Confirmation not possible, no compertment allocated for load document

Hi expert,
Recently we have done upgradation from 4.7 to ECC 6.0. Now while doing testing in Sandbox after doing inbound delivery, when we are creating shipment document its not taking the compartment of the vehicle though the vehicle master is absolutely ok.
Its giving an error: Message No: 09031"Confirmation not possible, no compertment allocated for load document"
Can any one help.
Regards,
Amlan Neogi

I have resolved the issue.
regards,
Amlan Neogi

Similar Messages

  • Adobe Scout issue: not starting a new session for loaded SWFs

    We have an issue with Adobe Scout. It does not listen (doesn't start a new session like it sould) for a SWF loaded by another (main) SWF. The SWFs have advanced telemetry enabled and the setup is correct as described inhttp://www.adobe.com/devnet/scout/articles/adobe-scout-getting-started .html. Please help
    Thank you
    I am using Win 7 64-bit, the latest versions of Adobe Scout and Flash Player, Chrome 32 / IE 11.
    Also I have made sure that the Scout server is listening, as descibed in the article linked above: Verify that the Scout server listening. Open Scout, and then type localhost:7934 into your web browser. It should respond quickly with "server dropped connection", "no data received", or something similar (since Scout is not an HTTP server). Scout should show the error message "can't start a session because the telemetry data isn't valid". If the browser stalls for a long time, and then comes back with "server not found" or something similar, then the socket isn't working.

    The correct answer is here: http://stackoverflow.com/questions/21827477/adobe-scout-is-not-starting-a-new-session-for- loaded-swfs

  • "could not get an output file for the document (error RWI 00314)"

    Hi
    We are getting the following error when running the Webi Reports "could not get an output file for the document (error RWI 00314)". The issue seems to be related to Tomcat Memory Heap size, our Tomcat Java heap Size is 1024MB. We were able to resolve  the issue by restarting the Tomcat. We cannot restart the Tomcat in Prod if this is happening frequently.
    Can some one please suggest  any other solution other than restarting the Tomcat frequently, our platform is BOBJ XI 3.1 SP3 with FP 3.1 our Wndows OS is 32 Bit.
    Thank's for your help

    Hi Sreeram,
    Earlier i also faced same kind of problem.
    To solve this kind of problems you need to shutdown the server.
    second thing is when patches missed that time also you will get this kind of problem.
    check j2ee connection is it properly working or not?
    Regards,
    samar reddy.

  • Deleting confirmation not possible for particular PO item.

    Dear experts,
    we are on an SRM 5.0 server 550 with a classic scenario.
    We are experiencing some problems when deleting confirmations on 1 certain process.
    case:
    - puchase order created with 1 item (10 pieces)
    - confirmation was created for 5 pieces.
    - invoice was created for these 5 pieces.
    - confirmation created for the following 5 pieces
    - trying to delete the confirmation but not possible because the delete button is greyed out
    Does anybody has an idea why we cannot delete such a confirmation? There is an invoice on the PO item, but only on the first 5 pieces, not on the last 5...
    Regards,
    Tom

    Hi,
    Check the followwing points:
    -Tx_RZ20. Check under menu Confirmations for Backend errors.
    -Check Idocs exchanged. Check Outbound IDOCS(Type MBGMCR) in SRM an Inboudn Idocs in the backend.
    -Check GR in Tx BBP_PD. Search using Object Type: BUS2203 and GR number. Search for alerts in the GR.
    There is a recurrent root cause for the "GR error in process": Posting Date locked". You could try to change posting date to the currente date in th GR and confirm again.
    Thanks and Regards,
    Abraham

  • "Not possible to determine account for sales order or project stock"

    Hi,
    I get this error when trying to create a purchase order (type EUB). I think I should define a new account for sales order. How should I proceed?
    Thanks in advance.
    Luis.

    Hi
    1) Check the spro-MM-purchasing-account assignment-Maintain account assignment categories -
        Here check the account modifications against Account assignment category C,P
    2) Then go to OBYC -GBB check the account maintained against the account modifier obtained in step 1
    Regards
    Sandeep

  • Context Binding is not possible in webdynpro component for Interactive form

    Hi,
    Click
    [Enhancement of webdynpro component|http://swethacblog.blogspot.com/2011/11/context-binding-for-interactive-form.html#!/2011/11/context-binding-for-interactive-form.html] to view the procedure that I have followed to create interactive form in enhanced view.
    Can you please tell me that why i am getting the context menu nodes in invisible mode while binding it to from interface.
    Thank you,
    Swetha.C

    Hi Abhil,
    If your layout type is 'ZCI Layout' then you have insert the webdynpro script in the layout. After selecting the ZCI Layout click on enter and then go to layout tab, in this go to Utilities menu->select Insert WebDynpro Script.
    If you do this then in the Hierarchy tab of adobe form you can see the (Variable) ContainerFoundation_JS, it means that you have inserted WebDypro Script in the form.
    Finally activate the form and run the application.
    Thanks,
    Jhansi Miryala

  • Since iOS 5activation not possible. Tried it for a few hours but doesn't work. How can i solve this problem?

    When I try to activate from my iPhone it says: iPhone could not be acticated, actication Server is unavaillable. When I connect to iTunes it says: No Sim-Card insert. But my Sim-Card is insert! How can i solve this problem? It's freaking me out. I try it since yesterday without any success...
    Please help.

    If you have to ship your phone back to the US, then you will need to ship is to a friend or a relative who actually lives out there.  You CANNOT ship it directly to Apple as they will not accept it.  Send it to a relative or friend that you have there and if you don't have any, then you are out of luck as there is nothing that you can do.
    That is why is was not really a good idea to purchase an iPhone is the US when you are ultimately going to use it in China.  With no international warranty on the iPhone you are stuffed really.  You should have bought it in China and then you would not be facing this problem.
    Nothing you can do except get on a plane and fly to the US or send the phone to a friend or relative.

  • Confirmation Control Key Should be mandatory for PO document type

    Hi All,
    I want to know, is there any configuration settings to make mandatory "confirmation control key" for the Particular Purchasing document type's.
    If it is not there what should be the best to achieve this requirement.
    Thanks in Advance,
    Shankar.

    Hi
    I think there is no standard setting to make mandatory document "confirmation control key" for the Particular Purchasing document type's.
    Best way is to maintain in Purchasing view of vendor master record since confirmations rare sent by the vendor.If you want for some perticular materials you can maintain in Purchasing info record.
    Regards
    Ramakrishna

  • Not able to set properties for Exported documents

    I am pretty new to crystal report, my problem is I export reports into pdf, excel, rtf and doc.
    While exporting I want to set document Properties I am using SummaryInfo to fill in the values
    SelectedRepDoc.ReportOptions.EnableSaveSummariesWithReport = True
    SelectedRepDoc.ReportOptions.EnableSavePreviewPicture = True
    SelectedRepDoc.SummaryInfo.ReportAuthor = "TEST"
    While debugging I see the values getting set but after export when I open the document and see properties of it its not set.
    Also I have to set these values at runtime only because author name can be different based on my application logic.

    hi
    summary info in crystal reports is for .rpt types.. it will be useful for placing the special fields report title author inside the report.
    VMSSanthosh M.sc.,CGT.,MCP.,

  • Reference number from MIRO not populated in PO History for IR document

    Hi SAP Gurus,
    We are on ECC 5.0
    I have posted invoices through MIRO with the Reference field populated. When I go back to transaction ME23N and display the PO history, I expect to see the Reference number from MIRO for the invoice receipt document, but it shows as blank.
    Does anyone know how this gets populated and if we're missing any config settings?
    Thanks,
    Linda

    Make this flag for Account assignment category in the customization
    SPRO -> Materials Managment -> Purchasing -> Account assignment -> Maintain A/c assignment category.
    Select the relevent a/c assignment category and click on details button.
    For PO with no account assignment
    Make this flag for Account assignment category in the customization
    SPRO -> Materials Managment -> Purchasing -> define external representation of Item category
    If here the Invoice receipt indicator is not checked then you want see the IR document at PO history

  • When will be possible to use iPhone for uploading documents, please this problem make me be really frustrated. Thank you

    I Try to upload a document using my iPhone but the single option is to upload pictures  please let try to fix this problem

    Its possible now, though not through Safari.
    You'll need to use a Browser that supports uploading of other files such as iCab Mobile
    https://itunes.apple.com/en/app/icab-mobile-web-browser/id308111628?mt=8

  • Not possible to define Custom Applications in PI2.0 for Assurance?

    Hi,
    Problem:
    It seems that it's not possible to chage ports for the pre-defined applications under Operate->Applications and Services.
    Impact:
    We have a business application that we would like to define but that applications ports (tcp 3128 and 5001) collides with already prededfined applications like:
    Application Details: http
    Protocol(s)/Port(s) tcp/80, tcp/8000, sctp/80, tcp/3128
    Application Details: yahoo-messenger
    Protocol(s)/Port(s) tcp/5000-5001, tcp/5050, udp/5000-5001, tcp/5100
    By showing the wrong application name for our own applications makes the Assurance part pretty useless for us and our help desk.
    Any suggestions?
    Regards
    Ronnie

    I think you maybe made a wrong turn somewhere. This is the forum for Photoshop Elements, the junior consumer version of Photoshop. I suspect you want either the Premiere forum, the Photoshop forum, or the Encore forum, all of which can be found here:
    http://www.adobeforums.com/webx/.3bc4f8d8/

  • Document Contains Errors - Approval not possible

    Hi,
    We are having issue in our Invoice Workflow.
    When ever the approver is trying to approve the document, he is getting the error message "Document Contains Errors -> Approval not possible".
    We have verified the document and check for error messages and found the below error messages on the Document.
    E BBP_PD              047 Posting period 006 2011 is not open.
    The document was submitted some time in the first week of December and as part of AP process the posting period will be closed during the first week of every month.  This is a common business case and why is it stopping from posting the doc?
    FYI..this Invoice is posted against the WBS element.
    Pls give some insight on this and how to address the issue.
    Regards,
    Satya

    Hi,
    The posting date in the invoice is referring to the past period which is closed.You will have to change the invoice posting date to current period date and then process.
    Regards,
    Sanjeev

  • System Error- restart not possible - Error Message in MONI

    Hi,
    Though my flow is running fine. with success flags, there are couple of below error messages.
    System Error- restart not possible
    Message ID D59F2131E30E45E21D5BADCC8C0F8656 for pipeline CENTRAL version 000 already exists in system
    why am I getting these errors..
    Regards,
    Varun

    What was the status of your server (XI/ PI and the receiving application) at the time of processing of these messages? Also check if the payload was sent with all the required information.
    Regards,
    Abhishek.

  • DTR Error- Checkout is not possible.

    Hi all,
    I am having a problem with DTR. I wanted to modify a view in a componenet.and I am getting the following error.
    Checkout is not possible. See below for details.
    View com.prj.Vendor_View
    ======>problem: DTR workspace is not modifiable    
    /JD0_TRACK01_Dprj_1sap.com/src/packages/com/prj/Vendor_View.wdview.xlf
    please can any one suggest me how to solve this error.
    Regards
    Thank you
    Maruti

    Hi Nagarajan Kumarappan
    Thank you so much .you are right. I have changed the properties as you suggested and its working now.I could able to modify labels.
    By the way may i know how did it happend like that../ as I need to change the properties for each and every related  file in the project.Please let me know if you have got any idea.Any way your suggestion solved my problem and I am awarding ponits.
    Regards
    Maruti

Maybe you are looking for

  • 13" (2010) MacBook Pro Display settings are showing a second "built-in" display that doesn't exist

    I have a 13" mid-2010 MacBook Pro, running OS X 10.10.2 I also have an LG 23MP75 monitor attached, at a resolution of 1920 x 1080 (60Hz) using the display port to a VGA adapter. This is my standard configuration for in the office. When I attached my

  • What happened to list view in calendar with iOS 7

    It seems like my favorite view is now longer there. Am I missing something?

  • Itunes credit card ban

    I have been using the came credit card with iTunes for 3-4 years. All of a sudden I was being asked to verify the payment method.  I thought it was because I got a new iPhone5 this weekend and it needed the verification because the account was being

  • MM_preloadImages is not defined error

    Everything works fine in Firefox and Opera, but IE will not load the flash file on the main page. If you click on the link to "service page" in the Latest Projects section everything loads fine once you get off the main page. In FireBug, I get MM_pre

  • Max no of application modules

    Hi all, In our Jdeveloper application, we have around 18 root application modules (with no nested application modules). For a new project, we want to build a another model project on top of this application. Is it possible to do so? and if so what ar