Confirmation - Work Center - Routing

Hi all,
I try to understand routings. When i try to confirm an operation with BAPI_PRODORDCONF_CREATE_TT for a work center which is not defined in routings, it returns no problem. But it is not in routing. How can it be confirmed? Or what changes when define the workcenter and confirm with it?
Thanks,

Has it relation with standard times ?
Regards,
techmaster

Similar Messages

  • Work Center Routing

    Hi Gurus,
    Please can you explain in detail how Work center routing functions with T- Codes?
    And how it works?
    Regards,
    PMAddi

    Hi,
    For details of Work Center in routing u need to float ur query in PP forum. PM its work center and maintenance task list.

  • Production Order confirmation/ work center activity type calcuation

    Hi All,
    In the parameters defined through standard value key in work center, we have defined ZZI_06 which calculates its value based on the other parameter using a formula as shown below.
    change over ZZI_01     ZZI_01     
    startup          ZZI_02     ZZI_02     
    run-time        ZZI_03     ZZI_03 * ZZI_09 / ZZI_08 / ZZI_11     
    overheade    ZZI_06     ( ZZI_03  + ( ZZI_01 + ZZI_02 ) / 2 )     
    After confirmation when we checked in C014 we noticed that the overhead hours calculation ZZI_06 was always picking the planned parameter values(from the routing) and not the actual values from CO11N. 
    Just wondering if the reason for this is the way I defined the formula or am I missing any setting?
    Ideally I am looking for value of  ZZI_06 calculated from values of the ZZI_01, ZZI_02, ZZI_03 which I enter in the CO11N screen.
    Thank You.

    Have u run the over head calculation for your order KGI2?
    Regards,
    Ganesh

  • Routing & Work Center ALE TCODE

    Hello All,
              What are tcode to send WORK CENTER & ROUTING using ALE?
    Points will be awarded.
    Regards,
    Dilip

    For wrok center :HRKK1WRKC
    ,LOIWCS01,LOIWCS02
    PPCC2RECWORKCENTER01 Send work centers to PDC system
    WORKC2 Workcenters in CC2
    WORKC3 Work centers in CC3
    WORKC4 Workcenters in CC4
    LOIROU01 Master routing
    LOIROU02 Master routing
    ROUTING_CREATE01 Creation of a routing
    Hope this`ll help you ..
    Thanks

  • Work Center displaying wrong in CO14 Transaction

    Dear Experts
    We are facing a Problem at time of Confirmation Through CO11N,Under work center field there are 2 fields Current to Confirm & Planned to Confirm,user is entering same Work Center in both fields,But when we save the confirmation & check in C014,we are seeing in Current to Confirm field some Other work center which is not there in Routing.
    From where system is picking this work center.
    I am not able to understand.
    Is this a customisation issue,Or a Master data issue.
    Regards
    Sandeep patil

    Hi Sandeep,
    Planned to confirm work center is  Production Order work center
    Current to confirm work center is actual running work center (becase due to some reason for doing other work center)
    To Check confirmation parameters (SPRO)
    OPK0 (may be included Details area 0410 or 0420)
    Regards,
    Sankaran

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Work center design and operation confirmation

    Hi All,
    In my scenario im grouping the similar m/c to a work center
    say for ex. 4 lathes m/c into a single work center as LatheALL and also the indiv cap as 4
    my customer wants the traceability in which m/c the job is done
    So i had designed in such a way that
    1 LatheALL -4 cap(this will be additional wc)
    2. lathe1 - 1cap
    3.lathe2 - 1cap
    4.lathe3-1cap
    5.lathe4-1cap
    in the routing only latheALL will be given., this will help customer in planning
    when going for operation confirmation i will give confirmation for that operation and will confirm as lathe1or lathe2  or etc.. this will help prodn dept for traceability in which m/c the work is done
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    also suggest by giving confirmation for another work center will the capacity for the original work center will be reduced
    Regards
    Anand Srinivasan

    Hi Anand,
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    yes, during confirmation time to enter the orginal actual work center, this suitable for your client requirement, do the settings for OPK0 - change the confirmations parameters (0410 or 0420)
    Regards,
    Sankaran

  • Confirmation of a formula in work center in the confirmation

    Hi All,
              I want a result of a formula of work center of particular operation in confirmation. Can any body guide the steps

    Hi Vachanala,
                           1. You create a standard value parameter in OP7B which is to be used in the formula.
                           2. Your standard value key created through OP19 should be containing this parameter which you have created and this key should be assigned in the basic data in the work center. Check generate box before saving the SVK.
                           3. You define the formula which uses this parameter through OP21. You should check allowed for calculation box.
                           4. In the costing tab of work center you maintain the formula against this parameter. If you want to cost it In that case  and should also maintain an activity through KL01 and maintain a price for it through KP26. This activity should also then be maintained against the parameter in the costing tab of work center. Also check the reference indicator against the parameter.
                           5. Assign this work center to the operation in routing.
                           6. Create order, release and do confirmation, if you click actual data system should propose you the quantity as per calculation. Cost will be calculated if you maintained as per point 4, in the planned cost against the order.
                               Please check and revert.
    Regards
    Sm.

  • Work Center Group Confirmation

    I have the following Work Centers:
    FOUNDRY
    WC1
    WC2
    WC3
    I made a hierarchy where all the work centers are under FOUNDRY.
    Now I use WC1/2/3 in my routing. My question is, is there anything that can be done where I could confirm just FOUNDRY and all of the operations in the work centers beneath it would be automatically confirmed?
    Also, when I follow up I dont want to follow up on each individual work center, I want to follow up on the FOUNDRY level, possible?

    but that would mean in my routing I have to put
    WC 1 / 2 / 3 and ALSO FOUNDRY (which is not logical, foundry is just created to group the WCs)
    Also that would also leave the problem of following up on the Foundry level, I need a report that wouldn't show the WC1/2/3 just show the progress on the FOUNDRY (group) level.
    Thank you

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Automatic change of Work Center during Confirmation.

    Happy New Year to all!
    Just want to ask if anyone of you encountered the scenario during confirmation in which the backflushed work center was changed. The user claims that they did not do any changes during confirmation nor did they change manually the order itself. The confirmation happened last December and they only noticed it this month when they were checking the reports.
    I did not configure their system so that they can change the Work Center during confirmation. By default, the work center is grayed out during confirmation.
    Hope to hear from some of you soon!
    Thanks and regards,
    jLmendoza
    Edited by: John Luis Mendoza on Jan 4, 2011 3:15 AM

    Dear
    If your production order operations are re-scheuled and dispatched after Capacity Avalaiblity check in cm21/cm22/cm31 etc  , then during the dispatch of operation ,  you have option to change Work Cnetre , time , date based on the selection option in Startgy profile (CM31/CM21-Enter the WORK CENTRE /Order )  and check wether work centre is changed.
    One more option may be in Order Change in CO02-Operation Overview -Operation -Work centre -Here user may change the Work Centre .
    If you have Order Change management active then you can trace the same .
    Refer : Production order change history
    Otherwise , there is not such confirguration in SPRO where work centre can be changed automatrically during confirmaiton because it will grade out based on the ste of confirmaiton default screen in OP00.
    Hope it clarifies
    Regards
    JH

  • Request for detailed acts to upload Work center,  BOM, Routing data in LSMW

    Hello PP ANgels,
    Request for detailed actions to upload Work center/Resource,  BOM, Routing/Recipe data in LSMW.
    Thanks in advance

    Sanjay,
    In the forum I found that you had used some "drops", that require a password to view.
    In these forums, the only links I post are public (help.sap.com) and from SAP support (service.sap.com/support).  SAP Support is mostly available only to customers and partners of SAP.  If you meet these criteria, and need a login for the SAP support site, contact the license administrator for your company's SAP licence (this is usually a Basis person).  If you cannot locate this person in your company, contact Service Marketplace directly (service.sap.com/mp).  Alternatively you can contact your local SAP Sales office and speak to your account administrator.
    Maybe it would be a better idea to group all standard solutions in one place.
    I expect it will be so...in Nirvana.  Here, life still entails suffering.
    With respect to your detailed questions, I would have a hard time answering, I have never used recordings in LSMW to create work centers, I always use standard batch/direct input.  I suspect that the VGEXX items are the units of measure from CRHD, I suspect LARXX items are activities from CSSL, and I couldn't comment on FORXX items without doing some research.
    This is the SCM PP forum.  You might get more answers posting this in the ERP PP forum SAP ERP Manufacturing - Production Planning (SAP PP) , since work centers/routings/recipes/BOMs are more or less irrelevant in SCM.
    Sorry I couldn't be of more assistance.
    Best Regards,
    DB49

  • Read Routing and work center details from transfer order

    Hello
    I am using transaction LT31 to print a form for the transfer order.
    The customer wants me to print a field that is in the work center details of the routing for this material and plant.
    I can see this data with transaction CA02 where i enter material and plant,and then the work centers are beeing displayed.From here i can double click on the work center and see the field Supply area that i have to print.
    My answer now is,how to read details on the work center starting from my transfer order number.Which is the table connection between transfer order table LTAK and the tables where i can find the work center details.
    Thank you

    I have found the solution:
    ltak-tanum = mseg-tbnum
    read aufnr from mseg and go to afko
    mseg-aufnr = afko-aufnr
    read plnnr from afko and go to plpo
    afko-plnnr = plpo-plnnr
    from plpo read arbid and go to crhd
    plpo-arbid = crhd-objid
    from here,we can find the arbpl and the field that i was looking for PRVBE

  • Tables for routing (for work center)

    hi friends,
    I am doing report on routing but i did not get value for work center i got tables CRHD CRCA CRCO CRHH CRHS CRTX KAKO KAZY .
    i try to get result by using link with PLPO and PLKO.
    in TCode CA03 when i see the technical attributes it stors the dat ain structure PLPOD but i am unable to use it.
    kindly can anybody tell me how to work center.
    thanks & regards
    Bhupinder Singh Kaler

    Hi Bhupi kaler,
    try to link CRHD and PLKO with WERKS ( Plant ) field ane get the ARBPL ( Work center ).
    Best regards,
    raam

  • Routing and Work Center

    My Friend,
    What tables and fields I can user to create a report with link ( Work center X Routing X machine times X labor times) I need of list with this information to analysis.
    I need comparete the times SAP information(Routing) verses Real Operation ( production line) by list.
    Thank you for any help.
    Best regards
    Armando

    Hi,
    You should have searched or posted your question in production planning forum.
    For example, check the link [Labour time and Machine time - production order table   |Labour time and Machine time - production order table]
    Regards

Maybe you are looking for

  • Free apps issue

    There should be 6 free apps on the new mac, why do I only have 3 ? (keynotes, pages and numbers are missing)

  • Accessing multi-section templates in Pages 5... how?

    We have some templates created in Pages 4.3 that have multiple sections defined.  (A cover page, various internal Body page styles, and an end page).  We constructed our documents in 4.3 using selections from the various sections in the templates (e.

  • Guest VLAN unable to get DHCP IP address from Anchor Controller

    Hello everybody, In our test set up, we have two WLC 5508 Controllers connected via Checkpoint UTM-1 firewall Inside and DMZ Interfaces. Both the WLC controllers are connected to the firewall via Cisco 3750 switch. On the Local (Inside) Controller, g

  • Flat file upload ( data from Non SAP)

    Hi experts -- Need to create say morethan 400 infobjects in our scenario. so can any one help me, is there any alternative to create the same rather than creating manually.Is there any option thru BDC. i mean thru a file with data types,length,..desc

  • Using IPD files to restore data using a Mac

    HI Whilst my daughter was living at home I was backing up her BB 9700 using my PC. However she has now gone off to university and lost her BB which has been replaced under insurance. We now need to restore all of her contacts etc. The problem is that