Connecting two BW systems to the one R/3 source system

Hi all!
I have to connect two BW Systems to one R3 system. In our last tests we have had problems trying to connect two BW  servers simultaneously with R/3 source system because it allows only a logical system name for each R/3 client, and (We guess that we need to define tow diferent logical system name, one for each connection). This has been generating errors when we try to load data from R/3 to BW because, we guess, R/3 does not recognize the BW source system in the ALE connection for someone BW systems at transfer data. In this moment I have one connection active (BW1-R3). The BW2-R3 connection is already inactive. Does anybody know how perform this? we need solve the transfers problem as soon as possible.
Thanks!  Judi

Ah...
please don't post twice the same question...in these forums we are always the same !!!
You can close this thread to avoid to look in two different posts...
Bye,
Roberto

Similar Messages

  • Connecting 2 Bw systems to the one R/3.

    Hi,
    Could you please explain the risk and impact while Connecting 2 Bw systems to the one R/3.
    And also i need information How the delta queues( RSA7) will be available  for a single datasource.
    Regards,
    Kranthi

    You can connect any no. of BI systems to a R/3 system. Since each of the connections is independent of the other(creating/replicating the data staging) - there should not be any risk. Though the question of neccessity does occur.
    RSA7 is a transaction to view all the delta datasources active in the system. i.e. only datasources with delta changes in the R/3 will come to delta queue. e.g.
    Say A and B are datasources. Say A has some data which has come in delta - so RSA7 will show only datasource A with no. of changed records.
    Cheers
    Kiran

  • Can you have two slides shows on the one interactive page?

    I'm just new at learning interactive pdfs in indesign so sorry if this is common knowledge. I know how to create a slide show on a page, but can you have two slide shows on the one page or more for that matter? (Ideally I need 3.) Each slide show has its own set of images and buttons.

    Just :http://www.youtube.com/watch?v=Dm0aeMUPZ4U
    But I'm happy to create them a different way if needed be.

  • Multiple rows in BI Infocube/or DSO for one row in source system

    Hi Gurus,
    I have a typical scenario where in I have a ztable in R/3 system and it contains some custome transaction data.
    The business scenario wants it to split into multiple records in BI ( ofcourse keys for each records in BI would be unique). Either infocube or DSO can be used to store the data in BI.
    Is it possible to do that. As far as my knowledge goes( I have limited BI exposure) one record from source system ( read row) is transformed into one record ( row) in BI in simple transformation.
    Please give me some rough idea if its possible how can we achieve it.
    I know we can write an ABAP program and create a ztable to do it and use the ztable as source for incube/dso. But I want to use this as last option.
    Thanks
    Sumit

    Hi,
    An ODS will be better.
    Use a start routine.
    data-package --> package2
    create your own package with your rules.
    update.insert.modify.append....
    package2 --> data_package
    and from 1 row, you create n row as your rules would like..
    Regards,

  • Change the delta pointer at source system side

    Hi BI friends,
       I'm facing some problem while extracting the data from XI system. Whenever i try to fetch the data from XI then it throws an ABAP dump TSV_TNEW_BLOCKS_NO_ROLL_MEMORY.
      As per my konwledge, we have made setting in source system to maintain delta only for 14 days and now we are in 13th day.
    we have only one day remaining to correc the memory issue at source system otherwise we will miss out all transaction data (delta).
    My question is,
    1. is there any way that we can change the delta pointer to change no. of days from 15 to 30 in source system side?
    2. is there any way to resolve the above memory /ABAP dump other than following checkings (we have checked the below mentioned terms).
    - - - - RFC, IDOC, Reduce packet size, RFC
    Your help is highly appreciated.
    Regards,
    Varun

    we already proposed this solution to XI team but is there any way to resolve this issue from BW System side...
    even we have performed some t-codes but dint help us to resolve the issue.
    throw some input.

  • ECC6.0 upgrade and BW steps for mapping the new ECC6.0 source system

    Hello gurus
    We are upgrading from R3 4.6C to ECC6.0. We use BW 7.0 SP 18. We will create the new ECC6.0 source system in BW, replicate metadata and everything. The question is how do we copy or reassign the existing objects pointing to our current 4.6c dev system (transfer rules, transformations, infopackages, process chains) to point to the new ECC6.0 dev system ? As a note,  we also need to keep the current 4.6c source system objects until go-live o ECC6.0.
    What is the common practice in such a case ? I am sure we are not unique...
    A prompt response would be appreciated.
    Thank you all.

    So the plan is to copy dev R3 and upgrade that - then Q r3 copied and upgrade that - then upgrade directly prod R3?
    If so - then if it were me - I would firstly prove all this in a sandbox environment where BW dev points at an upgraded sandbox R3 ecc
    ie same logical system
    Then once that is proved I would organise downtime of BW development for a few months whilst the d-q-p ecc happens
    Then when they copy dev r43 to ecc r3 i would then just point BW dev at the new ecc box and go from there (ie clear the deltas - change the logical system name to the new ecc box - replicate meta data - transtru all the datasources - run the process chains nothign to worry about)
    However if you cant afford the down time - you may have to have an alternative transport route - ie copy dev BW to a another dev bw box and have an alternative path to production for issues
    Then once everything is upgraded redo the changes through d-q-p to get the transports back in line (thats what we did)

  • Test System (BQ1) Objects showing up wrong Source System after Transport.

    Hi Experts,
    We are working on IS-U BI7.0 Project. We have finished with our Development and have transported the DataSources, Transformations and DTPs from Development (BD1) into Test (BQ1) Systems.
    We have entered values in the Conversion of Logical Source Systems correctly.
    When we select the DataSource and Click Object Directory Entry from the Extras Menu, we found that the Original Source System is defined as BQ1 instead of BD1 (Development System), which is where the Object is getting Transported from.
    We have implemented an SAP Note:1008633 (Incorrect Source System after Transport (RSTRAN 514) but couldn't resolve the issue.
    We basically want all the Objects in the BQ1 (Test System) showing the Original Source System as BD1 (Development System) but only the DataSources and it's connected Transformations and DTPs are originating from the BQ1 (Test) System itself (The Transformations when Transported from BD1 to BQ1 are Transported with a different Technical Name which is very strange).
    Had anyone faced similar problem and if so, what was the effective solution implemented.
    Any help in this regard is very much appreciated.
    Thanks in Advance.
    Best Regards,
    Chandu.

    It is resolved by our Basis.
    Thanks,
    Chandu

  • System slow during loading data from source system

    hi,
    I am trying to load master data from r/3 into bw in quality envirnoment by means of a process chain. The problem is it being a master data load is consuming a lot of time. My development and quality environments are maintained on the same server. I doubt about this being something related to memory. If anybody could mention the ways through which memory can be monitored along with the reason for the slow nature of the system would be very helpful.
    Source system: R/3.
    Environment    : Q03(quality)
    Load               : Master data(full load)

    Hi,
    I will suggest you to check a few places where you can see the status
    1) SM37 job log (In source system if load is from R/3 or in BW if its a datamart load) (give request name) and it should give you the details about the request. If its active make sure that the job log is getting updated at frequent intervals.
    Also see if there is any 'sysfail' for any datapacket in SM37.
    2) SM66 get the job details (server name PID etc from SM37) and see in SM66 if the job is running or not. (In source system if load is from R/3 or in BW if its a datamart load). See if its accessing/updating some tables or is not doing anything at all.
    3) RSMO see what is available in details tab. It may be in update rules.
    4) ST22 check if any short dump has occured.(In source system if load is from R/3 or in BW if its a datamart load)
    5) SM58 and BD87 for pending tRFCs.
    Once you identify you can rectify the error.
    If all the records are in PSA you can pull it from the PSA to target. Else you may have to pull it again from source infoprovider.
    If its running and if you are able to see it active in SM66 you can wait for some time to let it finish. You can also try SM50 / SM51 to see what is happening in the system level like reading/inserting tables etc.
    If you feel its active and running you can verify by checking if the number of records has increased in the data tables.
    Thanks,
    JituK

  • Two web dispacther pointing to one ERP 6.0 System.

    Dear friends, a customer has the need to connect a second web dispatcher form the DMZ. They have one web dispatcher installed locally serving internal request (customer network). But now, they need to install a second web dispatcher for external requests (DMZ) with SSL. I think this is totally possible without problem, but i have a doubt regarding of the connection of two web dispatcher to one ERP 6.0 system.
    Do you visualize any problem with this configuration?
    Your coments will be very appreciated.
    Thanks and best regards.
    Hector.

    Hi Hector
    Could you refer the SCN & SAP links
    SAP WEB Dispatcher and DMZ
    Access SAP Webgui and Portal Through Internet Using Web dispatcher
    https://help.sap.com/saphelp_nwce10/helpdata/en/48/8fe37933114e6fe10000000a421937/frameset.htm
    SAP Web Dispatcher - SAP Library
    BR
    SS

  • Connecting two Mac minis and using one monitor

    I am thinking about getting two Mac minis to run concurrently, accessing both on the same Thunderbolt Display (also to be acquired) using screen sharing and connecting the two Macs via firewire (or thunderbolt).
    I have certain programs I need to run in Windows (Bloomberg terminal and MS Excel in Windows version) but don't want to run them in parallel on one computer as (in my experience) the performance is very slow.
    By running two computers at the same time, I'm hoping that can avoid the entire system griding to a halt. I also think it will allow me to upgrade more cheaply as the Mac mini is improved over time.
    Is this a completely daft idea? Would I be better off with a new iMac or a refurbish Mac Pro?
    Any feedback is welcome, even of the abusive variety.

    "File sharing preferences" is indeed how to do it.  Connect both minis to your router (one by ethernet cable, one by wifi, it doesn't matter.)
    Then turn on "File Sharing" in Sharing Prefs on both minis.  Also, give them both meaningful, different names under "Computer Name".
    Then, when you open a finder window on one mini, the other one should appear under "Shared", like this:

  • Connect two internet lines on the same cisco router 3945 series

    i have two internet lines from the same provider and i have one router i want to connect the two lines in the same router
    any ideas !!!!!!!!!!!!!

    Hi,
    No problem, similar treatment. Follow 
    1. Create IP SLA/Track for both internet link
    2. Break your LAN subnet into 2 smaller subnet
    3. Create route map, Match with 1 subnet & route the traffic towards 1st internet link
    route-map General_Internet_Traffic permit 10
    match ip address 115
    set ip next-hop verify-availability 10.1.1.1 track 1
    set ip next-hop verify-availability 11.1.1.1 track 2
    4. Create route map, Match with 2 subnet & route the traffic towards 2nd internet link
    5. Configure NATing/PATing over the interface, selecting by route-map 
    ip nat inside source route-map General_Internet_Traffic interface FastEthernet0/0 overload
    - Ashok

  • Connect two 7344 motion controllers in one PC

    Can I use two NI - PCI 7344 motion controllers in one PC. My application requires 6 axis and hence I want to use two PCI 7344 motion controllers. I am already using one. Can I configure another one in the same PC to add more axes to my current system. If yes, then how to configure the other one, so that it acts as the 5th and 6th axes in my system. I'm using LabVIEW 7.1 in my application.
    Regards,
    Giridhar Rajan
    Automation Engineer
    Cruiser Controls
    Mumbai, India

    You can add as many PCI-7344 boards to your PC as you want. The only
    limitation is the number of PCI-slots available. In your software you
    need to control the axes from the second PCI-7344 seperately from the
    axes of the first one. That means that there are no built in methods to
    start the axes on two or more boards synchronously. If this is not a
    feature that you need then everything is quite straight forward. If you
    need tight synchronization you might write an onboard program that's
    running on the second board and that waits e. g. for a breakpoint
    signal to be generated by the first board immediately after the axes
    are started.
    Assumed that you need tight motion synchronization with the additional
    axes a better choice would be to use one PCI-7356 (6 axes) or a
    PCI-7358 (8 axes) instead of two PCI-7344. The 735x boards are pin- and
    software-compatible to the 734x boards. You could return your 7344 to
    NI and buy a 735x board with a fair discount ("hardware upgrade"). If
    this is an option for you please contact your local NI branch.
    Best regards,
    Jochen Klier
    National Instruments Germany

  • Can there be two itunes librarys on the one computer?

    I am giving my PC to my parents and we will share it for a few months until I get myself a laptop. Both my mother and I have ipods and we both have separate itunes libraries. Is it possible to have both the separate libraries on the one computer - I guess under our separate user names and it not interfere with each others library? Will opening itunes under our separate usernames bring up the correct libaray?
    Thanks

    Yes you can have more than one library. The simplest thing is to have two separate user accounts then things are kept entirely separate:
    This article may help:
    http://support.apple.com/kb/HT1495?viewlocale=en_US

  • SSIS Connection Manager: MSOLAP100 where is the one for SSAS 2012 ?

    I have an SSIS project under SSDT, that should process a SSAS 2012 Cube, when I setup the connection, the SSIS Connection Manager gives me only MSOLAP100 as a possible connection manager type. From my understanding this is the one for SQL 2008 R2. Where
    is the one for SSAS 2012 and how can I enable it ?
    I feel this is a bug in SSDT:
    I used another UI dialog and could create a new connection like this:
    Still it says ConnectionManagerType MSOLAP100, however in the connection string I now have Provider=MSOLAP.5, this seems to be another SSDT bug.

    If this issue can be reproduced in multiple machines, then you can you can submit a feedback at
    http://connect.microsoft.com/SQLServer/Feedback and hope it is released in the next release of service pack or product.

  • Can i back up my mac and windows operating system on the one hard drive?

    Hello everyone, i use a 4TB external hard drive to back up my imac. I recently installed Parallels and Windows 8.1 so I can run a PMS for my business. Now that i have installed Parallels and windows 8.1 on the mac can i format the drive so it will back up the mac and the windows operating system? Thanks!

    If you want to back up with Time Machine, you need a GUID partition table and an HFS (Mac OS X) partition. If you can also create a Windows partition without destroying the partition table, then you can use the same drive for both systems. I can't give you specific instructions for Windows.

Maybe you are looking for