Confirmation should not be allowed till materials issued from store
Hello friends,
I have a production order in which one material is issued automatically by Backflush function in confirmation and other material is issued manually. I want that confirmation must not be happen till materials are issued from store.
Waiting for reply!
Thanks!
HI
Check these BAdis for your requirement:
WORKORDER_GOODSMVT
RM_BFLUSH_GOODSMVT
also if working in REM then check REM profile for incorrect goods MVt in OSP2 and in Discrete check OPK4 with your oreder type for termination of incorrect goods MVt
Check and revert
Regards
Anupam Sharma
Similar Messages
-
Without standard release confirmation should not allow in process order
Our clients need is that without standard release confirmation should not allow in process order.
We are using CORK,cor6 and MB31 My need is to apply user exit in all cases.
I got input from sdn User exit:-PPCO0006 Function module Exit_SAPLCOZF_003
INCLUDE ZXCO1U06
I need to activate this only during confirmation.ie confirmation to be avoided if cost is not released.
Regards,
PertHi,
You are right. For preventing confirmation in case std cost estimate release is not available you need to do enhancement. You can check for following exit along with exit which you mentioned in your post :
Enhancement CONFPI05
EXIT_SAPLCORF_405 - Process Ord. Conf.: Cust.-Specific Enhancements when Saving
INCLUDE ZXCOFU10
Check either of the enhancements which may fulfill your business requirement.
Regards,
Tejas -
Production Order Usage Probability should not be allowed to change after GI
Dear Gurus,
pls tell me how to do this ,Production Order Usage Probability should not be allowed to change after Goods Issue (GI) done against Prod Order . pls tell me procedure or any UserEXit for this.
Thanks in Advance,
Regards,
DevHi,
Can you elaborate little bit more?
Regards,
Sankaran -
PO RELEASED IT SHOULD NOT BE ALLOWED TO AMMEND
Sir,
once po is released it is should not be allowed to edit.
how can i configure this
regards
ameyHi Amey,
Once PO is released it cant be Changed it can be done by doing the following setting in SPRO.
SPRO>Material Management>Purcahsing->Purchase order->Release procedure for purchase order--->Define release Procedure for the PO
In this Release Stategy config there is option called Release indicator
where in we have to define a release ID and this release ID ( Eg A ) has to be given 1 cannot changeable in the feild in chagble--for the allowing no changes in PO after release and then we have to go to release Strategy option we can select the release strategy we want the change and in the Strategy
click on the release status and in this status we can give the ID defined earlier ( at which level what effect should come)
hope so it helps
regards
Anjanna. -
Inventory in storage bins should not be allowed to go negative
Hi
Inventory in storage bins should not be allowed to go negative?
Regards
Vivekyou can uncheck the "Allow negative stock" for the combination of warehouse and the storage type.
Path is-
SPRO > Logistics execution > Warehouse management > Stock removal startegies.
Then select your strategy.
Check out if it helps.
Regards,
nilesh -
Zero quantity should not be allowed for STO delivery
Hi,
zero quantity should not be allowed for STO delivery.
when i create a delivery for a STO it should not allow zero quantity
can someone throw some light.
AlecHi,
Please maintain the "B - Create Delivery with qty greater than Zero" in Part.dlv./item in shipping tab page of the customer of site.
more briefly: in WB02 --> click on the customer of the site --> Shipping Tab page --> Maintain B (Create Delivery with qty greater than Zero)
Regards,
Srini -
User should not be allowed to login 2 times to an application from same m/c
Hi Everyone,
I have to find all possible solutions to below problem:
Problem: User should not be allowed to login 2 times to an application from same machine.
Steps to produce the problem:
1) User 1 logins to application.
2) User 1 tries to login with different credentials from same machine.
3) User 1 should be presented with a message that he cannot login from same machine using 2 browsers.
4) User 2 tries to login to application with credentials of user 1. System should now display an alert to both users on System 1 and System 2 of this conflict.
Please share your thoughts regarding above problem.
Thank you
Edited by: rishab.garg on Feb 25, 2009 10:53 PMWhen a user logs in to application flag it in database. Irrespective of client machine and browser when another user tries to login using same user id you will be able to identify that easily using stored flag against the user id.
If you want to distinguish between client machine for displaying different messages you can easily do this by comparing client IP address. To obtain client IP address use:
request.getRemoteAddr();Note that getRemoteAddr() might return last proxy machine's IP address (in case proxy is used) instead of client's machine. In that case you may consider using cookie (though using cookie is not a great idea).
Thanks,
Mrityunjoy
Edited by: mrityunjoy on 28 Feb, 2009 11:43 PM -
BOM editing should not be allowed while creating P.O./ Scheduling agreement
BOM editing should not be allowed while creating P.O. / Scheduling agreement
Hi,
I think that when you create a subcontracting PO it READS the valid BOM, so there's no locking. From a business point of view you need to question such a requirement, since in SAP you can have many kinds and types of BOMs. Then what if one of the BOMs is open in change mode (edited) exactly when you try to create the order? It should not allow you to create the order? Why?
Regards,
Mario -
Reg:Confirmation should not happen without issuing goods.
Hi Friends.
We have an issue regarding goods movement.
I need to know, is there any setting can be made for the below issue.
1. how to make settings that confirmation of production order or any goods movement( Of finished good) , should not be done untill and unless goods issue has been done for the order,.
EX: After releasing the order , we have to issue goods for productionn. then only we can do confirmation.
But we are facing the issue that without issuing the goods also, we are able to confirm. so i need to stop the confirmation or any goods movement which will happen without issuing the goods,,
Waiting for your positive answers,,thank u in advace.Dear
You can try the following user exit in your case : Enhancement - MBCF0002 /FM - EXIT_SAPMM07M_001/Include - ZXMBCU02
Or T.code OPK4. Set termination of Order confirmation in case of wrong Goods movement.
- Use User Status .T.code is BS02.
Refer : GR restrict before Confirmation & Confirmation restrict before GI
Regards
JH -
Restrict Yield to be confirmed should not less then operation GR quantity.
Dear Sap Gurus,
I have an issue. I want to restrict Yield to confirm quantity should not be more or less then operation GR quantity.
I am doing production order confirmation through Co11.
How can i restrict it ? or please guide user exit for that.
Regards
rvyasHi
You can use implicit enhancement to restrict the confirmation in CO11N screen.
Check with your ABAPer to use it.
Regards
Bala -
QM system has expired, MIGO should not be allowed
HI All,
If the vendor QM Sytem has expired ,then the sytem should not allow posting of goods receipt (MIGO) by using the functionality of Quality Info record or any other methods of control like vendor master or purchasing info record.
Please provide your valuable suggestions
Thanks & regards,
rajeshThe QM system is only designed to control the creation of the PO against vendors with the specifiied QM system.
If you want to block receipt at the time of MIGO, you will need to use a MIGO user exit to do a check against the vendor's QM system to verifiy it ihas not expired since the purchase order was created.
FF -
PR derelease should not be allowed after PO creation
Dear Friends
I have created a PR, released , then PO is created with reference to PR. After that I came back to me54n and cancel the PR release. As per our Business Practice it should not allow to cancel the PR release after PO creation.
I have maintained message 06 076/06 400 and 06 608 as error message.
The changeability indicator is also maintained as '1' against the release indicator'2'.
I don't want to go for any Badi implementation or user exit. Is there any solution in standard SAP
Thanking you
TapanEven I tried this testing but it seems like not working. I this is standard SAp behaviour.
Check this OSS notes 493900
1. Question :
Why can I modify a purchase requisition although I set the changeability of
the release indicator to '1' ('Cannot be changed')?
Answer :
The purchase requisition is not modifiable via a purchasing transaction
like ME52 or ME52N. But it is possible to change the purchase requisition
from any other external application like sales order, planned order,
maintenance order or network.
The Changeability functionality only concerns the purchasing transactions.
This is intended and a new release strategy determination takes place if
there is a modification of the data in the external application.
But logically why the user is cancelling the PR after PO creation? Even if they cancel the PR it doesnt impact the PO which is already created. Even if they cancel and re release the PR and try to create a new PO, system wont allow you to create new PO stating that PR is already ordered. Even though it looks strange but it doesnt harm the procurement. -
Re-extraction should not be allowed in J2i5
Hi friends,
I have this business requirement that data should not be re-extracted once the extraction is done
in J2I5 .
I did not find any User_exit or BADI for the same .
Can anybody suggest me how can i go about it.?You can copy the program to a Z program and check whether the excise registers are already extracted with the given date or not.
You can make use of Last extraction date button on the input screen to validate the data on the input screen.
Regards, -
Sales Order item should not be allowed to modify after doing PGI.
Dear all SAP experts,
When i create a sales order say for 10 pieces. Now I have created the delivery for all the 10 pieces & also created the invoice.
My requirement is when i create a delivery for all 10 pieces then after doing the PGI the system should make the sales order line item & qty "grey" - I should not be able to change the sales order item in any respects.
If not from delivery then when i save the invoice for that sales order then I should not be able to modify the sales order item & qty.
With best regards,
Allabaqsh G. PatilHi
I think there can be a problem in copy control
In copy control at item level, in teh item category, ensure that the field "Update document flow" and the Pos/neg quantity are properly updated.
Update document flow shoudl be ticked on
Pos/neg quantity should be positive.
Before doing this , check teh document flow of the sales order. Do the same after doign this configuration. Note the difference.
This will solve your problem -
User should not be allowed to change plant in SO once PR/PO is created
Hi SAP Gurus,
User has created the Purchase Request & Purchase Order for a sales order line item. After PR/PO creation user is able to change the plant. We need to stop that is there any standard configuration or setting by which i can stop the user to change the plant.
System is giving the error if i am trying to delete the item since the PO exist but not stoping me to change the plant.
Thanks
SurenderHi,
Standard setting is not available.You need to write the specific code in Sales order change exist by checking the VBEP -schedule line table where the PR exists.so for the line item the Plant should not be changeable.
Sales Order Change exit the following requirement has to be incorporated.
You can find the user exits in SPRO-Sales and DistributionSystem ModificationsUser Exits--User Exits for Order Processing.
Regards,
Saju.S
Maybe you are looking for
-
Hello i have the Macbook pro 2.53ghz. I have many videos and stuff like that and i want to connect my laptop to the tv. I was wondering if there were attatchments or anything like that could let me connect my MacBook Pro to my Tv. Thank you very much
-
Workflow step by step configuration for scheduling level agreement release
Hi All, I tried alot to configure step by step scheduling level agreement release using workflow. But, The release code I couln't pass using workflow. Plz guide me, or let me know some useful links for the same.
-
Why does itunes say the entry point is not found
why does itunes say it didn't install correctly and to reinstall?
-
AE CS3 inconsistent colors - HDTV (Rec. 709) color preset is bad?
I have 2 sets of known-good SMPTE colors bars generated from Avid - SD and HD. In AE, with Simulate Output turned on, the displayed black level of the HD bars is twice as high as the SD. They should be identical. I created 2 projects for each clip: I
-
Compression possible with Tcube?
Hello BPS Experts, There is no partioning by request in Tcube. please correct me if i am wrong. then how can we do the compression of tcubes ? i think i am missing some thing. please suggest. Thanks BWer