Confirmations for Limit Orders in ECS

In extended classic scenario when creating a limit order, there is an error in process in the local PO related to the follow-on documents for goods receipt with the following error message:
'Combination of GR/IR control not allowed for external services'
It is only possible to create the order in the backend if the Invoice Only option is selected in the Limit Order, but then this means it is not possible to create a confirmation for Limit Orders!
Has anyone else come across this problem in ECS for limit orders?  As far as I am aware the functionality should work with GR-based invoice verification.  In the backend PO it is possible to create the same order without any errors!

Monica,
My analysis till now is:
1) It is true that limit oders are not going with "Confirmation & Invoice" flag. We need to raise OSS.
(There is one additional problem with this is "The vendor master flags don't get transferred to PO" for this you will have to implement the OSS notes 956083.)
Now after applying this notes you see the standard functionality:
2) If we are creating PO with "Invoice Only" flag then there are follwoing options:
a) If the "GR based invoice" flag in vendor master is checked then the POs goes into D item category and you can enter a service sheet for them.
b) If the "GR based invoice" flag in vendor master is NOT checked then the POs goes into B item category and you can enter invoice just after PO.
I made change in V_T163Y for B item category and checked the flag for GR but then too I am not able to enter GR for item category B.
Please assign points for useful answer as applicable.

Similar Messages

  • Cancel Confirmations for Limits Orders in SRM.

    We are able to Create Confirmations in SRM for Limit orders and It creates a service entry sheet in ECC with Mvmt Type 101.. When we try to cancel these Confirmations from SRM. It a creates a Cancellation document in SRM but it doesnu2019t flow to ECC.. when Checked in the Shopping cart Related documents it is found that the Qty is getting added up even for cancelled Confirmation which got created.
    We are looking for Solution if we cancel the limit order confirmation from SRM , it should cancel the service entry sheet posted in backend ECC..
    And we will be doing confirmations/Cancellations only from SRM
    Please help us with your responses.. we are on SRM 7.0 EHP 1 .

    Hello,
    We have faced same issue in SRM 5.0
    We created a custom program for it using RFC FM BBP_entrysheet_cancel  we have to cancel the Entry sheet in  backend.
    Regards,
    Neelima

  • Confirmation for Limit PO

    Hi,
    While posting a confirmation for limit PO, if I tried to add items from a catalog then I I am getting the error "Incorrect transfer of limit data from calling application". Are there any specific OCI settings required for this?
    In the link https://websmp101.sap-ag.de/~sapidp/011000358700005436392003E.pdf ...I could see that there is a presentation for "Access to catalog via OCI during confirmation" at the top of page 4. But not sure where can I find that PPT in service.sap.com.
    Could you please help me in this?
    thanks,
    Arun

    Gil,
    We found that, only service items can be added to limit confirmation as in backend R/3 service POs will get created which will accomodate only service items.
    You need to create contract and catalog with service items. Then only it will get added to limit confirmation.
    Hope this would help you.
    Thanks,
    Arun

  • Progress confirmation for process order

    Hello to all,
    I want to use the progress confirmation functionality for process order. I know that it is possible for production orders, but I couldn't find respective transaction for process order. Do you know if it is possible to use progress confirmation for process orders.
    BR,
    Nikolay

    Thanks for your inputs, but they are not useful!
    COR6 - it cannot be used once the order is confirmed at phase level;
    COOISPI - it's a report
    COR6N -it is the standard transaction for process order confirmation
    I want to do so-called "unplanned milestone" for process orders, something similar to CO1F for production orders.
    BR,
    Nikolay

  • Confirmation for PM order

    Hi PM Expert,
    When i am creating confirmation for PM order, system do a goods movement as a automatic without  ticking goods movement  button. How to set consumption after ticking goods movement  and save button.
    Regards,
    Aktolga

    Hi,
    Please ensure you have not enabled back flushing in component tab,by which material would be issued automatically.
    Regards,
    Sudhakar

  • Restricing CO11N confirmations for TECO orders

    For production orders with partial confirmations and TECOed say  TECO & PCNF, PDLV  how to restrict further confirmation happening in CO11N
    Thanks & Regards
    Manikandan .J

    Hi Mani,
    You can restrict it the confirmations for TECO order by following ways.
    1) Using User Status (T.Code BS02) - You can set both Production order and / or Prod. Cofirmation
    2) User Exit
         - CONFPP05 PP order confirmation.: Customer enhancements during saving
         - CONFPP04 PP order confirmation: Customer-specific input checks 2
         - CONFPP02 PP Order confirmation: Customer-specific input checks 1
    Regards,
    Dhaval

  • Good Receipt for Limit orders/Framework orders

    Hello Guruz,
    Is it possible to have GR for Limit orders/Framework orders?
    Regards

    Hello,
    Framework order is also known as Blanket PO.....which we use for the procurement of Low value Material with Long term planning....It is used as Mini Contract....
    For making Blanket PO....you have to choose Order type: FO in ME21N....with Item category "B"(Limit)
    For creating Blanket PO... You need not have to maintain material master.....Maintaining Account assignment Category in PO is mandatory....also you have to maintain Validity Period in Blanket PO...
    As per SAP Best Practice.....for Blanket PO, GR is not possible.....you can directly post multiple Invoices for One Blanket PO....The validity and total Value of these Invoices for Blanket PO during LIV can be controlled by tolerance keys LA and LD in the T.Code:OMR6 for your Company Code.
    In SAP, Blanket Purchase Orders refer to the business process where you have a Purchase Order with a validity period (start / end date) and a limit on the item. No Goods Receipt takes place. Payment is triggered by Invoice.
    no Goods Receipt (GR) will take place, the GR indicator is switched off when the item category B is selected.
    Regards,
    Shailesh

  • Production confirmations for Production order

    Hi all
    I am using ECC 6.0 and Production orders. When I do a final confirmation to the order the order is in a 'CNF' status. Now after it is in a CNF status if I try to perform another confirmation using a CO15 then it allows me to do a confirmation with a 'warning'. If I am using a CO11 or CO11N then its a hard error. Is there a way I can get a warning message on a already Final confirmed order in tcode CO11 or CO11N?
    thanks

    Hi John,
    You want the system to allow to confirm operation wise even though you have already confirmed with respect to order
    I dont think its possible,because if you see logically -once we do the confirmation for the order system will complete the confirmation for operations too ie it will book the time,cost to the respective cost center
    So logically it will not be possible to confirm the operations which are already confirmed when doing the order confirmation
    If you want to do order wise confirmation then you have to cancel the order confirmation & then you will be able to do operation wise confirmation
    Hope the above explantion is understandable
    Revert back if you have further query
    Reward points if useful
    Regards,
    SVP

  • Error while posting confirmation for limit PO

    Hi Experts,
    we are having a standalone scenario(SRM 7) and the issue is as mentioned below
    The situation is that the PO is a limit order with 2 line items. The first line item is complete and has been closed off with the u201Cno further confirmation/invoiceu201D indicators selected. However the 2nd line still has some limit remaining but the when the central confirmations attempts to enter a good receipt against the line they get an error message which is "No Confirmation could be entered for purchase order"
    please guide me how to solve this.
    regards
    smita

    Hi,
    please find furhte information.
    a limit sc is created for a value of 37000 GBP and after approval it created a PO. but the user went and added a line item directly in PO for 40000 GBP. Now the total value of SC is 77000 GBP.
    user has created a confirmation for 36000GBP and selected no confirmation required further.there is no issues with this lin item
    but with the second line item he posted confimation for value 37000 gbp and invoiced for 30000 GBP.
    when i am trying to post confirmation for 3000 GBP system is throwing an error that "no confirmation could be entered for purchase order"
    could any one guide me how to solve this or any suggestions for solving this.
    regards
    smita

  • Change in account assignment for Limit Order SRM not replicated to backend

    User has made in SRM (5.0 Ext Classic scenario) a limit shopping cart with Invoice and Confirmation and Acc. assigment 'Known' . This resulted in a PO with has been replicated to backend . In MM PO with Imtem category 'D' has been created.
    The user know reports that he has made wrong account assignment and asks for change so that the new cost assigment appears in his Confirmations as proposal.
    Normally I am able to do this through Tx 'process purchase order' (BBP_POC) in SRM and it is properly replicated to backend - meaning PO in MM is updated with new cost assigment
    However for this limit order the changes I have made in BBP_POC seems not to be replicated into backend and hence on goods receipt it still shows the old assigment.
    Anyone an idea of cause for this?
    Thanks in advance for any reply or help

    Hello,
    1) Are you seeing any errors in rz20.
    2) You may consider transferring the PO again to the backed using the function module BBP_PD_PO_TRANSFER_EXEC.
    3) If you see any account assignment errors , check the account assignment in SRM and ERP PO are the same or as mapped in the table BBP_C_ACC
    Regards,
    Pavan

  • Confirmation for Service Order

    Hi Gurus,
    How to create follow-up document of Confirmation for a service order in IC Agent role
    Thanks,Sarat

    You could use the left navigation bar to go to service confirmation tab and just click create on service confirmations, the prerequisite is you must be on the service order from which u want to create Confirmation, this will link up all the transactions your interaction record
    Second way of doing it, is click on followup document from service order to create service confirmation prerequisite here is that you must have the configuration ready for creating follow up documents
    Thanks
    Raj

  • Generating Inbound delivery based on Vendor Confirmation for Purchase order

    Is there a way to create Inbound deliveries based on Vendor confirmation for a purchase order.
    Here is the complete scenario.
    Buyer Creates the PO for qty 100 and Date August 29
    Vendor Confirms that he can supply a qty of 50 for August 29 and remaining 50 for Sep15th
    Based on vendor confirmation, Buyer creates 2 vendor confirmations (AB) to match with the data received from Buyer, without modifing the PO.
    Requirement:
    Inbound deliveries should get created based on the vendor confirmation.
    As MRP looks at Inbound delivery for Planning purposes once they are available, Inbound delivery should match with vendor confirmation data.
    Is it possible to get this requirement met with standard config available in SAP.

    could you eventually get the answer from the docu Set Up Confirmation Control

  • Goods Receipt after Completion Confirmation for Service Order

    Hi,
    We have a scenario in which a Notification is used to create a Sales Order & a Service Order using the action button.
    The Sales Order has a old/used product as a line item which we will consume along with some other new parts(added in the components tab in Service Order) to make a remanufactured product which we will obtain after using IW42 for Completion Confirmation. (The Service order is to carry the cost of refabrication/refurburishment & additional parts as well)
    We need to do Goods receipt of this remanufactured product to bring it into stock so that we can deliver the same using the same sales order.
    Is this possible? We have tried using Refurbishment order both CS/PM but have not been successful in inwarding the remanufactured product using IW8W.
    Kindly do suggest possibility of using a Service Order(created through a notification) with a GR feature for the above process of inwarding. Any alternate suggestions would also be very helpful.
    If this functionality can be achieved with some enhancement(custom exit, BADI etc) & some amongst you have worked on something similar , please do share your valuable inputs
    Thanks & Best Wishes
    Vishal

    Hi
    I dont think you will be able to do Goods receipt against prodcution order using inbound delivery VL31N. Inbound deliveries are normally created for Purchase orders and then GR can be posted wrt to the inbound delivery.
    Prod order is normally within warehouse only so you can use MB31 and post GR directly against Prod order.
    If you can explain more about your scenario hope we may help
    Please let us know
    thanks

  • Auto Confirmation for combined order with quantity distribution

    Dear All,
    we need your help that we have using the auto-confirmation for normal production order , but got the problem in combined order confirmation for final operation , in final operation we are not getting quantity distribution with respect to child order.
    please suggest any BAPI is there?

    Not possible in standard system.

  • EDI Confirmation for Purchase Order

    Hi All,
    Scenario : Our vendor is located abroad. The Purchase order is transmitted to the vendor via EDI. The vendor sends a confirmation for the PO as an IDOC via EDI. The suitation we have is that there are instances where there is a miss match( Requested item doesn't match the confirmed item) between the item in the PO and the IDOC received from the vendor as confirmation. But the PO is still confirmed. Is there a method where we identify when there is a miss match in the item.
    Any input on the above would be appreciated.
    Thanks
    Nigel

    Hi Nigel,
    You could control this via customizing purchasing->Confimrations->Setup confirmation using SPRO.
    here ,you can specify the tolerance for price quantity and material.
    The tolerances you define apply to all vendors. Using the enhancement MM06E001 provided by SAP, you can specify that the tolerances do not apply to certain vendors.
    If the acknowledged quantities, prices, and dates vary from those set out in the PO or purchase agreement, the system issues a warning message. In this case, the purchasing document is not updated.
    Regards,
    Karuna

Maybe you are looking for

  • Jampack and keyboard connection questions

    2 questions: 1. I have just bought GB Jampack (the one with lots of extra loops), but can't seem to notice any difference. How do I know that the disc has downloaded OK? Can't remember how many loops were there in the first place! 2. I'm trying to co

  • More than 512 rows - xcelsius cannot export a PDF

    I have a table of 2000 rows that excelsius needs to work on.  the combobox component needs to select data related to a vendor and put it in another sheet for display. my xcelsius is not connected to sap hence filtering of data is done through combobo

  • Problem in Sap script for Check printing

    Hi all,   I have problem in Check printing for FI Module. In Tcode f-58 i am taking the printout of checks. For my user they want to move the main window in upwards, but the sap script <b>F110_PRENUM_CHCK</b> not allowing to move upwards. how to do t

  • CSM TCL script or http checksum

    Hello, I need to do some HTTP keepalive based on the http page itself (no error code returned by the server). With the CSS we were able to do it because the css was doing a checksum of the http page. So when there was changes the service was consider

  • Library...gone

    out of nowhere my library was erased.......there are no songs or playlists, nothing the songs are still on my ipod but itunes is empty, i can always readd the songs, but i want my playlists and playcounts cuz i've listeed to some songs 400 times in a