dear gurus,
kindly tell how can i restrict confirmation of successor activity. Example in my Network structure diagram their is only one netwrok and three internal activities and relationship is finish start for all three activity.
1. activity ===>fs===> 2.activity ===>fs ===> 3.activity
As all can see the flow, i want is when i confirm activity 2 or 3 without confirming activty 1 the system should not confirm the successor activities.
kindly help its urgent
saqib usman

Hi,
Please use Tcode :SMOD
Use: Enhance ment as CONFPS02.
I never tried it still, the
help is pasted below for your quick referal.
Thanks.
Please reward if helpful.
CONFPS02    PS confirmation: Customer-specific input checks 1
The enhancement CONFPS02   contains the following components:
Function exit:
EXIT_SAPLCORF_007  PS confirmation: Customer-specific input check without changes
You can use this enhancement to subject the confirmation to your own checks, after the SAP standard checks have run. The confirmation can no longer be changed.
As well as the activity (AFVGD), the complete network header (CAUFVD) and the confirmation  (AFRVD) are transfered in the interface.
Activities
1. Create the enhancement
Either create a new project or use an existing project.
2. Activate the project.
Your enhancement can only take effect after you have activated the project.
Further notes
Enhancements are, in contrast to modifications, release-insensitive, since they are not in the original SAP system, but in a name range that is reserved for customers.
You can find information about the general procedure for creating enhancements by choosing Utilities -> Documentation ->  Onlinemanual

Similar Messages

  • I am having trouble installing photoshop Lightroom.  I have the S/N #... I need it to be confirmed and activated so i can receive an email to activate the system to my computer.  I am not sure how to go about doing so.

    I am having trouble installing photoshop Lightroom.  The program is installed and has some sections blocked off.  I have the S/N #... I need it to be confirmed and activated so i can receive an email to activate the system to my computer.  I am not sure how to go about doing so. 

    If you have a serial number, you simply need to enter it into the proper fields.
    Since you don't say what version of Lightroom, and what sections are "blocked off", let me guess that you have Lightroom CC, and you need to enter the serial number to turn it into Lightroom 6. Here are the instructions: Adobe Photoshop Lightroom Help | Serialize Lightroom CC trial to activate as Lightroom 6
    And if that's not the right assumption, then please give us the details.

  • Restrict work order confirmation without activity price in KP26.

    HI Guys,
    we are maintaining the activity price in KP26 for mandays activity and confirming it in IW41. Now if activity price is not maintained in KP26, and confirming the mandays in IW41, system should through an error message. please let me know how can i do this.
    Anil Kumar. V

    Hi
    you can check the SPRO in Define Control Parameters for Completion Confirmations where you can mark the Actual cost , and Termination for incorrect act cost. where in it will through an error which confirming the same.
    If the above conditions don't met your requirement you can check the same using user exit
    Regards
    Thyagarajan

  • Project system: error when confirm an activity

    Hi Gurus,
    I try to confirm an activity ( TC: CJ20N ). I go through "Edit / Activity / Confirm" but I get following message NO VALID CAPACITY FOR FINITE SCHEDULING (mssg Nr. C7 057).
    However I already confirmed an activity assigned to the same work center.
    Do you have any explanation what why the error message occurs???
    What does the indicator relevant for finite scheduling mean?
    Please advice!
    Thanks

    Hi
    I think you are using Capacity planning for scheduling activities in PS. Hence check your work center or any reports of your PS/WBS where u can see the available capacity for scheduling your activity.
    This is not refferring to the Activity type in controlling, it is referring to the Internal Activity in PS.
    Regards,
    Suraj

  • Auto confirmation of activity - reg

    Hi all,
    Actually in my project iam using 10 activities to get one FERT item.
    Proj Def:CNC M/C
    L1WBS
    L2WBSE-1:Design
    L2WBSE-2:Purchase
    L2WBSE-3:Assembly
    For Design WBSE iam using 10 activities,here for each activity iam attaching one BOM,
    again in Purchase WBSE  iam using same 10 activities for just information of PO completion for tht particular BOM.
    and for Assembly WBSE also iam assigning same 10 Activities for assembling .. Ok..
    Now once i release the Project ,then PR's will raised for all BOM's..Ok...
    thn after once PO's completed for these all ten activities.
    Based on this all 10 activitis in Purchase WBSE want to get confirm automatically.
    Same process for Assembly WBSE also..
    Is thr any option for auto confirmation of activities???????if its thr pls let me know.
    Pls help in this regard...................
    ---Prakash.

    Hi,
    As per standard SAP, there is no automatic confirmation of activity based on procurment process. For confimration activity various methods are available such as time entry in CATS / through External system / transaction codes cn25 /27 etc. Some kind of enhancment is required for automatic acitivity confirmation. You may need help of ABAPer in this. In Confirmation node of configuration, there is enhancement of confirmation.
    Automatic confirmation of activity functionality is n't available in standard SAP. This has also certain logic. Let us say in WBSE for design, how system will identify the confirmation of the tasks & some input is required for this. Morever activities are defined by user only & it is also n't an account assignment object.
    Hope this will help you.
    Regards,
    Rakesh

  • Interlock for confirmation of activity

    Dear Gurus,
    My scenario is as follows -
    I have created project structure, It has single network and activities looped into.
    Activities are spread across several WBS elements.
    I have done scheduling of netwok by linking all activities and defined relationship (FS) in network graphics.
    The finish to start sequence is like this
    10 - 20 - 30 - 40 - 50 and so on
    Problem - After releasing the project and network, I am able to confirm any activity in above sequence.
    Requirement - system should not allow me to confirm activity 30 before confirmation of activity 10 and 20.
    But I am able to confirm activity 30 before confirming 10 & 20.
    Pl suggest me which settings I may need to do. Useful answer will be blessed with full marks.
    Thanks and Regards
    Parimal

    Dear Parimal,
    Please go to the T-code OPSU and find the control key used in your network profile. Now change the confirmation indicator to "2 - Confirmation Required".
    This will solve your requirement
    Regards,
    Uddhab Paul
    Edited by: Uddhab Paul on Feb 12, 2009 7:29 AM

  • Confirmation Of Activity

    Hello Experts,
                          I haven't partially confirmed an activity by 30%. Now, in report CN48N the report is not showing any value under column of "Actual Work" & "Remaining Work". Please suggest why this is not showing me d actual figures.
    The UOM is H there.. Does it has any correlation wit that?
    Please help.
    Thnks & Regards,
    Ankur

    Looks like the system is calculating the new "Actual Work" value by subtracting the previously entered Actual work value against remaining work and is calculating the new actual work value based on that.
    Ex:
    Originally scheduled work = 450 HRS.
    Actual work entered at 1st confirmation = 10%, so actual work = 45 HRS; Remaining work = 405 HRS
    Now, when you try CN25 again and enter a % Processing value (Ex: 50%), the calculation is based on 405 - 45 = 360, and the new Actual work HR inputed is 180 HRS. Seems weird functionality to me also.
    Users here enter the 'Actual' hrs., so I never had this issue. I guess it is better to just enter the #hrs. for each entry of confirmations, the system reflects the % Processed accurately.
    PS: The Actual & Remaining Work values did show up for me in CN48N, when % Processing value is entered in CN25.
    Edited by: sdn sap on Feb 24, 2012 2:18 PM

  • Want Automatic scheduling in case I partially confirm the activity

    Hi Experts,
    I have one network with two activities having FS relationship with duration for ex.10 & 20Days.
    Activity 1:  ES = 01-01-2009  & EF = 10-01-2009  (Date -Month - Year format)
    Activity 2:  ES = 11-01-2009  & EF = 30-01-2009
    I havedone the following settings:
    1) Adjust Basic Dates
    2) Automatic Scheduling
    3) In confirmation parameters - Propose dates
    Now I had done the partial confirmation of activity 1 with actual start 03-01-2009 & Actual Finish 11-01-2009  & forcast duration 2 days
    Now when i save the NW or Project but system dose not do the automatic scheduling Earliest dates remain same .For this I have to do manually
    Can some one help so that the system schedule automatically & the result would be as
    Activity 1:  ES = 03-01-2009  & EF = 13-01-2009
    Activity 2:  ES = 14-01-2009  & EF = 03-02-2009
    Regards,
    Deependra

    Hi
    The ES and EF dates are the dates for planning only. Scheduling is done for the planning purpose only.
    Once you do the actual / partial confirmation of the activity, the difference between your planned visa-vis your actual dates will help you to understand your planned credentials.
    Regards,
    Uddhab

  • Confirmation of activity type in Process order -Impact in FI.

    Dear All,
    On doing a confirmation of a activity type for a process/ Production order - values get posted to secondary cost element which has been assigned to a acitivity type.  This means only a impact in controlling but not in FI
    How woould the booking happens in FI ?is it not required to book in FI, if yes, why.
    Please suggest.
    Thanks.

    Hi Daya
    1. You can calculate activity price for plan in KSPI and for actual KSII for respective CCtr and activity type...but some times people manually update price at KP26 directly which in my opinion is not right way because price is either more or less than the real calculation in KSPI and KSII...
    2. However in your case price is directly updated in KP26 against activity type..when confirmation is done in order this rate * activity qty is your value posted in order level and at the same time respective CCtr is also credited by this amount which you can see in CCtr report
       Example:  CCtr  XXXX01
                       Activity type 999999
                       Sec cost Element for activity type 999999 (43 cat)
        Suppose you have booked FI entries for some expenses like Salary in F-02/FB50...against CCtr XXXX01   So your CCtr XXXX01 is debited by Salary amount and this amount will be absorbed in product through activity for which you need  activity price and confirmation.
        FI entry is booked your expense in GL a/c Salary and same time debited your CCtr through CE salary....Now when you charging this expense in product through prod order you are doing it through confirmation of activity qty which in turn calculating value by taking price from KP26 and qty from confirmation.
    Kamal

  • I am trying to install Illustrator C6 on new system (Win8.1), Already de-activated from old system.  I downloaded the 3 files.  First file opened and had fonts, but second file (1.8Gb) does not open; does not appear to have an exe file. How do i install?

    I am trying to install Illustrator C6 on new system (Win8.1), Already de-activated from old system.  I downloaded the 3 files.  First file opened and had fonts, but second file (1.8Gb) does not open; does not appear to have an exe file. How do i install?

    what files (names and extensions) did you download?
    Downloadable installation files available:
    Suites and Programs:  CC 2014 | CC | CS6 | CS5.5 | CS5 | CS4, CS4 Web Standard | CS3
    Acrobat:  XI, X | 9,8 | 9 standard
    Premiere Elements:  13 |12 | 11, 10 | 9, 8, 7
    Photoshop Elements:  13 |12 | 11, 10 | 9,8,7
    Lightroom:  5.7.1| 5 | 4 | 3
    Captivate:  8 | 7 | 6 | 5
    Contribute:  CS5 | CS4, CS3
    Download and installation help for Adobe links
    Download and installation help for Prodesigntools links are listed on most linked pages.  They are critical; especially steps 1, 2 and 3.  If you click a link that does not have those steps listed, open a second window using the Lightroom 3 link to see those 'Important Instructions'.
    window using the Lightroom 3 link to see those 'Important Instructions'.

  • CreativeCloud.exe doesn't work anymore. It seens to be not activated in the system tray.

    Hello and sorry for my english. My name is Jean-Pierre BRETHES and I have a problem with the creativecloud.exe program which doesn't want anymore to start. (since a while now) The icon in the system tray doesn't appear and it still to be gray (not red). When I clic to lunch the program nothing happen. When I try to reinstall it the download end by a windows "error 50" and everything is stopped.
    AT the beginning I wanted to download In design  program to try the PAO functionalities. Thank to help me. My email adress is <removed email - kglad>. Have a nice day. JP

    Hello and sorry for the delay. Thank you for your answer. I did what you wrote and everything is fine now. Really thank you for that. I fully understood regarding my email address in my message. I will not anymore do this error.
    Have a nice day.
    Sincerely, Jean-Pierre BRETHES
    De : kglad 
    Envoyé : dimanche 6 juillet 2014 23:33
    À : Jean Pierre BRETHES
    Objet :  CreativeCloud.exe doesn't work anymore. It seens to be not activated in the system tray.
    CreativeCloud.exe doesn't work anymore. It seens to be not activated in the system tray.
    created by kglad <https://forums.adobe.com/people/kglad>  in Downloading, Installing, Setting Up - View the full discussion <https://forums.adobe.com/message/6527054#6527054>

  • Restrict the system to create the delivery for certain quantity

    Dear All,
            Can we able to restrict the system for the creation of delivery for some quantity.
    For example
        We have created the sales order for  100 quantity.
    Now we want that at the time of delivery creation system must restrict to some quantity (say only 5 qty not more than that)
    looking for your reply.
    Regards
    Pawan

    Hi,
    Can please checkout through the following areas-
    1. In sales order at item level maintain underdelivery tolerance as 95% of 100 qty.
    2. Check in material master of sales view i think some functionality but its work all the materials not for particular sales order.
    3. Write the code in exit V50STAT at the delivery creation for quantities.
    Rewards if it helps
    Regards
    Goutham

  • Classic scenario : Confirmation and invoice in same system ?

    Hello experts,
    My question is as follows.
    I am trying to learn various scenarios in SRM as a beginner.i undrstand how the scenarios are present and what they mean .
    In classic scenario,
    can i create a goods receipt in ERP(MIGO) and then a invoice in SRM ?
    If this is possible, then i wont be able to see the related documents in the shopping cart for the self service procurement business process.
    Help me understand this process and the technical scenario.
    Will there be a constrainst that always the confirmation and invoicing has to be done in the same system. either ERP or SRM ?
    Thanks
    per

    Hi Per,
    1. Yes this is possible, We can create the confirmation and invoice in either systems.
    2. However most of the business requirements would always follow creating the follow on documents in one of the system, mostly ERP. It is totally dependent of the business and the customer. The decision of deciding on the Classic or ECS would always take this into consideration.
    Anything we do in the system should justify the business need of the customer. The possibility to create the documents is a option to provide the flexibility. Hope this helps. Let me know incase of more clarifications.
    Regards
    Mustameer

  • Create activity from external system

    Hi
    What is meant by creating activity from external system.
    I need to work on an enhancement which deals with function module to create activity that can be called from external systems e.g. on demand.
    I am not sure what does that exactly mean?
    Any pointers would be helpful.
    Thanks
    Alka

    Hi guys,
    Thanks for your answers... But is it possible to call transaction NOTIF_CREATE from an external system?
    I have done something already so that those 3 fields will be automatically populated for a message sent from an external system.
    I changed the screen and called FM BAPI_NOTIFICATION_CREATE(a remote enabled FM which is the one being used by transaction NOTIF_CREATE to create a message) inside FM BCOS_SEND_MSG.
    I populated the category, subject and solution in the FM export parameters as well as the solution number in the sap data table. I put a destination also..
    This FM calls another FM DNO_OW_CREATE_NOTIFICATION which is the one being used from the external system but do not cater the functionality to send the 3 fields that we need.
    As you will notice, there are lots of standard objects that I've changed. =)
    My problem now is that the system data sent is the same with the system data if you create the message using NOTIF_CREATE. Some system that were sent when a message is sent from an external system is missing but at least the sap system and client ID is sent. There is no external reference number also. But hopefullly, the users will accept it. Can't find any other solution to this.
    Thanks,
    Eric

  • Missing Fonts when fonts are activated on the system.

    I created an Indesign CS6 document (334pg book) and used ITC Garamond Bold for the document subheads. This was done with a paragraph style. After editing the document I get a missing font warning for ITC Garamond Bold. The font is activated on the system using Suitcase Fusion 4. If I create a new document the font is available. Both documents open. One shows the font missing. On a Mac OSX 10.6.8. Any ideas on fixing this missing font error?

    Why not obtain FontFingler or FontNuke and run these font cache burping utilities and see if the problem goes away? Is it installed in more than one place? Does one of your documents have a Document Fonts subfolder and the other doesn't? Did you maybe try to Export the afflicted document to IDML, and then turn around and re-open that file?

Maybe you are looking for

  • Game Center friend request problems

    I've tried to add my friend through Game Center and I sent the friend request fine via email, but when I asked her if she got the request, she said that she did and that on her friends list it said that I was added to her list and that she could see

  • Airport has stopped working -- Now Can't Create a Network

    We're using a wireless router (not an Apple AirPort router) to connect to the internet. We've had connections before, but now this has simply stopped working. In the past, I've solved this problem by just creating a new network and connecting to that

  • IN THE VIEW OF A PROSUMER USER OF APERTURE.

    I don't know about other users, but i am a PRO-SUMER user, not a FULL PRO user, i got aperture for four reasons : 1.- I liked the interface 2.- I liked the none destructive features it has 3.- The quantity of pictures it allows. 4.- The freedom it ga

  • Creative Cloud window is perpetually showing me a waiting symbol when I try to download Photoshop

    Hi! I'm trying to download a 30 day trial of photoshop and my creative cloud window is open to apps but showing me that blue rotating circle that indicates I should wait. And nothing is happening! My computer is fast and this shouldn't be a problem.

  • .PDF files in DVD ROM content

    I am using a Mac and Encore CS4. I am trying to include a .pdf file as DVD ROM content. Whenever I try this, all .pdf files are "grayed out" and I can't use them. Adobe Acrobat Reader 9 and Adobe Acrobat Pro are both installed on the computer. I can