Consequences of adding a 3rd currency in PRD?

Dear All,
    We have upgraded my client's system during the past year, and we have a new requirement regarding the currencies they have today. They want to add a third currency to their system. The following are some doubts I have:
1. how will documents already in the system look?
2. what will happen with current open items?
3. what will happen to documents to be compensated?
We are particluarly concerned about carryforward balances, if we upload an initial balance only in the third currency, and how this will look at the start of the following fiscal year.
Does anyone know of a standard SAP solution for this?
Thank you in advance!
Regards,
E.

Hi,
Adding third currency to existing system is not an easy task.  You need to consider all open items and other factors etc.  There are some third party tool available for this.  You may check out for this as an easy option.
Best Regards,
Madhu

Similar Messages

  • Add 3rd currency to NEW-GL in a productive system

    Hi,
    Can someone have experience or have the knowledge of adding 3rd currency to NEW-GL in a productive system?
    BR,
    Benni

    Hi Shankar,
    I got anopther reply that says: In case you already post to NEW GL you have to contact SAP. Are you sure  that it is possible to add 3rd currency in a productive system?  How the system set up the initial values for open items in such a way that revaluation would work fine?
    BR,
    Benni

  • Adding a 3rd Monitor to a Power Mac G5

    I am curious as to how - and if - I can add a 3rd monitor to my G5.
    Currently I have an ATI 9650 Graphics Card and it runs my 2 23" CD wonderfully. I have been considering adding a 3rd monitor if possible and getting a 30" to have in the middle of the 23's.
    Does anyone have knowledge or experience in doing this. It doesn't necessarily have to be a 30 in the middle, another 23 would suffice.
    Thanks in advance!!!

    To my knowledge, the ATI 9600 PCI is currently the only PCI based
    video card that can be used in the g5
    This turns out not to be the case. Any 3.3 volt PCI card will operate in a G5 PCI slot. This should include Radeon 7000, 9000, and 9200 PCI cards. I'm using a PCI Raedon 7000 in my G5 this moment. With my 2-head 9600, I can run 4 displays.
    7000 PCI = VGA + DVI
    9600 AGP = ADC + DVI
    I am skeptical that any PCI card has an ADC port. The PCI 2.x spec doesn't provide for powering an ADC monitor, so I suspect an ADC display can be driven from only an Apple-AGP slot or a standard PCI-Express slot.

  • Consequences of adding and smartform to output type in nace

    Dear experts,
      I have one doubt . I want to link one smart form to output type EF   ie purchase order. When I am saving it system  is asking for customizing requests. I am doing this in development system to check the functionality of one smartform. Because we dont have any IDES System to test. Well I want to what are the consequences of adding an smartform to output type in nace. Whether it wil reflect in quality system  without transporting the request. After testing can i remove that smartform which is attached to output type EF. Please confirm.

    No replies .

  • Adding a 3rd drive questions

    1.) I have a mac pro with two 3Ghz processors and two 500GB harddrives. Does anyone know if adding a 3rd 500GB hard drive will make the mac run much hotter?
    2.) I will use the 3rd drive just for backing up files, so it will not be accessed on a regular basis. In this case, should I still be concerned with finding a drive that is not too noisy? The drive only makes noise and spins when it is being accessed, right?
    Thanks!!

    On the other hand the Maxtor drives that you do
    recommend have had one of the worst quality
    reputations in the past. Since they've been
    acquired by Seagate the quality of Maxtor drives has
    improved.
    Actually, what happened was once Seagate took over they had Maxtor stop making the Maxline III 7V300F0. The Seagate 7200.10 does not compare well to it so they removed the competition.
    While the 7200.10 provides good sequential performance with large files it is unable to keep up with the Maxline models in small file duplication tests. It is too bad that Seagate did not integrate Maxtor technnology into Seagate products.
    In addition, the Seagate 7200.10 320GB still has a write speed limitation of 47MB/sec. when mounted internally as a single drive inside Apple Mac Pro and PowerMac G5 models. I have a complaint posted on this at Seagate and they tell me no fix is available for the 320GB model.
    Now when I buy a Maxtor 300GB at Frys it is just a rebranded 7200.10 hard drive with a 3 year warranty instead of a 5 year warranty that would have been provided had it been sold under the Seagate label.
    Seagate bought Maxtor and instead of using the technology, dumped Maxtor hard drives. It will be very interesting to see what Seagate tries to pass off to Maxtor customers when they need warranty service in the future.

  • Performance consequences to adding materialized view logs to tables?

    I am writing a very complex query for a client of our transactional database system and this will require the creation of a materialized viewbecause all attempts at tuning to make performance acceptable have failed.
    I want to enable fast refresh of the MVIEW but I am confused regarding the consequences of the addition of adding materialized view logs to the base tables.
    Some of the tables are large and involved in alot of transactions and I am wondering if the performance of INSERT/UPDATES will be seriously affected by the presence of an mview log.
    This may be a simple question to answer but I was unable to find a clear cut answer in the literature.
    Thanks for any answers!!
    Chris Mills
    Biotechnology Data Management Consultant

    Last time i looked into this there were three cases to consider
    If you're doing conventional row-by-row DML then the impact is just one insert into a heap table per row modified.
    If you are modifying a high number of rows using bulk-binds then the overhead is very severe because modifying 1,000 rows on the base table causes 1,000 non-bulk bound inserts into the log table.
    Direct path inserts have extremely low overhead because the MV log is not touched. Instead, the range of new rowids added is logged in ALL_SUMDELTA
    http://oraclesponge.wordpress.com/2005/09/15/optimizing-materialized-views-part-ii-the-direct-path-insert-enhancement/

  • Problem Adding Calculations to Currency Formated Cells

    I have a cell that is formated in currency (USD in this case, i.e. $1,000) and I want to add a calculation to that cell. I double click on the cell with the $1,000, put the cursor at the begining of the cell (before the $) and push "=". A forumula rounded box with a X and √ appears. I type in "+500". Now what shows is "=$1,000+500". I push return and get a syntax error! I now have to go back and delete the comma and the $. Yuck.
    It's even worse, if you have a cell with $10 in it. Then the above process thinks it referencing row 10!
    Excel handles this issue seamlessly.
    Any ideas? Is this a bug?

    Numbers is not MS Excel, and MS Excel is not Numbers. Each application has features that are not supported by the other.
    Not a bug, although it does appear to be a not-well-thought-out feature.
    The issue is that once the $ is in the entry box, the whole "$1,000" is perceived (within that cell) as a text string. Any formula using one of the arithmetic operators will choke on text.
    The second use of the $ sign is as the absolute reference operator. If it preceded a number equal to or smaller than the largest row number on the table, the combination will be interpreted in a formula as an absolute reference to that row, or to the cell in that row in the same column as the formula; whichever better fits the reference in that formula.
    Either way, you're not going to get the result you want, and you are likely to get a syntax error message.
    OTOH, in a cell where the fixed number has been entered as the result of an equation (eg. =1000), formatting the cell as currency will change the displayed value, but not the value as it appears in the entry box. Neither the $ sign nor the thousands separator (,) will appear, you will be able to append "+500" (without the quotes) to the end of the formula, and you will get the expected result ( $1,500) displayed in the cell. And, as the formula itself contains NO $, the issue of 10 being recognized as a row reference will not arise.
    For my own use, I'd simply avoid the currency format except for summary cells. A column containing a list of numerical values (with two places after the decimal) is easily recognized as a list of currency amounts, even without to $ sign. The same list with the sign applied to every value is cluttered, and more difficult to read.
    Regards,
    Barry
    PS: If you want this feature changed in a future edition of Numbers, your best route is to Provide Numbers Feedback, using the menu item of that name in the Application menu (in Numbers, the "Numbers" menu). The link will also take you to the feedback page.

  • Migrating Databases from ISCSI Storage - adding second (3rd?) server, creating a DAG

    Dear all,
    we currently have a single Exchange server, 2010, current patchlevel, 2008R2 OS
    9 Mailbox Databases, Size about 3 TB, about 1 TB (!) Public folder.
    Mailbox Databases and Public Folder are stored on a netapp, attached via ISCSI. We are replacing the ISCSI device and have to move the databases to a new ISCSI Device.
    Plan is also to have a DAG with 2 mailbox servers and a third server as CAS/Hub Transport.
    Currently I see 3 options:
    1. Connecting the "old" Exchange to the new ISCSI device, moving the Databases offline, adding a second and a third server, creating a dag, replicating the DBs to the new servers, removing the old server from the dag, remove the Mailbox role from
    the old server and use it as CAS/Hub Transport.
    2. Adding a second Mailbox Server, moving the databases to the second server, remove the Mailbox role from the old server and use it as CAS/Hub Transport, add a third mailbox server, create a dag.
    3. Adding a second and a third Mailbox server, configuring a DAG, replicating the Databases to the new servers, removing the "old" server from the DAG
    Do you have any recommendations about that?
    Best
    Markus

    Hi,
    Agree with Nothing 123. The option 3 can be a simple and effective method to achieve your goal.
    One thing we need to note is that all DAG members should use the same operation system. And it is recommended to have two NICs for DAG, one for MAPI, one for Replication.
    Best regards,
    Belinda Ma
    TechNet Community Support

  • After adding a 3rd light they all turn off

    I'm building a project where I need several small moving lights on a picture of an audio mixing board. I've done this effect before in After Effects where I just created several point lights, placed them close to the picture layer then animated the motion I needed on all of them. The effect was great. I'm trying to do the same thing in Motion, and it works great until I add the 3rd point light. One or two lights it works great. But when i turn on the 3rd light they all turn off and the lighting goes to it's default lighting. Is this a setting somewhere where there is a max number of lights allowed? Is the program not able to handle the number of lights? Or is my system not strong enough? Somebody please help.
    Dual G5 Power PC   Mac OS X (10.4.9)   Final Cut Studio 2

    Strangely enough, when I had this problem, both with an x1900 and a 7300GT, I loaded the Motion project into QuickTime Player and was able to export from there...
    Patrick

  • Possibility of adding the 3rd interface as a 2nd Public interface?

    Is it possible, with VPN 3030, to configure the 3rd interface (which is labeled as "External" and, is usually used for "management", I assume) as another Public interface? So that two different kinds of VPN connections can be physically separated....
    Any help and pointers will be much appreciated! -Bill

    Hi Aamir,
    I am having problem to understand the use of External interface of VPN3000.
    Does it mean I can have a VPN3000 with two Providers? Public interface terminates to ISP 1 and External interface terminates to ISP 2 ?
    Regarding the routing (only one default gateway) does it mean the following traffic flow ?
    1. Incoming traffic from ISP 1 will go to the Public interface and outgoing traffic will go through the same Public interface.
    1. Incoming traffic from ISP 2 will go to the External interface , but outgoing traffic will go through Public interface.
    Thanks,
    Engel

  • Questions about adding a 3rd node on a 2-node RAC cluster

    Hello,
    I have created a 2-node cluster on 1 VMServer machine following the steps as described in RAC11gR1-OVM-template-TestConfiguration.pdf
    Now want to add a third node as documented in Appendix B of this document, but this is not clear to me.
    Here it is stated in step 7: "Do not run this procedure on a node with RAC software already configured.", while on the other hand step 9 says you need to run the Add Node procedure with the -noCopy option since the software is already loaded on the new node. This seems a conflicting message to me.
    Can anyone clarify this?
    Can't I just add a node using this procedure when you already have a 2 node cluster up and running?
    Thanks,
    Klaas.

    Klaas,
    Step 7 says to run on the new node this to setup the network:
    "Invoke the network configuring script in silent mode as root on the new VM:
    # /u01/clone/netconfig.sh -n3
    Flag -n3 means 3rd node, -n4 would be 4th node, etc. Do not run this procedure on a node with RAC software already configured."
    Step 9: says to run addNode.sh, as normally in the documentation, this is run from existing cluster member. You need to add the -noCopy flag so that software doesn't get copied to the new VM, since the software is already there, it is not configured or running yet, but the software is there.
    In such procedures it's often the case you need to run some commands on existing, and some on new node(s). I think the misunderstanding is that software existing on the VM doesn't mean it's running or configured.
    This entire process is fully automated in the 11.2 templates.

  • Adding a 3rd display with quartz extreme enabled

    Hello,
    I'm running a dual 2.0ghz G5, and I'm looking for a graphics card that will allow me to add an extra quartz extreme enabled monitor. Based on a few recommendations I picked up the ATI 9200, but this is when I ran into the problem. Everything is choppy, and it makes it difficult to go between the QE enabled monitors and the non-QE monitor without being distracted by the difference. Are there any solutions out there for me?
    Thanks in advance!
    Dual 2.0 GHz G5   Mac OS X (10.4.9)  

    Hi Trey,
    Make that parameter to Optional prompt, to make optional prompt in the paremeter you need to change the properties of parameter as Optional prompt as "true".
    with the optional prompt if you specify 'yes' it will display those vales, if 'NO' it will display those values, if you didn't specify any values then it will display all values.
    the formula is look like the below
    if (HasValue({?OpenToPublic}) = "Both" then true
    else if {?OpenToPublic} = 'Yes' then {rpt_DriveMaster.OpenToPublic} = True
    else if {?OpenToPublic} = 'No' then {rpt_DriveMaster.OpenToPublic} = False
    Hope the above information will help you.
    --Naga.

  • E72 Scoll among mailboxes and adding a 3rd box to ...

    Hi - new E72 user and am curious how I can do the following:
    1. If I am in a mailbox's inbox, and I want to go to my other mailboxes, is there some shortcut I can use to scroll through the inboxes of each mailbox?  Currently I am scrolling to the top of the screen and then clicking into the folders drop menu, then manually scrolling all the way down to each mailbox.
    2. I have 3 email account on the device, but only 2 are showing on the dashboard.  Can I add a third one?  This way I can click into it directly from the dashboard.
    Thanks!
    Marshall 

    Why do you ask?
    Just add the name in front of the array by concatenating two arrays:
    app.activeDocument.metadataPreferences.keywords =
    ["MyCompanyName"].concat(app.activeDocument.links.everyItem().name);
    Note: the names of the links will also include the file suffixes like .tif, .eps etc.
    See the documentation at:
    Adobe InDesign CS6 (8.0) Object Model JS: MetadataPreference
    Adobe InDesign CS6 (8.0) Object Model JS: Array
    Adobe InDesign CS6 (8.0) Object Model JS: Array
    Uwe

  • Additional Local currency is to be added : Impact Anaylsis

    Hello  FICO Experts,
    We have a requirement to define the 3rd local currrency as Group currency for the company code that is already live and running in Production.
    This is for consolidation report.
    I would like to understand from your experience the impact of adding the 3rd currency in the new FY 2008(Apr - Mar).
    Also Is there any changes required in the SD-MM integration due to this config change?
    Thank you
    Regards
    Manish

    Hi ,
    You can have your custom Z ot Y Form created with the additional data you required . It is possible in GTS, if you first make sure that the additional data that you looking for is present in GTS.
    Kind regards,
    Sameer

  • Adding new currency to SAP R/3

    Hi,
    All Experts.
    I am adding to new currency RON to SAP R/3 all the DO's & DONT's  given in system. I am stuck up at one point that is Define translation ratios for currency translation. The process in SAP Note is given like this....
    Under the customizing point "Define translation ratios for currency translation" (Transaction OBBS), choose the menu point Selection criteria -- > By Contents.
    In the pop-up, choose the fields "From currency" and "To currency". In the next pop-up, enter the field contents ROL for both the "From currency" and the "To currency" as well as the Oper. "OR". Press the button "Choose".
    You should now have selected all ratios where either the "from" or the "to" currency is ROL. Now select all found entries using the menu point Edit -- > Selections -- > Select All.
    Copy the currency pairs to new keys replacing ROL with RON. In most cases, you will also want to set the ratios to 1 to 1.
    SAP Note way out is quite tedious and I am not getting it....
    OR I want to try the same as NEW ENTRIES option. which one to opt. Can I go to simply for New Entries ? Will it hamper system ?
    Expert guidance will be helpful on this.
    Regards,
    Sharvari Joshi.

    Hi,
    Murali.
    Thanks again for help & guidance !
    One more question.
    SAP Note it is saying that :-
    The New Romanian Leu will have two decimal places. NO entry should be made under the customizing point "Set decimal places for currencies". (Transaction OY04). So, this is by default, do not make the entry by copying the old currency.
    Means that I need to skip the step Set decimal places for currencies completely ! Further more if I mention the amount in RON system will consider the TWO decimal places automatically. Right ?
    E.g. :- RON 100.00 Is it like this ?
    Regards,
    Sharvari Joshi.

Maybe you are looking for

  • Adobe Illustrator CS3: Fatal error during installation

    Hello, I just bought the AI CS3. It installed OK on my friend's laptop (windows). However, when I clicked the big button in the installation: "Install Adobe Illustrator CS3" A window showed: Initializing Adobe Illustrator... Then I got a message: "Se

  • Will not start after restore

    i have a 24" iMac that was regularly backed up to a time capsule via time machine.  when the hard drive crashed apple replaced the 320GB drive with their 500GB drive.  i anticipated a smooth and easy restore from the time machine backup, though it wo

  • Touchsmart IQ 790.uk - screen problems

    Starting today, on start up, the monitor on bootup displays only a light green screen / white horizontal gradiented lines. The graphics card in the PC died a few months ago, and I've been operating on the motherboard's VGA ever since. I want to deter

  • Charts not appearing properly after upgrade

    I have just upgraded from 10g to 11g, i see that all my charts are not displayed as they are in 10g. Like legend names are not appearing, for some charts the whole view is gone, for line bar graps bars are gone like this there are lots of issues in a

  • POP and IMAP aren't starting?

    I used the "Configure Mail Service" option, setup both POP and IMAP access for a couple of my users in the Workgroup Manager, and the Mail Service status is "Running" (also running are Outgoing/Incoming SMTP, Junk Mail Filtering, and Virus Scanning),