Confirmation Resrtiction before GOODS ISSUE

Greetings........
                         How to restrict the Partial or final confirmation Before issueing Goods To Production order.

Dear,
Use backflush indicator  in the master the creation (ie.,Material master, routings, workcenter). So that.. u an create order then material auto good issues to order when confirmation and receipts
And also you can control this with Backflushing and Termination if there is any error in Goods Movements with OPK4, so that it will ensure at every time GI will be posted along with the Confrimation.
Or use the Use user exit EXIT_SAPMM07M_001
Please refer this thread.
default quantity of confirmation(co11) should allowed in goods movements mb
Regards,
R.Brahmankar

Similar Messages

  • Restict the confirmation before Goods issue

    HI,
    I need to know how can we restrict the confirmation of process order before Goods issue to the order?
    Now user is confirming the order by putting 0 qty in the order.  Any inputs ?
    rajeswari

    Dear,
    You need to define default production storage loaction in MRP2 for you component then system will take it during confirmation.
    For batch selection you need to go for automatic batch determination for 261 movement.
    Create serch procedure in MBC1 sty type ME01 with plant materail and mov type combination.
    Assign the sort rule here. Before that you need to create the sort rule in CU70.
    Else determine the batches in order it self then it take as default in confirmation.
    If you do the confirmation of 0qty then in good movent tape there will no items if is saved it then there is no problem.
    Hope this will solve your probelm.
    Regards,
    R.Brahmankar

  • Billing in CRM before goods issue in ECC

    Does anyone know if it is possible to create a billing document in CRM before the goods issue has been posted for the delivefry created in ECC? In some cases we need toi have a Pro Forma, before goods issue has been posted.
    Best regards,
    Pascal.

    Couple of things to Clarify here.. There is no such thing as Financial postings in CRM. If you are referring to Billing..CRM can support creation of Debit Memos only and nothing beyond that. So DMs will become your billing document and any other subsequent Accounting entries are dependent on external system like ECC.
    As the other person said, you need to configure the whole 9 yard on Billing in CRM using CRM BEA
    Thanks
    Raj

  • POD confirmation date allow to give before goods issue date.

    Hello ,
    Would like to know that POD confirmation date process , system allows to input the pod date before the actual goods issue date in VLPOD screen as logically it should be wrong i guess as per my knowledge .i.e as soon as goods receipt by customer then only he will confirm pod , how system can allow before the actual goods issue date in VLPOD.
    for eg:
    1.sales order
    2.delivery
    3.goods issue with 23.12.2013
    4.pod date can enter with 01.12.2013 and save it.
    5.billing document
    Please advisse your thoughts/suggestions.
    Regards
    venkat

    hi venkat
    system will take back also , there is no config control ,you have to user user exit and control it
    include:   MV50AFZ1
    user exit:  USEREXIT_SAVE_DOCUMENT_PREPARE.
    IF likp-vkorg EQ '1000'.    "
        READ TABLE XLIKP INDEX 1.
         IF XLIKP-PODAT IS NOT INITIAL AND  XLIKP-WADAT_IST grater then or eq to XLIKP-PODAT
          MESSAGE e001(Z1) with xlips-VBELN.  "MESSAGE DOCUMENT DATE IS BACK DATE ( CHECK YOUR ENTRY)
         ENDIF.
      ENDIF.
    check the ABAPER discuss with above logic
    regards
    sankar

  • Order Confirmation Without Doing Goods Issue & No Goods Receipt W/o Confirm

    Hi,
         I am facing a problem at client site & i need a quick response from you people.
    If i am not doing GOODS ISSUE to a Production Order the system is allowing me to do Confirmation for that Production order & also the system is allowing me to do GOODS RECEIPT for that Order before doing complete Confirmation.
    My client wants that Without doing Goods Issue it should not allow order confirmation & also No Goods receipt without doing Final confirmation. Please help me regarding this configuration, How to do it. If it is possible then please help me& tell how to do it.
    I am in final stage of my project.Please i want a quick response.
    regards
    Jimmy

    Hi Ashish,
    you need to create new thread anyway
    for process industry you need to use CONFPI 02  you can put this in SMOD and go to display in that you can see component when you click that you can find functional module  : EXIT_SAPLCORF_402 click in that you can see include in which you need to modify
    take help of ABAP and do some modify to this module
    Thanks
    Bala

  • Billing before goods issue

    Dear all,
    How can i configure the copying control from Order (OR) to Bill (F2) so that i can create the bill before the goods issue.
    Thanks
    Mostafa

    Dear Mostafa,
    Just a suggestion:
    When Delivery is involved in your process, why do you want to maintain Order-to-Bill functionality?
    Instead, I would suggest to maintain the flow, like:
    Order --> Delivery (w/o PGI) ---> Billing
    i.e. You create an Order, and with reference to Order create a Delivery Document (just save the Delivery document and don't PGI). This will give you Delivery Doc. No.
    With reference to this no., create Billing Document.
    Now, later-on, Do PGI for Delivery Doc., as Reqd.
    Best Regards,
    Amit.
    Note: If, this is not ful-filling the requirement, Please breif.

  • No confirmation possible without Goods Issue.

    Hello Gurus,
    In my plant presently the users can create process orders and confirm the process orders and also post the Goods Receipt without Goods Issue taking place. How can I control this.
    Regards
    Sri.

    Hi,
    If they are using MB1A for goods issue for and MB31 for goods reciept then you have to use user exits.
    If they are using confirmation tcodes then goto transaction OPK4.In the error handling block of General individual entry tab you have to check goods movement and termination for incorrect goods Movts.
    Hope this will help you.
    regards,
    kaushik

  • Inspection lot is being created before good issue

    Dear gurus.,
    Here´s the scenario: a Fert Material has InspType 05 active and inspection plan is also created.
    The users on SD are trying to post goods issue at VL01n returning this material to our stock. However the system show a message "Status of inspection lot 050000000242 / partial lot 000000 does not allow good issue".
    This messages does not appear when they SAVE the "delivery" BEFORE posting the good issue. When that happens, a inspection lot is created at QA32 without movement type. So QM has to process this inspeciton lot before SD do the good issue. When the goods issue is carried out then another inspection lot is created on QM with a movement type 655.
    I can´t figure out why the system is creating this inspection lot BEFORE posting the goods issue. I´ve check the "data for goods issue" at QA03 on those ispection lot and it says numbers of the costumer, sales order and delivery. Shouldn´t be only one inspection lot with movement type 655?
    I kindly ask for your help.
    Best regards,

    It sounds like your system has maintained an inspection type for the return delivery type in the SD config and that you have QM activated for movement type 655 in config.   Do one or the other.
    When the inspection type is configured against the delivery type, the inspection lot is created when the delivery is created.
    The config is found in QM, quality inspection, inspection lot creation, inspection at shipping.
    FF

  • Material before Goods Issue

    A New Requirement:-
    After the material has been produced as a finished product the material will be sold from the appropriate plant. In SAP usually we do PGI.
    The requirement is:
    After producing the material in our plant some specific material should go out form our plant and same shold come inside.
    Because we are giving the specific materials for printing the batch.
    In SAP how the material can be issued and taken back after printing.
    Thanks

    Anand,
    As per my understanding of ur problem, The answer to this is the process Called " SUBCONTRACTING" .
    In which u will issue material to subcontractor for printing and will take back and can sale again to customer.
    Search the ccommunity for details about subcontracting and take the help of MM consultant because this process has lots of MM integration part.
    Thanks,
    Raja

  • With out goods issue confirmation should not be done

    Dear all ,
    Is there any method or user exit to  stop the confirmation with out goods issue to the production order.
    Regards
    Srinivas

    Reddy,
    User status to my is not a good solution if you are really looking to restrict confirmation if goods are not Issued, the reason why I am saying is that you can have referance of user status with respect to "GMPS"-Goods movement posted status.
    The major draw back is that SAP sets this status for partial goods movement or even incase GR alone is done, so how can this really help...
    Regards,
    Prasobh

  • Error in goods issue witjout release of production order

    hi gurus,
    I have created production order but not released only created.
    Now  I am doing Goods issue in MIgo then it is not allowing.
    I want to know the reason for that.

    Dear ,
    It is a normal behaviour of the SAP system in Production Order Cycle that once the Production Order Status is CRTD , REL -Relased , Material Availablity Check , Capacity Availablity Check has done , then one should execute M31/MIGO/MB1A to perform the the good issue .
    Even if you goto MIGO -Goods Issue -Reservation Number -Enter Res Num  and execute .It will give you an error with Yellow marked light because , till you REL the Production Order , there will not be any confirmation agisnt the reservation number to carry out  any Movement Type with documents number .
    So REL is mandatory before Goods Issue done againt any PO
    Hope this is clear
    Regards
    JH

  • Able to do Goods Receipt without Goods Issue in Intercompany STO process

    Hi,
    We are in ECC 6.0 and noticed that we are able to post Goods Receipt in receiving plant (Intecompany) without even goods issues in supplying plant.
    How to restrict proceeding Goods receipt in case no GI at supplying plant?
    Please advice.
    Regards,
    Ram

    SAP explains in OSS Note 25220 - No stock in transit with cross-company purchase orders:
    This procedure was chosen because usually the issuing and receiving companies have to be managed on different computers.  In addition, goods receipt in the receiving plant can be posted before goods issue in the issuing plant with this kind of stock transfer, i.e., the corresponding stock in transit would temporarily be negative.
    If you want restrict this situation, then you have to do some coding in  userexi: EXIT_SAPMM07M_001

  • Goods Issue in Production order

    Hi all
    I am using a Production order scenario where some of the components are Goods issued. The steps that I am following is:
    1/ Release the order
    2/ Do a GI of the components using MIGO. I put the actual qty and the batch consumed
    When I go back to the Production order using CO02/CO03 and go to the 'component' tab it does not show me the batch which I Goods Issued from the MIGO screen. It shows me the quantity but not the batch.
    Is there a way I can make the batch appear in the Production order. The business process does not allow me to assign the batch in the Production order.
    thanks

    Hi,
    If you want the batch to be visible in the component overview, the batch has to be entered in the component overview screen before the goods issue.
    In this case when you do goods issue using MIGO with reference to production order, then system would propose the batches from the order automatically in MIGO.
    Populating the batch automatically in the component overview screen can be achieved by customizing batch search strategy for the production order. If your process is acceptable to populate batch before goods issue, then the Batch search strategy can be configured to determine the batches automatically during order release.
    Please let me know whether the above propsal solves your purpose. If its fine, then I would send you the procedure to configure the batch search strategy.
    Otherwise the only way to see the component batch is thru Order info system via transaction COOIS or CO28->Documented goods movement or via CO02, by navigating thru the menu Goto->Documented goods movement.
    Regards,
    Jayakandan

  • How to re-run output determination after goods issue through idoc

    Hello,
    i've got a question about output determination. We are currently in a process to automate picking, packing and goods issue through a 3rd party software. The software creates DELVRY03-Idocs including picking, packing and goods issue-information. Picking, packing and goods issue work just find and after submitting the idoc, the delivery is updated as needed.
    The problem arises when it comes to printing the shipping document on the printer belonging to the picking station that just processed the delivery. To determine the correct printer, the external software includes the picking station number inside the idoc. A user exit in idoc_input_delivery puts the number (3 digits) into likp-traid. The customizing for using this field inside output determination is complete and seems to be working.
    The problem is: as the number of the picking station is not known before goods issue, the LD00 message must not be generated before goods issue. I used the appropriate condition insinde the message scheme, the message is not generated until goods issue is complete. After processing the DELVRY03-Idoc, the message should be found and generated, but it isn't. When i take a look at the delivery after submitting the idoc, goods issue is complete, picking and packing is done - and no sign of an header message of type LD00. First i thought about a misconfiguration inside my customizing for output determination, but when i access the delivery via vl02n (change delivery), output determination seems to be processed again and without making any changes or actions, LD00 is generated and waiting for processing. After saving the delivery, LD00 is processed and the shipping document is printed exactly where it should be.
    So, as my customizing seems to work and everything else around idoc processing doesn't make any problems either, i conclude that, after processing the idoc, R/3 just needs a little kick to re-run the output determination, find the now fitting condition for LD00, find the appropriate entry in the condition table and print the document.
    I already tried report rsnast00, but this one just seems to run already created messages.
    Any ideas how to automate this little "kick in the butt"?
    Thanks in advance!

    I'm working on a similar issue with ws_delivery_update. I'm not using the IDOC as you are, but I'm using the function in a program of mine to PGI the delivery, but the output isn't being added to the delivery. I've tried to run the function twice as you suggested, but that doesn't seem to work. Do you have any suggestions or ideas on things to try?
    Thanks,
    Eric

  • Post Goods Issue before TO Confirmation

    Hello,
    Is there any possibilities for Post Goods Issue of a delivery document before confirming the TO.
    Scenario 1. Delivery 2. Create TO 3. Post Goods Issue 4. Confirmation.
    Regards

    if the item category in your delivery has a picking relevance, then it is not possible to post a goods issue before picking, since picking quantity is updated when the TO is confirmed.
    Why do you want to post it in that illogical sequence?

Maybe you are looking for

  • DATA from structure

    hi firends, i need to retreive data from table and structure is it possible eg-- AAA is table having atr no       BBB is strucrure in run time its having some data related to AAA table atrno i want a select query for this  plz some one provide me wit

  • How to play analog sound with PC input

    Hello, I have connected a pc to the pc input (VGA sub D15) in my TV 46TL933. I am looking to connect the analog audio output from the pc into the TV. I already tried to connect the audio signal to the component input, but the tv doesn't listen that i

  • Steps to write Inbound Idoc program

    Hi All can any body send me steps to write sample inbound idoc program 1) from which tables i have to fetch data. 2) wat should be the status before processing idoc and wat   is  the expected status. Like a complete real time program with explanation

  • Error in configuring SSL

    Hi, Working on bea weblogic 7.0 with sp1. Using keytool, generated keystore with storetype jks, generated alias generated certreq and obtained certificate from local MSCA, imported trustca to the keystore. Passed the parameters in the bea weblogic ad

  • How to load PDF (HTML Loader) with File Reference (dialog box) [AIR]?

    Hi.  I'm trying to get my AIR application to load a PDF document from the dialog box using File Reference Class. With the code that I have if I use a regular Loader then I can get a PNG image to load into a container and display on the screen.  But P