application doesn't function anymore.  Any hints on how to resol

  • Help: Controlling transitions in flash web galleries from CS4/Bridge

    Hi all, Is there a way to control the transitions from one image to the next when generating a flash web gallery? I'm using CS4/Bridge on WinXP. The fade out/in from one image to the next is very chunky, no matter what the file size.  And that's on m